VEHICLE TRIPS OF HIRED VEHICLE AP39TP0024 OF DEE/MRT/PODILI FOR THE MONTH OF FEBRUARY- 2023
Name of the Trip Sh
Date From
Substation No
Progress of work IR FR KM
220KV SS Podili. a) Prepared the estimates for oil filteration of PTR's in MRT Subdivision, Podili. b)
01/02/2023 Podili 13346 201648 201693 45
prepared the vehicle bill of MRT Subdivision Podili for the month of January-2023.
220KV SS Podili.
02/02/2023 Podili 13346 1) Attended to replace the faulty MFM of 33KV Dosakayalapadu feeder with spare 201693 201738 45
one at 220KV SS Podili. 2) Attended office works at 220KV SS Podili.
220KV SS Podili. a) Attended for the preparation of data regarding proposed Capacitor banks in 201738 201783
03/02/2023 Podili 13346 markapur and podili SD. b) Attended the office works at 220KV SS Podili. 45
1) Preparation of Estimate's of Oil regeneration of 10/16 MVA PTR 1,2 at 132KV SS
P.Dornala and 10/16 MVA PTR 1 & 31.5MVA PTR 2 at 132KV SS Cumbum in
MRT Sub Division Podili at O/o:EE/MRT&TR/Ongole.
04/02/2023 Podili Ongole. 13346 201783 201899 116
2) Office works at O/o:EE/MRT&TR/Ongole.
Attended for testing of MAIN-1 (ALSTOM-P444) & MAIN-2 (ABB REL 670) relays
14/02/2023 Podili 220KV SS Podili. 13347 of 220KV Parchuru-1 feeder, downloaded and analysed the DR and Events at 220KV 202499 202544 45
SS Podili.
132 KV SS Attended for OLTC oil changing works of 31.5 MVA PTR -1 (Toshiba make) and
15/02/2023 Podili 13347 202544 202764 220
Giddalur. charging of 33kv Rajupalem feeder (new) at 132 KV SS Giddalur.
a) Attended to rectify the indication ckt. of 132 kv kanigiri -1 FDR at 220kv ss Podili.
16/02/2023 Podili 220KV SS Podili. 13347 b) Attended office works at 220kv ss Podili. 202764 202809 45
132 KV SS Periodical testing of Relays and CT's Tan-delta of 31.5 MVA PTR-1 & PTR-2 , 33kv
17/02/2023 Podili 13347 202809 203029 220
Giddalur. feeders and capacitor bank 1&2 at 132kv ss Giddalur .
18/02/2023 <------- No Trip -------> 13347 203029 203029 0
19/02/2023 <------- No Trip -------> 13347 203029 203029 0
20/02/2023 <------- No Trip -------> 13347 203029 203029 0
Attended for rectification works of capacitor bank cells of 5MVAR capacitor bank
132KV SS and 33KV Kanigiri feeder breaker (Make:BHEL) spring charge motor rectification
21/02/2023 Podili 13348 203029 203139 110
Kanigiri. works at 132KV SS Kanigiri.
1) Attended to check the TC-1 faulty of 132KV Lingasamudram feeder at 220KV SS
Podili. 2) Attended to Check the healthiness of the spare Energy meters at 220KV SS
22/02/2023 Podili 220KV SS Podili. 13348 203139 203184 45
Podili.
Attended to prepare the estimate of oil filtration of 10/16 MVA EMCO PTR available
23/02/2023 Podili 220KV SS Podili. 13348 203184 203229 45
at 132KV SS P.dornala at 220KV SS Podili along with office works.
132KV SS 1) Attended for OLTC oil changing works of 10/16MVA PTR-1, 31.5 MVA PTR -2
Kesinenipali and and 31.5MVA PTR-3 at 132KV SS Kesinenipali. 2) Attended for OLTC oil changing
24/02/2023 Podili 13348 203229 203449 220
132KV SS works of 50MVA PTR-1 & 50 MVA PTR -2 at 132KV SS Y.G.pallem.
Y.G.pallem.
1) Prepares the comparative statement of 10/16MVA CGL PTR of 132KV SS
P.Dornala at 220kv ss, Podili. 2) prepared Detailed tripping report of 220kv Podili-
25/02/2023 Podili 220KV SS Podili. 13348 Parchuru-1 feeder at 220kv SS Podili and office works. 203449 203494 45