Professional Documents
Culture Documents
Pumpsets
Pumpsets
Pumpsets
As on 05.04.2024
No of Pumpsets not working/No of
Total No of Pumpsets/Locations Locations at Which Pumps under repair
S.No. MB
Grid
Division Athari Athari
Raghava MEIL Ramulu(CPWS Raghava MEIL Ramulu(CPWS
Gandhinagar) Gandhinagar)
1 2 3 4 5 6 7 8
1 Adilabad 25/9 48/20 0/0 07/07 03/03 00/00
2 Nirmal 76/21 55/23 32/10 19/12 00/00 00/00
ADILABAD DISTRICT
No.of Pumps If so Pumps not working from
Pumps
S.No Name of the Pumping Pumping from Pumping HP of Each No of Habs not Remarks Target Date No of Habitations
Sub Division Station Towards pump covered working Pump No No.of Days not Affected
Working Stand By Total Defunct from
working
1 2 3 4 5 6 7 8 9 10 17 18 19 20 22 23 24
Babuldhole 500KL GLBR 224 habitations Soft starter and Pump 18/03/2024 226 habitations
2 Ichoda Babuldhole @BABULDHOLE 148 2 1 3 1 2 6/25/2023 298
Sump GUTTA of 4 mandals under repair of 4 mandals
3 Ichoda Bhutai Bhutai sump 20KL GLBR @ 40 8 Habitations 1 1 2 1 2 5/2/2023 352 soft starter problem 3/10/2024 8 Habitations
Umardha-G
5 Adilabad Daheguda Daheguda 40KL OHBR & 60 29 Habitations 2 1 3 1 1 8/2/2022 625 Motor & Pump are 2/28/2024 29 habs in
Sump MOLALGUTTA under repair Adilabad Mandal
7 Ichoda Karathwada Karathwada 120KL OHBR @ 60 32 Habitations 2 1 3 1 3 7/12/2023 281 PCV problem 3/10/2024 32 Habitations
Sump Karathwada hill
Page 2 of 14
Annexure
Pumpsets Stauts of SRSP-Adilabad Segment -M/s.MEIL 4/18/2024
ADILABAD DISTRICT
No.of Pumps If so Pumps not working from Remarks
Name of HP of No of Pumps Target Dates No of
S.No the Sub Pumping Station Pumping from Pumping Towards Each Habs not No.of Days as promised Habitations
Division pump covered Workin Stand Total working Pump Defunct from not by Agency Affected
g By No working
1 2 3 4 5 6 7 7 8 9 16 17 18 19 20 21
4 Habs
Mandabaguda 20 4 1 1 2 1 1 9/2/2023 229 Motor 2/27/2024 4 habitations
(Mandabaguda,Kuchiryal,
sump problem
Nagapur,Jainoorpalli)
8 Ichoda IPS at Mandabaguda 5 habs (New kandepally, old
motor and
Mandabaguda kandepally, 15 5 1 1 2 1 1 10/16/2023 185 2/28/2024 5 habitations
starter
sump Andur,Ragunathpur,Narayanpur
problem
)
IPS at Mathura Mathura thanda 3 Habs (Muthnur thanda, Motor
9 Ichoda 7.5 3 1 1 2 1 1 10/16/2023 185 2/29/2024 3 habitations
thanda sump Cherqwai 1 & Cherwai 2) Problem
Neredugonda
10 Ichoda IPS at Neredugonda Neredigonda OHSR 3 1 1 1 2 0
sump
3
11 Ichoda IPS at Peechara Peechara sump 5 1 1 2 1 2 8/20/2023 242 Motor 2/29/2024 3 habitations
habs(Peechara,laxmipur,addala 3
Problem
thimmapur)
motor under
13 Adilabad IPS at Ratnapur Ratnapur sump OHSR & RATNAPUR 15 1 1 1 2 1 2 3/20/2023 395 3/6/2024 1 habitation
repair
OHSR & NEW NANDIGAON,
Regulaguda sump 4 2 1 1 2 0
REGULAGUDA
14 Adilabad IPS at Regulaguda
OHSR & PALLI B , PALLI K,
Regulaguda sump 15 3 1 1 2 0
NANDIGAON
Page 3 of 14
No.of Pumps If so Pumps not working from Remarks
Name of HP of No of Pumps Target Dates No of
S.No the Sub Pumping Station Pumping from Pumping Towards Each Habs not No.of Days as promised Habitations
Division pump covered Workin Stand Total working Pump Defunct from not by Agency Affected
g By No
working
1 2 3 4 5 6 7 7 8 9 16 17 18 19 20 21
17 Adilabad IPS at Sonkhas Soankhas HABITATIONS 5 4 1 1 2 0
Adilabad Thoyaguda sump OHSR & ASHODA 5 2 1 1 2 0
18 IPS at Thoyaguda
Adilabad Thoyaguda sump OHSR & POONAGUDA 15 2 1 1 2 0
Motor
Ichoda Upparpally sump Morkandi OHSR 7.5 1 1 1 2 1 2 11/12/2023 158 2/29/2024 1 habitation
problem
19 IPS at Upparpally
Ichoda Upparpally sump Upparpally OHSR 2 1 1 1 2 0
Shifted to
20 Adilabad IPS at Wanwat Wanwat sump OHSR & MANGLI 20 1 1 2 1 2 1/7/2023 467 3/9/2024 1 Habitation
1 Jandaguda
sump
Adilabad District Total 24 24 48 13
Page 4 of 14
Pumpsets Status of SRSP-Adilabad Segment -M/s.Raghava 4/18/2024
ADILABAD DISTRICT
No.of Pumps If so Pumps not working from Remarks
Name of HP of Pumps
Pumping Pumping Pumping No of Habs No of Habs
S.No the Sub Each not Target Date
Station from Towards covered Pump Defunct No.of Days affected
Division pump Working Stand By Total working No Defunct from Upto not working
1 2 3 4 5 6 7 8 9 10 17 18 19 20 22 1 27
1st motor -
Dahegaon 40KL GLBR & internal cable 12 Habitations
4 Adilabad Dahegaon Sump PALSI B 50 12 Habitations 2 1 3 1 1 7/1/2019 1753 connections in 4/12/2024
panel board
Motor, Pump
Daheguda 40KL OHBR & are under
5 Adilabad Daheguda Sump MOLALGUTTA 60 29 Habitations 2 1 3 1 1&3 8/2/2022 625 repair & Low
29 Habitations 4/13/2024
discharge
Karathwad Karathwada
120KL OHBR @ PCV,BFV Not 32 Habitations
7 Ichoda Sump Karathwada hill 60 32 Habitations 2 1 3 1 2 10/12/2021 919 functioning
a
60KL OHBR @
Suryanagar Bearing
8 Ichoda DevulNaik 101 28 Habitations 2 1 3 1 1 8/7/2023 255 28 Habitations 4/12/2024
SuryaNagar Sump problem
Thanda Hill
1st motor
impeller
Damangud Damanguda
20KL OHBR @
9 Ichoda 15 11 Habitations 1 1 2 1 1 10/19/2023 182 problem & 11 Habitations 4/12/2024
a Sump RATANGUDA Butterfly valve
failed
Adilabad District Total 16 9 25 7
Page 5 of 14
Annexure
Pumpsets Stauts of SRSP-Adilabad Segment -M/s.MEIL 4/18/2024
ADILABAD DISTRICT
2 Habs
( Chinthakarra &
IPS at Chinthakarra
2 Ichoda Kothaguda SRs) 7.5 2 1 1 2
Chinthakarra sump
6
habs(Peddaguda
m,
5 Ichoda IPS at Guddem sump naguda,keshavgu 30 6 1 1 2
Guddem
da,jaithuguda,ma
haduguda,Lendig
uda)
Non Return
IPS at Kolamguda Valves
6 Adilabad OHSR & BHURKI 20 1 1 1 2 1 1 6/21/2023 302 4/11/2024
Kolamguda sump failed since
15 days
LAXMANGUDA &
IPS at Laxmanguda DONDARGUDA
7 Adilabad 10 2 1 1 2
Laxmanguda sump OHSRS
Page 6 of 14
No.of Pumps If so Pumps not working from
S.N Name
the
of Pumping
Sub Pumping Pumping HP of
Each
No of
Habs
Pumps
not
No of
Remarks Habitations
o Division Station from Towards pump covered Workin Stand Total working Pump Defunct from Defunct Affected
No.of Days
g By No Upto not working
1 2 3 4 5 6 7 7 8 9 16 17 18 19 20 20 21
4 Habs
(Mandabaguda,K
Mandabaguda
Ichoda uchiryal, 20 4 1 1 2
sump
Nagapur,Jainoorp
IPS at alli)
8 Mandabagu
da 5 habs (New
kandepally, old Pump
Mandabaguda
Ichoda kandepally, 15 5 1 1 2 1 1 12/16/2022 489 Winding got
sump
Andur,Ragunathp Burnt
ur,Narayanpur)
IPS at
10 Ichoda Neredugonda Neredigonda 3 1 1 2
Neredugond 1
sump OHSR
a
3
IPS at Peechara habs(Peechara,la
11 Ichoda 5 3 1 1 2
Peechara sump xmipur,addala
thimmapur)
Page 7 of 14
No.of Pumps If so Pumps not working from
S.N Name
the
of Pumping
Sub Pumping Pumping HP of
Each
No of
Habs
Pumps
not
No of
Remarks Habitations
o Division Station from Towards pump covered Workin Stand Total working Pump Defunct from Defunct Affected
No.of Days
g By No Upto not working
1 2 3 4 5 6 7 7 8 9 16 17 18 19 20 20 21
IPS at
16 Ichoda Sakriyanaik 2habs(Ispur,chinn 10 1 1 2
sakriyanaik 2
thanda sump a gondu guda)
thanda
IPS at
17 Adilabad Soankhas HABITATIONS 5 4 1 1 2
Sonkhas
Page 8 of 14
Pumpsets Stauts of SRSP-Adilabad Segment -Agency Raghava constructions-Nirmal District 4/18/2024
2 Raghava Bhainsa Intake Well Intake Well BHAINSA 301 2 1 3 1 2 12/11/2023 129 1.pump problem and its at 260 4/11/2024
@ Bhainsa @ Bhainsa INTAKE TO. Nizamabad workshop
AERATOR
4 Raghava Nirmal WTP 15000 KL sump Arepally 1207 4 2 6 2 1 11/7/2023 163 1. butter fly valve disc 797 4/10/2024
@Madegaon at 130MLD WTP GLBR damged PN-25,2.2.Soft
starter coil issue .Coils are
-130 MLD at Pune workshop.The work
is in progress
Raghava Madegaon 74 2 1 3
OHBR
5 Raghava Bhainsa WTP @ 6000 KL OHBR TO 121 2 1 3 s
Bhainsa-50 sump 50MLD BHAINSA r
i
MLD WTP LOKESHWAR m
AM AND a
MUNCIPALIT n
Y
5 Bhainsa WTP @ 6000 KL
Bhainsa-50 sump 50MLD
MLD WTP No.of Pumps If so Pumps not working from
Name of
S.No Agency the Sub Pumping Pumping from Pumping HP of Each Pumps not Remarks Habs Target Date
Division Station Towards pump working Defunct No.of Days Covered
Working Stand By Total Pump No Defunct from
Upto not working
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 16
Raghava OHBR TO 61 2 1 3
KUBEER
KUNTALA
Raghava OHBR TO 101 2 1 3
MUDHOLE
TANOOR
6 Raghava Bhainsa IPS at 100KL sump DOWNELLY 20 1 1 2
KUNTALA -II kuntala OHSR
12 Raghava Bhainsa IPS at 30kl sump at JHARI OHSR 20 1 1 2 1 1 12/12/2023 128 Motor winding 3 4/13/2024
WADJHARI wadjhari problem.winding damaged
14 Raghava Bhainsa IPS at 40kl sump SUMP TO 15 1 1 2 1 1 12/20/2023 120 Motor winding got burnt 3
RANGASHIVI Rangashivini HABS
NI
No.of Pumps If so Pumps not working from
Name of
S.No Agency the Sub Pumping Pumping from Pumping HP of Each Pumps not Remarks Habs Target Date
Division Station Towards pump working Defunct No.of Days Covered
Working Stand By Total Pump No Defunct from
Upto not working
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 16
15 Raghava Bhainsa IPS at 100kl sirpalli Sirpally to 20 1 1 2 1 2 12/17/2023 123 Motor winding 5
Sirpally (palsi) Ranjani problem.winding damaged
(Palsi) Thanda
OHSR
16 Raghava Bhainsa IPS at 60kl sump SUMP TO 20 1 1 2 1 1 12/12/2023 128 Motor winding got burnt 11
VEEREGAO veergaom HABS
M
17 Raghava Bhainsa IPS at Bolsa 250kl sump BOREGAON 40 1 1 2 1 2 12/22/2023 118 PUMP problem ( AT HYD 11 4/15/2024
Bolsa OHBR WORK SHOP ).new pump
req
2(40KL)
Raghava 500kl sump BOREGAON 40 2 1 3 1 3 12/18/2023 122 PUMP problem ( AT HYD 16 4/14/2024
Bolsa OHBR- WORK SHOP )
I(60KL)
18 Raghava Bhainsa IPS at Edbid 400kl sump Edbid OHSR 20 1 1 2
Edbid 60 KL
19 Raghava Bhainsa IPS at 250kl sump Karegaon 20 1 1 2 1 2 12/26/2023 114 Cable burusted, 14
Karegaon Karegaon OHSR require replacement of
cable&PUMP SHAFT
PRBLM (AT HYD WORK
SHOP )
21 Raghava Bhainsa IPS at 400KL sump BIDRELLI 7.5 1 1 2 1 1 12/2/2023 138 Motor winding 1
Bidrelli Bidrelli problem.winding damaged
Raghava BIDRELLI 5 1 1 2
OHSR
M/s Raghava Constructions- Nirmal District Total 44 32 76 20
Pumpsets Stauts of SRSP-Adilabad Segment -Agency MEIL-Nirmal District 4/18/2024
60 KL sump
2 M/s.MEIL Nirmal Bhainsa IPS at Chintalbori Chinthalbori CHINTALBORI OHSR 5 1 1 2
100KL sump
3 M/s.MEIL Nirmal Bhainsa IPS at GOLLAMADA Gollamada Hab 10 1 1 2
5 M/s.MEIL Nirmal Bhainsa IPS at ANTHARNI 120KL sump Antharni SUMP TO HABS 15 2 1 3
60 KL sump
6 M/s.MEIL Nirmal Bhainsa IPS at Brahmeshwer bramheshwar Hab 7.5 1 1 2
IPS at 60 KL sump
7 M/s.MEIL Nirmal Bhainsa
MARLAGONDA Marlagonda Hab 7.5 1 1 2
8 M/s.MEIL Nirmal Bhainsa IPS at palsi 100 KL sump Palsi Palsi ohsr 5 1 1 2
IPS at Sirpally 40 KL sump sirpally
9 M/s.MEIL Nirmal Bhainsa
Thanda 3 thanda 3 Sirpally Thanda 3 7.5 1 1 2
10 M/s.MEIL Nirmal Bhainsa IPS at Wai 100 KL sump wai Wai 7.5 2 1 3
16 M/s.MEIL Nirmal Bhainsa IPS at OWNI 250KL sump at Owni BASAR SUMP 22.5 1 1 2
dupyathanda ohsr,
M/s.MEIL Nirmal Nirmal 40KL sump Dupya laxminagar 10 1 1 2
17 IPS at Dupyathanda glsr,antulvai
thanda
M/s.MEIL Nirmal Nirmal dupyathanda,sirpally 7.5 1 1 2
18 M/s.MEIL Nirmal Nirmal IPS at Kusli 150KL sump Kusli Anjani thnada ohsr 10 1 1 2
IPS at Ippachalma
19 M/s.MEIL Nirmal Nirmal 100KL sump Lingapur lingapur ohsr 15 1 1 2
(Lingapur) & IP
RAnapur ohsr,
20 M/s.MEIL Nirmal Nirmal IPS at Ranapur 40KL sump Rnapur 12.5 1 1 2
gangapur ohsr
KORAKANTI
100KL sump
22 M/s.MEIL Nirmal Nirmal IPS at RAYADARI Rayadhari GONDUGUDA AND 20 1 1 2
OTHER 3 HABS
VASTAPUR & OTHER
23 M/s.MEIL Nirmal Nirmal IPS at THANDRA 40KL sump Thandra 15 1 1 2
TWO HABS
No.of Pumps If so Pumps not working from
S.No Agency District Name of the Pumping Station Pumping from Pumping Towards HP of Each Pumps not Remarks Target Date
Sub Division pump working No.of Days
Working Stand By Total Pump No Defunct from not
working
1 2 3 4 5 6 7 8 9 10 11 18 19 20 21 22 23
S.No Agency District Name of the Pumping Pumping from Pumping Towards HP of Each Pumps not
Sub Division Station pump working No.of Days
Working Stand By Total Pump No Defunct from
not working
1 2 3 4 5 6 7 8 9 10 11 18 19 20 21
L.Ramchandra Intakewell @ Intakewell @ Aerator 10 MLD
1 reddy Nirmal Nirmal Gandhinagar Gandhinagar WTP 100 1 1 2 0
Ananthapet &
Nirmal Neelaipet 20 1 1 2 0
L.Ramchandra IPS at 150kl sump
8 reddy Nirmal Bhagyanagar Bhagyanagar
Nirmal Bhagyanagar 7.5 1 1 2 0
Nirmal Yellareddipet 15 1 1 2 0
L.Ramchandra
9 reddy Nirmal Nirmal IPS at mugij 300kl sump mugij mugij 12.5 1 1 2 0