MERIAN OPERATIONS Version No: 3.0
Issue Date: December 2019
Form
Page No: Page 1 of 5
FATALITY RISKS TO CONSIDER FOR THE WORK? Refer to My Prospector Newmont FRM Site Pages aspx.
Requirements
Work Permits Personal Protective Equipment (PPE)
Confined Space Isolation Excavation Hot Work Face shield Mono goggles Hearing Protection
Live Electrical Work High Voltage Access Scaffolding Cyanide Area Respirator Dust Masks Impervious Gloves
Vegetation disturbance Working at Height Rescue Plan Grid mesh Hard Hat Safety Harness Steel Toe Boots
removal
Sea-can modification Fire Protection disruption Oversized Load Lift Plan Life Vest Safety glasses Gas Detector
Job Specific Resources
Barricading Signs Sentry Board Fire Blanket Fire Extinguisher Radio/Phone
Drinking Water Running Water Air mover (fan) Voltage Reducer Colorimeter
MAKE SURE ALL FATALITY RISK CRITICAL CONTROLS ARE IN PLACE BEFORE WORK STARTS
2. JOB PREPARATION/ POOR COMMUNICATION DISCUSS AND EXPLAIN EACH TASK TO CREW N
DISCUSSION
MISUNDERSTANDING
USE SPOTTER
PINCH POINT N
USE PROPER GLOVES
WATCH HAND POSITIONING