Professional Documents
Culture Documents
Construction Plans
Construction Plans
26/08/2021
2m WIDE EASEMENT
· 99.59
PVC
· 99.62 LPOD
· 2m WIDE EASEMENT
·
99.6
N.F. PALINGS
2m HT
·
·
·
99.70 99.66
99.76
·
·
LOT 1148
400 m2
99.80
99.80
99.84 99.76
LOT 1147
99.
VACANT LAND 8 VACANT LAND
RECYCLED WATER 26/08/2021 26/08/2021 LEGEND
PROVIDE RECYCLED WATER PLUMBING CONNECTED TO
2NO. TOILET CISTERNS, 2 NO. GARDEN TAPS AND 1No. 99.85 S/W PROPERTY INLET
TAP TO WASHING MACHINE SIGNED AS HOT COLD AND 99.88
RECYCLED AS PER DEVELOPERS REQUIREMENTS. 99.84 S/W PIT
99.88
EXT. PALINGS 2m HT
SEWER MANHOLE
OPTICOMM ESTATE ELECTRICITY PIT
REFER TO ELECTRICAL PLAN FOR DETAIL ON OPTICOMM
PROVISION ELECTRICITY POLE
10
0.0
TELSTRA PIT
WATER
METER
100.0
w TREE
100.10 99.97 100.01 99.96
STREET SIGN
CONCRETE FOOTPATH
T.B.M.
2m HT 2m HT
EXT. 2m HT
GAS METER
CONCRETE
CROSSING WATER METER
GWW ET GWW GWW
99.80 99.70
INVERT ROLLOVER CONCRETE KERB & CHANNEL
T.B.M. SHRUBS / FOLIAGE
G.I. NAIL ON
ELECTRICITY PIT
HEGGART CRESCENT R.L. 100.00
FINAL DRAWING
BCTA Homes Pty Ltd COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
FINAL DRAWING
BCTA Homes Pty Ltd COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
FINAL DRAWING
BCTA Homes Pty Ltd COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
FINAL DRAWING
BCTA Homes Pty Ltd COMPLETED BY: PAUL DYER
·
·
·
·
·
·
·
·
FINAL DRAWING
BCTA Homes Pty Ltd COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER
BCTA Homes Pty Ltd FINAL DRAWING
COMPLETED BY: PAUL DYER