Orawing of SHIP'S NAME.
PROPELLER
19,9000.W. CI
EMICAL, TANKER SHIPYARD FUKUOKA SHIPBUILDING CO.,LTD.
FINISHED PLAN
IMG No. 9657478
SNO.
N-2056
TOTAL 12 SHEETS with COVER
DATE CONTENTS OF REVISION Rev.
APPROVED i
EXAMINED M. Yamamoto. ma
CHECKED. kK. Himel NAKASHIMA EROPELEEE C
DESIGN DEPARTMENT
DRAWN Kk. Katayama IBPARTNEN
SKENO. 76095 PATE 2012-05-30 PHENO. SKe-76095
THIS DRAWING OF GOCUMENT IS THE PROPERTY OF NAKASHINA PROPELLER CO, 7D. AilD MUST NOT PARTIALLY OA WHOLLY BE COPIED,
DISCLOSED OR TRANSFERRED TO ANY THIAD PASTY I ANY MANNER, “We WIKTEN CONSENT OF NAKASHIIAA PROPELLER CO., LTD.DNO.76095~1
* MAIN ENGINE
TYPE MAKITA 6842MC7
MAX. CONTINUOUS OUTPUT 5000.0 kw
REVOLUTION PER, MINUTE 120.0 RPM
Se
* PROPELLER eOLAR N-PAI(NHV)
' TYPE = ' 25° SKEW
DIAMETE! 5050.0 (mm)
PITCH (0. 3929.4 (mm)
PITCH RATIO(0.7R) 0.7781,
PITCH (MEAN) 3723.1 (mm)
PITCH RATIO (MEAN) 0.7372
EXP. AREA 10.8160 (m*)
EXP. AREA RATIO 0.5400
MAX. BLADE WIDTH RATIO 0.2402
MAX, BLADE THICKNESS RATIO 0.0437
BOSS RATIO 0.1485
RAKE ANGLE -0.75 (deg.)
TURNING DIRECTION RIGHT HANDED
KALBC3
MATERIAL (NI-AL-BRONZE)
MASS 8580.0 (kg)
MOMENT OF INERTIA IN THE AIR 9540.0 (kg-m’)
* ITEMS OF INSPECTION s FINISHING TOLERANCE
‘' Iso 484 FIRST CLASS '' (1981-08-15)
PITCH
TOTAL MEAN (#,-) 0.758
MEAN PER BLADE (#,-) 1.008
PER BLADE
MEAN . FROM 0.5R TO 0.95R
FROM 0.2R TO 0.4R
LOCAL FROM 0.5R TO 0.95R
PROM 0.2R TO 0.4R
PROPELLER RADIUS
BLADE THICKNESS
(+) TOLERANCE min.2. 5mm
(-) TOLERANCE min. 1.5mm
BLADE WIDTH (D/2) min.10 mm
ANGULAR DEVIATION BETWEEN TWO
CONSECUTIVE BLADES
RAKE, AXIAL POSITION & RELATIVE AXIAL
POSITION OF CONSECUTIVE BLADES. (#,-) 1.008DNO.76095-2
GENERAL NOTE
1. ALL TESTY,AND INSBECTIONS ARE TO BE MADE IN ACCORDANCE
SLASSIFICATION RULE SPECIFIED IN COVER
See a
2. MECHANICEL EROPERIES OF MATERIAL TO BE TENSILE STRENGTH OF
S90N/mm*2" MINIMUM AND AN ELONGATION OF 16% MINIMUM.
3. THE SURFACE OF BLADES AND BOSS TO BE FINISHED SMOOTHLY.
THE BLADES OF PROPELLER TO BE FINISHED ACCORDING TO THE ATTACHED
PERMISSIBLE TOLERANCES TABLE (1.8.0, 484/1 CLASS1).
4, THE LEADING EDGES AND TRAILING EDGES TO BE FINISHED BY USING
PLATE GAUGES AT EACH SECTION.
5. THE STATIC BALANCING TEST TO BE CARRIED OUT AFTER THE COMPLETION.
(ALLOWABLE UNBALANCE VASS}%,2. Kgiipiti TP)
UNCHED ON A CONSPICUOUS
, MASS, DIAMETER, PITCH,
7. BLADE MARKS A,B,C,D AND E TO BE CARVED ON THE BOSS.
8. BONNET IS TO HAVE A HYDRAULIC TEST OF 0.2MPa(2kgf/cm*2
9, MACHINING TOLERANCE
MACHINING TOLERANCE UNLESS OTHERWISE SPECIFIED
NOT APPLICABLE TO DRILL HOLES
DIMENSTON (mm) JroreRaNce (mm)| ANGLE
over ~ Not more than|
a Oe SURFACE
6 ~ 30] 40.5 SYMBOLS
30 ~ 120] 40.8 vvvv
120 ~ 400] 41.2 vvv
400 ~ 1000] #2.0 vv
1000 ~ 2000] #30 v
2000 ~ 4000] $4.0DNO.76095-3
*** CALCULATION OF BLADE THICKNESS ACCORDING TO NK RULE ***
BLADE THICKNESS AT 0.25 RADIUS : T25 (cm)
T25 = SORT( S*W*K1*H / (K2*Z*N*L25) )
BLADE THICKMSss af Gygo RADIUS : T60 (cm)
T60 = SRWARISH / (K2*24NA*1.60) )
H Mi Too CONTINUOUS RATING (ki)
% : NUMBEROF BLADES
N : MAXIMUM CONTINUOUS RATING DIVIDED BY 100
D + PROPELLER DIANETER (m)
P70 : PITCH AT 0.70 RADIUS (m)
E : BLADE RAKE (cm)
0: MAXIMUM THICKNESS ON SHAFT CENTER LINE (cm)
K + MATERIAL CONSTANT
AE : DEVELOPED AREA RATIO
LDS : MOULDED DEPTH (m)
SDS : DRAET (m)
B : BREADTH (m) se
CB : BLOCK COEFFICIENT |
w
COEFFICIENT OF STRESS. INCREASE:
od Re
AT 0.25 RADIUS
K1 = 30.3/SQRT(1+1. 62* (P25/D) **2) * (0. 386*D/P70+40.239*P25/D)
K2 = K~(1.92*E/T0+1.71) *D*D*N*HN/1000
COEFFICIENT OF STRESS FLUCTUATION
P25 : PITCH AT 0.25 RADIUS (m)
L25 : WIDTH AT 0.25 RADIUS (cm)
RADIUS
-3/SQRT (1+0.281* (P60/D) **2) * (0.113*D/P70+0.022*P60/D)
(1.24*E/T0+1.09) *D*D*N*N/1000
COEFFICIENT OF STRESS FLUCTUATION
P60 : PITCH AT 0.60 RADIUS (m)
L60 : WIDTH AT 0.60 RADIUS (cm)
FILLET RADIUS BETWEEN BOSS AND BLADE : RO (¢
RO = TR+(0.25-RB) *(TO-TR) /0.25 :
TR : REQUIRED THICKNESS AT 0.25 RADIUS (cm)
70 : MAXIMUM THICKNESS ON SHAFT CENTER LINE (cm)
RB: BOSS RATIO
16.93
16.25
8.79
7.81
5000.0
1.200
5.050
3.9294
-3.31
22.06
1.300
0.5400
13.000
9.550
23.700
0.7819
0.8063
15.323
1.248
2.800
3.1329
87.53
4,549
1.267
2.800
3.8948
119.84
18.61
16.25
22.06
0.1485QUANTITY PER SHIP TS GIVEN IN THIS TABLE.
ASRS BCR AT.
aT cenENT ‘SHIPYARD SUPPLY
16 |0"RING RUBBER 1 1
15 [62.5 SECURING WIRE poner ae mM ™
14 |masteR Part aes 1 1
13. |RASHER copper a 2 2 N-1
12 [rasner peers 2 Paa-3
11 super Packine fe etoes eee ane 1 Pua
to |pr 3/8 JomNT PLUG Ee nee 1 Jona.
9 [Pe 7/8 Puc pec 1 PAL
8 [er s/s puuc Senet 1 1 Pr-a3
Es me : i
i wees i : res
5 Ses oe i o haus
3 [PACKING cLaND iar Bronze, 1 1 fr ee
2 power te fe ie Pana ye
1 fPropeLuer Pee aieein ° 1 1 |ssso ne MK RULE
TARE PARTICULARS TRTERTAL [Test WORKING [SPARE TOTAL [PER ONE | TOTAL [sy heenarks
PIECE it + fit | & at | iy it
#8 # 8 pee get eas to [No, REQUTRE7BYE BO MASS/Et (he) i =
¥-S609L “ONTDNO.76095~5
DETAIL OF TIP
DIRECTION OF TURNING
1,000R 2525.0 EXPANDED CONTOUR GL.
0.950R 2398.8
0.900R 2272.5 H
PROJECTED a LEADING EDGE
t
i 0. 800R 2020.0 5
i al ;
gs
0. 700R__1767.5 3
z TRAILING EDGE
\ P|
1 0.600R 1515.0 SI t
Y sy)
1 al I
iT Z \
ee Ht 0. 500R 1262. 5
yy & :
iy &
i 0.4008 1010. 0
yt =
ty Bj |
yy :
if 0. 300R__757.5 i
| i 0.2508 S| a /]
fi 0. 2008 o a /
fy i o.ask 375.0
=/R___|_ RADIUS (an) | GL=TE (Gm) THAK Gan)
0.14 375.0| 364.7 ol {197.5
0.2000 05.0) 402.6) Ww] : 182.9)
g.2b00 ar 438.4 436.9 875.3 169.3
000! 474.7[465.3[ 940.01 156.2 :
0.4000 1010.0[ $55.3| 498.2110 131 eee ete)
0.5000] 1262 652.6] 488.41 4141.01 109.1 ; 29
0. 6000/1515. 0) 771.7426 71119874 87.9 Seo)
0.7000] 1767. 909-0 96.0! 1205-0 67.9] 50
0.8000] 2020.0 7069-91 54 il 4124-0 4o,4 a
0.8000) 227. 4{=338.0| 890-4) 31.5 25.0
0.9500; 2398.6] i281.9/ -609.6 672.3) 23.1 =
0.9750] 2461.9] 1283. 7|_-787.0| 496.7) cra =] SCALE= 1/18. 30
10000! 2525.0 1133.51 -14335) o.0 15.4ONG.76095-6
35
8 -M24
3 j—— a
de 5 Sfh,|
Re | R2
oe 35. 0/30. o a
10.9] [5.0 gl a
DETAIL OF "A" oak ao
“a” I} R600.0 SHAFT. STARTING. POINT eee
MARK P R600.0
BLADE” A” 190.0 at
A ¥
@ oe
tif
OL, ARE a BIL A0
0 6
a 915.0
OF ‘SHAFT TAPER LENGTH
25 tS
tS
BLADE”C” BLADE”D”
® aoe
12 =M 20 TAPPED
Eee erre ag tee
a
a
aby VIEW "Q-Q"DNO.76095-7
SuIM ONTNOOGS S*zo ie aeoe
i
45 |
10 |--23_
50
WTA
“x” EEA
| 35 +h 30 —+!
le §5 —_-»|
10
Zsi000 ‘TAPER STARTING POINT
J ES
1
Te
ese
wae
Sis oodDNG.76095-8
SHEET PACKING
0505,
(3) 2=888. de422, to
640 SPOT FACE(VV)
SECTION A
IryPe =a
syupoLs [ROUGHNESS
Ww 188
Y. 508__| 1) Filing up cement. (SHIPYARD SUPPLY)
~ 1008 | 2) For filling grease and air venting.DNO.76095-9
DEVELOPED PROPELLER TAPER PART
of
a
Ro g
SECTION 0-9
al 2
gq
A
aI
a
|
Al
3
RO.S RO
—
R18 BS
SECTION S-S
DETAIL OF
(OIL INJECTION HOLE)
650
650DNO.76095~10
ACCORDING TO NK RULE
wae ny Sheet of Propeller Fitting (Keyless) *#*
Material of S| Material of Boss KA1BC3
* Input.
Tan (alpha) = H = 5000.0 (kW) W =120.0(r.p.m.) /100
Vs = 14,92 (Knot) RO = 198.50(mm) R1=375.0(mm) Qv=595000.0(N-m)
R2=0.0(mm) LO = 450.00(mm) A=1092000.0(mm*2) Ne=68.1(x.p.m.) /100
KR1=R1/RO = 1.8892 KR2=R2/RO=0 K4=8.49 KS=1.4
D = 5.05 (m) K6=0.55 K7=1.2 Kw=172
* Calculation
FV = 2405541. 6N
P = 49.82 (N/mm*2) 2 0.168: = c = 1.200000
Ko= (4.12 + 8.988 * (Cb-Cs)/(Ch-C0}) /L00(an/*C)
Minimum: Ll= 9.89-13.11*Cb/10¢ 8. 565/100 (mm)
Maximum: L2= L1+2.07 SS
Pull-Up Force :Kz = 1001.8*1000 (N/mm) coefficient: H=0. 13
(102. 2ton/mm)
Li =9.89 (mm) L2 = 11.96 (mm)
* Table (Cb=Boss Temp. ,Cs=Shaft Temp.)
Cb=Cs Li
(C) (mam)
35.0 8.44
30.0 8.65
25.0 8.86
20.0 9.06
15.0 9.27
10.0 9.47
5.0 9.68
0.0 9.89Temperature (deg.)
35
30
25
10
DNO.76095-11
PULL UP LENGTH CURVES
== sax. PULL-UP LeNeTt
MIN. PULL-UP LENGTH
A’: AXIAL PULL-UP LENGTH : mm