QP/6/F/5

INSPECTION REQUEST (IR)


Project Name Project Manager Site Manager
Date : 02/04/2024 IR No. E9
Zimplats solar project Ahmed Khira Ahmed Abo Tabl
Drilling of holes in Block 4 West side Discipline:
Mech.
From: EETD Name: Abo Tabl Signature: Spec Ref:
To: Owner Name: Andrew Signature:
Attachment : Block 4 West Side Drilling Layout Total No. of Pages: Dwg No.
1
Distribution:
Project Manager Construction Project Manager Project Coordinator
Quality Control Others (Specify) Others (Specify)

The following work has been inspected and accepted by EETD QC Engineer:

Drilling of 84 holes in Block 4 West Side

And will be ready for inspection from : Max. Date of Inspection:


JECCA QAQC and SHENXIN Engineers:
Name: Signature: Date:
Millicent T Mugwira
Vongai Marusho

Inspection Results
Code Status Date Signature
A Approved
B Approved as noted
C Work not accepted, Rework,Adjust,and Resubmit
D Not Ready.Resubmit when Ready
Estimated Date for Closing IR:

Above subject works have been visually inspected by the Consultant and found acceptable as
Owner per the code given above

Comments

EETD Owner
Name: Ahmed Abo Tabl Name: Andrew Mutamiri
Position: Sr. Site Manager Position: Project Manager
Signature: Signature:
Date: Date:

Ver.1 1/1