REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


-
oct,· .i3> \:)Y'W\--\

DI " o2Aj -~ 1)

OFFICE OF THE SECRETARY


MANILA

~N 21 2011

DEPARTMENT ORDER SUBJECT: UPDATED CONSULTANCY BILLING


GUIDELINES
03
In line with the policy of the Department to improve the delivery of its services,
all DPWH implementing offices and consultants are hereby required to follow the
guidelines for the payment of claims of consultants prescribed under the updated
Consultancy Billing Guidelines of December 2010. The updated guidelines now
include incorporate New Government Accounting System (NGAS) requirements.

The said guidelines are contained in two manuals, as follows:

1. The Manual containing the "Guidelines to Implementing Offices for


Processing Claims for Payment" shall be used by DPWH implementing
offices, including the Project Management Offices (PMOs), Regional and
District Offices, for verification and checking the completeness and
proprietary of billing documents submitted by consultants and in the
preparation of necessary supporting documents required under the
existing Accounting and Auditing Rules and Regulation; and,

2. The Manual containing the "Guidelines to Consultants for Preparing


Claims for Payment" which covers advance payment, monthly progress
payments and final payment shall be used by the consultants in the
preparation of billings to ensure that documents are prepared accurately
and properly prior to submission for payment of claims to the Department,
through the Document Tracking System (DoTS).

Copies of these two manuals can be obtained through the intra net. Offices
without access to the intranet may contact the MIS Library to obtain a softcopy.

Implementation of the New Process on Payment of Contractors Claims for


Civil Works Projects under Department Order No. 207, series of 2000, shall remain
in effect.

This Order shall take effect immediately and shall supersede Department
Order No. 25, series of 2001.

OGELIO L. SINGSON
Secretary

IIII IIIII1
WIN1 L04120
Department of Public Works and Highways

GUIDELINES TO IMPLEMENTING OFFICES


FOR PROCESSING CLAIMS FOR PAYMENT
(CONSULTANCY SERVICES)

December 2010
PREFIX

The purpose of this manual is to provide guidelines to Implementing Offices


(IO) on the verification of billing documents submitted by the Consultants
for Consultancy Services Contract to the Department. These also include
guidelines on the preparation of some documents that need to be prepared or
documents that need to be secured by the IO prior to its submission to the
Accounting Division-CFMS. These guidelines provide examples of
documents that must be used and provide directions on how these documents
are prepared.

The “Guidelines to Consultants for Preparing Claims for Payment”


contains the information for the Consultants to prepare billing claims. The
Implementing Office should use this document for checking the
completeness of each individual item submitted by the Consultant.

These guidelines cover the following types of payment claims:


◊ Advance Payment
◊ Monthly Progress Billing
◊ Final Payment

The Implementing Office can be a Project Management Office (PMO) or


any other unit of the Department tasked to supervise the implementation of a
Consultancy Services Contract.

Claims must follow the Documents Tracking System (DoTS) Processing.


TABLE OF CONTENTS

PART A: ADVANCE PAYMENT - - - - - - - - - - - - - - - 2

PART B: PROGRESS BILLING – LOCAL - - - - - - 49

PART C: PROGRESS BILLING – FOREIGN - - - - 103

PART D: FINAL PAYMENT - - - - - - - - - - - - - - - - -152


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

PART A. ADVANCE PAYMENT ................................. 2


I. Introduction ....................................................................... 2

II. Verification of Documents ................................................ 4


II.1 Verification of Letter-Request of Consultant ................................... 4
II.2 Verification of Advance Payment Invoice........................................ 9
II.3 Verification of Attachments ............................................................ 12

III. Preparation of Forms ...................................................... 22


III.1 Preparation of Summary of Charges ............................................... 22
III.2 Preparation of Executive Summary ................................................ 25
III.3 Preparation of Disbursement Voucher ............................................ 28
III.3 Preparation of Disbursement Voucher ............................................ 28
III.4 Preparation of Certification per Department Order No. 55 Series of
1988 ................................................................................................. 31
III.5 Preparation of Special Account Withdrawal Application .............. 33
III.6 Preparation of the FCDU Transfer Slip .......................................... 36
III.7 Preparation of Lending Institution Direct Application for
Withdrawal ...................................................................................... 39
III.8 Preparation of Fund Utilization Report .......................................... 42

IV. Attachments from the Implementing Office ................... 43


IV.1 Transmittal of Contract Documents to COA .................................. 44
IV.2 SAC Certification on the Advance Payment Security in the Form of
Bank Guarantee ............................................................................... 45
IV.3 Certification on the Validity and Authenticity of the Advance
Payment Security ............................................................................ 46
IV.4 Certificate of Mobilization of Consultant’s Personnel ................... 47

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Part A. Advance Payment


This section provides the information necessary to verify and process the advance
payment claim of a Consultant. This is only applicable when the contract between
DPWH and the Consultant allows it.

I. Introduction
This section contains the steps on how the Implementing Office will verify the
Consultant’s billing for advance payment. It also includes the procedures in the
preparation of forms to be used.
Advance Payments may be in lump sum or two equal payments depending on what
the Contract between the Department and the Consultant allows. The contract
provision on advance payment must be checked to see to it that the total claim for
each currency does not exceed the amount stated in the contract and the amount
guaranteed on the Surety Bond.
The table below summarizes the steps and actions that need to be done by the
Implementing Office.
STEP ACTION
1 Check the submitted billing with supporting documents for
completeness. The billing for advance payment should have the
following supporting documents arranged as follows:
For the First Release of Payment, these are the needed documents:
1. Letter-Request of Consultant
2. Advance Payment Invoice
3. Advance Payment Security in the form of Bank Guarantee
4. Certified True Copy of Approved Contract
5. Certificate of Availability of Funds
6. Certified True Copy of Resolution of Award
7. Certified True Copy of the Notice to Proceed
For the Final/Lump-sum Release of Payment, the above mentioned
documents are also needed plus the Certification of Mobilization of
Consultant’s Personnel
2 Verify the documents listed below for accuracy. The process of
verification is listed on the next section.
3 If the supporting documents are incomplete and/or the documents
listed above are inaccurate, the billing must be returned to the
concerned Consultant for correction.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 2


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

STEP ACTION
4 If the supporting documents are complete and accurate, the
Implementing Office must now prepare the required forms. The
procedure for preparation is listed on the Section III. – Preparation of
Forms
5 The Implementing Office must also provide Certified True Copy of the
following documents:
• SAC Certification on the Advance Payment Security in the
form of Bank Guarantee
• Certification on the Validity and Authenticity of the Advance
Payment Security
• Transmittal of contract documents to COA
6 The billing documents must have appropriate approvals before
submitting them to Accounting for processing of payment.

Note:

Before the Implementing Office approves the Certification of Mobilization of


Consultant Personnel the Consultant must submit first a letter request
providing the list of personnel and staff mobilized for the implementation of
the Project.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 3


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II. Verification of Documents

This section provides the descriptions of the forms that needs to be verified by the
Implementing Office before the preparation of other documents.

II.1 Verification of Letter-Request of Consultant

• Checking of Entries

ITEM ITEM DESCRIPTION


NO
1 Date This must be the date the letter request
was prepared.
2 Attention This must be the name and designation
of the responsible official of the
project (at least a Project Director).
3 Reference This must be the nature of the service
and the name of the project (e.g.
Technical Consultancy Services for
BRP – Phase I).
4 Advance Payment This must be the type of advance
Security payment security (e.g. Unconditional
Bank Guarantee, Letter of Credit, or
Surety Bond).
5 Request This must be the type of request for
release of advance payment. The
consultant has two options if allowed
by the Contract. Option A – the
advance payment could be release in
two payments, the first, immediately
upon award of the Contract and the
final, after the substantial mobilization
of personnel. Option B – 100% of the
advance payment in lump sum release,
after the substantial mobilization of
personnel.
6 Amount in Words This must be the amount of advance
payment being requested in words to
include the currency (e.g. One Million
& 00/100 Pesos).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 4


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
7 Amount in Figures This must be the amount of advance
payment being requested in figures to
include the currency symbol (e.g.
P 1,000,000.00).
8 Currency This must be the currency being
requested for advance payment as
specified in the Contract.
9 Bank Information Indicate the bank and the account
information where the payments
should be made (i.e. Name of the
bank, Account Number, Bank
Address, Sort Code and the Swift
Code).
10 Project Manager This must be the name and designation
(Signature) of the authorized representative of the
Consultant. He/she must affix his
signature on the space provided.

• Sample Format

The sample formats of the Letter Request of the Consultant are given on
the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 5


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.II.1. Letter – Request of Consultant, Release of Advance Payment

Option A – Two Releases of Advance Payment (First Release)

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph

1 April 16, 1997

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat


2 Project Director, PMO-ICB

Reference: Technical Consulting Services for the Development and Implementation of the
3 Institutional Capacity Building (ICB) Project for the Department of Public Works
and Highways (DPWH)

Sir:

In accordance with the conditions of the Contract, we have complied with all your guidelines and
requirements, that is; i) the Form of Agreement was executed by and between both parties, ii) the
4 __________________________ in a form and from a bank acceptable to the client in amounts
equal to the Advance Payment was submitted to the Client.

Accordingly, may we request your good office to release the first 50% of the advance payment in
Local Currency – Philippine Peso immediately, as our Notice to Proceed was issued on April 7,
5 1997. 6
8 Attached is an invoice in the amount of ______________________________________________
_______________________________________________ (P_______________). 7

Please make Peso payments to:


BPR Consultants, Inc.
Account Number: 999-088906-040
9 Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
Makati, Metro Manila, Philippines

Your expeditious processing of this invoice would be appreciated.

Very truly yours,

Robert Doe
10 ICB Project Manager
BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 6


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.II.1. Letter – Request of Consultant, Release of Advance Payment (Continuation)

Option A – Two Releases of Advance Payment (Final Release)


BPR Consultants, Inc.
Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph

1 April 16, 1997

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat


2 Project Director, PMO-ICB

Reference: Technical Consulting Services for the Development and Implementation of the
3 Institutional Capacity Building (ICB) Project for the Department of Public Works
and Highways (DPWH)

Sir:

In accordance with the conditions of the Contract, we have complied with all your guidelines and
requirements, that is; i) the Form of Agreement was executed by and between both parties, ii) the
4 __________________________ in a form and from a bank acceptable to the client in amounts
equal to the Advance Payment was submitted to the Client.

Accordingly, may we request your good office to release the final 50% of the advance payment in
Local Currency – Philippine Peso as we have substantially mobilized our staff in connection with
5 the implementation of the above-mentioned project. 6
8 Attached is an invoice in the amount of ______________________________________________
_______________________________________________ (P_______________). 7
Please make Peso payments to:
BPR Consultants, Inc.
Account Number: 999-088906-040
9 Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
Makati, Metro Manila, Philippines

Your expeditious processing of this invoice would be appreciated.

Very truly yours,

Robert Doe
ICB Project Manager
10 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 7


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.II.1. Letter – Request of Consultant, Release of Advance Payment (Continuation)

Option B – Lump Sum Release of Advance Payment

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph

1 April 16, 1997

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat


2 Project Director, PMO-ICB

Reference: Technical Consulting Services for the Development and Implementation of the
3 Institutional Capacity Building (ICB) Project for the Department of Public Works
and Highways (DPWH)

Sir:

In accordance with the conditions of the Contract, we have complied with all your guidelines and
requirements, that is; i) the Form of Agreement was executed by and between both parties, ii) the
4 __________________________ in a form and from a bank acceptable to the client in amounts
equal to the Advance Payment was submitted to the Client.

Accordingly, may we request your good office to release 100% of the advance payment in Local
Currency – Philippine Peso as we have substantially mobilized our staff in connection with the
5 implementation of the above-mentioned project. 6
8 Attached is an invoice in the amount of ______________________________________________
_______________________________________________ (P_______________). 7
Please make Peso payments to:
BPR Consultants, Inc.
Account Number: 999-088906-040
Singapore & Bangkok Bank
9 SBB Tower, 8000 Ayala Avenue
Makati, Metro Manila, Philippines

Your expeditious processing of this invoice would be appreciated.

Very truly yours,

Robert Doe
ICB Project Manager
10 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 8


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.2 Verification of Advance Payment Invoice

• Checking of Entries

ITEM ITEM DESCRIPTION


NO
1 Name of Project This must be the name of the project.
2 Consultant’s Information This must contain the name of the
principal Consultant, address, telephone
number, fax numbers, and e-mail address
if there is any.
3 Invoice Number This must contain the Invoice number and
must use the format [Acronym-Currency
(e.g. USD for US Dollars)-nnnn (must
start with 0000)]. This number must also
be a unique number.
4 Date This must be the date of the preparation of
the Invoice.
5 Currency This must be the Currency being billed for
the advance payment (in this case
Philippine Peso).
6 Purpose “Advance Payment” must be indicated on
this item.
7 Currency Symbol This must be the currency symbol (e.g.
PhP for Philippine Peso; US$ for US
Dollars – in this case PhP).
8 Amount This must be the amount being requested
in figures. See Item # 6 of the Letter
Request of Consultant.
9 Consultant Name This must be the company name of the
(Company) principal Consultant.
10 Bank Information The bank and the account information
where the payments should be made
should be complete (i.e. Name of the
bank, Account Number, Bank Address,
Sort Code and the Swift Code).
11 Certifying Official The Consultant Project Manager must
Signature affix his/her signature on the space
provided.
12 Certifying Official The name of the Consultant’s Project
Manager must be in printed all capitals.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 9


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Recommending Official For signature of the Project Director of
Signature the Implementing Office after the entries
has been checked and needed documents
has been verified and attached
accordingly.
14 Recommending Official The name of the Project Director of the
Implementing Office must be printed all
capitals.
15 Date of signing This section must be dated by the
respective signatories.
16 Attachments Check the completeness and accuracy of
the attached documents.
17 Approving Official For signature of the Secretary.
Signature
18 Approving Official The name of the Secretary must be printed
in all capitals.

• Sample Format

A sample format of the Advance Payment Invoice is given on the next


page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 10


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.II.2 Advance Payment Invoice

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 11


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3 Verification of Attachments

The Implementing Office must see to it that the following documents are submitted
with the claim for advanced payment: (Listed next to the document is the section
where an example of this document can be found).

• Original Copy of Advance Payment Security in the form of Bank


Guarantee (II.3.1)
• Certified True Copy of Approved Contract (II.3.2)
• Certification of Availability of Funds (II.3.3)
• Certified True Copy of Resolution of Award (II.3.4)
• Certified True Copy of Notice to Proceed (II.3.5)

Please see the sample forms of the above-mentioned documents on the following
pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 12


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.1 Advance Payment Security in the form of Bank Guarantee

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 13


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.1 Advance Payment Security in the form of Bank Guarantee (Continuation)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 14


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.2 Copy of Approved Contract

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 15


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.2 Copy of Approved Contract (Continuation)

ROGELIO L. SINGSON
Secretary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 16


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.3 Certification of Availability of Funds

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 17


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.4 Copy of the Resolution of Award

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 18


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.4 Copy of the Resolution of Award (Continuation)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 19


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.4 Copy of the Resolution of Award (Continuation)

ROGELIO L. SINGSON
Secretary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 20


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3.5 Copy of the Notice to Proceed

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 21


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III. Preparation of Forms


The following section provides description of the forms that must be prepared by
the Implementing Office and the procedures for preparation.
The forms that must be completed and included in the claim for advance payment
are:
• Summary of Charges (A.III.1)
• Executive Summary (A.III.2)
• Disbursement Voucher (A.III.3)
• Certification per Department Order No. 55 series of 1988 (A.III.4)
• Special Account Withdrawal Application (A.III.5)
• FCDU Transfer Slip (A.III.6)
• Lending Institution Direct Application for Withdrawal (A.III.7)
• Fund Utilization Report (A.III.8)

III.1 Preparation of Summary of Charges

• Definition /Purpose

The Summary of charges will be prepared by the Implementing Office once all
the submitted documents for the billing has been verified and checked for
accuracy and authenticity. This will be signed by the Head of the Implementing
Office (i.e. Project Director) and will be approved by the Secretary.

• Procedure

The Summary of Charges must contain the following information:

ITEM ITEM DESCRIPTION


NO
1 Name of the Project Indicate the name of the Project.
2 Period Covered Indicate the period covered by the billing
claim (in this case “Advance Payment”).
3 Advance Payment Describe the advance payment being
Description requested. Indicate whether it is the first
50% or the Final 50% or Lump-sum and
the currency component (in this case Local
Currency for Peso).
4 Contract Amount Indicate the contract amount for the
currency being requested for an advance
payment.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 22


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
5 % Advance Payment Indicate the percentage of advance payment
Requested being requested. For advance payment with
two equal payments this must be 50%
while for lump-sum this must be 100%.
6 Actual Percentage of Indicate the allowed percentage of contract
advance payment/ cost as advance payment. In most cases this
Contract Cost is 20% of the total contract cost. In the
event the Consultant requested a much
lower percentage as advance payment, this
must be changed accordingly.
7 Gross Amount Indicate the amount of advance payment
being requested.
8 Total Remuneration Indicate the total cost of remuneration for
Cost project staff and local consultants/
personnel.
9 Withholding tax Indicate the amount of the computed
(WT) withholding tax. This is applicable only for
the Local Currency Component and is
computed as 2% (or depending on the
contract) of the Local Remuneration
(excluding the 12% VAT) portion of the
Advance Payment being requested.
10 Value Added Tax Indicate the amount of the computed VAT.
(VAT) This is applicable only for the Local
Currency Component and is computed as
5% (or depending on the contract) of the
Local Remuneration (excluding the 12%
VAT) portion of the Advance Payment
being requested. This is applicable only for
local currency component.
11 Total Withholding This is equivalent to the sum of as 2% (or
depending on the contract) EWT (Item 9)
and as 5% (or depending on the contract)
EVAT (Item 10).
12 Amount Due This is equivalent to the Gross Amount
Consultant minus the Total Withholding (Item 11).
13 Certifying Official Indicate the name of the Project Manager
of the Implementing Office (PRINTED)
and the official designation. The official
concerned must signed on top of this
section.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 23


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
14 Approving Official Indicate the name of responsible official (at
least a Project Director of the
Implementing Office) and his designation
approving the payment. The official
concerned must sign on top of this section.

• Format

The Summary of Charges must follow the format given below.

A.III.1 Summary of Charges

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 24


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.2 Preparation of Executive Summary

• Definition/Purpose

The Executive Summary is a brief summary of the status of the Project. The
details of this form are gathered from the Contract Agreement and Letter of
Credit/Bank Guarantee/Surety Bond. The Implementing Office prepares this
document to be signed by the Assistant Secretary or the Undersecretary with
supervision of the Project.

• Procedure

The Executive Summary must contain the following information:

ITEM ITEM DESCRIPTION


No
1 Reference No. Refer to the Invoice Number. This
must be the Invoice Number of the
billing claim.
2 Date Indicate the date the document was
prepared.
3 For Indicate the name of the Head of
Office.
4 Thru Indicate the name of the
Undersecretary in-charge of the
project. This will not be applicable if
the signatory to the Executive
Summary is the Undersecretary
himself.
5 Subject Indicate the nature of the
Claim/Billing (e.g. 10% advance
payment), the nature of the Contract,
the name of the Project and Location,
the Loan Package and the amount
being claimed in words and in figures.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 25


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
6 Action Recommended Indicate “For Approval” or “For
Payment”.
7 Implementing Office Indicate the name of the Implementing
Office concerned.
8 Reviewing Office Indicate CFMS (or CFMD in Regional
Offices), which is the reviewing
office.
9 Consultant Name Refer to the Contract Agreement. This
must be the name of the prime
Consultant as specified on the
contract.
10 Contract Amount Refer to the contract agreement for the
original amount of the project.
11 Contract Time Refer to the contract agreement for the
duration of the project.
12 Effectivity of the Refer to the contract agreement for the
Contract date of effectivity of the project.
13 Contract Expiry Date Refer to the contract agreement for the
date of expiration of the project.
14 Contractor’s Surety Data Input the kind of surety bond for the
advance payment (10.1); the amount
(10.2); the issuing company (10.3); the
expiration date (10.4) and who made
the validation (10.5)
15 Remarks Indicate any comment, note,
clarification regarding the project.
16 Authorized Official This must bear the signature, name
and designation of the responsible
official in the implementation of the
Project. This must be at least with a
rank of a Project Director.

• Format

The format for Executive Summary is given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 26


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.III.2 Executive Summary

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila

1
Reference No. _________________
Date: ________________________ 2

3
EXECUTIVE SUMMARY
4
For
For :: Secretary
SecretaryRogelio
GregorioL.R.
Singson
Vigilar
Thru : U/Sec. Angel Malapitan
1. Subject: Invoice for 50% of the Advance Payment for mobilization under the Local Currency
Component (Peso) of the Contract for Consultant’s Services of BPR Consultants, Inc. for the 5
development and implementation of the Institutional Capacity Building (ICB) Project under the
IBRD-assisted Highway Management Project (Loan No. PH 4030) in the amount of SIX
MILLION FIVE HUNDRED SEVENTY SIX THUSAND SIX HUNDRED FIFTY NINE &
00/100 PESOS (P 6,576,659.00).
6
2. Action Recommended: For Approval
7
3. Implementing Office: DPWH - Planning
4. Reviewing Office: CFMS 8
5. Contractor: BPR Consultants, Inc.
6. Contract Amount: P 65,766,590.00 (Local Currency Component) 9
7. Contract Time: 24 Months 10
8. Effectivity of Contract: 14 April 1997.
9. Contract Expiry Date: 13 April 1999. 11
10. Contractor’s Surety for Advance Payment: 12
10.1 Kind: Surety Bond No. G (16) 2544
10.2 Amount: P 13,153,318.00 13
10.3 Issued by: Eastern Assurance and Surety Corporation
10.4 Expiration: Until advance payment is fully paid 14
10.5 Validated by: Chairman, Special Action Committee 15
11. Remarks: First 50% Advance Payment Claim (Peso Component)

JOSE MAKALINTAL 16
Designation

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 27


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.3 Preparation of Disbursement Voucher

• Definition/Purpose

The Disbursement Voucher is the Departments Official Payment Document.


This document is what CFMS (CFMD) uses to process the payment request.
This will be filled up first in the implementing office and will be processed in
the CFMS (CFMD).

• Procedure

The Implementing Office must fill up the upper portion of the Disbursement
Voucher with the following information:

ITEM ITEM DESCRIPTION


NO
1 Voucher Number Leave this blank, this will be filled by
the Accounting Division.
2 Date Indicate the date of preparation of this
document.
3 Name of Claimant; Bank This must be the name of the prime
Name and Address Consultant as specified in the
Contract. Indicate the Payee’s Bank
Name and address where the payment
will be deposited or sent.
3a TIN Indicate the TIN of Consultant
(format: 999-999-999-000).
4 Address of Claimant This must be the address of the prime
Consultant as specified in the
Contract.
5 Project ID Indicate the ID assigned to the Project.
6 Paying Agency Indicate DPWH and the Implementing
Office.
PARTICULARS OF PAYMENT
7 Description of Payment Provide the type of payment (e.g. 50%
advance payment), the nature of the
services/contract, the name of the
Contractor/Consultant, and the name
of the project.
8 Actual Percentage of Indicate the allowed percentage of
advance payment/ contract cost as advance payment. In
Contract Cost most cases this is 20% of the total
contract cost. In the event the
Consultant requested a much lower
percentage as advance payment, this
must be change accordingly.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 28


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
9 Total Contract Amount Indicate the total amount of the
contract for the currency being billed.
10 Total Remuneration Indicate the total cost of remuneration
Cost for project staff and local consultants/
personnel.
11 Gross Amount Indicate the amount of advance
payment being requested for payment.
12 Withholding tax (WT) Indicate the amount of the computed
withholding tax. This is applicable
only for the Local Currency
Component and is computed as 2%
(depending on the contact) of the
Local Remuneration (excluding the
12% VAT) portion of the Advance
Payment being requested.
13 Value Added Tax Indicate the amount of the computed
(VAT) VAT. This is applicable only for the
Local Currency Component and is
computed as 5% (depending on the
contact) of the Local Remuneration
(excluding the 12% VAT) portion of
the Advance Payment being requested.
14 Net Amount in Figures Indicate the net amount due to the
Consultant in figures. This will be
equal to the Gross Amount minus the
WT and the VAT.
15 Net Amount in Words Indicate the net amount due to the
Consultant (Item 11) in words.
16 Approving Officer Indicate the name and designation of
the official approving the voucher.
The official must be at least an
Undersecretary. For the purpose of the
advance payment, the signatory for
this Item must be the Secretary.

• Format

The form for Disbursement Voucher is provided on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 29


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.III.3 Disbursement Voucher

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 30


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.4 Preparation of Certification per Department Order No. 55 Series of 1988

• Definition /Purpose

This document will be prepared by the Implementing Office and must be


signed by the Head of Implementing Office certifying that all the
requirements and supporting papers pursuant to Department Order No. 55,
Series of 1988 have been complied with, reviewed and found in order by
the Implementing Office.

• Procedure

The Certification per Department Order No. 55 Series of 1988 must contain
the following information.

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of the preparation of the
Certification.
2 Name of the Project Indicate the name of the Project.
3 Consultant Indicate the company name of the principal
Consultant.
4 Claims Indicate the currency, amount in words and
in figures the claims for Advance Payment.
5 Head of the Indicate the name and designation of the
Implementing Office head of implementing office. The official
concerned must sign at the top of his/her
printed name.

• Format

The Certification per Department Order No. 55, Series of 1988 must follow
the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 31


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.III.4 Certification per Department Order No. 55 Series of 1988

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 32


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.5 Preparation of Special Account Withdrawal Application

• Definition/Purpose

This document is being prepared by the Implementing Office to pay the


advance payment due to the Consultant from the Loan Proceeds thru the
Special Account, if applicable. This form will be prepared in conjunction with
the FCDU Fund Transfer Slip which will be discussed in the next section. This
form should only be used if payment is being paid out of the Special Account.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Application No. Leave this blank, CFMS will supply
this number after the claims has been
reviewed and endorsed for approval of
payment.
2 Date Indicate the date of preparation of this
document.
3 Local Bank Indicate the name and address of the
branch of local bank where the Special
Account is setup. This can be obtained
from CFMS.
4 Attention Indicate the name and the position of
the responsible official of the Local
Bank. This can be obtained from
CFMS.
5 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
6 Program Name and Loan Indicate the name of the program as
No. approved by the Lending Institution
and the Loan No.
7a Amount payable from Indicate the amount of advance
Loan Proceeds in words payment payable from the Loan
proceeds in words.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 33


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
7b Amount payable from Indicate the amount of advance
Loan Proceeds in figures payment payable from the Loan
proceeds in figures.
8 Account No. Indicate the Account No. of the
Special Account.
9 Payee Indicate the company name of the
principal Consultant.
10 Payee Account No. Indicate the Payee’s Bank Account
No. and other bank information (e.g.
Sort Code and Swift Code) where the
payment will be deposited or sent.
11 Bank Name and Address Indicate the Payee’s Bank Name and
address where the payment will be
deposited or sent.
12 Remarks Indicate the payment purposes to
include the categories being billed for,
the type of the service, the name of the
project and the period being billed for
payment.
13 Budget Information Leave this blank, this will be filled out
by the CFMS.
14 Head of the Implementing Indicate the name and designation of
Office the Head of the Implementing Office.
The official concerned must sign this
on top of this section.
15 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.

• Format

The Special Account Withdrawal Application must follow the format on the
next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 34


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.III.5 Special Account Withdrawal Application

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 35


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.6 Preparation of the FCDU Transfer Slip

• Definition/Purpose

This document is the prescribed form by the Local Bank where the Special
Account is deposited. This form will be prepared in conjunction with the
Special Account Withdrawal Application in order to transfer the amount of
payment to the Consultant’s Bank Account. This form should only be used if
the advance payment is being paid out of the Special Account.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of preparation of this
document.
2 Foreign Currency Indicate an “X” in the appropriate box
of the Foreign Currency payment if
the advance payment is for a foreign
currency component.
3 Mode of Payment Indicate an “X” or check mark the
preferred mode of payment by he
Consultant.
4 Consultant Information Indicate the company name and the
address of the principal consultant.
5a Amount payable from Indicate the amount of advance
Loan Proceeds in words payment payable from the Loan in
word.
5b Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds in figures.
6 For Charges Indicate an “X” or a check mark on
the Debit box.
7 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
8 Payee Account No. Indicate the Payee’s Bank Account
No. and other bank information (e.g.
Sort Code and Swift Code) where the
payment will be deposited or sent.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 36


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
9 Bank Name and Address Indicate the Payee’s Bank Name and
address where the payment will be
deposited or sent.
10 Payment Details Indicate the particular office of the
Department that manages the Special
Account and the corresponding
Application No. (see Item No. 1 of the
Special Account Withdrawal
Application).
11 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.

• Format

The FCDU Fund Transfer Slip must follow the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 37


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.III.6 FCDU Fund Transfer Slip

DATE:

CARPBANK FCDU FUND TRANSFER SLIP


3 2
For multiple transactions, please use one form for each transaction type and check applicable box below:

† Telegraphic Transfer † Demand Draft ; Manager’s Check In Foreign Currency † US$ † JPY † Others UK Pounds Sterling
PAYEE/ADDRESS/TEL.NO. SOURCE OF FUND TRANSFER
BPR Consultants, Inc. - ICB Cash
20 Ayala Ave. cor. Paseo de Roxas On-Us LBP Check No. ________________________________________
4 Salcedo Village, Makati City Debit my/our Savings/Current Account No. ________________________
Philippines
AMOUNT IN WORDS/FIGURES: FOR CHARGES:

SIX MILLION FIVE HUNDRED EVENTY SIX † Cash 6


5a THOUSAND SIX HUNDRED FIFTY NINE & 00/100 † On-Us LBP Check No. ________________________________________
PESOS ONLY.
; Debit my/our Savings/Current Account No. 0014-0024-80
7
(P 6,576,659.00)
5b FOR TELEGRAPHIC TRANSFER SPECIAL INSTRUCTION:

V A L I D A T I O N
Payee’s Account No. 999-088906-040 8
Paying Bank’s Name & Address:

SINGAPORE & BANGKOK BANK


SBB TOWER, 8000 AYALA AVENUE
Makati City, Metro Manila
9 10
I/We hereby agree to be bound by the terms and conditions on the reverse side hereof.

In case payment is debited to a joint account, I/We also hereby declare under penalties of perjury

T E L L E R’ S
that my/or co-depositor/s is/are still living.

Payment Details I/We hereby authorize ______________________________________________________ whose

DPWH-PMO-IBRD NO.
signature appears below to receive the Demand Draft/Traveler’s Check applied for. 11
Third Currency US Dollar Phil. Peso
Face Amount
Exchange Rate PEDRO MAUNAWAIN ANGEL MALAPITAN
US$ Amount UNDERSECRETARY UNDERSECRETARY
Add: Bank Commission SIGNATURE OF REPRESENTATIVE SIGNATURE OVER PRINTED NAME OF APPLICANT
Corr. Bank Charges DD/TC/OTT NO. PREPARED BY: CHECKED BY:
Cable
Others SIGNATURE VERIFIED BY: BALANCE VERIFIED BY: APPROVED BY:
Total
COPY 1 – ACCTG. DIV. 2-CASHIERING DIV. 3-CLIENT (All savings withdrawals must be
accompanied by a passbook. This shall serve as your receipt when machine validated)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 38


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.7 Preparation of Lending Institution Direct Application for Withdrawal

• Definition/Purpose

This document is the prescribed form by the Lending Institution if the payment
to the Consultant from the Loan Proceeds will be withdrawn directly from the
Lending Institution (instead of the Special Account). The example provided is
for World Bank Direct Application for Withdrawal.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Lending Institution Indicate the name of the lending
institution and its address.
2 Loan No. Indicate the Loan No.
3 Application No. Leave this blank, CFMS will fill this
up in accordance with their record.
4 Currency Indicate the currency being billed for
(e.g. Philippine Peso, US Dollars or
UK Sterling Pounds - in this case
Philippine Peso).
5 Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds in figures.
6 Payees Bank Information Indicate the name and address of the
Bank and the Consultant’s Account
No. where the payment will be sent.
7 Purchase Order Indicate the type of work done (e.g.
Consultancy Services).
8 Payee Information Indicate the company name and
address of the principal Consultant.
9 Description of Services Indicate “Direct Payment”.
10 Total Amount of Contract Indicate the total amount of contract to
include Contract Amendment and
Supplemental Agreement and the
corresponding currency.
11 Percentage financed from Indicate the percentage of the Contract
Loan Proceeds being financed out of Loan Proceeds.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 39


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
12 Signature of Authorized The authorized official will sign this
Representative form once the CFMS has endorsed for
approval the billing claims.
13 Authorized Signatory Indicate the name of the authorized
official (at least an Assistant
Secretary) to sign this application.
14 Date Leave this blank, the authorized
representative must indicate the date
he/she signed for approval this
application.

• Transmittal to the Lending Institution

This application once signed must be sent to the Lending Institution with the
certified true copy of the Summary of Charges, the Executive Summary, the
Invoice Summary and the Invoice.

• Format

The Lending Institution Direct Application for Withdrawal must follow the
format specified by the Lending Institution. The sample format shown on the
next page follows the World Bank Format.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 40


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

A.III.7 Lending Institution Direct Application for Withdrawal

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
IBRD – Project Management Office
1

THE WORLD BANK 2


1818 H Street, N.W. Washington DC 20433
APPLICATION FOR WITHDRAWAL
1. IBRD Loan No.: 3430 - PH .
3
or IDA Credit No.: _____________________
2. Confinaciers Ref. No.: __________________
IBRD/IDA Ref. No.:05-______ or 14 - 4
3. Application No.: DPWH – 719 .

Attention: Disbursement Division


5
4. Please Pay Philippine Peso PhP 6,576,659.00 .

(Currency name) (Amount to be paid in figures)

We apply for this withdrawal from the account opened under the Loan or Development Credit Agreement, and hereby
certify and agree as follows:

A. The undersigned has not previously withdrawn from the Account to meet these expenditures. The undersigned
has not and does not intend to obtain funds for this purpose out of the proceeds of any other loan, credit, or grant;
B. The goods and services covered by this application have been or are being purchased in accordance with the terms
of the Agreement;
C. The expenditures have been made or are being made only for goods or services from eligible sources;
D. For those items where reimbursement is being claimed on the basis of a Statement of Expenditures (SOE), all
documentation authenticating these expenditures will be made available for review by auditors and World Bank
missions upon request. These documents have been retained at the location shown on the individual SOE sheet;
E. In the event that all or part of the funds withdrawn from the Account pursuant to this application are returned to
the World Bank, the undersigned hereby authorizes the World Bank to apply the current value of such funds as a
credit to the Account; or if the amount is small, apply such funds to the borrower’s next payment due for interest,
commitment charges, service charges or principal.

DETAILS OF EXPENDITURE PAYMENT INSTRUCTIONS


(use summary sheets if additional space is required or
if expenditures relate to more than one supplier,
category, or sub-project)
5. NAME AND ADDRESS OF CONTRACTOR 8. NAME AND ADDRESS OF PAYEE’S BANK
OR SUPPLIER (if different from payer) AND ACCOUNT NO. 999-088906-040
Singapore & Bangkok Bank
6
SBB Tower, 8000 Ayala Avenue
Makati City

6. PROCUREMENT DETAILS
a) CONTRACT OR PURCHASE ORDER
7 NUMBER AND DATE
Consultancy Services - ICB 9. PAYEE NAME AND ADDRESS
b) DATE OF PROCUREMENT NO-
OBJECTION NOTICE (complete for BPR Consultants, Inc.
contracts above prior review limit) 20 Ayala Avenue cor. Paseo de Roxsa 8
Salcedo Village
c)BRIEF DESCRIPTION OF GOODS, Makati City
9 WORKS OR SERVICES
Direct Payment
d) CURRENCY AND TOTAL AMOUNT OF
10 CONTRACT
PhP 65,766,590.00
e) TOTAL AMOUNT OF INVOICES
COVERED BY THIS APPLICATION (net
5 of retention and other deductions)
PhP 6,576,659.00
7. WITHDRAWAL DETAILS 10. If Payee’s Bank is not located in the Country whose
a) CATEGORY OR SUB-PROJECTS NO. currency is claimed, enter the name and address of
their bank’s correspondent in the country whose
currency is to be paid.
b) PERCENTAGE OF EXPENDITURES TO
BE FINANCED: BY THE WORLD BANK
11 SWIFT CODE:
CS = 100% 11. SPECIAL PAYMENT INSTRUCTIONS AND
INVOICE REFERENCES 12
BY COFINANCIER (if any)

12. By Republic of the Philippines 14. __________________________________________


14 Name of Borrower Signature(s) of Authorized Representative(s)
13
15. _________________________________________
13. ________________________________________
Print Name(s) and Title(s) of Authorized Representative(s)
Date

SUBMIT APPLICATION TO ADDRESS SHOWN ABOVE


For World Bank Use Only

Approved W/A No.


Form 1903 IE(1-92)
Krys/A:/M1/FORM.doc

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 41


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.8 Preparation of Fund Utilization Report

The Implementing Office must attach Fund Utilization Report. This ensures that
Implementing Office is monitoring the project’s funding. CFMS will attach
Obligation Request applicable to the billing.

See sample report below:

A.III.8 Fund Utilization Report

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 42


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

IV. Attachments from the Implementing Office


The Implementing Office must see to it that the Certified True Copy of the
following documents are provided for inclusion on the Advance Payment claim to
be sent to the CFMS: (Listed next to the documents is the section where an example
of this document can be found.)

For First Release of Advance Payment


• Transmittal of Contract Documents to COA (IV.1)
• SAC Certification on the Advance Payment Security in the Form of
Bank Guarantee (IV.2)
• Certification on the Validity and Authenticity of the Advance Payment
Security (IV.3)

For Final/Lump-sum Release of Advance Payment


• Certificate of Mobilization of Consultant’s Personnel (IV.4)

Please see the sample forms of the above-mentioned documents on the following
pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 43


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

IV.1 Transmittal of Contract Documents to COA

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 44


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

IV.2 SAC Certification on the Advance Payment Security in the Form of Bank
Guarantee

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila

May 22, 1997

CERTIFICATION

This is to certify that Bank Guarantee No. 120/12144097 issued by Midland Bank
plc, 27-32 Poultry, London ECP2P 2BX, Member Hongkong and Shanghai Banking
Corporation, Ltd., on January 15, 1997, in the amount not exceeding ONE MILLION
THREE HUNDRED FIFTY THOUSAND US DOLLARS (USD 1,300,000), for the
account of BPR Consultants, Inc., to guarantee Advance Payment for Consultancy
Services for the development and implementation of the Institutional Capacity Building
(ICB) Project, has been verified valid and authentic, as evidenced by the letter of
Authentication issued by Ms. Andrea Fernandez, Asst. Vice President, Corporate
Relationship Management, Hongkong Bank, dated May 30, 1997, copy attached.

(SGD)
Cesar D.Mejia
Director III, Legal Service
Chairman, Special Action Committee(SAC)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 45


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

IV.3 Certification on the Validity and Authenticity of the Advance Payment


Security

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 46


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

IV.4 Certificate of Mobilization of Consultant’s Personnel

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 47


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

PART B. PROGRESS BILLING – LOCAL .......... 49


I. Introduction .................................................................... 49

II. Verification of Documents ............................................. 50


II.1. Verification of Supporting Summary Personnel - Local Consultants/
Project Staff ................................................................................................ 50
II.2. Verification of Supporting Summary Per Diem ......................................... 56
II.3. Verification of Supporting Summaries for Other Recoverable Cost ......... 60
II.4. Verification of Invoice Summary ............................................................... 68
II.5. Verification of Progress Billing Invoice .................................................... 71
II.6. Verification of Budgeted Balance Summary Sheet .................................... 74
II.7. Verification of Letter - Request of Consultant ........................................... 77

III. Preparation of Forms ..................................................... 80


III.1. Preparation of Summary of Charges .......................................................... 80
III.2. Preparation of Executive Summary ............................................................ 84
III.3. Preparation of Disbursement Voucher ....................................................... 87
III.4. Preparation Certification per Department Order No. 55 Series of 1988 .... 90
III.5. Preparation of Special Account Withdrawal Application .......................... 92
III.6. Preparation of the FCDU Transfer Slip ...................................................... 95
III.7. Preparation of Lending Institution Direct Application for Withdrawal ..... 98
III.8. Preparation of Fund Utilization Report .................................................... 101

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

PART B. PROGRESS BILLING – LOCAL


This section provides the information necessary to verify and process the progress
claim of the consultant, as provided in the contract between DPWH and the
consultant.

I. Introduction

This section contains the steps on how the Implementing Office will verify the
consultant billing for progress billing. It also includes the procedures in the
preparation of forms to be used.

The table below summarizes the steps and actions that need to be done by the
Implementing Office

STEP ACTION
1 Check the submitted billing with supporting documents for
completeness. The billing for progress billing should have the
following supporting documents arranged as follows:

• Letter – Request of Consultant


• Invoice
• Invoice Summary
• Supporting Summary Personnel-Local Consultants/Project
Staff
• Supporting Summary Per Diem
• Supporting Summary Other Recoverable Cost
• Budgeted Balance Summary

Note: Lump-sum contracts do not require Supporting Summary


Documents, Time Sheets and Official Receipts.
2 Verify the documents and attachments for accuracy and authenticity.
The process of verification is listed on the next section.
3 If the supporting documents/attachments are incomplete and/or the
documents listed above are inaccurate, the billing must be returned to
the concerned Consultant for completion or correction.
4 If the supporting documents are complete and accurate, the
Implementing Office must now prepare the required forms. The
procedure for preparation is listed on the Section III. – Preparation of
Forms
5 The billing documents must have appropriate approvals before
submitting them to Accounting for processing of payment.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 49


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II. Verification of Documents

The following section provides descriptions of the forms that need to be


verified by the Implementing Office before the preparation of other
documents.

II.1 Verification of Supporting Summary Personnel - Local Consultants/


Project Staff

• Checking Entries

ITEM ITEM DESCRIPTION


NO.
1 Project Name This must be the name of the project as
specified in the contract, including
acronym being used if possible.
2 Consultant This must be complete and correct
Information Consultants information such as name
of the company, address, telephone and
fax number and e-mail address as
specified in the contract.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
PHP for Philippine Peso)-nnnn(must
start with 0000)].
4 Date This must be the Invoice date.
5 Category This must be the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose This must be the currency being billed
(in this case Philippine Peso).
7 From This must be the start date of the billing
period.
8 To This must be the end date of the billing
period.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 50


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO.
9 Name This must be the full name of the
personnel or consultants being billed
for the period. If there is any changes or
addition of personnel or consultants
named in the contract a copy of the
approved substitution or supplemental
contract must be provided. Project Staff
substitution does not require approval
from DPWH.
10 Designation This must be the position of the Local
Consultants/Project Staff as it specified
in the Contract.
11 Factor This must be the factor to be used in
determining the remuneration of each
consultant/project staff for the month
covered. The attached time sheet for
each personnel must be checked
thoroughly. The numerator must
indicate the number of days worked by
each personnel (including holidays).
The denominator has to be on the basis
of the contract. Some contract may
have a 30 days/month or 22
days/month. The contract basis should
be used as the denominator. If the
contract specifies a 30 days/month, then
for months with 31 days, 30 should be
used as the denominator for personnel
who worked less than 31 days. For the
month of February (i.e. 28 or 29 days),
if a full month is worked the
denominator will be the actual days of
the month (i.e. 28 or 29), else the
denominator should be 30. The 22
days/month basis is usually applied to
personnel doing office work while the
30days/month basis is usually applied
to personnel doing field works or
assigned in the field.
12 Monthly Rate This must be the monthly rate in
appropriate currency of each personnel
in accordance with the Contract.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 51


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO.
13 Amount This must be the amount resulted from
multiplying to the corresponding
monthly rate (item 12) by the factor
(item 11) in two decimal places.
14 Total Factor This must be the sum of the factors
(item 11). For the Local Consultants,
this figure must be carried over to Item-
C of the Budgeted Balance Summary,
Form L-12.
15 Total Amount This must be the total remuneration for
the month: equivalent to the sum of the
remuneration of each personnel in the
category (Item 13). This figure must be
carried over to Item-A/B of Form L-10.
16 Signature This has to have the signature of the
(Consultant) authorized representative of the
Consultant.
17 Name & This must be the name and the
Designation designation of the authorized
(Consultant) representative of the Consultant.
18 Signature (DPWH) This must be signed by the Head of the
DPWH implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be correct
and the attachments complete and
authentic.
19 Name & This must be the name and designation
Designation(DPWH) of the DPWH Head of the
implementing Office.
20 Signature Date This must be the date when the
authorized representative of the
Consultant and the DPWH Head of the
implementing Office sign this
document.

• Sample Format

Sample formats of the Supporting Summary Personnel – Local


Consultants/Project Staff and the Monthly Time Sheet are given on the
next pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 52


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.1 Supporting Summary – Personnel


Form L-01

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Personnel-Project Staff
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Designation Factor Monthly Rate Total 13

Gregorio Roda Office Manager 18/21 P 36,750.00 P 31,500.00

Bernardino Aguirre Tech. Support Manager 19/21 P 34,650.00 P 31,350.00

Garry Magpantay Computer Specialist 21/21 P 21,976.50 P 21,976.50

Myla Mañalac Accountant 21/21 P 26,754.00 P 26,754.00

Doreen de Chavez Executive Secretary 19/21 P 18,154.50 P 16,425.00

Rodoulph Atienza Ofc. Automation Spclst 19/21 P 18,154.50 P 16,425.00

Marvin Palomeno Utility Personnel 21/21 P 7,140.00 P 7,140.00


14

10
A
TOTAL 138/21 /////////// P151,571.50 15

11
CERTIFIED CORRECT:
16
DATE:
17 ROBERT DOE
ICB Project Manager 20

18 DATE:
JUAN MATAPAT
19 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 53


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.1 Supporting Summary - Personnel (Continuation)


Form L-02

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas Personnel- 5
2
Salcedo Village, Makati City Local Consultants
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Designation Factor Monthly Rate Amount

Ana Ortega Senior I.S. Analyst 20/21 P 56,956.37 P 54,244.16


13
Elaine Vizconde Senior I.S. Analyst 19/21 P 62,652.00 P 56,685.14

Maria Beltran Senior I.S. Analyst 19/21 P 37,021.63 P 33,495.76

Maritess Enriquez Senior I.S. Analyst 19/21 P 51,260.72 P 46,378.75

Rey Catarroja Senior I.S. Analyst 19.5/21 P 35,597.72 P 33,055.03

Melchor Jeremias Senior I.S. Analyst 17/21 P 62,652.00 P 50,718.29

Jeremias Uy Senior I.S. Analyst 15/21 P 62,652.00 P 44,751.43

Jason Caguioa Senior I.S. Analyst 15/21 P 54,108.54 P 38,648.96

Teddy Manguray Senior I.S. Analyst 20/21 P 54,108.54 P 51,531.94

TOTAL 163.5/21 /////////// P 409,509.46 B


15
10
CERTIFIED CORRECT:
11
14 C
16 DATE:
ROBERT DOE
17 ICB Project Manager 20

18 DATE:
JUAN MATAPAT
19 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 54


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.1 Supporting Summary - Personnel (Continuation)

Institutional Capacity Building (ICB) Project


Department of Public Works and Highway

Name: Garry Magpantay


Position: Computer Specialist

Time Sheet for the Month of January, 2000

Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Manila X X X X X X X X X X

Location 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Manila X X X X X X X X X X X

Codes: Totals: 21
X = Work Day _______________
H = Holiday
x = Half Day
Blank = Non-work Day

Garry Magpantay Certified Correct:


Garry Magpantay

Gregorio Roda
Gregorio Roda
ICB Office Manager

Noted by:

eÉuxÜà WÉx
Robert Doe
ICB Project Manager

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 55


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.2 Verification of Supporting Summary Per Diem

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the project name as specified in
the contract, including acronym being used if
possible.
2 Consultant This must be the complete and accurate
Information Consultants information such as name of the
company, address, telephone and fax number,
and e-mail address as specified in the Contract.
3 Invoice Number This must be the Invoice number with this
format [Acronym-Currency (e.g. PHP for
Philippine Pesos)-nnnn (must start with
0000)].
4 Date This must be the Invoice Date .
5 Category This must be the category as used in the
contract or on any amendment or supplemental
agreement.
6 Purpose This must be the currency being billed (in this
case Philippine Peso).
7 From This must be the start date of the billing period.
8 To This must be the end date of the billing period.
9 Name This must be the name of the consultants as
specified in the contract.
10 Description This must be the description of the per diem
being billed (e.g. first 60 days or after 60 days).
11 No. of Days This must be the number of days being billed
for the per diem. The number of days must be
based on the Monthly Time Sheet for each
foreign consultant and would be strictly
allowed only for stay in the Philippines.
12 Rate This must be the applicable rate depending on
the type of per diem specified in the contract
for each foreign consultant.
13 Amount This must be the amount resulted from
multiplying the no. of days (Item 11) by the
rate (Item 12) as specified in this document for
each foreign consultant.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 56


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
14 Total Amount This must be total amount by adding all the
amounts (Item 13) in the “Amount” column.
This figure must be carried over to Item-D of
the Invoice Summary, Form L-10.
15 Signature (Consultant) This has to have the signature of the authorized
representative of the Consultant.
16 Name & Designation This must be the name & designation of the
(Consultant) authorized representative of the Consultant.
17 Signature (DPWH) This must be signed by the Head of the DPWH
Implementing Office (e.g. Project Director)
after all the entries in this form has been
verified to be correct and the attachments
complete and authentic.
18 Name & Designation This must be the name and designation of the
(DPWH) DPWH Head of the Implementing Office.
19 Signature Date This must be the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing Office sign
this document.

• Sample Format

Sample formats of the Supporting Summary Per Diem and the


Monthly Time Sheet of the Foreign Consultant are given on the next
pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 57


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.2 Supporting Summary Per Diem

Form L-03

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
5
20 Ayala Avenue cor. Paseo de Roxas Per Diem
2
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Description #of days Rate Amount

Robert Doe Per diem(after 60 days) 31 P 3,340.00 P 103,540.00


13
Mary Houston Per diem(after 60 days) 31 P 3,340.00 P 103,540.00

John Pacino Per diem(after 60 days) 28 P 3,340.00 P 93,520.00

Arnold Gore Per diem(after 60 days) 27 P 3,340.00 P 90,180.00

Stephen Blaire Per diem(after 60 days) 28 P 3,340.00 P 93,520.00

Kevin Vincent Per diem(after 60 days) 27 P 3,340.00 P 90,180.00

10

11
TOTAL 172 /////////// P 574,480.00 D
14

CERTIFIED CORRECT:

15 DATE:
ROBERT DOE
16 ICB Project Manager 19

17 DATE:
JUAN MATAPAT
18 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 58


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.2 Supporting Summary Per Diem (Continuation)

Institutional Capacity Building (ICB) Project


Department of Public Works and Highway

Name: John Pacino


Position: Technical Specialist

Time Sheet for the Month of January, 2000

Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Manila T X X X X X X X X X X X X
U. S.

Location 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Manila X X X X X X X X X X X X X X X X

Codes: Totals: 2928


X = Work Day _______________
T = Travel Day
Blank = Non-work Day

]É{Ç ctv|ÇÉ Certified Correct:


John Pacino

eÉuxÜà WÉx
Robert Doe
ICB Project Manager

Juan Matapat
Juan Matapat
Project Director – PMO-ICB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 59


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.3 Verification of Supporting Summaries for Other Recoverable Cost

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the name of the project,
including acronym being used if
possible.
2 Consultant This must be the complete and accurate
Information Consultants information such as name of
the company, address, telephone and fax
number, and e-mail address.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
PHP for Philippine Peso)-nnnn(must
start with 0000)].
4 Date This must be the Invoice Date.
5 Category This must be the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose This must be the currency being billed
(in this case Philippine Peso).
7 From This must be the start date of the billing
period.
8 To This must be the end date of the billing
period.
9 Date This must be the date of purchase/
procurement of the goods/services to be
billed.
10 Vendor This must be the vendor’s name or the
business name where the goods or
services to be billed has been purchased
or procured.
11 Description This must be the description of the
goods or services to be billed.
12 Amount This must be the amount of the
goods/services to be billed. The original
copy of the invoice, delivery receipt and
official receipt must be attached on this
form and in the order it is presented.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 60


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Total Amount This must be the sum of the amounts to
be billed (item 12). This amount is
carried over to the corresponding
categories in the Invoice Summary
(Form L-10) and the Budgeted Balance
Summary (Form L-15).
14 Signature This has to have the signature of the
(Consultant) authorized representative of the
Consultant.
15 Name & This must be the name and the
Designation designation of the authorized
(Consultant) representative of the Consultant.
16 Signature (DPWH) This must be signed by the Head of the
DPWH Implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be correct
and the attachments complete and
authentic.
17 Name & This must be the name and designation
designation of the DPWH Head of the Implementing
(DPWH) Office.
18 Signature Date This must be the date when the
authorized representative of the
Consultant and the DPWH Head of the
Implementing Office sign this
document.

Notes:

1. Purchase and billing of service vehicle(s) of Consultants must be in


accordance with Department Order 03 Series of 2010 – Guidelines on
the Acquisition of Motor Vehicles for Use in Infrastructure Project
Supervision (or any subsequent or superseding Department Order)
which requires Department of Budget and Management (DBM) prior
approval.

2. Purchase and billing of IT Equipment(s) of Consultants must be in


accordance with Department Order 49 Series of 2007 – Guidelines on
the Acquisition and Inventory of Information Technology (IT) Goods
and Services (or any subsequent or superseding Department Order)
which requires MIS prior approval.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 61


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

• Sample Format

Sample formats of the Supporting Summaries for Other Recoverable


Cost are given below and on the next pages.

B.II.3 Supporting Summary Other Recoverable Cost


Form L-04

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Local Travel & Vehicle
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/04/00 ABC Rental Car Car rental, Isuzu(Jan 1-31, 2000) P 43,000.00

01/04/00 ABC Rental Car Car rental, Toyota(Jan 1-31, 2000) P 40,000.00 12
01/04/00 Peso Rent-a-Car Car rental, Terrano(Jan 1-31,2000) P 40,000.00

01/04/00 Peso Rent-a-Car Van rental, MBenz(Jan 1-31,2000) P 57,000.00

10

TOTALS P 180,000.00 13 E

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 62


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)


Form L-05

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Utilities &
Salcedo Village, Makati City Maintenance
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/12/00 Vira Pest Control Pest Control Treatment(Jan 2000) P 1,600.00


. . ICB Project Office and Conference .
. . Room . 12
01/19/00 Philcopy Maintenance including P 44,363.33
. . replacement of parts of Mita DC- .
. . 5590 .

10
TOTALS P 45,963.33 13 F

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 63


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form L-06

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Communication Cost
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/10/00 AT & T International Calls ($73.15 P 2,960.53


. . converted @ P 40.4720/US$ .
12
01/31/00 PLDT Telephone Calls - 894-9606 P 9,771.64

01/31/00 PLDT Telephone Calls - 894-7306 P 3,971.81

10

TOTALS 16,703.98 13 G

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 64


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form L-07

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Office Suplies
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/05/00 Reboot Computer Store Zip Disk P 900.00

01/07/00 Amazon Books(US$69.99 converted @ P P 2,825.92 12


. . 40.376/US$) .

01/12/00 Airfreight 2100, Inc. Fedex P 1,860.70

01/24/00 FNN Enterprises Various Office Supplies P103,451.13

01/31/00 Southgate Technologies HP 3909A Toner Cartridge P 19,050.00

10
TOTALS P 128,087.75 13 H

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 65


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form L-08

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Communication
Salcedo Village, Makati City Network
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/07/00 Western Telecoms Payment for installation of 5 E1 P 140,000.00


. . with DID/DOD and one (1) E1 .
. . Domestic Leased Line . 12
01/28/00 Alcaphones Payment for the cabling P 254,596.48
. . installation and related works at .
. . Central Office and NCR .

10
TOTALS P 394,596.48 13 I

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 66


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form L-09

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Contingency
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/25/00 PhilToday Daily, Inc. Newspaper advertisement for P 75,926.00


. . Specific Procurement Notice of A1 .
. . published on Dec. 12,20&26, 1999 . 12
01/28/00 Maharlika Publishing Corp Newspaper advertisement for P 70,000.00
. . Specific Procurement Notice of B2 .
. . published on Dec. 12,20&26, 1999 .

10
TOTALS P 145,926.00 13 J

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 67


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.4 Verification of Invoice Summary

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the name of the project,
including acronym being used if
possible.
2 Consultant This must be the complete and accurate
Information Consultants information such as name of
the company, address, telephone and fax
number and e-mail address.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency (e.g.
PHP for Philippine Peso)-nnnn(must
start with 0000)].
4 Invoice Date This must be the Invoice Date.
5 Purpose This must be the currency being billed
(in this case Philippine Peso).
6 From This must be the start date of the billing
period.
7 To This must be the end date of the billing
period.
8 Date This must be the end date of the billing
period.
9 Remuneration These must be the categories that fall
Categories under remuneration such as Local
Consultants and Project Personnel as
specified in the Contract.
A/B Remuneration This must be the amount from the
Carry-over category applicable category totals from Form L-
total 01/ L-02.
10 Total Remuneration This must be the sum of the category
totals for the categories under
Remuneration. 12% of this amount will
be added to the Invoice as Value Added
Tax (VAT). See Item 14.
11 Recoverable Cost These must be the applicable categories
Categories that fall under recoverable cost such as,
but not limited to Per Diem, Local
Travel, Utilities and Maintenance,
Communication Costs, Office Supplies
and Contingency as specified in the
Contract.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 68


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
12 Sub-total This must be the sum of the category
Recoverable Cost totals for the categories under
Recoverable Cost.
13 Total without VAT This must be the sum of the
Remuneration sub-total (Item 10) and
the Recoverable Cost sub-total (Item
12).
14 VAT This must be the equivalent of 12% of
Item 10, rounded in two decimal places.
15 Grand Total This must be the sum of the Total (Item
13) and the VAT (Item 14) in two
decimal places. This amount is carried
over to Item K of the Progress Billing
Invoice.
16 Certifying Official This has to have the signature of the
Signature authorized representative of the
Consultant.
17 Certifying Official This must be the name and the
designation of the authorized
representative of the Consultant.
18 Recommending This must be signed by the Project
Official Signature Manager of the Implementing Office.
19 Recommending This must be the name and designation
Official of the Project Manager of the
Implementing Office.
20 Approving Official This must be signed by the Head of the
Signature DPWH Implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be correct
and the attachments complete and
authentic.
21 Approving Official This must be the name and designation
of the DPWH Head of the Implementing
Office.
22 Signature Date This must be the date this document was
signed by the respective parties.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 69


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

• Sample Format

Sample format of the Invoice Summary is given below.

B.II.4 Invoice Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 70


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.5 Verification of Progress Billing Invoice

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Name of Project This must be the name of the project,
including acronym being used if
possible.
2 Consultant’s Information This must be the complete and accurate
Consultants information such as name
of the company, address, telephone and
fax number, and e-mail address.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
PHP for Philippine Peso)-nnnn(must
start with 0000)].
4 Invoice Date This must be the Invoice Date.
5 Currency/Purpose This must be the currency being billed
(in this case Philippine Peso).
6 From This must be the start date of the billing
period.
7 To This must be the end date of the billing
period.
8 Currency Symbol This must be the currency symbol (e.g.
PhP for Philippine Peso; US$ for US
Dollars) of the amount being billed.
K Amount This must be the amount being billed in
figures to two decimal places. This is
the carry-over amount from Item 15 of
Form L-10.
9 Consultant Name This must be the company name of the
(Company) principal Consultant.
10 Bank Information This must be the bank and the account
information where the payments should
be made (i.e. Name of the bank,
Account Number, Bank Address, Sort
Code and the Swift Code).
11 Certifying Official This has to have the signature of the
Signature authorized representative of the
Consultant.
12 Certifying Official This must be the name and the
designation of the authorized
representative of the Consultant.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 71


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Recommending Official This must be signed by the Head of the
Signature DPWH Implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be
correct.
14 Recommending Official This must be the name and designation
of the DPWH Head of the
Implementing Office.
15 Signature Date This must be the date this document
was signed by the respective parties.
16 Attachments The entries here must be check with the
supporting summaries attachments with
this Invoice.
17 Signature of Approving Signature of Approving
Official Official for the Invoice
18 Name & designation of Indicate the name of responsible
Approving Official official (at least an Undersecretary) and
his designation approving the Invoice.
In the case of the first progress billing,
the Secretary must be the Invoice
approving official.

• Sample Format

A sample format of the Progress Billing Invoice is given on the next


page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 72


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.5 Progress Billing Invoice

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 73


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.6 Verification of Budgeted Balance Summary Sheet

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the Name of the
project, including acronym being
used if possible.
2 Currency This must be the currency being
billed (in this case Philippine Peso).
3 Note This must be any information that is
not applicable on the table of this
form such as if there is any Contract
Amendment or Supplemental
Agreement.
4 Category This must be categories as
stipulated on the contract.
5 Budgeted Amount This must be the budgeted amount
for each category. The amount
would include the amount in the
original contract plus any amount
added or subtracted thru Contract
Amendments or Supplemental
Agreement.
6 Budgeted Man- This must be the budgeted number
Months of man-months for
personnel/consultants.
7 Date This must be the last day of the
billing period.
8 This Invoice Amount This must be the corresponding
amount for each category. (See
items A, B, D, E, F, G, H, I and J on
Invoice Summary).
9 Total-to-Date Amount This must be the total amount at the
end of this billing period for each
category. These amounts will be
equal to the total amount of
previous invoices plus the amount
for this billing period.
10 Total-to-Date This must be the total number of
Man- Months man-months at the end of this
billing period.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 74


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
11 Balance Amount This must be the balance amount
for each category. These amounts
will be equal to the budgeted
amount (item 5) minus the total-to
date amount (item 9).
12 Balance This must be the balance of man-
Man-Months months for the personnel. This will
be equal to the budgeted man-
months (item 6) minus the total-to
date man-months (item 10).
13 Totals This must be the sum of each
column.
C This Invoice This must be the total number of
Man-Months man-months for the billing period
(see item 14 of Supporting
Summary - Personnel).
14 Certifying Official This has to have the signature of the
Signature authorized representative of the
Consultant.
15 Certifying Official This must be the name and the
designation of the authorized
representative of the Consultant.
16 Recommending This must be signed by the
Official Signature Implementing Office Project
Manager
17 Recommending This must be the name and
Official designation of the Implementing
Office Project Manager.
18 Approving Official This must be signed by the Head of
Signature the DPWH Implementing Office
(e.g. Project Director) after all the
entries in this form has been
verified to be correct.
19 Approving Official This must be the name and
designation of the DPWH Head of
the implementing Office.

• Sample Format

A sample format of the Budgeted Balance Summary Sheet is given on


the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 75


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.6 Budgeted Balance Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 76


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.7 Verification of Letter - Request of Consultant

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Consultant This must be the Consulting firm’s
Information information such as company name,
nature of business, address, telephone
and fax number (incl. country and
access code) and e-mail address.
2 Project Name This must be the name of the project.
3 Agency Name This must be the agency name (i.e.
Department of Public Works and
Highways, address and telephone
number).
4 Invoice Date This must be the date of preparation of
the invoice.
5 Attention The Invoice letter must be addressed to
the responsible official for the project
(at least a Project Director).
6 Reference This must be the type of service, name
of the project and the owner of the
project (i.e. DPWH).
7 Salutation This must be addressed to the
responsible official (see Item 5) of the
Department.
8 Invoice Number This must be the Invoice Number as it
appears on Item 3 of Form L-11.
9 Currency This must be the currency being billed
(in this case Philippine Peso).
10 Currency Symbol This must be the symbol of the currency
being billed (in this case PhP).
11 Company Name This must be the company name of the
(Consultant) principal consultant.
12 Bank Information This must be the bank and the account
information where the payments should
be made (i.e. Name of the bank,
Account Number, Bank Address, Sort
Code and the Swift Code).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 77


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Signature This must be signed by the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager).
14 Name & This must be the name and the
Designation designation of the authorized
(Consultant) representative of the Consultant and the
Company Name.
K Total Invoice This must be the total amount of the
Amount Invoice. See Item 15 of Form L10.

• Sample Format

A sample format of the Letter – Request of Consultant is given on the


next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 78


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.II.7 Letter – Request of Consultant

Form L-13

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
1 Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph
2
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
nd
3 2 Street, Port Area, Manila
Tel. Nos: +63 2 303-3088 Fax. +63 2 303-3085

4 February 2, 2000

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat, PMO-ICB Project Director 5


Reference: Technical Consulting Services for the Development and Implementation
6 8
of the Institutional Capacity Building (ICB) Project for the Department of
Public Works and Highways (DPWH)

7 Dear Mr. Matapat: 9

Attached is Invoice Number ICB-PHP-0012 for Recoverable: Philippines Peso in the


amount of PhP2,102,946.60 for the period covering January 1-31, 2000.

10 Please make Peso payments to:


BPR Consultants, Inc.
11 Account Number: 999-088906-040 K
Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
12 Makati, Metro Manila, Philippines
Telephone Nos.: 814-0052
Fax Nos.: 817-5319

Your expeditious processing of this invoice would be appreciated.

13 Very truly yours,

Robert Doe
ICB Project Manager
14 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 79


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III. Preparation of Forms

The following section provides description of the forms and the procedures
that must be followed by the Implementing Office for completing them.

The forms that must be completed are:

• Summary of Charges (B.III.1)


• Executive Summary (B.III.2)
• Disbursement Voucher (B.III.3)
• Certification per Department Order No. 55 Series of 1988 (B.III.4)
• Special Account Withdrawal Application (B.III.5)
• FCDU Fund Transfer Slip (B.III.6)
• Lending Institution Direct Application for Withdrawal (B.III.7)
• Fund Utilization Report (B.III.8)

III.1. Preparation of Summary of Charges

• Definition /Purpose

The Summary of charges will be prepared by the Implementing Office


once all the submitted documents for the billing has been verified and
checked for accuracy and authenticity. This will be signed by the Head of
the Implementing Office (i.e. Project Director) and will be approved by
the responsible official (at least an Assistant Secretary) with supervision
of the Project.

• Procedure

The Summary of Charges must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Name of the Project Indicate the name of the Project.
2 Period Covered Indicate the period covered by the billing
claim.
3 Currency Indicate the currency component (in this
Component case Local Currency for Peso).
4 Period Covered Indicate the period covered by the billing
claim.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 80


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
5 % Recoupment for Indicate the percentage being recouped for
Advance Payment the advance payment as specified in the
Contract. This figure is the percentage of
the contract given as an advance payment
to the Consultant, normally 20%.
K Total Invoice Indicate the total invoice amount being
Amount billed, see Item 15 of the Invoice Summary
(Form L-10).
6 Amount of Indicate the amount to be recouped to pay
Recoupment for the advance payment. This is equivalent
to the percentage in Item 5 multiplied by
the total invoice amount (Item K) of
invoice being billed for the period. This
will be carried over to Item L of the
Executive Summary.
7 Total Remuneration Indicate the total remuneration being billed
for the period, see Item 10 of the Invoice
Summary.
8 Withholding This figure is equivalent to 1 minus the %
recoupment factor recoupment for advance payment (Item 5).
For example for a 20% advance payment,
this would be: 1.00-0.20 = 0.80.
9 EWT This is equivalent to the 2% (depending on
the contract) of the Total Remuneration
(Item 7) multiplied by the Withholding
recoupment factor (Item 8). This will be
carried over to Item M of the Executive
Summary.
10 EVAT This is equivalent to the 5% (depending on
the contract) of the Total Remuneration
(Item 7) multiplied by the Withholding
recoupment factor (Item 8). This will be
carried over to Item N of the Executive
Summary.
11 Total Withholding This is equivalent to the sum of 2%
(depending on the contract) EWT (Item 9)
and 5% (depending on the contract) EVAT
(Item 10). This will be carried over to Item
O of the Executive Summary.
12 Amount Due This is equivalent to the Total Invoice
Consultant Amount minus the Amount of Recoupment
(Item 6). This will be carried over to Item P
of the Executive Summary.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 81


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Total Previous This is equivalent to the total amount of
Billing progress billing claim previously billed for
the applicable currency or component.
14 Total Invoice to This is equivalent to the sum of the total
Date previous billing (Item 13) plus the total
invoice amount approved (Item K) for this
billing period. See Item 13 of the Budgeted
Balance Summary.
15 Contract Amount Indicate the contract amount of the project
in each of the appropriate currency. The
amount of supplemental contracts must be
included if there’s any.
16 Remaining Balance This is equivalent to the Contract Amount
(Item 15) minus the Total Invoice to-date
(Item 14).
17 Certifying Official Indicate the name of the responsible
personnel of the Implementing Office
(PRINTED) and his/her designation. The
personnel concerned must sign on top of
this section.
18 Approving Official Indicate the name of responsible official (at
least a Project Director of the
Implementing Office) and his designation
approving the payment. The official
concerned must sign on top of this section

• Format

The Summary of Charges must follow the format given on the next
page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 82


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.1 Summary of Charges

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 83


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.2. Preparation of Executive Summary

• Definition/Purpose

The Executive Summary is a brief summary of the contractual


information of the project and the summary of the billing claim for the
period covered. The Implementing Office prepares this document to be
signed by the official (must be at least an Assistant Secretary) responsible
with the supervision of the project.

• Procedures

Executive Summary must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Reference No. Indicate the Invoice No. of the claim.
2 Date Indicate the date of preparation.
3 Thru Indicate the Department’s authorized
representative to sign the check, Special
Account Application or the Lending
Institution Direct Application for
Withdrawal.
4 Subject Indicate the currency being billed, the type
of services, the period of billing, the name
of the Consulting firm and the name of the
project.
5 Implementing Office Indicate the implementing office of the
project.
6 Reviewing Office Indicate the office responsible for the
review of the invoice.
7 Contractor Indicate the company name of the principal
consultant.
8 Contract Amount Indicate the contract amount of the project
in each of the appropriate currency. The
amount of supplemental contracts must be
included if there’s any.
9 Contract Time Indicate the contract duration of the project.
Any additional time due to supplemental
contracts must be included also.
10 Effectivity of Indicate the start of the project.
Contract
11 Contract Expiry Indicate the expected date of the
Date completion of the project as provided for in
the contract or the supplemental contracts.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 84


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
12 Remarks Indicate the currency being billed (e.g. US
Dollars, Philippine Peso or UK Sterling).
13 Period Covered Indicate the start date and the end date of
the billing period.
14 Percentage of Indicate the percentage of recoupment for
Recoupment the Advance Payment.
15 Total Remuneration Indicate the total remuneration being billed
for the period, see Item 10 of the Invoice
Summary.
16 Withholding This is figure is equivalent to 1 minus the
recoupment factor % recoupment for advance payment (Item
5). For example for a 20% advance
payment, this would be: 1.00-0.20 = 0.80.
17 Endorsing Official Indicate the name and designation of the
Department’s responsible official (at least a
Project Director) to endorse the Executive
Summary. On top of this section the said
official must sign his/her name.
K Invoice Amount Indicate the total invoice amount being
billed, see Item K of the Invoice Summary
(Form L-10).
L Amount of See Item 6 of the Summary of Charges
Recoupment (Form L-14).
M EWT See Item 9 of the Summary of Charges
(Form L-14).
N VAT See Item 10 of the Summary of Charges
(Form L-14).
O Total Withholdings See Item 11 of the Summary of Charges
(Form L-14).
P Amount Due to See Item 12 of the Summary of Charges
Consultant (Form L-14).

• Format

The Executive Summary must follow the format given on the next
page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 85


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.2 Executive Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 86


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.3. Preparation of Disbursement Voucher

• Definition/Purpose

The Disbursement Voucher is the Department’s Official Payment


Document. This document is what CFMS uses to process the payment
request. This will be filled up first in the Implementing Office and will be
reviewed/processed in the CFMS.

• Procedures

The Implementing Office must fill up the upper portion of the


Disbursement Voucher with the following information:

ITEM ITEM DESCRIPTION


NO
1 Voucher Number Leave this blank, this will be filled by
the Accounting Division.
2 Date Indicate the date of preparation of this
document.
3 Name of Claimant; Bank This must be the name of the prime
Name and Address Consultant as specified in the
Contract. Indicate the Payee’s Bank
Name and address where the payment
will be deposited or sent.
3a TIN Indicate the TIN of Consultant
(format: 999-999-999-000).
4 Address of Claimant This must be the address of the prime
Consultant as specified in the
Contract.
5 Project ID Indicate the ID assigned to the Project.
6 Paying Agency Place DPWH and the Implementing
Office.
PARTICULARS OF PAYMENT
7 Purpose Place the payment purposes to include
the categories being billed for, the type
of the service and the name of the
project.
K Total Invoice Amount Indicate the total invoice amount being
billed, See Item K of the Invoice
Summary.
8 Withholding Tax The computation of the EWT and
Computation EVAT is shown here. See Form L14
and L15.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 87


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
L Amount of Recoupment See Item 6 of the Summary of Charges
(Form L-14).
M EWT See Item 9 of the Summary of Charges
(Form L-14).
N VAT See Item 10 of the Summary of
Charges (Form L-14).
P Net This is the amount that is due to the
Consultant after deducting the
withholding and the recoupment. See
Item 12 of the Summary of Charges
(Form L-14).
9 Payable by Loan This is the amount that is payable by
Proceeds loan proceeds. It is equivalent to the
invoice total without VAT (Item 13 –
Invoice Summary) minus the amount
of recoupment (Item L) multiplied by
the percentage of the Peso (Local
Component) covered by loan
proceeds.
10 Payable by GOP This is the amount payable by the
Government of the Republic of the
Philippines (GOP) in figures through
this Voucher. It is computed as Net
amount due to the Consultant (Item P)
minus the amount payable by the Loan
Proceeds (Item 9).
11 Payable by GOP in words Indicate the amount payable by GOP
in words.
12 Voucher Approving Indicate the name of responsible
Official official (at least an Undersecretary)
and his designation approving the
Voucher. In the case of the first
progress billing, the Secretary must be
the Voucher approving official.

• Format

Disbursement Voucher must follow the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 88


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.3 Disbursement Voucher

Form L-16

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 89


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.4. Preparation of Certification per Department Order No. 55 Series of 1988

• Definition /Purpose

This document will be prepared by the Implementing Office and must


be signed by the Head of Implementing Office certifying that all the
requirements and supporting papers pursuant to Department Order
No. 55, series of 1988 have been complied with, reviewed and found
in order by the Implementing Office.

• Procedure

The Certification per Department Order No. 55 Series of 1988 must


contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of the preparation of the
Certification
2 Name of the Project Indicate the name of the Project
3 Consultant Indicate the company name of the principal
Consultant
4 Claims Indicate the currency, amount in words and
in figures the claims for Progress Billing
Payment.
5 Head of the Indicate the name and designation of the
Implementing Office head of implementing office. The official
concerned must sign at the top of his/her
printed name.

• Format

The Certification per Department Order No. 55, Series of 1988 must
follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 90


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.4 Certification per Department Order No. 55 Series of 1988

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 91


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.5 Preparation of Special Account Withdrawal Application

• Definition/Purpose

This document is being prepared by the Implementing Office to pay the


amount due to the Consultant from the Loan Proceeds thru the Special
Account, if applicable. This form will be prepared in conjunction with the
FCDU Fund Transfer Slip which will be discussed in the next section.
This form should only be used if payment is being paid out of the Special
Account.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Application No. Leave this blank, CFMS will supply
this number after the claims has been
reviewed and endorsed for approval of
payment.
2 Date Indicate the date of preparation of this
document.
3 Local Bank Indicate the name and address of the
branch of local bank where the Special
Account is setup. This can be obtained
from CFMS.
4 Attention Indicate the name and the position of
the responsible official of the Local
Bank. This can be obtained from
CFMS.
5 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
6 Program Name and Loan Indicate the name of the program as
No. approved by the Lending Institution
and the Loan No.
7 Amount payable from Indicate the amount payable from the
Loan Proceeds in words Loan proceeds (See Item No. 6 of the
Disbursement Voucher – Form L16) in
word.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 92


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
Q Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds (See Item No. 6 of the
Disbursement Voucher – Form L16) in
figures.
8 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
9 Payee Indicate the company name of the
principal Consultant.
10 Payee Account No. Indicate the Payee’s Bank Account
No. where the payment will be
deposited or sent.
11 Bank Name and Address Indicate the Payee’s Bank Name and
address where the payment will be
deposited or sent.
12 Remarks Place the payment purposes to include
the categories being billed for, the type
of the service, the name of the project
and the period being billed for
payment.
13 Budget Information Leave this blank, this will be filled out
by the CFMS.
14 Head of the Implementing Indicate the name and designation of
Office the Head of the Implementing Office.
The official concerned must sign this
on top of this section.
15 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.

• Format

The Special Account Withdrawal Application must follow the format on


the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 93


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.5 Special Account Withdrawal Application

Form L-18

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Application No: 1
IBRD – Project Management Office

Date: _____________________
2
CARP BANK OF THE PHILIPPINES
3 Intramuros Branch
Intramuros, Manila 4
Attention : Mr. ROMEO MANLANGIT - Manager
5
Subject : Account No. 0014-0024-80
SA Highway Management Project
Loan 3430-PH
6

Sir:

Pursuant to the provision of DBM/DOF/COA Joint Circular No. 2-97 dated 21 March 7
1997, please debit the amount of PHP ONE MILLION SIX HUNDRED TWENTY SIX
THOUSAND TWO HUNDRED FORTY NINE & 18/100 ONLY ( P 1,626,249.18) from
Account No. 0014-0024-80 under the working fund for credit to the account of (Manager’s Q
Check).
9
8
PAYEE : BPR Consultants, Inc
ACCOUNT NO. : 999-088906-040 10
BANK : Singapore & Bangkok Bank 11
ADDRESS : SBB Tower, 8000 Ayala Avenue, Makati City

REMARKS :Payment of reimbursable expenses (per diem, local travel and vehicle rental,
communication costs, utilities and maintenance, project personnel, office
supplies, communication networks and others) during the period January 1-
31, 2000 in connection with the Consultancy Services Contract for the
12
Institutional Capacity Building (ICB) Project, under the Highway
Management Project (HMP)
Advise of Allotment No. : ___________________________________
Dated : ___________________________________
Obligation No. : ___________________________________ 13
N C A No. : ___________________________________

Very truly yours,

JUAN MATAPAT
PMO-ICB, Project Director 14
16 APPROVED:

PEDRO MAUNAWAIN ANGEL MALAPITAN


Undersecretary Undersecretary
Authorized Signatory Authorized Signatory

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 94


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.6 Preparation of the FCDU Transfer Slip

• Definition/Purpose

This document is the prescribed form by the Local Bank where the
Special Account is deposited. This form will be prepared in conjunction
with the Special Account Withdrawal Application in order to transfer the
amount of payment to the Consultant’s Bank Account. This form should
only be used if the payment is being paid out of the Special Account.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of preparation of this
document.
2 Mode of Payment Indicate an “X” or check mark the
preferred mode of payment by he
Consultant.
3 Consultant Information Indicate the company name and the
address of the principal consultant.
4 Amount payable from Indicate the amount payable from the
Loan Proceeds in words Loan proceeds (See Item No. 6 of the
Disbursement Voucher – Form L16) in
word.
Q Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds (See Item No. 6 of the
Disbursement Voucher – Form L16) in
figures.
5 For Charges Indicate an “X” or a check mark on
the Debit box.
6 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
7 Payee Account No. Indicate the Payee’s Bank Account
No. where the payment will be
deposited or sent.
8 Bank Name and Address Indicate the Payee’s Bank Name and
address where the payment will be
deposited or sent.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 95


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
9 Payment Details Indicate the particular office of the
Department that manages the Special
Account and the corresponding
Application No. (see Item No. 1 of the
Special Account Withdrawal
Application – Form L18.
10 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.

• Format

The FCDU Fund Transfer Slip must follow the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 96


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.6 FCDU Fund Transfer Slip

Form L-19

DATE:

CARPBANK FCDU FUND TRANSFER SLIP


2 For multiple transactions, please use one form for each transaction type and check applicable box below:

† Telegraphic Transfer † Demand Draft ; Manager’s Check In Foreign Currency † US$ † JPY † Others UK Pounds Sterling
PAYEE/ADDRESS/TEL.NO. SOURCE OF FUND TRANSFER
BPR Consultants, Inc. - ICB Cash
20 Ayala Ave. cor. Paseo de Roxas On-Us LBP Check No. ________________________________________
3 Salcedo Village, Makati City Debit my/our Savings/Current Account No. ________________________
Philippines
AMOUNT IN WORDS/FIGURES: FOR CHARGES:

† Cash
ONE MILLION SIX HUNDRED TWENTY SIX 5
THOUSAND TWO HUNDRED FORTY NINE & 18/100 †
4 PESOS ONLY.
On-Us LBP Check No. ________________________________________

(P 1,626,249.18) ; Debit my/our Savings/Current Account No. 0014-0024-80 6


Q FOR TELEGRAPHIC TRANSFER SPECIAL INSTRUCTION: 7

V A L I D A T I O N
Payee’s Account No. 999-088906-040

Paying Bank’s Name & Address:

SINGAPORE & BANGKOK BANK


SBB TOWER, 8000 AYALA AVENUE
Makati City, Metro Manila

8 I/We hereby agree to be bound by the terms and conditions on the reverse side hereof.
9
In case payment is debited to a joint account, I/We also hereby declare under penalties of perjury

T E L L E R’ S
that my/or co-depositor/s is/are still living.

Payment Details I/We hereby authorize ______________________________________________________ whose


signature appears below to receive the Demand Draft/Traveler’s Check applied for. 10
DPWH-PMO-IBRD NO.
Third Currency US Dollar Phil. Peso
Face Amount
Exchange Rate PEDRO MAUNAWAIN ANGEL MALAPITAN
US$ Amount UNDERSECRETARY UNDERSECRETARY
Add: Bank Commission SIGNATURE OF REPRESENTATIVE SIGNATURE OVER PRINTED NAME OF APPLICANT
Corr. Bank Charges DD/TC/OTT NO. PREPARED BY: CHECKED BY:
Cable
Others SIGNATURE VERIFIED BY: BALANCE VERIFIED BY: APPROVED BY:
Total
COPY 1 – ACCTG. DIV. 2-CASHIERING DIV. 3-CLIENT (All savings withdrawals must be accompanied by a passbook. This shall serve as your receipt when machine validated)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 97


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.7 Preparation of Lending Institution Direct Application for Withdrawal

• Definition/Purpose

This document is the prescribed form by the Lending Institution if the


payment to the Consultant from the Loan Proceeds will be withdrawn
directly from the Lending Institution (instead of the Special Account).
The example provided is for World Bank Direct Application for
Withdrawal.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Lending Institution Indicate the name of the lending
institution and its address.
2 Loan No. Indicate the Loan No.
3 Application No. Leave this blank, CFMS will fill this
up in accordance with their record.
4 Currency Indicate the currency being billed for
(e.g. Philippine Peso for local
currency).
Q Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds (See Item No. 6 of the
Disbursement Voucher – Form L16) in
figures.
5 Payees Bank Information Indicate the name and address of the
Bank and the Consultant’s Account
No. where the payment will be sent.
6 Purchase Order Indicate the type of work done (e.g.
Consultancy Services).
7 Payee Information Indicate the company name and
address of the principal Consultant.
8 Description of Services Indicate “Direct Payment”.
9 Total Amount of Contract Indicate the total amount of contract to
include Contract Amendment and
Supplemental Agreement and the
corresponding currency.
10 Percentage financed from Indicate the percentage of the Contract
Loan Proceeds being financed out of Loan Proceeds.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 98


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
11 Signature of Authorized The authorized official will sign this
Representative form once the CFMS has endorsed for
approval the billing claims.
12 Authorized Signatory Indicate the name of the authorized
official (at least an Assistant
Secretary) to sign this application.
13 Date Leave this blank, the authorized
representative must indicate the date
he/she signed for approval this
application.

• Transmittal to the Lending Institution

This application once signed must be sent to the Lending Institution with
the certified true copy of the Summary of Charges, the Executive
Summary, the Invoice Summary and the Invoice.

• Format

The Lending Institution Direct Application for Withdrawal must follow


the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 99


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

B.III.7 Lending Institution Direct Application for Withdrawal


Form L-20
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
IBRD – Project Management Office
1

THE WORLD BANK 2


1818 H Street, N.W. Washington DC 20433
APPLICATION FOR WITHDRAWAL
1. IBRD Loan No.: 3430 - PH . 3
or IDA Credit No.: _____________________
2. Confinaciers Ref. No.: __________________
IBRD/IDA Ref. No.:05-______ or 14 - 4
3. Application No.: DPWH – 719 .

Attention: Disbursement Division


Q
4. Please Pay Philippine Peso PhP 1,626,249.18 .

(Currency name) (Amount to be paid in figures)

We apply for this withdrawal from the account opened under the Loan or Development Credit Agreement, and hereby
certify and agree as follows:

A. The undersigned has not previously withdrawn from the Account to meet these expenditures. The undersigned
has not and does not intend to obtain funds for this purpose out of the proceeds of any other loan, credit, or grant;
B. The goods and services covered by this application have been or are being purchased in accordance with the terms
of the Agreement;
C. The expenditures have been made or are being made only for goods or services from eligible sources;
D. For those items where reimbursement is being claimed on the basis of a Statement of Expenditures (SOE), all
documentation authenticating these expenditures will be made available for review by auditors and World Bank
missions upon request. These documents have been retained at the location shown on the individual SOE sheet;
E. In the event that all or part of the funds withdrawn from the Account pursuant to this application are returned to
the World Bank, the undersigned hereby authorizes the World Bank to apply the current value of such funds as a
credit to the Account; or if the amount is small, apply such funds to the borrower’s next payment due for interest,
commitment charges, service charges or principal.

DETAILS OF EXPENDITURE PAYMENT INSTRUCTIONS


(use summary sheets if additional space is required or
if expenditures relate to more than one supplier,
category, or sub-project)
5. NAME AND ADDRESS OF CONTRACTOR 8. NAME AND ADDRESS OF PAYEE’S BANK
OR SUPPLIER (if different from payer) AND ACCOUNT NO. 999-088906-040 5
Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
Makati City

6. PROCUREMENT DETAILS
a) CONTRACT OR PURCHASE ORDER
6 NUMBER AND DATE
Consultancy Services - ICB 9. PAYEE NAME AND ADDRESS
b) DATE OF PROCUREMENT NO-
OBJECTION NOTICE (complete for
contracts above prior review limit)
BPR Consultants, Inc.
20 Ayala Avenue cor. Paseo de Roxsa
7
Salcedo Village
c)BRIEF DESCRIPTION OF GOODS, Makati City
8 WORKS OR SERVICES
Direct Payment
d) CURRENCY AND TOTAL AMOUNT OF
9 CONTRACT
PhP 84,892,756.00
e) TOTAL AMOUNT OF INVOICES
Q COVERED BY THIS APPLICATION (net
of retention and other deductions)
PhP 1,626,249.18
7. WITHDRAWAL DETAILS 10. If Payee’s Bank is not located in the Country whose
a) CATEGORY OR SUB-PROJECTS NO. currency is claimed, enter the name and address of
their bank’s correspondent in the country whose
currency is to be paid.
b) PERCENTAGE OF EXPENDITURES TO
BE FINANCED: BY THE WORLD BANK
10 SWIFT CODE:
CS = 100% 11. SPECIAL PAYMENT INSTRUCTIONS AND
INVOICE REFERENCES
11
BY COFINANCIER (if any)

12. By Republic of the Philippines 14. __________________________________________


13 Name of Borrower Signature(s) of Authorized Representative(s)
12
15. _________________________________________
13. ________________________________________
Print Name(s) and Title(s) of Authorized Representative(s)
Date

SUBMIT APPLICATION TO ADDRESS SHOWN ABOVE


For World Bank Use Only

Approved W/A No.


Form 1903 IE(1-92)
Krys/A:/M1/FORM.doc

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 100


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III.8 Preparation of Fund Utilization Report

The Implementing Office must attach Fund Utilization Report. This ensures
that Implementing Office is monitoring the project’s funding. CFMS will
attach Obligation Request applicable to the billing.

See sample report below:

B.III.8 Fund Utilization Report

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 101


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

PART C. PROGRESS BILLING – FOREIGN ..... 103


I. Introduction .................................................................. 103

II. Verification of Documents ........................................... 104


II.1. Verification of Supporting Summary Personnel .................... 104
II.2. Verification of Supporting Summary International Travel.... 109
II.3. Verification of Supporting Summaries for Other Recoverable
Cost......................................................................................... 117
II.4. Verification of Invoice Summary .......................................... 121
II.5. Verification of Progress Billing Invoice ................................ 124
II.6. Verification of Budgeted Balance Summary Sheet ............... 127
II.7. Verification of Letter - Request of Consultant ...................... 130

III. Preparation of Forms ................................................... 133


III.1. Preparation of Summary of Charges ...................................... 133
III.2. Preparation of Executive Summary ....................................... 136
III.3. Preparation of Disbursement Voucher ................................... 139
III.4. Preparation of Special Account Withdrawal Application...... 142
III.5. Preparation of the FCDU Transfer Slip ................................. 145
III.6. Preparation of Lending Institution Direct Application for
Withdrawal ............................................................................. 148

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

PART C. PROGRESS BILLING – FOREIGN


This section provides the information necessary to verify and process the progress
claim of the consultant, as provided in the contract between DPWH and the
consultant.

I. Introduction

This section contains the steps on how the Implementing Office will verify the
consultant billing for progress billing. It also includes the procedures in the
preparation of forms to be used.

The table below summarizes the steps and actions that need to be done by the
Implementing Office.

STEP ACTION
1 Check the submitted billing with supporting documents for
completeness. The billing for progress billing should have the
following supporting documents arranged as follows:

• Letter – Request of Consultant


• Invoice
• Invoice Summary
• Supporting Summary Personnel
• Supporting Summary International Travel
• Supporting Summary Other Recoverable Cost
• Budgeted Balance Summary

Note: For Lump-sum contracts, Supporting Summary Documents,


Time Sheets and Official Receipts are not required.
2 Verify the documents and attachments for accuracy and authenticity.
The process of verification is listed on the next section.
3 If the supporting documents/attachments are incomplete and/or the
documents listed above are inaccurate, the billing must be returned to
the concerned Consultant for completion or correction.
4 If the supporting documents are complete and accurate, the
Implementing Office must now prepare the required forms. The
procedure for preparation is listed on the Section III. – Preparation of
Forms
5 The billing documents must have appropriate approvals before
submitting them to Accounting for processing of payment.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 103


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II. Verification of Documents

The following section provides descriptions of the forms that need to be


verified by the Implementing Office before the preparation of other
documents.

Verification of Supporting Summary Personnel

• Checking Entries

ITEM ITEM DESCRIPTION


NO.
1 Project Name This must be the name of the project as
specified in the contract, including
acronym being used if possible.
2 Consultant This must be complete and correct
Information Consultants information such as name
of the company, address, telephone and
fax number and e-mail address as
specified in the contract.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
USD for US Dollars)-nnnn(must start
with 0000)].
4 Date This must be the Invoice date.
5 Category This must be the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose This must be the currency being billed
(e.g. US Dollars or UK Sterling Pounds
- in this case US Dollars).
7 From This must be the start date of the billing
period.
8 To This must be the end date of the billing
period.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 104


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO.
9 Name This must be the full name of the
personnel or consultants being billed
for the period. If there is any changes or
addition of personnel or consultants
named in the contract a copy of the
approved substitution or supplemental
contract must be provided. Project Staff
substitution does not require approval
from DPWH.
10 Designation This must be the position of the Foreign
Consultant as it specified in the
Contract.
11 Factor This must be the factor to be used in
determining the remuneration of each
consultant for the month covered. The
attached time sheet for each personnel
must be check thoroughly. The
numerator must indicate the number of
days worked by each personnel
(including holidays and travel days).
For months with 31 days, if a
Consultant worked for a full month the
factor should be 31/31, else the factor
will be the number of days worked over
30. For the month of February (i.e. 28
or 29 days), if a full month is worked
the denominator will be the actual days
of the month (i.e. 28 or 29), else the
denominator should be 30.
12 Monthly Rate This must be the monthly rate in
appropriate currency of each personnel
in accordance with the Contract.
13 Amount This must be the amount resulted from
multiplying to the corresponding
monthly rate (item 12) by the factor
(item 11) in two decimal places.
14 Total Factor This must be the sum of the factors
(item 11). ). For the Foreign
Consultants, this figure must be carried
over to Item-A of the Budgeted Balance
Summary, Form F-07.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 105


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO.
15 Total Amount This must be the total remuneration for
the month: equivalent to the sum of the
remuneration of each personnel in the
category (Item 13). This figure must be
carried over to Item-B of Form F-05.
16 Signature This has to have the signature of the
(Consultant) authorized representative of the
Consultant.
17 Name & This must be the name and the
Designation designation of the authorized
(Consultant) representative of the Consultant.
18 Signature (DPWH) This must be signed by the Head of the
DPWH implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be correct
and the attachments complete and
authentic.
19 Name & This must be the name and designation
Designation(DPWH) of the DPWH Head of the
Implementing Office.
20 Signature Date This must be the date when the
authorized representative of the
Consultant and the DPWH Head of the
Implementing Office sign this
document.

• Sample Format

Sample formats of the Supporting Summary Personnel and the


Monthly Time Sheet are given on the next pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 106


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.1 Supporting Summary – Personnel

Form F-01

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Personnel
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Title Factor Monthly Rate Total 13

Robert Doe Project Manager 31/31 $ 25,250.00 $ 25,250.00

Mary Houston BPR Analyst 31/31 $ 25,250.00 $ 25,250.00

John Pacino BPR Analyst 28/30 $ 17,320.00 $ 16,165.33

Arnold Gore Technical Specialist 29/30 $ 18,438.00 $ 17,823.40

A
10 14

11
B
15

TOTAL 117/30 /////////// $ 84,488.73

CERTIFIED CORRECT
16
DATE:
17 ROBERT DOE
ICB Project Manager 20

18 DATE:
JUAN MATAPAT
19 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 107


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.1 Supporting Summary – Personnel (Continuation)

Institutional Capacity Building (ICB) Project


Department of Public Works and Highway

Name: Arnold Gore


Position: Technical Specialist

Time Sheet for the Month of January, 2000

Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Manila T X X X X X X X X X X X X
U. S.

Location 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Manila X X X X X X X X X X X X X X X X

Codes: Totals: 29
X = Work Day _______________
T = Travel Day
Blank = Non-work Day

Arnold Gore Certified Correct:


Arnold Gore

eÉuxÜà WÉx
Robert Doe
ICB Project Manager

Juan Matapat
Juan Matapat
Project Director – PMO-ICB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 108


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Verification of Supporting Summary International Travel

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the project name as specified in
the contract, including acronym being used if
possible.
2 Consultant This must be the complete and accurate
Information Consultants information such as name of the
company, address, telephone, and fax number
and e-mail address as specified in the Contract.
3 Invoice Number This must be the Invoice number with this
format [Acronym-Currency (e.g. USD for US
Dollars)-nnnn (must start with 0000)].
4 Date This must be the Invoice Date.
5 Category This must be the category as used in the
contract or on any amendment or supplemental
agreement.
6 Purpose This must be the currency being billed (e.g. US
Dollars or UK Sterling Pounds - in this case
US Dollars).
7 From This must be the start date of the billing period.
8 To This must be the end date of the billing period.
9 Name This must be the name of the consultant being
billed for International Travel.
10 Description This must be the description of the travel
including the origin and the destination and the
date of travel. For other currencies not in
accordance with the Contract, the date of
purchase of the ticket and the corresponding
BSP conversion rate must also be described.
11 Amount This must be the amount being reimbursed for
the international travel. The currency that will
be used shall be the currency stipulated in the
contract. For other currencies not in
accordance with the contract the BSP
conversion rate at the date the ticket was
purchased (see C.II.3) shall be used.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 109


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
12 Total Amount This must be total amount by adding all the
amounts (Item 11) in the “Amount” column.
This figure must be carried over to Item-C of
the Invoice Summary, Form F-05.
13 Signature (Consultant) This has to have the signature of the authorized
representative of the Consultant.
14 Name & Designation This must be the name & designation of the
(Consultant) authorized representative of the Consultant.
15 Signature (DPWH) This must be signed by the Head of the DPWH
Implementing Office (e.g. Project Director)
after all the entries in this form has been
verified to be correct and the attachments
complete and authentic.
16 Name & Designation This must be the name and designation of the
(DPWH) DPWH Head of the Implementing Office.
17 Signature Date This must be the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing Office sign
this document.

• Sample Format

A sample format of the Supporting Summary International Travel and


the sample attachments are given on the next pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 110


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.2 Supporting Summary International Travel

Form F-02

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 International Travel
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


10

Name Description Amount 11


9 Arnold Gore Airfare(Manila-USA/Return) $ 2,928.45

C
12
TOTALS $ 2,928.45

CERTIFIED CORRECT
13
DATE:
14 ROBERT DOE
ICB Project Manager 17

15 DATE:
JUAN MATAPAT
16 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 111


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

• Attachments

The following documents must be attached to the Supporting Summary –


International Travel.

Should there be a need for currency conversion and for Accounting


purposes, following is the BSP online link for the reference.

C.II.3 Exchange Rate as per Bangko Sentral ng Pilipinas


( URL: http://www.bsp.gov.ph/statistics/statistics_online.asp )

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 112


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Attachment #1: Foreign Personnel Certification as to Purpose and


Cost of Travel – this is a mandatory attachment that should be issued by
the foreign personnel who made the travel.

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
nd
2 Street, Port Area, Manila
Tel. Nos: +63 2 303-3088 Fax. +63 2 303-3085

January 3, 2000

CERTIFICATION

This is to certify that the airline ticket invoiced to DPWH for Arnold Gore was used
specifically for the Institutional Capacity Building (ICB) Project and was used for no
other purpose. In addition, I certify that the amount invoiced to DPWH for the said ticket
is the actual amount paid.

Arnold Gore
Arnold Gore
ICB Project Manager
BPR Consultants, Inc.

Attachments: Certified true copy of the ticket

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 113


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Attachment #2: Certified true copy of the ticket and Original Invoice
– this attachment serves as the official receipt/invoice of the cost of
international travel for reimbursement. The attachments will depend on
the payment information shown in the plane ticket as enumerated below:

Case 1 – the plane ticket will be accepted as the receipt and invoice if
it shows the actual amount paid (e.g. if it was purchased using a credit
card for payment as shown in the Attachment #2-Sample A in the next
page).

Attachment #2-Sample A – Certified true copy of the plane ticket


with information on the actual amount paid (e.g. purchased by credit
card). The encircled information below shows that the ticket was paid
using a credit card.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 114


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Case 2 - if the plane ticket does not show the actual payment made for its
purchase as shown in Attachment #2-Sample B.1, a copy of the Original
Invoice must be added to the attachment (see Attachment #2–Sample
B.2).

Attachment #2-Sample B.1 – Certified true copy of the plane ticket


without information on the actual amount paid (need to include
original copy of the Invoice, refer to the next page).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 115


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Attachment #2-Sample B.2 – Original copy of the Invoice (must be


submitted in conjunction with Attachment #2-Sample B.1 in the
preceding page).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 116


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Verification of Supporting Summaries for Other Recoverable Cost

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the name of the project,
including acronym being used if
possible.
2 Consultant This must be the complete and accurate
Information Consultants information such as name of
the company, address, telephone and fax
number, and e-mail address.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
USD for US Dollars)-nnnn(must start
with 0000)].
4 Date This must be the Invoice Date.
5 Category This must be the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose This must be the currency being billed
(e.g. US Dollars or UK Sterling Pounds
- in this case US Dollars).
7 From This must be the start date of the billing
period.
8 To This must be the end date of the billing
period.
9 Date This must be the date of purchase/
procurement of the goods/services to be
billed.
10 Vendor This must be the vendor’s name or the
business name where the goods or
services to be billed has been purchased
or procured.
11 Description This must be the description of the
goods or services to be billed.
12 Amount This must be the amount of the
goods/services to be billed. The original
copy of the invoice, delivery receipt and
official receipt must be attached on this
form and in the order it is presented.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 117


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Total Amount This must be the sum of the amounts to
be billed (item 12). This amount is
carried over to the corresponding
categories in the Invoice Summary
(Form F-05) and the Budgeted Balance
Summary (Form F-07).
14 Signature This has to have the signature of the
(Consultant) authorized representative of the
Consultant.
15 Name & This must be the name and the
Designation designation of the authorized
(Consultant) representative of the Consultant.
16 Signature (DPWH) This must be signed by the Head of the
DPWH Implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be correct
and the attachments complete and
authentic.
17 Name & This must be the name and designation
designation of the DPWH Head of the Implementing
(DPWH) Office.
18 Signature Date This must be the date when the
authorized representative of the
Consultant and the DPWH Head of the
Implementing Office sign this
document.

• Sample Format

Sample formats of the Supporting Summaries for Other Recoverable


Cost are given on the next pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 118


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.3 Supporting Summary Other Recoverable Cost

Form F-03

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Equipments &
Salcedo Village, Makati City Softwares
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000

Date Vendor Description Amount


9 01/04/00 Good Guys Various computer equipments $ 90,000.00

10

11

12

TOTALS $ 90,000.00 13 D

CERTIFIED CORRECT
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 119


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form F-04

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Contingency
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000

Date Vendor/Name Description Amount


9 01/06/00 Microsoft Corporation Additional software for the $ 5,193.00
implementation of the DPWH
Communication Network
10

11

12

TOTALS $ 5,193.00
13 E

CERTIFIED CORRECT
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 120


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Verification of Invoice Summary

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the name of the project,
including acronym being used if
possible.
2 Consultant This must be the complete and accurate
Information Consultants information such as name of
the company, address, telephone and fax
number, and e-mail address.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
USD for US Dollars)-nnnn(must start
with 0000)].
4 Invoice Date This must be the Invoice Date.
5 Purpose This must be the currency being billed
(e.g. US Dollars or UK Sterling Pounds
- in this case US Dollars).
6 From This must be the start date of the billing
period.
7 To This must be the end date of the billing
period.
8 Date This must be the end date of the billing
period.
9 Categories This must be the categories as specified
in the Contract.
B-E Carry-over category This must be the applicable category
total totals from Form F-01 to F-04.
10 Grand Total This must be the sum of the Items B, C,
D and E in two decimal places. This
amount would be carried over to Item F
of the Progress Billing Invoice.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 121


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
11 Certifying Official This has to have the signature of the
Signature authorized representative of the
Consultant.
12 Certifying Official This must be the name and the
designation of the authorized
representative of the Consultant.
13 Recommending This must be signed by the Project
Official Signature Manager of the Implementing Office.
14 Recommending This must be the name and designation
Official of the Project Manager of the
Implementing Office.
15 Approving Official This must be signed by the Head of the
Signature DPWH Implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be correct
and the attachments complete and
authentic.
16 Approving Official This must be the name and designation
of the DPWH Head of the Implementing
Office.
17 Signature Date This must be the date when the
authorized representative of the
Consultant and the DPWH Head and
Project Manager of the Implementing
Office sign this document

• Sample Format

A sample format of the Invoice Summary is given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 122


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.4 Invoice Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 123


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Verification of Progress Billing Invoice

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Name of Project This must be the name of the project,
including acronym being used if
possible.
2 Consultant’s Information This must be the complete and accurate
Consultant’s information such as name
of the company, address, telephone and
fax number, and e-mail address.
3 Invoice Number This must be the Invoice number with
this format [Acronym-Currency(e.g.
USD for US Dollars)-nnnn(must start
with 0000)].
4 Invoice Date This must be the Invoice Date.
5 Currency/Purpose This must be the currency being billed
(e.g. US Dollars or UK Sterling Pounds
- in this case US Dollars).
6 From This must be the start date of the billing
period.
7 To This must be the end date of the billing
period.
8 Currency Symbol This must be the currency symbol (e.g.
$ for US Dollars) of the amount being
billed.
F Amount This must be the amount being billed in
figures to two decimal places. This is
the carry-over amount from Item 10 of
Form F-05.
9 Consultant Name This must be the company name of the
(Company) principal Consultant.
10 Bank Information This must be the bank and the account
information where the payments should
be made (i.e. Name of the bank,
Account Number, Bank Address, Sort
Code and the Swift Code).
11 Certifying Official This has to have the signature of the
Signature authorized representative of the
Consultant.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 124


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
12 Certifying Official This must be the name and the
designation of the authorized
representative of the Consultant.
13 Recommending Official This must be signed by the Head of the
Signature DPWH Implementing Office (e.g.
Project Director) after all the entries in
this form has been verified to be
correct.
14 Recommending Official This must be the name and designation
of the DPWH Head of the
Implementing Office.
15 Signature Date This must be the date when the
authorized representative of the
Consultant and the DPWH Head of the
Implementing Office sign this
document.
16 Attachments The entries here must be check with the
supporting summaries attachments with
this Invoice
17 Approving Official Signature of Approving
Signature Official for the Invoice
18 Approving Official Indicate the name of responsible
official (at least an Undersecretary) and
his designation approving the Invoice.
In the case of the first progress billing,
the Secretary must be the Invoice
approving official.

• Sample Format

A sample format of the Progress Billing Invoice is given on the next


page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 125


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.5 Progress Billing Invoice

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 126


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.6 Verification of Budgeted Balance Summary Sheet

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Project Name This must be the Name of the
project, including acronym being
used if possible.
2 Currency This must be the currency being
billed (e.g. US Dollars or UK
Sterling Pounds - in this case US
Dollars).
3 Note This must be any information that is
not applicable on the table of this
form such as if there is any Contract
Amendment or Supplemental
Agreement.
4 Category This must be categories as
stipulated on the contract.
5 Budgeted Amount This must be the budgeted amount
for each category. The amount
would include the amount in the
original contract plus any amount
added or subtracted thru Contract
Amendments or Supplemental
Agreement.
6 Budgeted Man- This must be the budgeted number
Months of man-months for
personnel/consultants.
7 Date This must be the last day of the
billing period.
8 This Invoice Amount This must be the corresponding
amount for each category. (See
items B, C, D, and E on Invoice
Summary).
A This Invoice Man- This must be the total number of
month man-months for the billing period
by converting the Overall total
factor (Item 14 of Form F-01) from
a fraction to a number with two
decimal places.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 127


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
9 Total-to-Date Amount This must be the total amount at the
end of this billing period for each
category. These amounts will be
equal to the total amount of
previous invoices plus the amount
for this billing period.
10 Total-to-Date This must be the total number of
Man- Months man-months at the end of this
billing period.
11 Balance Amount This must be the balance amount
for each category. These amounts
will be equal to the budgeted
amount (item 5) minus the total-to
date amount (item 9).
12 Balance This must be the balance of man-
Man-Months months for the personnel. This will
be equal to the budgeted man-
months (item 6) minus the total-to
date man-months (item 10).
13 Totals This must be the sum of each
column.
14 Certifying Official This has to have the signature of the
Signature authorized representative of the
Consultant.
15 Certifying Official This must be the name and the
designation of the authorized
representative of the Consultant.
16 Recommending This must be signed by the
Official Signature Implementing Office Project
Manager
17 Recommending This must be the name and
Official designation of the Implementing
Office Project Manager.
18 Approving Official This must be signed by the Head of
Signature the DPWH Implementing Office
(e.g. Project Director) after all the
entries in this form has been
verified to be correct.
19 Approving Official This must be the name and
designation of the DPWH Head of
the Implementing Office.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 128


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

• Sample Format

A sample format of the Budgeted Balance Summary Sheet is given


below.

C.II.6 Budgeted Balance Summary


nj

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 129


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

II.7 Verification of Letter - Request of Consultant

• Checking Entries

ITEM ITEM DESCRIPTION


NO
1 Consultant This must be the Consulting firms
Information information such as company name,
nature of business, address, telephone
and fax number (incl. country and
access code) and e-mail address.
2 Project Name This must be the name of the project.
3 Agency Name This must be the agency name (i.e.
Department of Public Works and
Highways, address and telephone
number).
4 Invoice Date This must be the date of preparation of
the invoice.
5 Attention The Invoice letter must be addressed to
the responsible official for the project
(at least a Project Director).
6 Reference This must be the type of service, name
of the project and the owner of the
project (i.e. DPWH).
7 Salutation This must be addressed to the
responsible official (see Item 5) of the
Department.
8 Invoice Number This must be the Invoice Number as it
appears on Item 3 of Form F-06.
9 Currency This must be the currency being billed
(e.g. US Dollars or UK Sterling Pounds
- in this case US Dollars).
10 Currency Symbol This must be the symbol of the currency
being billed (e.g. $, £, Php).
11 Company Name This must be the company name of the
(Consultant) principal consultant.
12 Bank Information This must be the bank and the account
information where the payments should
be made (i.e. Name of the bank,
Account Number, Bank Address, Sort
Code and the Swift Code)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 130


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
13 Signature This must be signed by the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager).
14 Name & This must be the name and the
Designation designation of the authorized
(Consultant) representative of the Consultant and the
Company Name.
F Total Invoice This must be the total amount of the
Amount Invoice. See Item 10 of Form F-05.

• Sample Format

A sample format of the Letter – Request of Consultant is given on the


next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 131


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.II.7 Letter – Request of Consultant

Form F-08

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
1 Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph
2
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
nd
3 2 Street, Port Area, Manila
Tel. Nos: +63 2 303-3088 Fax. +63 2 303-3085

4 February 2, 2000

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat, PMO-ICB Project Director 5


Reference: Technical Consulting Services for the Development and Implementation
6 of the Institutional Capacity Building (ICB) Project for the Department of 8
Public Works and Highways (DPWH)

7 Dear Mr. Matapat:

Attached is Invoice Number ICB-USD-0010 for US Dollars in the amount of


$182,610.68 for the period covering January 1-31, 2000.
10
9
F Please make US Dollar payments to:
BPR Consultants, Inc.
11 Account Number: 12345678
Banco Americana
100 Wilshire Blvd.
Los Angeles, CA 90002
12
Sort Code: 24 12 27
Swift Code: BANAMGMAA8JA

Your expeditious processing of this invoice would be appreciated.

Very truly yours,


13

Robert Doe
ICB Project Manager
14 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 132


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

III. Preparation of Forms

The following section provides description of the forms and the procedures
that must be followed by the Implementing Office for completing them.

The forms that must be completed are:

• Summary of Charges (C.III.1)


• Executive Summary (C.III.2)
• Disbursement Voucher (C.III.3)
• Special Account Withdrawal Application (C.III.4)
• FCDU Fund Transfer Slip (C.III.5)
• Lending Institution Direct Application for Withdrawal (C.III.6)

Note: For purely foreign currency billing, Fund Utilization Report is


required. (B.III.8 )

Preparation of Summary of Charges

• Definition/Purpose

The Summary of charges will be prepared by the Implementing Office


once all the submitted documents for the billing has been verified and
check for accuracy and authenticity. This will be signed by the Head of
the Implementing Office (i.e. Project Director) and will be approved by
the responsible official (at least an Assistant Secretary) with supervision
of the Project.

• Procedure

The Summary of Charges must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Name of the Project Indicate the name of the Project.
2 Period Covered Indicate the period covered by the billing
claim.
3 Currency Indicate the currency component (e.g.
Component Foreign Currency for US Dollars).
4 % Recoupment for Indicate the percentage being recouped for
Advance Payment the advance payment as specified in the
Contract. This figure is the percentage of
the contract given as an advance payment
to the Consultant, normally 20%.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 133


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
F Total Invoice Indicate the total invoice amount being
Amount billed, see Item 10 of the Invoice Summary
(Form F-05).
5 Amount of Indicate the amount to be recoup to pay for
Recoupment the advance payment. This is equivalent to
the percentage in Item 4 multiplied by the
total invoice amount (Item F) of invoice
being billed for the period. This will be
carried over to Item G of the Executive
Summary.
6 Amount Due This is equivalent to the Total Invoice
Consultant Amount (Item F) minus the Amount of
Recoupment (Item 5). This will be carried
over to Item P of the Executive Summary.
7 Total Previous This is equivalent to the total amount of
Billing progress billing claim previously billed for
the applicable currency or component.
8 Total Invoice to This is equivalent to the sum of the total
Date previous billing (Item 7) plus the total
invoice amount approved (Item F) for this
billing period. See Item 13 of the Budgeted
Balance Summary.
9 Contract Amount Indicate the contract amount of the project
in each of the appropriate currency. The
amount of supplemental contracts must be
included if there’s any.
10 Remaining Balance This is equivalent to the Contract Amount
(Item 9) minus the Total Invoice to-date
(Item 8).
11 Certifying Official Indicate the name of the responsible
personnel of the Implementing Office
(PRINTED) and his/her designation. The
personnel concerned must sign on top of
this section.
12 Approving Official Indicate the name of responsible official (at
least a Project Director) and his designation
approving the payment. The official
concerned must signed on top of this
section.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 134


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.III.1 Summary of Charges

• Format

The Summary of Charges must follow the format given below.

Form F-09

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila

1
INSTITUTIONAL CAPACITY BUILDING (ICB) PROJECT

SUMMARY OF CHARGES
2
3
PERIOD COVERED *** JANUARY 1-31, 2000 ***

2 Consultancy Fees (US Dollar Component) $ 182,610.68


January 1-31, 2000 $ 182,610.68 F
TOTAL CHARGES $ 182,610.68 G
Less: 20% Recoupment of Advance Payment
4 (20% x $ 182,610.68) $ 36,522.14 5
H
F
Amount Due Consultant $ 146,088.54 6
=================

Total Previous Billing $ 4,037,849.71 7


Total Invoiced To-Date $ 4,220,460.39
8
Contract Amount (Including SA#2 and SA#3) $ 5,467,476.00
9
Remaining Balance $ 1,247,015.61
10
Certified Correct:

JOSE MAGPAYO
PMO Project Manager II 11

APPROVED FOR PAYMENT:

JUAN MATAPAT
12 PMO Project Director

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 135


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Preparation of Executive Summary

• Definition/Purpose

The Executive Summary is a brief summary of the contractual


information of the project and the summary of the billing claim for the
period covered. The Implementing Office prepares this document to be
signed by the official (must be at least an Assistant Secretary) responsible
with the supervision of the project.

• Procedures

Executive Summary must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Reference No. Indicate the Invoice No. of the claim.
2 Date Indicate the date of preparation.
3 Thru Indicate the Department’s authorized
representative to sign the check, Special
Account Application or the Lending
Institution Direct Application for
Withdrawal.
4 Subject Indicate the currency being billed, the type
of services, the period of billing, the name
of the Consulting firm and the name of the
project.
5 Implementing Office Indicate the implementing office of the
project.
6 Reviewing Office Indicate the office responsible for the
review of the invoice.
7 Contractor Indicate the company name of the principal
consultant.
8 Contract Amount Indicate the contract amount of the project
in each of the appropriate currency. The
amount of supplemental contracts must be
included if there’s any.
9 Contract Time Indicate the contract duration of the project.
Any additional time due to supplemental
contracts must be included also.
10 Effectivity of Indicate the start of the project.
Contract
11 Contract Expiry Indicate the expected date of the
Date completion of the project as provided for in
the contract or the supplemental contracts.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 136


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
12 Remarks Indicate the currency being billed (e.g. US
Dollars or UK Sterling Pounds - in this
case US Dollars).
13 Period Covered Indicate the start date and the end date of
the billing period.
14 Percentage of Indicate the percentage of recoupment for
Recoupment the Advance Payment.
15 Endorsing Official Indicate the name and designation of the
Department’s responsible official (at least a
Project Director) to endorse the Executive
Summary. On top of this section the said
official must sign his/her name.
F Invoice Amount Indicate the total invoice amount being
billed, see Item 10 of the Invoice Summary
(Form F-05).
G Amount of See Item 5 of the Summary of Charges
Recoupment (Form F-09).
H Amount Due to See Item 6 of the Summary of Charges
Consultant (Form F-09).

• Format

The Executive Summary must follow the format given in the next
page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 137


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.III.2 Executive Summary


Form F-10

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
1
Reference No. _________________
Date: ________________________ 2

EXECUTIVE SUMMARY
For :: Secretary Gregorio
Rogelio L. 3
For Secretary R.Singson
Vigilar
Thru : U/Sec. Angel Malapitan
1. Subject: Invoice (in US Dollars) for Consultancy charges during the period January 1 - 4
31, 2000 in connection with BPR Consultants, Inc. Consultants’ Services Contract for the
development of the Institutional Capacity Building (ICB) Project.
5
2. Action Recommended : For Approval
3. Implementing Office : DPWH - Planning 6
4. Reviewing Office : CFMS
5. Contractor : BPR Consultants, Inc. 7
6. Contract Amount
(Including SA #2 and 8
SA #3) : P 84,892,756 (Local Currency Component)
$ 5,467,476 (US $ Currency Component) 9
£ 878,301 (UK Pounds Currency Component)
10
7. Contract Time : 38 Months and 17 days.
8. Effectivity of Contract : 14 April 1997. 11
9. Contract Expiry Date : 30 June 2000.
10. Remarks : 12
This Invoice is for Consultancy charges (US Dollar Component) during the
period January 1-31, 2000 13

Total Charges (Period: January 1-31, 2000) $ 182,610.68


F
Less: 20% Recoupment of Advance Payment
(20% x $ 182,610.68) 36,522.14 G
14 =============
H
Amount Due Consultant $ 146,088.54

JOSE MAKALINTAL 15
Designation

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 138


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Preparation of Disbursement Voucher

• Definition/Purpose

The Disbursement Voucher is the Department’s Official Payment


Document. This document is what CFMS uses to process the payment
request. This will be filled up first in the Implementing Office and will be
reviewed/processed in the CFMS.

• Procedures

The Implementing Office must fill up the upper portion of the


Disbursement Voucher with the following information:

ITEM ITEM DESCRIPTION


NO
1 Voucher Number Leave this blank, this will be filled by
the Accounting Division.
2 Date Indicate the date of preparation of this
document.
3 Name of Claimant; Bank This must be the name of the prime
Name and Address Consultant as specified in the
Contract. Indicate the Payee’s Bank
Name and address where the payment
will be deposited or sent.
3a TIN Indicate the TIN of Consultant
(format: 999-999-999-000).
4 Address of Claimant This must be the address of the prime
Consultant as specified in the
Contract.
5 Project ID Indicate the ID assigned to the Project.
6 Paying Agency Indicate DPWH and the Implementing
Office.
PARTICULARS OF PAYMENT
7 Purpose Indicate the payment purposes to
include the categories being billed for,
the type of the service and the name of
the project.
8 Exchange Rate Exchange Rate on the last day of the
billing period (C.II.3).
K Total Invoice Amount Indicate the total invoice amount being
billed, See Item K of the Invoice
Summary.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 139


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
K1 Total Invoice in Local Indicate the total invoice amount (K)
Currency multiplied by Exchange Rate (8).
9 Payable by Loan This is the amount that is payable by
Proceeds loan proceeds. It is equivalent to the
invoice covered by loan proceeds.
9a Payable by Loan This is the amount that is payable by
Proceeds in Local loan proceeds (9) multiplied by the
Currency Exchange Rate (8).
10 Payable by GOP This is the amount payable by the
Government of the Republic of the
Philippines (GOP) in figures through
this Voucher. It is computed as Total
Invoice in Local Currency (Item K1)
minus the amount payable by the Loan
Proceeds in Local Currency (Item 9a).
11 Payable by GOP in words Indicate the amount payable by GOP
in words.
12 Voucher Approving Indicate the name of responsible
Official official (at least an Undersecretary)
and his designation approving the
Voucher. In the case of the first
progress billing, the Secretary must be
the Voucher approving official.

• Format

Disbursement Voucher and source of currency conversion must follow


the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 140


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.III.3 Disbursement Voucher

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 141


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Preparation of Special Account Withdrawal Application

• Definition/Purpose

This document is being prepared by the Implementing Office to pay the


amount due to the Consultant from the Loan Proceeds thru the Special
Account, if applicable. This form will be prepared in conjunction with the
FCDU Fund Transfer Slip which will be discussed in the next section.
This form should only be used if payment is being paid out of the Special
Account.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Application No. Leave this blank, CFMS will supply
this number after the claims has been
reviewed and endorsed for approval of
payment.
2 Date Indicate the date of preparation of this
document.
3 Local Bank Indicate the name and address of the
branch of local bank where the Special
Account is setup. This can be obtained
from CFMS.
4 Attention Indicate the name and the position of
the responsible official of the Local
Bank. This can be obtained from
CFMS.
5 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
6 Program Name and Loan Indicate the name of the program as
No. approved by the Lending Institution
and the Loan No.
7 Amount payable from Indicate the amount payable from the
Loan Proceeds in words Loan proceeds (See Item No. 6 of the
Summary of Charges– Form F-09) in
word.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 142


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
H Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds (See Item No. 6 of the
Summary of Charges– Form F-09) in
figures.
8 Account No. Indicate the Account No. of the
Special Account.
9 Payee Indicate the company name of the
principal Consultant.
10 Payee Account No. Indicate the Payee’s Bank Account
No. and other bank information (e.g.
Sort Code and Swift Code) where the
payment will be deposited or sent.
11 Bank Name and Address Indicate the Payee’s Bank Name and
address where the payment will be
deposited or sent.
12 Remarks Place the payment purposes to include
the categories being billed for, the type
of the service, the name of the project
and the period being billed for
payment.
13 Budget Information Leave this blank, this will be filled out
by the CFMS.
14 Head of the Implementing Indicate the name and designation of
Office the Head of the Implementing Office.
The official concerned must sign this
on top of this section.
15 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.

• Format

The Special Account Withdrawal Application must follow the format on


the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 143


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.III.5 Special Account Withdrawal Application


Form F-11
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Application No: 1
IBRD – Project Management Office

Date: _____________________

CARP BANK OF THE PHILIPPINES 4


Intramuros Branch
3 Intramuros, Manila
5
Attention : Mr. ROMEO MANLANGIT - Manager

Subject : Account No. 0025-0024-79 6


SA Highway Management Project
Loan 3430-PH

Sir:
7
Pursuant to the provision of DBM/DOF/COA Joint Circular No. 2-97 dated 21 March 1997,
please debit the amount of US$ ONE HUNDRED EIGHTY TWO THOUSAND SIX HUNDRED
TEN & 68/100 ONLY ( $ 182,610.68) from Account No. 0025-0024-79 under the working fund
for credit to the account of (Telegraphic Payment).
8
H
PAYEE : BPR Consultants, Inc 9
ACCOUNT NO. : 12345678 SORT CODE: 24 12 27 SWIFT CODE: BANAMGMAA8JA
BANK : Banco Americana 10
ADDRESS : 100 Wilshire Blvd., Los Angeles, CA 90002
11
REMARKS : Payment for Consultancy charges (US Dollar Component) during the period
January 1-31, 2000 in connection with the Consultancy Services Contract for the 12
Institutional Capacity Building (ICB) Project, under the Highway Management
Project (HMP)

Advise of Allotment No. : ___________________________________


Dated : ___________________________________ 13
Obligation No. : ___________________________________
N C A No. : ___________________________________

Very truly yours,

14
JUAN MATAPAT
PMO-ICB, Project Director
15 APPROVED:

PEDRO MAUNAWAIN ANGEL MALAPITAN


Undersecretary Undersecretary
Authorized Signatory Authorized Signatory

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 144


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Preparation of the FCDU Transfer Slip

• Definition/Purpose

This document is the prescribed form by the Local Bank where the
Special Account is deposited. This form will be prepared in conjunction
with the Special Account Withdrawal Application in order to transfer the
amount of payment to the Consultant’s Bank Account. This form should
only be used if the payment is being paid out of the Special Account.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of preparation of this
document.
2 Foreign Currency Indicate an “X” in the appropriate box
of the Foreign Currency payment
requested as specified in the Contract.
3 Mode of Payment Indicate an “X” or check mark the
preferred mode of payment by the
Consultant.
4 Consultant Information Indicate the company name and the
address of the principal consultant.
5 Amount payable from Indicate the amount payable from the
Loan Proceeds in words Loan proceeds (See Item No. 6 of the
Summary of Charges– Form F-09) in
word.
H Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds (See Item No. 6 of the
Summary of Charges– Form F-09) in
figures.
6 For Charges Indicate an “X” or a check mark on
the Debit box.
7 Account No. Indicate the Account No. of the
Special Account. This can be obtained
from CFMS.
8 Payee Account No. Indicate the Payee’s Bank Account
No. and other bank information (e.g.
Sort Code and Swift Code) where the
payment will be deposited or sent.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 145


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
9 Bank Name and Address Indicate the Payee’s Bank Name and
address where the payment will be
deposited or sent.
10 Payment Details Indicate the particular office of the
Department that manages the Special
Account and the corresponding
Application No. (see Item No. 1 of the
Special Account Withdrawal
Application – Form F-11).
11 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.

• Format

The FCDU Fund Transfer Slip must follow the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 146


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.III.6 FCDU Fund Transfer Slip


Form F-12

DATE:

CARPBANK FCDU FUND TRANSFER SLIP


3 2
For multiple transactions, please use one form for each transaction type and check applicable box below:

; Telegraphic Transfer † Demand Draft † Traveler’s Check In Foreign Currency ; US$ † JPY † Others UK Pounds Sterling
PAYEE/ADDRESS/TEL.NO. SOURCE OF FUND TRANSFER
BPR Consultants, Inc. - ICB Cash

4 20 Ayala Ave. cor. Paseo de Roxas On-Us LBP Check No. ________________________________________
Salcedo Village, Makati City Debit my/our Savings/Current Account No. ________________________

5 Philippines 6
AMOUNT IN WORDS/FIGURES: FOR CHARGES:

ONE HUNDRED EIGHTY TWO THOUSAND SIX † Cash

HUNDRED TEN & 68/100 US DOLLARS ONLY † On-Us LBP Check No. ________________________________________

(US $ 182,610.68) ;
H Debit my/our Savings/Current Account No. 0014-0024-80
7
FOR TELEGRAPHIC TRANSFER SPECIAL INSTRUCTION:

V A L I D A T I O N
Payee’s Account No. 12345678 Sort Code: 24 12 27
Swift Code: BANAMGMAA8JA 8
Paying Bank’s Name & Address:

9 BANCO AMERICANA
100 Wilshire Blvd. 10
Los Angeles, CA 90002

I/We hereby agree to be bound by the terms and conditions on the reverse side hereof.

11

T E L L E R’ S
In case payment is debited to a joint account, I/We also hereby declare under penalties of perjury
that my/or co-depositor/s is/are still living.

Payment Details I/We hereby authorize ______________________________________________________ whose


signature appears below to receive the Demand Draft/Traveler’s Check applied for.
DPWH-PMO-IBRD NO.
Third Currency US Dollar Phil. Peso
Face Amount
Exchange Rate PEDRO MAUNAWAIN ANGEL MALAPITAN
US$ Amount UNDERSECRETARY UNDERSECRETARY
Add: Bank Commission SIGNATURE OF REPRESENTATIVE SIGNATURE OVER PRINTED NAME OF APPLICANT
Corr. Bank Charges DD/TC/OTT NO. PREPARED BY: CHECKED BY:
Cable
Others SIGNATURE VERIFIED BY: BALANCE VERIFIED BY: APPROVED BY:
Total
COPY 1 – ACCTG. DIV. 2-CASHIERING DIV. 3-CLIENT (All savings withdrawals must be accompanied by a passbook. This shall serve as your receipt when machine validated)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 147


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

Preparation of Lending Institution Direct Application for Withdrawal

• Definition/Purpose

This document is the prescribed form by the Lending Institution if the


payment to the Consultant from the Loan Proceeds will be withdrawn
directly from the Lending Institution (instead of the Special Account).
The example provided is for World Bank Direct Application for
Withdrawal.

• Procedures

This document must be prepared by the Implementing Office with the


following information:

ITEM ITEM DESCRIPTION


NO
1 Lending Institution Indicate the name of the lending
institution and its address.
2 Loan No. Indicate the Loan No.
3 Application No. Leave this blank, CFMS will fill this
up in accordance with their record.
4 Currency Indicate the currency being billed for
(e.g. US Dollars or UK Sterling
Pounds - in this case US Dollars).
H Amount payable from Indicate the amount payable from the
Loan Proceeds in figures Loan proceeds (See Item No. 6 of the
Summary of Charges– Form F-09) in
figures.
5 Payees Bank Information Indicate the name and address of the
Bank and the Consultant’s Account
No. where the payment will be sent.
6 Purchase Order Indicate the type of work done (e.g.
Consultancy Services).
7 Payee Information Indicate the company name and
address of the principal Consultant.
8 Description of Services Indicate “Direct Payment”.
9 Total Amount of Contract Indicate the total amount of contract to
include Contract Amendment and
Supplemental Agreement and the
corresponding currency.
10 Percentage financed from Indicate the percentage of the Contract
Loan Proceeds being financed out of Loan Proceeds.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 148


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO
11 Signature of Authorized The authorized official will sign this
Representative form once the CFMS has endorsed for
approval the billing claims.
12 Authorized Signatory Indicate the name of the responsible
official (at least an Assistant
Secretary) authorized to sign this
application. The concerned officials
will sign this form once the CFMS has
endorsed for approval the billing
claims.
13 Date Leave this blank, the authorized
representative must indicate the date
he/she signed for approval this
application.

• Transmittal to the Lending Institution

This application once signed must be sent to the Lending Institution with
the certified true copy of the Summary of Charges, the Executive
Summary, the Invoice Summary and the Invoice.

• Format

The Lending Institution Direct Application for Withdrawal must follow


the format on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 149


CONSULTANCY BILLING GUIDELINES (IMP. OFFICE)

C.III.7 Lending Institution Direct Application for Withdrawal

Form F-13
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
IBRD – Project Management Office 1

THE WORLD BANK 2


1818 H Street, N.W. Washington DC 20433
APPLICATION FOR WITHDRAWAL
1. IBRD Loan No.: 3430 - PH .
3
or IDA Credit No.: _____________________
2. Confinaciers Ref. No.: __________________
IBRD/IDA Ref. No.:05-______ or 14 - 4
3. Application No.: DPWH – 718 .

Attention: Disbursement Division


H
4. Please Pay U.S. Dollar USD 146,088.54 .

(Currency name) (Amount to be paid in figures)

We apply for this withdrawal from the account opened under the Loan or Development Credit Agreement, and hereby
certify and agree as follows:

A. The undersigned has not previously withdrawn from the Account to meet these expenditures. The undersigned
has not and does not intend to obtain funds for this purpose out of the proceeds of any other loan, credit, or grant;
B. The goods and services covered by this application have been or are being purchased in accordance with the terms
of the Agreement;
C. The expenditures have been made or are being made only for goods or services from eligible sources;
D. For those items where reimbursement is being claimed on the basis of a Statement of Expenditures (SOE), all
documentation authenticating these expenditures will be made available for review by auditors and World Bank
missions upon request. These documents have been retained at the location shown on the individual SOE sheet;
E. In the event that all or part of the funds withdrawn from the Account pursuant to this application are returned to
the World Bank, the undersigned hereby authorizes the World Bank to apply the current value of such funds as a
credit to the Account; or if the amount is small, apply such funds to the borrower’s next payment due for interest,
commitment charges, service charges or principal.

DETAILS OF EXPENDITURE PAYMENT INSTRUCTIONS


(use summary sheets if additional space is required or
if expenditures relate to more than one supplier,
category, or sub-project)
5. NAME AND ADDRESS OF CONTRACTOR 8. NAME AND ADDRESS OF PAYEE’S BANK
OR SUPPLIER (if different from payer) AND ACCOUNT NO. 12345678
Banco Americana 5
100 Wilshire Blvd.
Los Angeles, CA 90002

6. PROCUREMENT DETAILS SWIFT CODE: BANAMGMAA8JA


6 a) CONTRACT OR PURCHASE ORDER
NUMBER AND DATE
SORT CODE : 24 12 27

Consultancy Services - ICB 9. PAYEE NAME AND ADDRESS


b) DATE OF PROCUREMENT NO-
OBJECTION NOTICE (complete for BPR Consultants, Inc. 7
contracts above prior review limit) 20 Ayala Avenue cor. Paseo de Roxsa
Salcedo Village
8 c)BRIEF DESCRIPTION OF GOODS, Makati City
WORKS OR SERVICES
Direct Payment
9 d) CURRENCY AND TOTAL AMOUNT OF
CONTRACT
USD 5,467,476.00
e) TOTAL AMOUNT OF INVOICES
H COVERED BY THIS APPLICATION (net
of retention and other deductions)
USD 146,088.54
7. WITHDRAWAL DETAILS 10. If Payee’s Bank is not located in the Country whose
a) CATEGORY OR SUB-PROJECTS NO. currency is claimed, enter the name and address of
their bank’s correspondent in the country whose
currency is to be paid.
b) PERCENTAGE OF EXPENDITURES TO
10 BE FINANCED: BY THE WORLD BANK
SWIFT CODE: 11
CS = 100% 11. SPECIAL PAYMENT INSTRUCTIONS AND
INVOICE REFERENCES
BY COFINANCIER (if any)

13 12. By Republic of the Philippines 14. __________________________________________ 12


Name of Borrower Signature(s) of Authorized Representative(s)

15. _________________________________________
13. ________________________________________
Print Name(s) and Title(s) of Authorized Representative(s)
Date

SUBMIT APPLICATION TO ADDRESS SHOWN ABOVE


For World Bank Use Only

Approved W/A No.


Form 1903 IE(1-92)
Krys/A:/M1/FORM.doc

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 150


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

PART D. FINAL PAYMENT ............................... 152


I. Introduction ................................................................ 152

II. Verification of Documents ......................................... 153


II.1 Verification of Applicable Forms and Attachments in Part B
and Part C .............................................................................. 153
II.2 Verification of BIR Clearance (Form 2555)......................... 153
II.3 Verification of the Inventory and Costing of Turned-over
Equipments ........................................................................... 155

III. Preparation of Forms ................................................. 159


III.1 Applicable Forms and Attachments in Part B and Part C .... 159
III.2 Other Required Forms .......................................................... 159

IV. Attachment ................................................................. 170

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

PART D. FINAL PAYMENT


This section provides the information necessary to verify and process the final
payment claim of the consultant, as provided in the contract between DPWH and
the consultant.

I. Introduction

This section contains the steps on how the Implementing Office will verify the
additional requirement on the consultant billing for final payment. The
applicable documents and attachments described in the Progress Billing
described in Part B and Part C for local and foreign currency respectively, are
also required in the preparation of the Final Payment. It also includes the
procedures in the preparation of additional forms to be used.

The table below summarizes the steps and actions that need to be done by the
Implementing Office

STEP ACTION
1 Check the submitted billing with supporting documents for
completeness. The claim for final payment should have the following
supporting documents discussed for Progress Billing in Part B and Part
C for local and foreign currency with the addition of BIR Clearance
(Form 2555) and the Inventory and Costing of Turned-over equipment
bought out of project funds and Invoice Receipt for said assets.
2 Verify the documents and attachments for accuracy and authenticity.
The process of verification for documents and attachments shall be the
same with the ones discussed under Part B and Part C. The process of
verification for BIR Clearance (Form 2555) and the Inventory and
Costing of Turned-over equipment bought out of project funds and the
Invoice Receipts is discussed in next page.
3 If the supporting documents/attachments are incomplete and/or the
documents listed above are inaccurate, the billing must be returned to
the concerned Consultant for completion or correction.
4 If the supporting documents are complete and accurate, the
Implementing Office must now prepare the required forms. The
procedure for preparation is listed on the Section III. – Preparation of
Forms of Part B and Part C
5 The billing documents must have appropriate approvals before
submitting them to Accounting for processing of payment.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 152


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

II. Verification of Documents

The following section provides descriptions of the forms that need to be


verified by the Implementing Office before the preparation of other
documents.

II.1 Verification of Applicable Forms and Attachments in Part B and Part C

The steps and processes in verifying the applicable documents in Part B and
Part C submitted by the Consultant will be the same as described in the said
sections.

II.2 Verification of BIR Clearance (Form 2555)

The Consultant must accomplish and attach the BIR Clearance Form 2555 as
part of the Final Payment requirement. The attachment must be original and
duly received by BIR.

• Checking Entries

ITEM ITEM DESCRIPTION


NO.
1 Consultant This must be the Consultant Name,
Information Address, TIN, and RDO.
2 Project Information This must be Project Information
including the Name and Location.
3 Contract Information This must be the detail of the contract
including the contract amount, and
amounts previously collected and taxes.

Sample of BIR Form 2555 is shown on the following page:

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 153


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.II.1 BIR Clearance (Form 2555)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 154


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

II.3 Verification of the Inventory and Costing of Turned-over Equipments

The previous Invoices submitted by the Consultant and the Contract


including amendments and supplemental agreement must be
thoroughly checked for all the equipment bought out of project funds.
All these equipments must be included in the Inventory submitted by
the Consultant and will form part of the claim for Final Payment.

• Checking Entries

ITEM ITEM DESCRIPTION


NO.
1 Project Name This must be the project, including
acronym being used if possible.
2 Consultant This must be the name of the principal
Consultant.
3 Item This must be the description of the
equipment/item bought out of project
funds. The Serial No. of the equipment
if there’s any must also be included.
The items must match the items bought
out of project funds as shown/described
on the invoices claimed by the
Consultant as allowed in the Contract or
any amendment and supplemental
agreements entered into by the DPWH
and the Consultant.
4 Quantity This must be the quantity of the
particular equipment/item bought out of
project funds.
5 Unit Price This must be the unit price of the
particular equipment/item bought out of
project funds. The unit must price must
include the currency it was billed.
6 Amount This must be the total amount spent for
a particular equipment/item. This will
be the quantity (Item 4) multiplied by
the unit price (Item5).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 155


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

ITEM ITEM DESCRIPTION


NO.
7 Date Invoiced This must be the date the particular
equipment/item bought out of project
funds was invoiced or reimbursed from
the Project.
8 Date Purchased This must be the date of purchased of
the particular equipment/item bought
out of project funds as it shows in the
official receipt.

• Sample Format

Sample formats of the Inventory and Costing of Turned-over


Equipment and supporting document are given on the next pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 156


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.II.2 Inventory and Costing of Turned-over Equipment

Institutional Capacity Building (ICB) Project 2


1 Under Contract with BPR Consultants, Inc.
Inventory of Turned-over Equipments 5
3
6
4 Date Date
Qty. Item Unit Price Amount
Purchased Invoiced
5 Compaq Deskpro 2000 – $2,229.00 $11,145.00 16-Mar-00 Mar-00
Pentium II/233 MHz with 7
15" Color Monitor

CPU Serial # Monitor SN


Item #1 7815BMJ20160 826CF03DA284 8
Item #2 7815BMJ20241 826CF03DA925
Item #3 727BD26ED385 7815BMJ20238
Item #4 7816BMJ20060 727BD26ED381
Item #5 7815BMJ20238 826CF03DA055

2 APC Back 650MI Back- $155.00 $310.00 16-Mar-00 Mar-00


UPS
#1: SN QS9932224578
#2: SN QS9933122384
1 Compaq Proliant 5500 $9,482.50 $9,482.50 10-Apr-00 Apr-00
Xeon Pentium III 550Mhz
CPU SN: 3862C701
Monitor SN: 802BF23AD
1 Additional Xeon
Processor 550Mhz $2,028.00 $2,028.00 10-Apr-00 Apr-00
1 Additional 256 MB $999.00 $999.00 10-Apr-00 Apr-00
1 Additional 512 MB $1,901.00 $1,901.00 10-Apr-00 Apr-00
1 Compaq 4/8 DAT Tape
Drive $824.00 $824.00 10-Apr-00 Apr-00
2 Canon BJC-50 Printer
with cable
#1: SN AGQK049509
#2: SN AGQK043615 $346.73 $693.46 31-May-00 May-00
1 MS Office 97 Pro. $651.75 $651.75 20-Aug-97 Aug-97
1 ABC Flowchart 7.0 Up $158.99 $158.99 3-Oct-97 Oct-97
1 Norton Anti-virus for
Windows 95, 3.1 and DOS $72.07 $72.07 3-Oct-97 Oct-97
32 MS Office 97 Standard $544.00 $17,408.00 24-Dec-97 Dec-97
32 Norton Utilities for
Windows 95 V2.0 $91.00 $2,912.00 24-Dec-97 Dec-97
1 Samsung Air-Con 2.0 HP
SN 046407310 P 18,500.00 P 18,500.00 19-Jan-98 Jan-98
1 Copying Machine DC-
1856
SN 37034219 P 128,350.00 P 128,350.00 16-Apr-98 Apr-98
24 EXM 402 - Jr. Executive
Chair - Low Back P 3,450.00 P 82,800.00 19-Jan-98 Jan-98
18 CD 102 - Computer Table P 3,410.00 P 61,380.00 18-Mar-98 Mar-98
4 NCT 1895 - Conference
Table - 6 seater P 6,600.00 P 26,400.00 20-Mar-98 Mar-98

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 157


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

• Attachment

The sample format below will be the basis by the Supply and Property
Management Division (SPMD) together with the Inventory in the
issuance of the Property Clearance. If the equipments will be turned-over
to the SPMD at the completion of the project, there is no need for this
document.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 158


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

III. Preparation of Forms

The following section provides description of the forms and the procedures
that must be followed by the Implementing Office for completing them.

III.1 Applicable Forms and Attachments in Part B and Part C

• Definition /Purpose
The Implementing Office will prepare the same forms described in
Part B and Part C. However, these are not the only forms to be
prepared to process the claims for final payment. These additional
forms are discussed in the next Section.

• Procedure
The information requirement and procedures in the preparation of the
applicable forms in Part B and Part C and its attachments will be the
same as discussed in those Sections.

III.2 Other Required Forms


The additional forms that must be completed are:
• Implementing Office Certificate of Clearance (D.III.2.a)
• Memo-Request to SPMD for the Issuance of SPMD Clearance
Certificate on Property Accountability (D.III.2.b)
• Certificate of Project Completion (D.III.2.c)
• Certification per Department Order No. 55 series of 1988
(D.III.2.d)
• Transmittal of Contract Documents re Final Completion of
Consulting Services duly received by Commission on Audit
(COA) with attached COA Checklist properly complied
(D.III.2.e)

III.2.a Preparation of the Implementing Office Certificate of Clearance

• Definition /Purpose
This Clearance is a pre-requisite by the Supply and Properties
Management Division (SPMD) for the issuance of the SPMD
Clearance Certificate on Property Accountability. It is issued by the
Head of the Implementing Office (at least a Project Director)
certifying that as per their records the Consultant has no property,
supply and financial accountabilities.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 159


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

• Procedure

The Implementing Office Certificate of Clearance must contain the


following information.

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of the preparation of the
Clearance
2 Consultant Indicate the company name of the principal
Consultant
3 Name of the Project Indicate the name of the Project
4 Loan Name/ No. Indicate the name of the loan package and
the loan number if applicable.
5 Head of the Indicate the name and designation of the
Implementing Office head of implementing office. The official
concerned must sign at the top of his/her
printed name.

• Format

The Implementing Office Certificate of Clearance must follow the


format given in the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 160


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.III.2.a Implementing Office Clearance Certificate

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
O FFICE O F THE SECRETARY
Manila
1

October 5, 2000
2

CLEARANCE CERTIFICATE

TO W HOM IT M AY CONCERN:
3
This is to certify that as per records of this Office, BPR CO NSULTANTS,
INC., Consultant of the Institutional Capacity Building (ICB) Project under the
IBRD-assisted Highway M anagem ent Project (Loan No. 3430-PH), has no property,
supply and financial accountabilities to our Office in connection with the said project.

4 This Certification is being issued as per request of the ICB in connection with
their claim for Final Paym ent on the above-m entioned project.

5
Juan M atapat
JUAN M ATAPAT
PM O Project Director

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 161


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

III.2.b Preparation of Memorandum –Request to SPMD for the


Issuance of the SPMD Clearance Certificate on Property
Accountability

• Definition /Purpose

This will be used in requesting the SPMD for the issuance of a


Clearance Certificate on Property Accountability as one of the pre-
requisite by the CFMS in processing the claim for Final Payment by
the Consultant.

• Procedure

The Inventory and Costing of Turned-over Equipment and certified


true copies of the Invoice Receipts must be attached to this Memo-
Request. The Memo-Request must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of the preparation of the
Clearance.
2 Consultant Indicate the company name of the principal
Consultant.
3 Name of the Project Indicate the name of the Project.
4 Head of the Indicate the name and designation of the
Implementing Office head of implementing office. The official
concerned must sign at the top of his/her
printed name.

• Format

The Memorandum –Request to SPMD for the Issuance of the SPMD


Clearance Certificate on Property Accountability must follow the
format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 162


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.III.2.b Memorandum –Request to SPMD for the Issuance of the SPMD


Clearance Certificate on Property Accountability

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
1

October 5, 2000

MEMORANDUM

FOR: The Director


AMMS
This Department
2
Attn: The Division Chief
Supply and Property Mgmt. Division

SUBJECT: SPMD Clearance Certificate on Property Accountability


for BPR CONSULTANTS, INC. on the Consultancy
Services Contract of the Institutional Capacity Building
(ICB) Project

In connection with the processing of the Final Payment for BPR 3


CONSULTANTS, INC. on the just completed Consultancy Services Contract for the
development and implementation of the Institutional Capacity Building (ICB)
Project, we would like to request for the issuance of the SPMD Clearance on
Property Accountability for the said project.

Attached for your reference are the Clearance Certificate from this Office and
copies of the Invoice Receipts of Properties turned-over in connection with the
implementation of the said project.

Your cooperation on this matter will be highly appreciated.

Juan Matapat
JUAN MATAPAT
PMO Project Director

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 163


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

III.2.c Preparation of Certificate of Project Completion

• Definition /Purpose

This document will be prepared by the Implementing Office and must


be signed by the Head of Implementing Office once the Consultant
has satisfactorily completed and turned-over all the Contract
requirement and deliverables.

• Procedure

The Certificate of Project Completion must contain the following


information.

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of the preparation of the
Clearance
2 Consultant Indicate the company name of the principal
Consultant
3 Name of the Project Indicate the name of the Project
4 Head of the Indicate the name and designation of the
Implementing Office head of implementing office. The official
concerned must sign at the top of his/her
printed name.

• Format

The Certificate of Project Completion must follow the format given


on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 164


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.III.2.c Certificate of Project Completion

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
1
October 6, 2000

CERTIFICATE OF COMPLETION

2
TO WHOM IT MAY CONCERN:
3
This is to certify that, per records of this Office, and in accordance with the
Contract and the corresponding Terms of Reference for the Institutional Capacity
4
Building (ICB) Project under the IBRD-assisted Highway Management Project
(Loan No. 3430-PH), BPR CONSULTANTS, INC. has satisfactorily completed and
turned-over to the DPWH all contract requirements and deliverables.

This certification is issued upon the request of BPR CONSULTANTS, INC. in


support of their claim for final payment for the above-mentioned project.

Juan Matapat
JUAN MATAPAT
PMO Project Director

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 165


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

III.2.d Preparation of Certification per Department Order No. 55 Series


of 1988

• Definition /Purpose

This document will be prepared by the Implementing Office and must


be signed by the Head of Implementing Office certifying that all the
requirements and supporting papers pursuant to Department Order
No. 55, Series of 1988 have been complied with, reviewed and found
in order by the Implementing Office.

• Procedure

The Certification per Department Order No. 55 Series of 1988 must


contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date of the preparation of the
Certification
2 Name of the Project Indicate the name of the Project
3 Consultant Indicate the company name of the principal
Consultant
4 Claims Indicate the currency, amount in words and
in figures the claims for Final Payment.
5 Head of the Indicate the name and designation of the
Implementing Office head of implementing office. The official
concerned must sign at the top of his/her
printed name.

• Format

The Certification per Department Order No. 55 Series of 1988 must


follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 166


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.III.2.d Certification per Department Order No. 55 Series of 1988

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
1
October 9, 2000

CERTIFICATION
2

In connection with the implementation of the Consultancy Services Contract of


3 the INSTITUTIONAL CAPACITY BUILDING (ICB) PROJECT, this is to certify
that BPR CONSULTANTS, INC. has submitted all the documentary requirements for
the processing of following Final Payment Claim, viz: 4

Currency Amount in Words Amt. (Figures)


Philippine Peso NINE HUDRED SIXTY EIGHT
THOUSAND SEVEN HUNDRED SIX &
91/100 PESOS P 968,706.91
US Dollars THREE HUNDRED FIVE THOUSAND
EIGHT HUNDRED EIGHT & 02/100 US
DOLLARS $ 305,808.02
UK Pounds Sterling FIFTY EIGHT THOUSAND FIVE
HUNDRDED SIXTY EIGHT & 82/100 UK
POUNDS STERLING £ 58,568.82

This is to certify further that all requirements and supporting papers pursuant to
Department Order No. 55, series of 1988 have been complied with, reviewed and found 5
to be in order.

Juan Matapat
JUAN MATAPAT
PMO Project Director

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 167


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

III.2.e Transmittal of Contract Documents re Final Completion of


Consulting Services duly received by Commission on Audit
(COA) with attached COA Checklist properly complied

The Implementing Office must see to it that Transmittal of Contract


Documents re Final Completion of Consulting Services is provided
for inclusion on the Final Payment claim. It must be received by COA
and the corresponding Checklist of Requirements under COA Circular
No. 2009-002 dated May 18, 2009 must be complied.

The COA checklist include:

1. Procurement Program/Program of Work which is basically the


Terms of Reference (TOR);
2. Certificate of Availability of Funds (CAF);
3. Advertisements in newspapers of general circulation
4. Abstract of bids supported by winning bidder’s offer and bid
tenders of other participants;
5. Letter of Award/Notice to Proceed;
6. Performance Bond of Winning Bids
7. Contract (original);
8. Certificate of Completion;
9. Original Invoice/Official Receipts

Sample Transmittal is given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 168


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.III.2.e Transmittal of Contract Documents re Final Completion of


Consulting Services duly received by Commission on Audit (COA)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 169


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

IV. Attachment

The Implementing Office must see to it that the SPMD Clearance Certificate
on Property Accountability is provided for inclusion on the Final Payment
claim to be sent to the CFMS.

• Definition /Purpose

This document must be secured by the Consultant and the Implementing


Office from the Supplies and Property Management Division (SPMD) of
AMMS certifying that the Consultant has no property and/or money
accountability with SPMD-AMMS.

• Procedure

This Document will be released by the SPMD after their representative,


the Consultant representative and the Implementing Office
representative has already conducted an inventory of the turned-over
equipment bought out of the project funds and other requirements
specified in the earlier portion of this Section.

• Format

Please see the sample format of the above-mentioned document on the


next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 170


CONSULTANCY BILLING GUIDLEINES (IMP. OFFICE)

D.IV.1 SPMD Clearance Certificate on Property Accountability

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 171


Department of Public Works and Highways

GUIDELINES TO CONSULTANTS FOR


PREPARING CLAIMS FOR PAYMENT

December 2010
PREFIX

The purpose of this manual is to provide guidelines to Consultants on the


preparation and submission of payment claims to the Department. These
guidelines provide examples of documents that must be used and provide
directions on how these documents are prepared.

These guidelines cover the following types of payment claims:


◊ Advance Payment
◊ Monthly Progress Billing
◊ Final Payment

The Consultant should exert the utmost care in the preparation of its billing
and ensure that documents and amounts are prepared accurately. Inaccurate
billings will result in delays of payments.

All Claims, documents, forms, etc. must use the name of the principal
Consultant as listed in the Contract.

Claims must follow the Documents Tracking System (DoTS) Processing.


TABLE OF CONTENTS

PART A: ADVANCE PAYMENT - - - - - - - - - - - - - - - 2

PART B: PROGRESS BILLING – LOCAL - - - - - - - 25

PART C: PROGRESS BILLING – FOREIGN - - - - - 58

PART D: FINAL PAYMENT - - - - - - - - - - - - - - - - - 90


PART A. ADVANCE PAYMENT ................................. 2
I. Introduction ............................................................................ 2

II. Preparation of Forms ............................................................. 4


II.1. Preparation of Letter - Request of Consultant ..................................... 4
II.2. Preparation of Certification of Mobilization of the Consultant’s
Personnel.............................................................................................. 9
II.3. Preparation of Advance Payment Invoice ......................................... 11

III. Attachments........................................................................... 14
III.1. Advance Payment Security in the form of Bank Guarantee ............. 15
III.2. Copy of Approved Contract .............................................................. 17
III.3. Certification of Availability of Funds ............................................... 19
III.4. Copy of the Resolution of Award ...................................................... 20
III.5. Copy of Notice to Proceed................................................................. 23

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Part A. Advance Payment


This section provides the information necessary to prepare the claim for an advance
payment to the Consultant, when the contract between DPWH and the Consultant
allows it.

I. Introduction
DPWH shall upon a written request of the Consultant, make an advance payment to
the Consultant in an amount specified in the contract. This can be made in lump-
sum or in two releases as allowed in the contract between the Department and the
Consultant. If the contract allows Advance Payment in multiple currencies, each
currency must have a separate request and set of documents.

This section is divided into two parts: First Release of Advance Payment and the
Final/Lump-sum Release of Advance Payment. If the Consultant wants to claim for
an advance payment immediately upon award of the Contract, 50% of the Advance
Payment can be requested if the Contract allows it using the documents and
procedures for the First Release of Advance Payment. However, if the Consultant
wants to claim 100% of the Advance Payment in lump-sum, follow the documents
and procedures stated in the Final/Lump-sum Release of Advance Payment section.

The Consultant’s billing for advance payment must contain the listed supporting
documents and arranged as follows:
(Listed next to the document is the Section that pertains to preparation of that
document.)

First Release of Advance Payment

The Consultant upon award of the Contract can request payment equivalent
to 50% of the allowable Advance Payment.

The required documents for this section are the following:


• Letter –Request of Consultant (A.II.1.)
• Advance Payment Invoice (A.II.3.)
• Advance Payment Security in the form of Bank Guarantee (III.1)
• Certified True Copy of Approved Contract (III.2)
• Certificate of Availability of Funds (III.3)
• Certified True Copy of Resolution of Award (III.4)
• Certified True Copy of the Notice to Proceed (III.5)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 2


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

The Security required for the Advance Payment must be equal to or greater than the
amount being requested. The Security instrument includes Bank Guarantee, Letter
of Credit or Surety Bond as specified in the Contract.

Final/Lump-Sum Release of Advance Payment

This section will be used if the Consultant wants to claim 100% of the
Advance Payment in lump-sum or to claim the remaining 50% of the
Advance Payment (if the Consultant opted for a 50% release of the Advance
Payment upon award of the Contract) upon Certification that the
Consultant’s personnel and staff has substantially mobilized.

The required documents for this section are the same as mentioned in the
First Release of Advance Payment except the Consultant must add the
Certificate of Mobilization of Consultant’s Personnel (A.II.2)

Note:

The Consultant is required to submit the Letter-Request of Consultant and provide


the list of personnel and staff mobilized. The Certification of Mobilization of the
Consultant’s Personnel must be obtained from the Implementing Office, as an
original document. All other items shall be submitted as Certified True Copy
documents.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 3


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II. Preparation of Forms


The following section provides the format of the required forms for advanced
payments, and the procedures for completing them.

The forms that must be completed are:


• Letter-Request of Consultant
• Certification of Mobilization of the Consultant’s Personnel (for
Final/Lump-sum Release of Advance Payment)
• Advance Payment Invoice

II.1. Preparation of Letter - Request of Consultant

• Definition/Purpose

The Consultant provides this document for the billing of advance payment.
This letter shall state that the Consultant has complied with all conditions of the
contract and requesting the Department for the release of advance/mobilization
payments. This letter/request is prepared on the Consultant’s letterhead. There
are three formats of the Letter - Request of Consultant (Release of Advance
Payment) exhibited on Section A.II.1 showing each type of request. The same
procedure is followed in preparing each format.

This will be prepared by the Consultant and submitted as an original copy.

• Procedure

The following are the steps for preparing the Letter-Request of Consultant:

ITEM ITEM DESCRIPTION


NO
1 Date Indicate the date the letter request was
prepared.
2 Attention Indicate the name and designation of the
responsible official of the project (at least
a Project Director).
3 Reference Indicate the nature of the service and the
name of the Project (e.g. Technical
Consulting Services for BRP – Phase I).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 4


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
4 Advance Payment Security Indicate the type of advance payment
security (e.g. Unconditional Bank
Guarantee, Letter of Credit, or Surety
Bond.
5 Request Indicate the type of request for release of
advance payment. The consultant has two
options if allowed by the Contract. Option
A – the advance payment could be release
in two payments, the first, immediately
upon award of the Contract and the final,
after the substantial mobilization of
personnel. Option B – 100% of the
advance payment in lump sum release,
after the substantial mobilization of
personnel.
6 Amount in words Indicate the amount of advance payment
being requested in words to include the
currency (e.g. One Million & 00/100
Pesos).
7 Amount in Figures Indicate the amount of advance payment
being requested in figures
(e.g. P 1,000,000.00).
8 Currency Indicate the currency being requested for
advance payment as specified in the
Contract.
9 Bank Information Indicate the bank and the account
information where the payments should be
made (i.e. Name of the bank, Account
Number, Bank Address, Sort Code and
the Swift Code).
10 Project Manager Indicate the name and designation of the
(Signature) authorized representative of the
Consultant. He/she must affix his
signature on the space provided.

• Format

Letter - Request of Consultant must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 5


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

A.II.1. Letter – Request of Consultant, Release of Advance Payment

Option A – Two Releases of Advance Payment (First Release)

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph

1 April 16, 1997

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat


2 Project Director, PMO-ICB

Reference: Technical Consulting Services for the Development and Implementation of the
3 Institutional Capacity Building (ICB) Project for the Department of Public Works
and Highways (DPWH)

Sir:

In accordance with the conditions of the Contract, we have complied with all your guidelines and
requirements, that is; i) the Form of Agreement was executed by and between both parties, ii) the
4 __________________________ in a form and from a bank acceptable to the client in amounts
equal to the Advance Payment was submitted to the Client.

Accordingly, may we request your good office to release the first 50% of the advance payment in
Local Currency – Philippine Peso immediately, as our Notice to Proceed was issued on April 7,
5 1997. 6
8 Attached is an invoice in the amount of ______________________________________________
_______________________________________________ (P_______________). 7

Please make Peso payments to:


BPR Consultants, Inc.
Account Number: 999-088906-040
9 Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
Makati, Metro Manila, Philippines

Your expeditious processing of this invoice would be appreciated.

Very truly yours,

Robert Doe
10 ICB Project Manager
BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 6


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

A.II.1. Letter – Request of Consultant, Release of Advance Payment (Continuation)

Option A – Two Releases of Advance Payment (Final Release)


BPR Consultants, Inc.
Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph

1 April 16, 1997

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat


2 Project Director, PMO-ICB

Reference: Technical Consulting Services for the Development and Implementation of the
3 Institutional Capacity Building (ICB) Project for the Department of Public Works
and Highways (DPWH)

Sir:

In accordance with the conditions of the Contract, we have complied with all your guidelines and
requirements, that is; i) the Form of Agreement was executed by and between both parties, ii) the
4 __________________________ in a form and from a bank acceptable to the client in amounts
equal to the Advance Payment was submitted to the Client.

Accordingly, may we request your good office to release the final 50% of the advance payment in
Local Currency – Philippine Peso as we have substantially mobilized our staff in connection with
5 the implementation of the above-mentioned project. 6
8 Attached is an invoice in the amount of ______________________________________________
_______________________________________________ (P_______________). 7
Please make Peso payments to:
BPR Consultants, Inc.
Account Number: 999-088906-040
9 Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
Makati, Metro Manila, Philippines

Your expeditious processing of this invoice would be appreciated.

Very truly yours,

Robert Doe
ICB Project Manager
10 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 7


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

A.II.1. Letter – Request of Consultant, Release of Advance Payment (Continuation)

Option B – Lump Sum Release of Advance Payment

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph

1 April 16, 1997

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat


2 Project Director, PMO-ICB

Reference: Technical Consulting Services for the Development and Implementation of the
3 Institutional Capacity Building (ICB) Project for the Department of Public Works
and Highways (DPWH)

Sir:

In accordance with the conditions of the Contract, we have complied with all your guidelines and
requirements, that is; i) the Form of Agreement was executed by and between both parties, ii) the
4 __________________________ in a form and from a bank acceptable to the client in amounts
equal to the Advance Payment was submitted to the Client.

Accordingly, may we request your good office to release 100% of the advance payment in Local
Currency – Philippine Peso as we have substantially mobilized our staff in connection with the
5 implementation of the above-mentioned project. 6
8 Attached is an invoice in the amount of ______________________________________________
_______________________________________________ (P_______________). 7
Please make Peso payments to:
BPR Consultants, Inc.
Account Number: 999-088906-040
Singapore & Bangkok Bank
9 SBB Tower, 8000 Ayala Avenue
Makati, Metro Manila, Philippines

Your expeditious processing of this invoice would be appreciated.

Very truly yours,

Robert Doe
ICB Project Manager
10 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 8


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.2. Preparation of Certification of Mobilization of the Consultant’s Personnel

The Certification of Mobilization of the Consultant’s Personnel must be


completed and obtain the appropriate approvals of DPWH (Project Manager if
applicable and Project Director) before the Release of Final/Lump-sum
Advance payment.

• Definition/Purpose

The Consultant needs to secure this document (with the appropriate approvals)
from the Implementing Office in original form prior to the submission of
billing.

• Procedure

Certification of Mobilization of the Consultant’s Personnel must contain the


following information:

ITEM ITEM DESCRIPTION


NO.
1 Implementing Office Indicate the name of the concerned
Implementing Office.
2 Date Indicate the date the Certificate was
prepared.
3 Consultant Name Refer to Contract Agreement. This
must be the name of the prime
Consultant as specified in the
Contract.
4 Project Name Refer to Contract Agreement. This
must be the name of the project as
specified in the Contract.
5 Project Location Refer to Contract Agreement. This
must be the location of the project as
specified in the Contract.
6 Section of the Contract Refer to Contract Agreement. This
must be the specific section of the
Contract that deals with the Advance
Payments and its requirement.
7 Project Manager Project Manager (if applicable) must
sign this certification.
8 Project Director Project Director must counter-sign this
certification.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 9


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Format

Certification of Mobilization of the Consultant’s Personnel must follow the


format given below:

A.II.2 Certification of Mobilization of the Consultant’s Personnel

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Implementing Office 1
Port Area, Manila

2 Date

CERTIFICATION

This is to certify that Consultant Name has substantially mobilized their personnel
in connection with its contract for the Project Name in Project Location.
5
4
This certification is being issued to support the claim for the Final Release of the
Advance Payment pursuant to Section _________ of the Contract for the above
project.
6

7
Name and Signature
Project Manager
1 Implementing Office

8
Name and Signature
Project Director
1 Implementing Office

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 10


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.3. Preparation of Advance Payment Invoice

• Definition/Purpose

The Consultant provides this document as an Invoice for the billing of advance
payment. This must be prepared by the Consultant and must be countersigned
by the Project Director of the project.

This will be prepared by the Consultant and submitted as an original copy.

• Procedure

The following are the steps for preparing the Advance Payment Invoice:

ITEM ITEM DESCRIPTION


NO
1 Name of Project Indicate the name of the project
2 Consultant’s Information Indicate the name of the principal
Consultant, address, telephone number,
fax numbers and e-mail address if there is
any.
3 Invoice Number Invoice number must use the format
[Acronym-Currency (e.g. USD for US
Dollars)-nnnn (must start with 0000)].
4 Date Indicate the date of the preparation of the
Invoice.
5 Currency Indicate the Currency being billed for the
advance payment (in this case Philippine
Peso).
6 Purpose Indicate whether it is First Release
Advance Payment, Final Release/Lump-
sum Advance Payment.
7 Currency Symbol Indicate the currency symbol (e.g. PhP for
Philippine Peso; US$ for US Dollars – in
this case PhP).
8 Amount Indicate the amount in figures.
9 Consultant Name Indicate the company name of the
(Company) principal Consultant.
10 Bank Information Indicate the bank and the account
information where the payments should be
made (i.e. Name of the bank, Account
Number, Bank Address, Sort Code and
the Swift Code).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 11


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
11 Certifying Official Affix the signature of the Consultant’s
Signature Project Manager or authorized
representative.
12 Certifying Official Indicate the name of the Consultant’s
Project Manager.
13 Recommending Official For signature of the DPWH Project
Signature Director of the project.
14 Recommending Official Indicate the name of the Project Director.
15 Date of signing Indicate the date this document was
signed by the respective parties.
16 Attachments Describe the attachments with this
Invoice.
17 Approving Official For signature of the Secretary.
Signature
18 Approving Official Indicate the name of the Secretary.

• Format

Advance Payment Invoice must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 12


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

A.II.3 Advance Payment Invoice

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 13


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III. Attachments
The Consultant must secure and submit the following documents with the claim for
advanced payment: (Listed next to the document is the section where an example of
this document can be found).

• Original Advance Payment Security in the form of Bank Guarantee


(III.1)
• Certified True Copy Approved Contract (III.2)
• Certificate of Availability of Funds (III.3)
• Certified True Copy Resolution of Award (III.4)
• Certified True Copy Notice to Proceed (III.5)

Please see the sample forms of the above-mentioned documents on the following
pages.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 14


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.1. Advance Payment Security in the form of Bank Guarantee

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 15


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.1 Advance Payment Security in the form of Bank Guarantee


(Continuation)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 16


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.2. Copy of Approved Contract

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 17


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.2 Copy of Approved Contract (Continuation)

ROGELIO L. SINGSON
Secretary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 18


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.3. Certification of Availability of Funds

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 19


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.4. Copy of the Resolution of Award

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 20


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.4 Copy of the Resolution of Award (Continuation)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 21


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.4 Copy of the Resolution of Award (Continuation)

ROGELIO L. SINGSON
Secretary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 22


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

III.5. Copy of Notice to Proceed

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 23


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

PART B. PROGRESS BILLING – LOCAL .......... 25


I. Introduction ................................................................... 25

II. Preparation of Forms .................................................... 26


II.1 Preparation of Supporting Summary Personnel –Local
Consultants/Project Staff ........................................................... 26
II.2 Preparation of Supporting Summary Per Diem......................... 32
II.3 Preparation of Supporting Summaries for Other Recoverable
Cost ............................................................................................ 36
II.4 Preparation of Invoice Summary ............................................... 45
II.5 Preparation of Progress Billing Invoice .................................... 48
II.6 Preparation of Budgeted Balance Summary ............................. 51
II.7 Preparation of Letter – Request of Consultant .......................... 54

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

PART B. PROGRESS BILLING – LOCAL


This section provides instructions to the Consultant on completing the monthly
progress payment claims. Each document that must be completed is listed separately
and instructions for completing the document are provided.

I. Introduction

The following are the documents and the information that must be provided by
the Consultant to support his monthly progress payment claims.

• Letter – Request of Consultant (B.II.7)


• Invoice (B.II.5)
• Invoice Summary (B.II.4)
• Supporting Summary Personnel-Local Consultants/Project Staff (B.II.1)
• Supporting Summary Per Diem (B.II.2)
• Supporting Summary Other Recoverable Cost (B.II.3)
• Budgeted Balance Summary (B.II.6)

Note: Lump-sum contracts do not require Supporting Summary Documents,


Time Sheets, and Official Receipts. The above-mentioned documents
must be arranged in the same order it is presented above.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 25


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II. Preparation of Forms

The following section provides description of the forms that must be used and
the procedures for completing them.

II.1 Preparation of Supporting Summary Personnel –Local


Consultants/Project Staff

• Definition/Purpose

The Consultant prepares this document as a supporting document for the


Remuneration of Local Consultants/Project Staff. The amount would be
based on the Monthly Rate specified in the contract and the number of days
work (e.g. week days and holidays) of the individual personnel.

• Procedure

Supporting Summary Personnel Project Staff must contain the following


information:

ITEM ITEM DESCRIPTION


NO.
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Consultants information such as name
Information of the company, address, telephone and
fax number and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency(e.g. PHP for
Philippine Peso)-nnnn(must start with
0000)].
4 Date Date of the preparation of the
supporting summary.
5 Category Indicate the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose The currency being billed (in this case
Philippine Peso).
7 From Indicate the start date of the billing
period.
8 To Indicate the end date of the billing
period.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 26


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
9 Name Indicate the full name of the Local
Consultant/Project Staff being billed for
the period. If there is any changes or
addition of Local Consultant named in
the contract a copy of the approved
substitution or supplemental contract
must be provided.
10 Designation Indicate the position of the Local
Consultant/Project Staff as it appears in
the Contract.
11 Factor Indicate the factor to be used in
determining the remuneration of each
Local Consultant/Project Staff for the
month covered. The numerator must
indicate the number of days worked by
each personnel (including holidays).
The denominator has to be on the basis
of the contract. Some contract may
have a 30 days/month or 22
days/month. The contract basis should
be used as the denominator. If the
contract specifies a 30 days/month, then
for months with 31 days, 30 should be
used as the denominator for personnel
who worked less than 31 days. For the
month of February (i.e. 28 or 29 days),
if a full month is worked the
denominator will be the actual days of
the month (i.e. 28 or 29), else the
denominator should be 30. The 22
days/month basis is usually applied to
personnel doing office work while the
30days/month basis is usually applied
to personnel doing field works or
assigned in the field.
12 Monthly Rate The monthly rate in appropriate
currency of each Local Consultant/
Project Staff in accordance with the
Contract.
13 Amount Remuneration of each consultant for the
month: equivalent to the corresponding
monthly rate (item 12) multiplied by the
factor (item 11) in two decimal places.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 27


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
14 Total Factor The sum of the factors (item 11). For
the Local Consultants, this figure must
be carried over to Item-C of the
Budgeted Balance Summary, Form L-
12.
15 Total Amount Total Remuneration for the month:
equivalent to the sum of the
Remuneration of each consultant (item
13). This figure must be carried over to
Item-A/B of the Invoice Summary,
Form L-10.
16 Signature Signature of the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager)
17 Name & Indicate the name and the designation
Designation of the authorized representative of the
(Consultant) Consultant.
18 Signature (DPWH) Signature of the Head of the DPWH
Implementing Office (e.g. Project
Director).
19 Name & Indicate the name and designation of
Designation(DPWH) the DPWH Head of the Implementing
Office.
20 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing
Office sign this document.

• Format

Supporting Summary Personnel – Local Consultant/Project Staff must


follow the formats (Forms L-01 and L-02) given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 28


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.1 Supporting Summary – Personnel

Form L-01

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Personnel-Project Staff
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Designation Factor Monthly Rate Total 13

Gregorio Roda Office Manager 18/21 P 36,750.00 P 31,500.00

Bernardino Aguirre Tech. Support Manager 19/21 P 34,650.00 P 31,350.00

Garry Magpantay Computer Specialist 21/21 P 21,976.50 P 21,976.50

Myla Mañalac Accountant 21/21 P 26,754.00 P 26,754.00

Doreen de Chavez Executive Secretary 19/21 P 18,154.50 P 16,425.00

Rodoulph Atienza Ofc. Automation Spclst 19/21 P 18,154.50 P 16,425.00

Marvin Palomeno Utility Personnel 21/21 P 7,140.00 P 7,140.00


14

10
A
TOTAL 138/21 /////////// P151,571.50 15

11
CERTIFIED CORRECT:
16
DATE:
17 ROBERT DOE
ICB Project Manager 20

18 DATE:
JUAN MATAPAT
19 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 29


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.1 Supporting Summary - Personnel (Continuation)

Form L-02

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas Personnel- 5
2
Salcedo Village, Makati City Local Consultants
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Designation Factor Monthly Rate Amount

Ana Ortega Senior I.S. Analyst 20/21 P 56,956.37 P 54,244.16


13
Elaine Vizconde Senior I.S. Analyst 19/21 P 62,652.00 P 56,685.14

Maria Beltran Senior I.S. Analyst 19/21 P 37,021.63 P 33,495.76

Maritess Enriquez Senior I.S. Analyst 19/21 P 51,260.72 P 46,378.75

Rey Catarroja Senior I.S. Analyst 19.5/21 P 35,597.72 P 33,055.03

Melchor Jeremias Senior I.S. Analyst 17/21 P 62,652.00 P 50,718.29

Jeremias Uy Senior I.S. Analyst 15/21 P 62,652.00 P 44,751.43

Jason Caguioa Senior I.S. Analyst 15/21 P 54,108.54 P 38,648.96

Teddy Manguray Senior I.S. Analyst 20/21 P 54,108.54 P 51,531.94

TOTAL 163.5/21 /////////// P 409,509.46 B


15
10
CERTIFIED CORRECT:
11
14 C
16 DATE:
ROBERT DOE
17 ICB Project Manager 20

18 DATE:
JUAN MATAPAT
19 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 30


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachment

The original Monthly Time Sheet for each personnel must be attached as
supporting document for the Supporting Summary Personnel – Local
Consultant/Project Staff. A sample of the Monthly Time Sheet is shown
below.

Institutional Capacity Building (ICB) Project


Department of Public Works and Highway

Name: Garry Magpantay


Position: Computer Specialist

Time Sheet for the Month of January, 2000

Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Manila X X X X X X X X X X

Location 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Manila X X X X X X X X X X X

Codes: Totals: 21
X = Work Day _______________
H = Holiday
x = Half Day
Blank = Non-work Day

Garry Magpantay Certified Correct:


Garry Magpantay

Gregorio Roda
Gregorio Roda
ICB Office Manager

Noted by:

eÉuxÜà WÉx
Robert Doe
ICB Project Manager

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 31


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.2 Preparation of Supporting Summary Per Diem

• Definition/Purpose

The Consultant prepares this document as a supporting document for the Per
Diem of Foreign Personnel. The amount would be based on the Daily Rate
specified in the contract and the number of days a particular personnel
stayed in the Philippines. The Per Diem daily rate is usually higher on the
first 60-days stay of the Consultant in the Philippines.

• Procedures

Supporting Summary Per Diem must contain the following information:

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including acronym being
used if possible
2 Consultant Consultants information such as name of the
Information company, address, telephone and fax number
and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency (e.g. PHP for Philippine
Pesos)-nnnn (must start with 0000)].
4 Date Date of the preparation of the Invoice
5 Category Indicate the category as used in the contract or
on any amendment or supplemental agreement.
6 Purpose The currency being billed (in this case
Philippine Peso).
7 From Indicate the start date of the billing period.
8 To Indicate the end date of the billing period.
9 Name Indicate the name of the Foreign Consultant
being billed for the Per Diem.
10 Description Indicate the description of the per diem being
billed (e.g. first 60 days or after 60 days).
11 No. of Days Indicate the number of days being billed for the
per diem. This figure will be taken from the
Monthly Time Sheet of each individual
Consultant.
12 Rate Indicate the daily rate as specified in the
Contract whether it for the first 60 days or after
60 days.
13 Amount This amount would be the number of days
(Item 11) multiplied by the Rate (Item 12).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 32


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
14 Total Amount Indicate the total amount by adding all the
amounts (Item 13) in the “Amount” column.
This figure must be carried over to Item-D of
the Invoice Summary, Form L-10.
15 Signature (Consultant) Signature of the authorized representative of
the Consultant.
16 Name & Designation Indicate the name and designation of the
(Consultant) authorized representative of the Consultant.
17 Signature (DPWH) Signature of the Head of the DPWH
Implementing Office (e.g. Project Director).
18 Name & Designation Indicate the name and designation of the
(DPWH) DPWH Head of the Implementing Office.
19 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing Office sign
this document.

• Format

Supporting Summary Per Diem must follow the format given on the next
page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 33


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.2 Supporting Summary Per Diem


Form L-03

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
5
2 20 Ayala Avenue cor. Paseo de Roxas Per Diem
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Description #of days Rate Amount

Robert Doe Per diem(after 60 days) 31 P 1,500.00 P 46,500.00


13
Mary Houston Per diem(after 60 days) 31 P 1,500.00 P 46,500.00

John Pacino Per diem(after 60 days) 28 P 1,500.00 P 42,000.00

Arnold Gore Per diem(after 60 days) 27 P 1,500.00 P 40,500.00

Stephen Blaire Per diem(after 60 days) 28 P 1,500.00 P42,000.00

Kevin Vincent Per diem(after 60 days) 27 P 1,500.00 P 40,500.00

10

11
TOTAL 172 /////////// P 258,000.00 D
14

CERTIFIED CORRECT:

15 DATE:
ROBERT DOE
16 ICB Project Manager 19

17 DATE:
JUAN MATAPAT
18 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 34


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachment

The original Monthly Time Sheet for each foreign personnel must be
attached as supporting document for the Supporting Summary Per Diem. A
sample of the Monthly Time Sheet is shown below.

Institutional Capacity Building (ICB) Project


Department of Public Works and Highway

Name: John Pacino


Position: Technical Specialist

Time Sheet for the Month of January, 2000

Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Manila T X X X X X X X X X X X X
U. S.

Location 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Manila X X X X X X X X X X X X X X X X

Codes: Totals: 2928


X = Work Day _______________
T = Travel Day
Blank = Non-work Day

]É{Ç ctv|ÇÉ Certified Correct:


John Pacino

eÉuxÜà WÉx
Robert Doe
ICB Project Manager

Juan Matapat
Juan Matapat
Project Director – PMO-ICB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 35


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.3 Preparation of Supporting Summaries for Other Recoverable Cost

• Definition/Purpose

The Consultant prepares these documents as a supporting document for


other Recoverable Cost such as but not limited to Local Travel and Vehicle,
Utilities and Maintenance, Communication Cost, Office Supplies,
Contingency and other recoverable cost as specified in the Contract.

• Procedures

The preparation of these supporting summaries will use only one format but
should be done separately for each category as it appear in the Contract or
any Contract Amendment/Supplemental Agreement and must contain the
following information.

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Consultants information such as name of
Information the company, address, telephone and fax
number and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency(e.g. PHP for
Philippine Peso)-nnnn(must start with
0000)].
4 Date Date of the preparation of the Invoice
5 Category Indicate the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose The currency being billed (in this case
Philippine Peso).
7 From Indicate the start date of the billing
period.
8 To Indicate the end date of the billing
period.
9 Date Indicate the date of
purchase/procurement of the
goods/services to be billed.
10 Vendor Indicate the vendor’s name or the
business name where the goods or
services to be billed has been purchased
or procured.
11 Description Describe the goods or services to be
billed.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 36


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
12 Amount Indicate the amount of the goods/
services to be billed. The original copy
of the invoice, delivery receipt and
official receipt must be attached on this
form and in the order it is presented.
13 Total Amount The sum of the amounts to be billed
(item 12). This amount must be carried
over to the corresponding categories in
the Invoice Summary (Form L-10) and
the Budgeted Balance Summary (Form
L-15).
14 Signature Signature of the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager)
15 Name & Indicate the name and the designation of
Designation the authorized representative of the
(Consultant) Consultant.
16 Signature (DPWH) Signature of the Head of the DPWH
Implementing Office (e.g. Project
Director)
17 Name & Indicate the name and designation of the
designation DPWH Head of the Implementing
(DPWH) Office.
18 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing
Office sign this document.

Notes:

1. Purchase and billing of service vehicle(s) of Consultants must be in


accordance with Department Order 03 Series of 2010 – Guidelines on the
Acquisition of Motor Vehicles for Use in Infrastructure Project
Supervision (or any subsequent or superseding Department Order) which
requires Department of Budget and Management (DBM) prior approval.

2. Purchase and billing of IT Equipment(s) of Consultants must be in


accordance with Department Order 49 Series of 2007 – Guidelines on the
Acquisition and Inventory of Information Technology (IT) Goods and
Services (or any subsequent or superseding Department Order) which
requires MIS prior approval.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 37


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Format

Supporting Summaries for Other Recoverable Cost must follow the format
given below and on the next pages. For presentation purposes several Forms
are shown to illustrate different categories as presented in the Invoice
Summary and the Budgeted Balance Summary.

B.II.3 Supporting Summary Other Recoverable Cost


Form L-04

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Local Travel & Vehicle
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/04/00 ABC Rental Car Car rental, Isuzu(Jan 1-31, 2000) P 43,000.00

01/04/00 ABC Rental Car Car rental, Toyota(Jan 1-31, 2000) P 40,000.00 12
01/04/00 Peso Rent-a-Car Car rental, Terrano(Jan 1-31,2000) P 40,000.00

01/04/00 Peso Rent-a-Car Van rental, MBenz(Jan 1-31,2000) P 57,000.00

10

TOTALS P 180,000.00 13 E

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 38


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)


Form L-05

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Utilities &
Salcedo Village, Makati City Maintenance
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/12/00 Vira Pest Control Pest Control Treatment(Jan 2000) P 1,600.00


. . ICB Project Office and Conference .
. . Room . 12
01/19/00 Philcopy Maintenance including P 44,363.33
. . replacement of parts of Mita DC- .
. . 5590 .

10
TOTALS P 45,963.33 13 F

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 39


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)


Form L-06

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Communication Cost
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/10/00 AT & T International Calls ($73.15 P 2,960.53


. . converted @ P 40.4720/US$ .
12
01/31/00 PLDT Telephone Calls - 894-9606 P 9,771.64

01/31/00 PLDT Telephone Calls - 894-7306 P 3,971.81

10

TOTALS 16,703.98 13 G

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 40


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)


Form L-07

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Office Suplies
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/05/00 Reboot Computer Store Zip Disk P 900.00

01/07/00 Amazon Books(US$69.99 converted @ P P 2,825.92 12


. . 40.376/US$) .

01/12/00 Airfreight 2100, Inc. Fedex P 1,860.70

01/24/00 FNN Enterprises Various Office Supplies P103,451.13

01/31/00 Southgate Technologies HP 3909A Toner Cartridge P 19,050.00

10
TOTALS P 128,087.75 13 H

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 41


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form L-08

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Communication
Salcedo Village, Makati City Network
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/07/00 Western Telecoms Payment for installation of 5 E1 P 140,000.00


. . with DID/DOD and one (1) E1 .
. . Domestic Leased Line . 12
01/28/00 Alcaphones Payment for the cabling P 571,076.48
. . installation and related works at .
. . Central Office and NCR .

10
TOTALS P 711,076.48 13 I

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 42


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form L-09

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Contingency
Salcedo Village, Makati City
Tel Nos.: +63 2 988 -0100 Fax Nos.: +63 2 988 -0105 6
3 E -mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-PHP-0012 Purpose: Philippine Peso
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


9

11
Date Vendor Description Amount

01/25/00 PhilToday Daily, Inc. Newspaper advertisement for P 75,926.00


. . Specific Procurement Notice of A1 .
. . published on Dec. 12,20&26, 1999 . 12
01/28/00 Maharlika Publishing Corp Newspaper advertisement for P 70,000.00
. . Specific Procurement Notice of B2 .
. . published on Dec. 12,20&26, 1999 .

10
TOTALS P 145,926.00 13 J

CERTIFIED CORRECT:
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 43


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachments

The original invoice, delivery receipt and official receipt must be attached
on the supporting summaries for Recoverable Cost and in the order it is
presented. Other original copy of documents that will show proof of
purchase or payments made (e.g. plane tickets, acknowledgement receipts)
or certified true copy of duly notarized Contract of Lease can also be
attached as supporting documents. For contingency, a certified true copy of
the DPWH authorization/approval to use the amount allocated must also be
attached in the supporting summary.

It is recommended that the original attachments be copied first on a bond


paper and then stapled the said original on the same bond paper.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 44


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.4 Preparation of Invoice Summary

• Definition/Purpose

The Invoice Summary is a consolidation of the amounts to be billed in each


category specified in the contract, where expenses have been incurred in the
given period. This summary is broken down into Remuneration Cost and
Recoverable Cost.

• Procedures

The Invoice Summary must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Consultants information such as name of
Information the company, address, telephone and fax
number and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency(e.g. PHP for
Philippine Peso)-nnnn(must start with
0000)].
4 Date Date of the preparation of the Invoice
5 Purpose The currency being billed (in this case
Philippine Peso).
6 From Indicate the start date of the billing
period.
7 To Indicate the end date of the billing
period.
8 Date Indicate the end date of the billing
period.
9 Remuneration Indicate the categories that fall under
Categories remuneration such as Local Consultants
and Project Personnel as specified in the
Contract.
A/B Remuneration Indicate the applicable category totals
Carry-over category from Form L-01/ L-02.
total
10 Total Remuneration Indicate the sum of the category totals
for the categories under Remuneration.
12% of this amount will be added to the
Invoice as Value Added Tax (VAT). See
Item 14.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 45


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
11 Recoverable Cost Indicate the categories that fall under
Categories recoverable cost such as, but not limited
to Per Diem, Local Travel, Utilities and
Maintenance, Communication Costs,
Office Supplies and Contingency as
specified in the Contract.
D-J Recoverable Cost Indicate the applicable category totals
Carry-over category from Form L-03 to L-09.
total
12 Sub-total Indicate the sum of the category totals
Recoverable Cost for the categories under Recoverable
Cost.
13 Total without VAT Indicate the sum of the Remuneration
sub-total (Item 10) and the Recoverable
Cost sub-total (Item 12).
14 VAT Indicate the equivalent of 12% of Item
10, rounded in two decimal places.
15 Grand Total Indicate the sum of the Total (Item 13)
and the VAT (Item 14) in two decimal
places. This amount would be carried
over to Item K of the Progress Billing
Invoice.
16 Certifying Official Signature of the authorized
Signature representative of the Consultant (e.g.
Project Manager)
17 Certifying Official Indicate the name and the designation of
the authorized representative of the
Consultant.
18 Recommending Signature of the Project Manager of the
Official Signature implementing Office.
19 Recommending Indicate the name and designation of the
Official Project Manager of the Implementing
Office.
20 Approving Official Signature of the Head of the DPWH
Signature implementing Office (e.g. Project
Director).
21 Approving Official Indicate the name and designation of the
DPWH Head of the Implementing
Office.
22 Signature Date Indicate the date this document was
signed by the respective parties.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 46


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Format

The Invoice Summary must follow the format given below.

B.II.4 Invoice Summary

Sample format of the Invoice Summary is given below.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 47


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.5 Preparation of Progress Billing Invoice

• Definition/Purpose

The Consultant provides this document as an Invoice for the progress billing
payments. This must be prepared by the Consultant and must be
countersigned by the Project Director of the project.

• Procedures

The following are the steps for preparing the Progress Billing Invoice and
must contain the following information:

ITEM ITEM DESCRIPTION


NO
1 Name of Project Indicate the name of the project
2 Consultant’s Information Indicate the name of the principal
Consultant, address, telephone number,
fax numbers and e-mail address if
there’s any.
3 Invoice Number Invoice number must use the format
[Acronym-Currency (e.g. PHP for
Philippine Peso)-nnnn (must start with
0000)].
4 Date Indicate the date of the preparation of
the Invoice.
5 Currency/Purpose Indicate the Currency being billed (e.g.
Philippine Peso).
6 From Indicate the start date of the billing
period.
7 To Indicate the end date of the billing
period.
8 Currency Symbol Indicate the currency symbol (in this
case PhP for Philippine Peso).
K Amount Indicate the amount being billed in
figures to two decimal places. This is the
carry-over amount from Item 15 of Form
L-10.
9 Consultant Name Indicate the company name of the
(Company) principal Consultant.
10 Bank Information Indicate the bank and the account
information where the payments should
be made (i.e. Name of the bank, Account
Number, Bank Address, Sort Code and
the Swift Code).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 48


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
11 Certifying Official Signature of the authorized
Signature representative of the Consultant (e.g.
Project Manager)
12 Certifying Official Indicate the name and the designation of
the authorized representative of the
Consultant.
13 Recommending Official Signature of the Head of the DPWH
Signature Implementing Office (e.g. Project
Director).
14 Recommending Official Indicate the name and designation of the
DPWH Head of the Implementing
Office.
15 Signature Date Indicate the date this document was
signed by the respective parties.
16 Attachments Describe the supporting summaries
attachments with this Invoice.
17 Signature of Approving Signature of Approving
Official Official for the Invoice
18 Name & designation of Indicate the name of responsible official
Approving Official (at least an Undersecretary) and his
designation approving the Invoice. In the
case of the first progress billing, the
Secretary must be the Invoice approving
official.

• Format

Progress Billing Invoice must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 49


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.5 Progress Billing Invoice

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 50


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.6 Preparation of Budgeted Balance Summary

• Definition/Purpose

The Consultant prepares this document to monitor the financial status and
the utilization of the Consultant’s time of the project.

• Procedure

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including
acronym being used if possible
2 Currency The currency being billed (in this
case Philippine Peso).
3 Note Indicate any information that is not
applicable on the table of this form
such as if there is any Contract
Amendment or Supplemental
Agreement.
4 Category Indicate the categories as specified
on the contract.
5 Budgeted Amount Indicate the budgeted amount for
each category. The amount would
include the amount in the original
contract plus any amount added or
subtracted thru Contract
Amendments or Supplemental
Agreement.
6 Budgeted Man-Months Indicate the total budgeted number
of man-months for consultants. It is
suggested that the same be done
also for Project Staff.
7 Date Indicate the last day of the billing
period.
8 This Invoice Amount Indicate the corresponding total
amount for each category. (See
items A, B, D, E, F, G, H, I and J
on Invoice Summary).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 51


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
C This Invoice Man- Indicate the total number of man-
month months for the billing period by
converting the Overall total factor
(Item 14 of Form L-02) from a
fraction to a number with two
decimal places.
9 Total-to-Date Amount Indicate the total amount at the end
of this billing period for each
category. These amounts will be
equal to the total amount of
previous invoices plus the amount
for this billing period.
10 Total-to-Date Indicate the total number of man-
Man- Months months at the end of this billing
period.
11 Balance Amount Indicate the balance amount for
each category. These amounts will
be equal to the budgeted amount
(item 5) minus the total-to date
amount (item 9).
12 Balance Indicate the balance of man-months
Man-Months for the personnel. This will be equal
to the budgeted man-months (item
6) minus the total-to date man-
months (item 10).
13 Totals Indicate the sum of each column.
14 Certifying Official Signature of the authorized
Signature representative of the Consultant
(e.g. Project Manager)
15 Certifying Official Indicate the name and the
designation of the authorized
representative of the Consultant.
16 Recommending This must be signed by the
Official Signature Implementing Office Project
Manager
17 Recommending This must be the name and
Official designation of the Implementing
Office Project Manager.
18 Approving Official Signature of the Head of the DPWH
Signature Implementing Office (e.g. Project
Director).
19 Approving Official Indicate the name and designation
of the DPWH Head of the
Implementing Office.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 52


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Format

Budgeted Balance Summary Sheet must follow the format provided below.

B.II.6 Budgeted Balance Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 53


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.7 Preparation of Letter – Request of Consultant

• Definition/Purpose

The Consultant provides this document as the main cover letter for their
progress billing claims. This letter/request is prepared on the Contractor’s
letterhead.

This will be prepared by the Consultant and submitted as an original copy.

• Procedures

The Letter Request of Consultant must contain the following information:

ITEM ITEM DESCRIPTION


NO
1 Consultant Indicate the Consulting firm’s
Information information such as company name,
nature of business, address, telephone and
fax number (incl. country and access
code) and e-mail address.
2 Project Name Indicate the name of the project.
3 Agency Name Indicate the agency name (i.e.
Department of Public Works and
Highways, address and telephone
number).
4 Invoice Date Indicate the date of preparation of the
invoice.
5 Attention The Invoice letter must be addressed to
the responsible official for the project (at
least a Project Director).
6 Reference Indicate the type of service, name of the
project and the owner of the project (i.e.
DPWH).
7 Salutation Salutation addressed to the responsible
official (see Item 5) of the Department.
8 Invoice Number Indicate the Invoice Number as it appears
on Item 3 of Form L-11.
9 Currency Indicate the currency being billed (in this
case Philippine Peso).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 54


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
10 Currency Symbol Indicate the symbol of the currency being
billed (e.g. $, £, Php).
11 Company Name Indicate the company name of the
(Consultant) principal consultant.
12 Bank Information Indicate the bank and the account
information where the payments should
be made (i.e. Name of the bank, Account
Number, Bank Address, Sort Code and
the Swift Code).
13 Signature Signature of the authorized representative
(Consultant) of the Consultant (e.g. Project Manager)
14 Name & Designation Indicate the name and the designation of
(Consultant) the authorized representative of the
Consultant and the Company Name.
K Total Invoice Indicate the total amount of the Invoice.
Amount See Item 15 of Form L10.

• Format

The Letter Request must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 55


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

B.II.7 Letter – Request of Consultant

Form L-13

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
1 Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph
2
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
nd
3 2 Street, Port Area, Manila
Tel. Nos: +63 2 303-3088 Fax. +63 2 303-3085

4 February 2, 2000

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat, PMO-ICB Project Director 5


Reference: Technical Consulting Services for the Development and Implementation
6 8
of the Institutional Capacity Building (ICB) Project for the Department of
Public Works and Highways (DPWH)

7 Dear Mr. Matapat: 9

Attached is Invoice Number ICB-PHP-0012 for Recoverable: Philippines Peso in the


amount of PhP2,102,946.60 for the period covering January 1-31, 2000.

10 Please make Peso payments to:


BPR Consultants, Inc.
11 Account Number: 999-088906-040 K
Singapore & Bangkok Bank
SBB Tower, 8000 Ayala Avenue
12 Makati, Metro Manila, Philippines
Telephone Nos.: 814-0052
Fax Nos.: 817-5319

Your expeditious processing of this invoice would be appreciated.

13 Very truly yours,

Robert Doe
ICB Project Manager
14 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 56


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

PART C. PROGRESS BILLING – FOREIGN ...... 58


I. Introduction .................................................................. 58

II. Preparation of Forms ................................................... 59


II.1 Preparation of Supporting Summary Personnel ......................... 59
II.2 Preparation of Supporting Summary International Travel ......... 64
II.3 Preparation of Supporting Summaries for Other Recoverable
Cost ............................................................................................. 72
II.4 Preparation of Invoice Summary ................................................ 77
II.5 Preparation of Progress Billing Invoice...................................... 80
II.6 Preparation of Budgeted Balance Summary............................... 83
II.7 Preparation of Letter – Request of Consultant ........................... 86

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Part C. Progress Billing – Foreign


This section provides instructions to the Consultant on completing the monthly
progress payment claims. Each document that must be completed is listed
separately and instructions for completing the document are provided.

I. Introduction

The following are the documents and the information that must be provided
by the Consultant to support his monthly progress payment claims.

• Letter – Request of Consultant (C.II.7)


• Invoice (C.II.5)
• Invoice Summary (C.II.4)
• Supporting Summary Personnel (C.II.1)
• Supporting Summary International Travel (C.II.2)
• Supporting Summary Other Recoverable Cost (C.II.3)
• Budgeted Balance Summary (C.II.6)

Note: Lump-sum contracts do not require Supporting Summary Documents,


Time Sheets, and Official Receipts. The above-mentioned documents
must be arranged in the same order it is presented above.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 58


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II. Preparation of Forms

The following section provides description of the forms that must be used and
the procedures for completing them.

II.1 Preparation of Supporting Summary Personnel

• Definition/Purpose

The Consultant prepares this document as a supporting document for the


Remuneration of Foreign Consultants. The amount would be based on the
Monthly Rate specified in the contract and the number of days work (e.g.
week days and holidays) of the individual personnel.

• Procedure

Supporting Summary Personnel Project Staff must contain the following


information:

ITEM ITEM DESCRIPTION


NO.
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Consultants information such as name
Information of the company, address, telephone and
fax number and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency(e.g. USD for US
Dollars)-nnnn(must start with 0000)].
4 Date Date of the preparation of the
supporting summary.
5 Category Indicate the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose The currency being billed(e.g. US
Dollars or UK Sterling Pounds - in this
case US Dollars).
7 From Indicate the start date of the billing
period.
8 To Indicate the end date of the billing
period.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 59


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
9 Name Indicate the full name of the Foreign
Consultant being billed for the period.
If there is any changes or addition of
Foreign Consultant named in the
contract a copy of the approved
substitution or supplemental contract
must be provided.
10 Designation Indicate the position of the Foreign
Consultant as it appears in the Contract.
11 Factor Indicate the factor to be used in
determining the remuneration of each
Foreign Consultant for the month
covered. The numerator must indicate
the number of days worked by each
personnel (including holidays and travel
days). For months with 31 days, if a
Consultant worked for a full month the
factor should be 31/31, else the factor
will be the number of days worked over
30. For the month of February (i.e. 28
or 29 days), if a full month is worked
the denominator will be the actual days
of the month (i.e. 28 or 29), else the
denominator should be 30.
12 Monthly Rate The monthly rate in appropriate
currency of each Foreign Consultant/
Project Staff in accordance with the
Contract.
13 Amount Remuneration of each consultant for the
month: equivalent to the corresponding
monthly rate (item 12) multiplied by the
factor (item 11) in two decimal places.
14 Total Factor The sum of the factors (item 11). For
the Foreign Consultants, this figure
must be carried over to Item-A of the
Budgeted Balance Summary, Form F-
07.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 60


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
15 Total Amount Total Remuneration for the month:
equivalent to the sum of the
Remuneration of each consultant (item
13). This figure must be carried over to
Item-B of the Invoice Summary, Form
F-05.
16 Signature Signature of the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager)
17 Name & Indicate the name and the designation
Designation of the authorized representative of the
(Consultant) Consultant.
18 Signature (DPWH) Signature of the Head of the DPWH
Implementing Office (e.g. Project
Director).
19 Name & Indicate the name and designation of
Designation(DPWH) the DPWH Head of the Implementing
Office.
20 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing
Office sign this document.

• Format

Supporting Summary Personnel – Foreign Consultant must follow the


formats (Form F-01) given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 61


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.1 Supporting Summary – Personnel

Form F-01

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Personnel
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3
E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
9 Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000 12

Name Title Factor Monthly Rate Total 13

Robert Doe Project Manager 31/31 $ 18,000.00 $ 18,000.00

Mary Houston BPR Analyst 31/31 $ 17,500.00 $ 17,500.00

John Pacino BPR Analyst 28/30 $ 17,500.00 $ 16,333.33

Arnold Gore Technical Specialist 29/30 $ 16,602.93 $ 16,049.50

Peter Maguire Technical Specialist 30/30 $ 16,605.90 $ 16,605.90 A


10 14

11
B
15

TOTAL 147/30 /////////// $ 84,488.73

CERTIFIED CORRECT
16
DATE:
17 ROBERT DOE
ICB Project Manager 20

18 DATE:
JUAN MATAPAT
19 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 62


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachment

The original Monthly Time Sheet for each personnel must be attached as
supporting document for the Supporting Summary Personnel. A sample
of the Monthly Time Sheet is shown below.

Institutional Capacity Building (ICB) Project


Department of Public Works and Highway

Name: Arnold Gore


Position: Technical Specialist

Time Sheet for the Month of January, 2000

Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Manila T X X X X X X X X X X X X
U. S.

Location 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Manila X X X X X X X X X X X X X X X X

Codes: Totals: 29
X = Work Day _______________
T = Travel Day
Blank = Non-work Day

Arnold Gore Certified Correct:


Arnold Gore

eÉuxÜà WÉx
Robert Doe
ICB Project Manager

Juan Matapat
Juan Matapat
Project Director – PMO-ICB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 63


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.2 Preparation of Supporting Summary International Travel

• Definition/Purpose

The Consultant prepares this document as a supporting document to


reimburse the cost of International Travel for Foreign Personnel. The
amount per round trip travel must not exceed the cost stipulated in the
Contract

• Procedures

The Supporting Summary International Travel must contain the following


information:

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including acronym being
used if possible
2 Consultant Consultants information such as name of the
Information company, address, telephone and fax number
and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency (e.g. USD for US
Dollars)-nnnn (must start with 0000)].
4 Date Date of the preparation of the Invoice
5 Category Indicate the category as used in the contract or
on any amendment or supplemental agreement.
6 Purpose The currency being billed (e.g. US Dollars or
UK Sterling Pounds - in this case US Dollars).
7 From Indicate the start date of the billing period.
8 To Indicate the end date of the billing period.
9 Name Indicate the name of the Foreign Consultant
being billed for International Travel.
10 Description Indicate the description of the travel including
the origin and the destination and the date of
travel. For other currencies not in accordance
with the Contract, the date of purchase of the
ticket and the corresponding BSP conversion
rate must also be described.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 64


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
11 Amount Indicate the amount being reimbursed for the
international travel. The currency that will be
used shall be the currency stipulated in the
contract. For other currencies not in
accordance with the contract the BSP
conversion rate at the date the ticket was
purchased (see C.II.3) shall be used.
12 Total Amount Indicate the total amount by adding all the
amounts (Item 11) in the “Amount” column.
This figure must be carried over to Item-C of
the Invoice Summary, Form F-05.
13 Signature (Consultant) Signature of the authorized representative of
the Consultant.
14 Name & Designation Indicate the name and designation of the
(Consultant) authorized representative of the Consultant.
15 Signature (DPWH) Signature of the Head of the DPWH
Implementing Office (e.g. Project Director).
16 Name & Designation Indicate the name and designation of the
(DPWH) DPWH Head of the Implementing Office.
17 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing Office sign
this document.

• Format

Supporting Summary International Travel must follow the format given


on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 65


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.2 Supporting Summary International Travel


Form F-02

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 International Travel
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000


10

Name Description Amount 11


9 Arnold Gore Airfare(Manila-USA/Return) $ 2,928.45

C
12
TOTALS $ 2,928.45

CERTIFIED CORRECT
13
DATE:
14 ROBERT DOE
ICB Project Manager 17

15 DATE:
JUAN MATAPAT
16 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 66


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachments

The following documents must be attached to the Supporting Summary –


International Travel.

Should there be a need for currency conversion and for Accounting


purposes, following is the BSP online link for the reference.

C.II.3 Exchange Rate as per Bangko Sentral ng Pilipinas


( URL: http://www.bsp.gov.ph/statistics/statistics_online.asp )

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 67


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Attachment #1: Foreign Personnel Certification as to Purpose and Cost


of Travel – this is a mandatory attachment that should be issued by the
foreign personnel who made the travel.

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
nd
2 Street, Port Area, Manila
Tel. Nos: +63 2 303-3088 Fax. +63 2 303-3085

January 3, 2000

CERTIFICATION

This is to certify that the airline ticket invoiced to DPWH for Arnold Gore was used
specifically for the Institutional Capacity Building (ICB) Project and was used for no
other purpose. In addition, I certify that the amount invoiced to DPWH for the said ticket
is the actual amount paid.

Arnold Gore
Arnold Gore
ICB Project Manager
BPR Consultants, Inc.

Attachments: Certified true copy of the ticket

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 68


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Attachment #2: Certified true copy of the ticket and Original Invoice
– this attachment serves as the official receipt/invoice of the cost of
international travel for reimbursement. The attachments will depend on
the payment information shown in the plane ticket as enumerated below:

Case 1 – the plane ticket will be accepted as the receipt and invoice if it
shows the actual amount paid (e.g. if it was purchased using a credit card
for payment as shown in the Attachment #2-Sample A in the next page).

Attachment #2-Sample A – Certified true copy of the plane ticket


with information on the actual amount paid (e.g. purchased by credit
card). The encircled information below shows that the ticket was paid
using a credit card.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 69


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Case 2 - if the plane ticket does not show the actual payment made for its
purchase as shown in Attachment #2-Sample B.1, a copy of the Original
Invoice must be added to the attachment (see Attachment #2–Sample
B.2).

Attachment #2-Sample B.1 – Certified true copy of the plane ticket


without information on the actual amount paid (need to include
original copy of the Invoice, refer to the next page).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 70


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Attachment #2-Sample B.2 – Original copy of the Invoice (must be


submitted in conjunction with Attachment #2-Sample B.1 in the
preceding page).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 71


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.3 Preparation of Supporting Summaries for Other Recoverable Cost

• Definition/Purpose

The Consultant prepares these documents as a supporting document for


other Recoverable Cost in Foreign Currency such as but not limited to
International Travel, Equipment and Softwares, Contingency and other
recoverable cost as specified in the Contract.

• Procedures

The preparation of these supporting summaries will use only one format
but should be done separately for each category as it appear in the
Contract or any Contract Amendment/Supplemental Agreement and must
contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Consultants information such as name of
Information the company, address, telephone and fax
number and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency(e.g. USD for US
Dollars)-nnnn(must start with 0000)].
4 Date Date of the preparation of the Invoice
5 Category Indicate the category as used in the
contract or on any amendment or
supplemental agreement.
6 Purpose The currency being billed (e.g. US
Dollars or UK Sterling Pounds - in this
case US Dollars).
7 From Indicate the start date of the billing
period.
8 To Indicate the end date of the billing
period.
9 Date Indicate the date of
purchase/procurement of the
goods/services to be billed.
10 Vendor Indicate the vendor’s name or the
business name where the goods or
services to be billed has been purchased
or procured.
11 Description Describe the goods or services to be
billed.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 72


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
12 Amount Indicate the amount of the goods/
services to be billed. The original copy
of the invoice, delivery receipt and
official receipt must be attached on this
form and in the order it is presented.
13 Total Amount The sum of the amounts to be billed
(item 12). This amount must be carried
over to the corresponding categories in
the Invoice Summary (Form F-05) and
the Budgeted Balance Summary (Form
F-07).
14 Signature Signature of the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager)
15 Name & Indicate the name and the designation of
Designation the authorized representative of the
(Consultant) Consultant.
16 Signature (DPWH) Signature of the Head of the DPWH
implementing Office (e.g. Project
Director).
17 Name & Indicate the name and designation of the
designation DPWH Head of the implementing
(DPWH) Office.
18 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the implementing
Office sign this document.

• Format

Supporting Summaries for Other Recoverable Cost must follow the


format given on next pages. For presentation purposes several Forms are
shown in the next pages showing different categories as presented in the
Invoice Summary and the Budgeted Balance Summary.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 73


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.3 Supporting Summary Other Recoverable Cost

Form F-03

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Equipments &
Salcedo Village, Makati City Softwares
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000

Date Vendor Description Amount


9 01/04/00 Good Guys Various computer equipments $ 90,000.00

10

11

12

TOTALS $ 90,000.00 13 D

CERTIFIED CORRECT
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 74


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.3 Supporting Summary Other Recoverable Cost (Continuation)

Form F-04

1
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
BPR Consultants, Inc.
Supporting Summary
20 Ayala Avenue cor. Paseo de Roxas 5
2 Contingency
Salcedo Village, Makati City
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105 6
3 E-mail: bpr.consultant.com.ph
7
4
Invoice Number ICB-USD-0010 Purpose: US Dollars
8
Date: February 2, 2000 From: January 1, 2000

To: January 31, 2000

Date Vendor/Name Description Amount


9 01/06/00 Microsoft Corporation Additional software for the $ 5,193.00
implementation of the DPWH
Communication Network
10

11

12

TOTALS $ 5,193.00
13 E

CERTIFIED CORRECT
14
DATE:
15 ROBERT DOE
ICB Project Manager 18

16 DATE:
JUAN MATAPAT
17 PMO PROJECT DIRECTOR

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 75


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachments

The original invoice, delivery receipt and official receipt must be


attached on the supporting summaries for Recoverable Cost and in the
order it is presented. Other original copy of documents that will show
proof of purchase or payments made (e.g. acknowledgement receipts) can
also be attached as supporting documents. For contingency, a certified
true copy of the DPWH authorization/approval to use the amount
allocated must also be attached in the supporting summary.

It is recommended that the original attachments be copied first on a bond


paper and then stapled the said original on the same bond paper.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 76


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.4 Preparation of Invoice Summary

• Definition/Purpose

The Invoice Summary is a consolidation of the amounts to be billed in


each category specified in the contract, where expenses have been
incurred in the given period.

• Procedures

The Invoice Summary must contain the following information:

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Consultants information such as name of
Information the company, address, telephone and fax
number and e-mail address
3 Invoice Number Invoice number must use the format
[Acronym-Currency(e.g. USD for US
Dollars)-nnnn(must start with 0000)].
4 Date Date of the preparation of the Invoice
5 Purpose The currency being billed (e.g. US
Dollars or UK Sterling Pounds - in this
case US Dollars)
6 From Indicate the start date of the billing
period.
7 To Indicate the end date of the billing
period.
8 Date Indicate the end date of the billing
period.
9 Categories Indicate the categories as specified in the
Contract.
B-E Carry-over category Indicate the applicable category totals
total from Form F-01 to F-04.
10 Grand Total Indicate the sum of the Items B, C, D
and E in two decimal places. This
amount would be carried over to Item F
of the Progress Billing Invoice.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 77


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
11 Certifying Official Signature of the authorized
Signature representative of the Consultant (e.g.
Project Manager)
12 Certifying Official Indicate the name and the designation of
the authorized representative of the
Consultant.
13 Recommending Signature of the Project Manager of the
Official Signature Implementing Office.
14 Recommending Indicate the name and designation of the
Official Project Manager of the Implementing
Office.
15 Approving Official Signature of the Head of the DPWH
Signature Implementing Office (e.g. Project
Director).
16 Approving Official Indicate the name and designation of the
DPWH Head of the Implementing
Office.
17 Signature Date Indicate the date when the authorized
representative of the Consultant and the
DPWH Head of the Implementing
Office sign this document.

• Format

The Invoice Summary must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 78


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.4 Invoice Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 79


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.5 Preparation of Progress Billing Invoice

• Definition/Purpose

The Consultant provides this document as an Invoice for the progress


billing payments. This must be prepared by the Consultant and must be
countersigned by the Project Director.

• Procedures

The following are the steps for preparing the Progress Billing Invoice and
must contain the following information:

ITEM ITEM DESCRIPTION


NO
1 Name of Project Indicate the name of the project.
2 Consultant’s Information Indicate the name of the principal
Consultant, address, telephone number,
fax numbers and e-mail address if
there’s any.
3 Invoice Number Invoice number must use the format
[Acronym-Currency (e.g. USD for US
Dollars)-nnnn (must start with 0000)].
4 Date Indicate the date of the preparation of
the Invoice.
5 Currency/Purpose Indicate the Currency being billed (e.g.
US Dollars).
6 From Indicate the start date of the billing
period.
7 To Indicate the end date of the billing
period.
8 Currency Symbol Indicate the currency symbol (e.g. $ for
US Dollars).
F Amount Indicate the amount being billed in
figures to two decimal places. This is
the carry-over amount from Item 10 of
Form F-05.
9 Consultant Name Indicate the company name of the
(Company) principal Consultant.
10 Bank Information Indicate the bank and the account
information where the payments should
be made (i.e. Name of the bank,
Account Number, Bank Address, Sort
Code and the Swift Code).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 80


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
11 Certifying Official Signature of the authorized
Signature representative of the Consultant (e.g.
Project Manager)
12 Certifying Official Indicate the name and the designation
of the authorized representative of the
Consultant.
13 Recommending Official Signature of the Head of the DPWH
Signature implementing Office (e.g. Project
Director).
14 Recommending Official Indicate the name and designation of
the DPWH Head of the Implementing
Office.
15 Signature Date Indicate the date this document was
signed by the respective parties.
16 Attachments Describe the supporting summaries
attachments with this Invoice
17 Approving Official Signature of Approving
Signature Official for the Invoice
18 Approving Official Indicate the name of responsible
official (at least an Undersecretary) and
his designation approving the Invoice.
In the case of the first progress billing,
the Secretary must be the Invoice
approving official.

• Format

Progress Billing Invoice must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 81


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.5 Progress Billing Invoice

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 82


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.6 Preparation of Budgeted Balance Summary

• Definition/Purpose

The Consultant prepares this document to monitor the financial status and
the utilization of the Consultant’s time of the project.

• Procedure

ITEM ITEM DESCRIPTION


NO
1 Project Name Name of the project, including
acronym being used if possible
2 Currency The currency being billed (e.g. US
Dollars or UK Sterling Pounds - in
this case US Dollars)
3 Note Indicate any information that is not
applicable on the table of this form
such as if there is any Contract
Amendment or Supplemental
Agreement.
4 Category Indicate the categories as specified
on the contract.
5 Budgeted Amount Indicate the budgeted amount for
each category. The amount would
include the amount in the original
contract plus any amount added or
subtracted thru Contract
Amendments or Supplemental
Agreement.
6 Budgeted Man-Months Indicate the total budgeted number
of man-months for consultants. It is
suggested that the same be done
also for Project Staff.
7 Date Indicate the last day of the billing
period.
8 This Invoice Amount Indicate the corresponding total
amount for each category (see items
B, C, D and E on Invoice
Summary).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 83


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
A This Invoice Man- Indicate the total number of man-
month months for the billing period by
converting the Overall total factor
(Item 14 of Form F-01) from a
fraction to a number with two
decimal places.
9 Total-to-Date Amount Indicate the total amount at the end
of this billing period for each
category. These amounts will be
equal to the total amount of
previous invoices plus the amount
for this billing period.
10 Total-to-Date Indicate the total number of man-
Man- Months months at the end of this billing
period.
11 Balance Amount Indicate the balance amount for
each category. These amounts will
be equal to the budgeted amount
(item 5) minus the total-to date
amount (item 9).
12 Balance Indicate the balance of man-months
Man-Months for the personnel. This will be equal
to the budgeted man-months (item
6) minus the total-to date man-
months (item 10).
13 Totals Indicate the sum of each column.
14 Certifying Official Signature of the authorized
Signature representative of the Consultant
(e.g. Project Manager)
15 Certifying Official Indicate the name and the
designation of the authorized
representative of the Consultant.
16 Recommending This must be signed by the
Official Signature Implementing Office Project
Manager
17 Recommending This must be the name and
Official designation of the Implementing
Office Project Manager.
18 Approving Official Signature of the Head of the DPWH
Signature Implementing Office (e.g. Project
Director).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 84


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
19 Approving Official Indicate the name and designation
of the DPWH Head of the
Implementing Office.

• Format

Budgeted Balance Summary Sheet must follow the format provided


below.

C.II.6 Budgeted Balance Summary

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 85


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.7 Preparation of Letter – Request of Consultant

• Definition/Purpose

The Consultant provides this document as the main cover letter for their
progress billing claims. This letter/request is prepared on the Contractor’s
letterhead.

This will be prepared by the Consultant and submitted as an original


copy.

• Procedures

The Letter Request of Consultant must contain the following information.

ITEM ITEM DESCRIPTION


NO
1 Consultant Indicate the Consulting firm’s
Information information such as company name,
nature of business, address, telephone
and fax number (incl. country and
access code) and e-mail address.
2 Project Name Indicate the name of the project.
3 Agency Name Indicate the agency name (i.e.
Department of Public Works and
Highways, address and telephone
number).
4 Invoice Date Indicate the date of preparation of the
invoice.
5 Attention The Invoice letter must be addressed to
the responsible official for the project
(at least a Project Director).
6 Reference Indicate the type of service, name of the
project and the owner of the project (i.e.
DPWH).
7 Salutation Salutation addressed to the responsible
official (see Item 5) of the Department.
8 Invoice Number Indicate the Invoice Number as it
appears on Item 3 of Form F-06.
9 Currency Indicate the currency being billed (e.g.
US Dollars or UK Sterling – in this case
US Dollars).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 86


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO
10 Currency Symbol Indicate the symbol of the currency
being billed (e.g. $, £).
11 Company Name Indicate the company name of the
(Consultant) principal consultant.
12 Bank Information Indicate the bank and the account
information where the payments should
be made (i.e. Name of the bank,
Account Number, Bank Address, Sort
Code and the Swift Code).
13 Signature Signature of the authorized
(Consultant) representative of the Consultant (e.g.
Project Manager)
14 Name & Indicate the name and the designation of
Designation the authorized representative of the
(Consultant) Consultant and the Company Name.
F Total Invoice Indicate the total amount of the Invoice.
Amount See Item 10 of Form F-05.

• Format

The Letter Request must follow the format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 87


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

C.II.7 Letter – Request of Consultant

Form F-08

BPR Consultants, Inc.


Re-engineering Consultants
20 Ayala Avenue cor. Paseo de Roxas
1 Salcedo Village, Makati City, Philippines
Tel Nos.: +63 2 988-0100 Fax Nos.: +63 2 988-0105
E-mail: bpr@consultant.com.ph
2
Institutional Capacity Building (ICB) Project
Department of Public Works and Highways
nd
3 2 Street, Port Area, Manila
Tel. Nos: +63 2 303-3088 Fax. +63 2 303-3085

4 February 2, 2000

Department of Public Works and Highways


Bonifacio Drive, Port Area
Manila, Philippines

Attention: Mr. Juan Matapat, PMO-ICB Project Director 5


Reference: Technical Consulting Services for the Development and Implementation
6 of the Institutional Capacity Building (ICB) Project for the Department of 8
Public Works and Highways (DPWH)

7 Dear Mr. Matapat:

Attached is Invoice Number ICB-USD-0010 for US Dollars in the amount of


$182,610.68 for the period covering January 1-31, 2000.
10
9
F Please make US Dollar payments to:
BPR Consultants, Inc.
11 Account Number: 12345678
Banco Americana
100 Wilshire Blvd.
Los Angeles, CA 90002
12
Sort Code: 24 12 27
Swift Code: BANAMGMAA8JA

Your expeditious processing of this invoice would be appreciated.

Very truly yours,


13

Robert Doe
ICB Project Manager
14 BPR Consultants, Inc.

Attachment: Invoice and Supporting Documents

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 88


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

PART D. FINAL PAYMENT ................................. 90


I. Introduction ................................................................... 90

II. Preparation of Forms .................................................... 91


II.1 Applicable Forms and Attachments in Part B and Part C ...... 91
II.2 Verification of BIR Clearance (Form 2555) .......................... 91
II.3 Inventory and Costing of Turned-over Equipments............... 93

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010)


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

Part D. Final Payment


This section provides instructions to the Consultant on completing the Final
Payment claims. The same documents and attachments described in the Progress
Billing described in Part B and Part C for local and foreign currency respectively,
will also be used in the preparation of the Final Payment. In addition to these the
BIR Clearance (Form 2555) and Inventory and Costing of Turned-over
Equipment bought out of project funds and Invoice Receipt (if there’s any) for
said assets will have to be submitted with the claims for Final Payment

I. Introduction

This section will discuss the documents needed to prepare the Final Payment
claim of the Consultant.

The preparation of the BIR Clearance (Form 2555) and Inventory and Costing
of Turned-over equipment bought out of project funds and Invoice Receipt for
said assets are discussed in the next page. If there is no equipment bought out
of project funds a Certification to that effect by the responsible official of the
project (at least by a Project Director) will have to be submitted with the
claim.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 90


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II. Preparation of Forms

The following section provides description of the forms that must be used and
the procedures for completing them.

II.1 Applicable Forms and Attachments in Part B and Part C

• Definition/Purpose

The Consultant will use the applicable forms and attachments discussed
in Part B and Part C.

• Procedure

The information requirement and procedures in the preparation of the


applicable forms of Part B and Part C and its attachments will be the
same as discussed in those sections.

II.2 Verification of BIR Clearance (Form 2555)

The Consultant must accomplish and attach the BIR Clearance Form 2555 as
part of the Final Payment requirement. The attachment must be original and
duly received by BIR.

• Checking Entries

ITEM ITEM DESCRIPTION


NO.
1 Consultant This must be the Consultant Name,
Information Address, TIN, and RDO.
2 Project Information This must be Project Information
including the Name and Location.
3 Contract Information This must be the detail of the contract
including the contract amount, and
amounts previously collected and taxes.

• Format

Sample of BIR Form 2555 is shown on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 91


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

D.II.1 BIR Clearance (Form 2555)

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 92


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

II.3 Inventory and Costing of Turned-over Equipments

• Definition/Purpose

The Consultant prepares this document as a requirement in processing the


final billing/payment. This document will reflect the quantity, unit value
and the date of purchase of the equipments (e.g. Computer
Hardware/Software, Furniture, and other Non-expendable items) bought
by the Consultant out of the project funds, as specified in the Contract.
As a proof of turn-over, all Invoice Receipt for Property must be
attached.

• Procedure

The Inventory and Costing of Turned-over Equipments must contain the


following information:

ITEM ITEM DESCRIPTION


NO.
1 Project Name Name of the project, including acronym
being used if possible
2 Consultant Indicate the name of the principal
Consultant.
3 Item Indicate the description of the
equipment/item bought out of project
funds. The Serial No. of the equipment
if there’s any must also be included.
4 Quantity Indicate the quantity of the particular
equipment/item bought out of project
funds.
5 Unit Price Indicate the unit price of the particular
equipment/item bought out of project
funds. The unit must price must include
the currency it was billed.
6 Amount Indicate the total amount spent for a
particular equipment/item. This will be
the quantity (Item 4) multiplied by the
unit price (Item5).

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 93


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

ITEM ITEM DESCRIPTION


NO.
7 Date Invoiced Indicate the date the particular
equipment/item bought out of project
funds was invoiced or reimbursed from
the Project.
8 Date Purchased Indicate the date of purchased of the
particular equipment/item bought out of
project funds as it shows in the official
receipt.

• Format

The Inventory and Costing of Turned-over Equipment must follow the


format given on the next page.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 94


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

D.II.2 Inventory and Costing of Turned-over Equipment

Institutional Capacity Building (ICB) Project 2


1 Under Contract with BPR Consultants, Inc.
Inventory of Turned-over Equipments 5
3
6
4 Date Date
Qty. Item Unit Price Amount
Purchased Invoiced
5 Compaq Deskpro 2000 – $2,229.00 $11,145.00 16-Mar-00 Mar-00
Pentium II/233 MHz with 7
15" Color Monitor

CPU Serial # Monitor SN


Item #1 7815BMJ20160 826CF03DA284 8
Item #2 7815BMJ20241 826CF03DA925
Item #3 727BD26ED385 7815BMJ20238
Item #4 7816BMJ20060 727BD26ED381
Item #5 7815BMJ20238 826CF03DA055

2 APC Back 650MI Back- $155.00 $310.00 16-Mar-00 Mar-00


UPS
#1: SN QS9932224578
#2: SN QS9933122384
1 Compaq Proliant 5500 $9,482.50 $9,482.50 10-Apr-00 Apr-00
Xeon Pentium III 550Mhz
CPU SN: 3862C701
Monitor SN: 802BF23AD
1 Additional Xeon
Processor 550Mhz $2,028.00 $2,028.00 10-Apr-00 Apr-00
1 Additional 256 MB $999.00 $999.00 10-Apr-00 Apr-00
1 Additional 512 MB $1,901.00 $1,901.00 10-Apr-00 Apr-00
1 Compaq 4/8 DAT Tape
Drive $824.00 $824.00 10-Apr-00 Apr-00
2 Canon BJC-50 Printer
with cable
#1: SN AGQK049509
#2: SN AGQK043615 $346.73 $693.46 31-May-00 May-00
1 MS Office 97 Pro. $651.75 $651.75 20-Aug-97 Aug-97
1 ABC Flowchart 7.0 Up $158.99 $158.99 3-Oct-97 Oct-97
1 Norton Anti-virus for
Windows 95, 3.1 and DOS $72.07 $72.07 3-Oct-97 Oct-97
32 MS Office 97 Standard $544.00 $17,408.00 24-Dec-97 Dec-97
32 Norton Utilities for
Windows 95 V2.0 $91.00 $2,912.00 24-Dec-97 Dec-97
1 Samsung Air-Con 2.0 HP
SN 046407310 P 18,500.00 P 18,500.00 19-Jan-98 Jan-98
1 Copying Machine DC-
1856
SN 37034219 P 128,350.00 P 128,350.00 16-Apr-98 Apr-98
24 EXM 402 - Jr. Executive
Chair - Low Back P 3,450.00 P 82,800.00 19-Jan-98 Jan-98
18 CD 102 - Computer Table P 3,410.00 P 61,380.00 18-Mar-98 Mar-98
4 NCT 1895 - Conference
Table - 6 seater P 6,600.00 P 26,400.00 20-Mar-98 Mar-98

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 95


CONSULTANCY BILLING GUIDELINES (CONSULTANT)

• Attachment

The sample format below must be used in the turn-over of equipment to


the Department’s official/personnel other than the Supply and Property
Management Division (SPMD). This format will be the basis by the
SPMD together with the Inventory in the issuance of the Property
Clearance. If the equipments will be turned-over to the SPMD at the
completion of the project, there is no need for this document.

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (December 2010) 96