Risk Assessment
Project Cairo Monorail/ NCC Date: 28th March 2022 MS reference No. Mobilization plan
Site/location Depot area Client; Alstom
Appointed Person carrying
Waleed Taha Date of Assessment:
out the Assessment:
Site contact: Phone: 01005466590
Description of Task: mobilizing the site
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 2 of 53
MODERATE (2) 2 4 6 8 10
MEDIUM RISK
SIGNIFICANT (3) 3 6 9 12 15 8 - 12 Further Risk Reduction Measures
should be considered
SEVERE (4) 4 8 12 16 20
.
CATASTROPHIC (5) 5 10 15 20 25
HIGH / INTOLERABLE RISK
Seek specialist advice/support.
15 - 25 Investigate alternatives.
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 3 of 53
Evaluation Respo
Affected Unmitigated Excavation
Permit to Work Hot Works W@H Lifting Risk after nsabile
Consequences
Risk
required? Potential Effected Control Person
Rail Access LOTO Cold work Specify Other: Recommended Control
Hazards Parties L S R
L S R
Activity
1- Lack of awareness
Whole body
4 4 16 PTW procedures shall be applied 2 2 4 Cons&
Leg/ arm fracture strictly, TBT/ STARRT to be conducted HSE
Preparation Inadequate Skin deterioration
as fire cause. Good communication channel with
of work planning/ lack of
coordination with Fatal
others whom involved must kept.
pre-start
(Doc, involved. Task explanation and equipment used
Competenc must be clearly stated and specified
Noncompliance Serious Injuries (MSRA relatively)
y& with working
vehicles, Safety devices for all site vehicles to be
procedures
checked, ensured effectively pre start.
General Working without process delays or Only competent/ nominated personnel
Activity proper PPE's stoppage to commence the job.
lack of inspection Injuries Full compliance with mandatory PPE's
Poor bruising High level of housekeeping/ waste
housekeeping/ management to be maintained all time.
fractures
Environmental The work permit must be closed out
impact after a job is completed.
Emergency plan Fully aware of emergency condition/
poor plan& well trained.
communicated. Area to be cordoned effectively.
Slipping Validation for all required license/
certificates for operatives, equipment
Tripping and machinery.
Falling All EIA aspects/ mitigations to be
reserved/ maintained.
Proper level of facility (heat stress
control, drinking water, fatigue
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 4 of 53
ensured that:
The engine is stopped and prevented
from unauthorized use (e.g.: starter
key removed), brake applied (and
with wheels chocked for heavy
vehicles)
All raised parts are lowered to the
ground (like forks) or put in a safe
position (cranes)
- No parked vehicle is obstructing
emergency exits, other routes, fire
equipment or electricity panels.
Contract with
plant and Area to be barricaded/ flagman to supervise
equipment (road
accident on site) Security will ensure people immediately
Sever injury inside the site (prevent congestion)
Injury / Property Speed limit of 20 km/h on site.
damage /
Interruption of site Safe traffic procedures to be in place
access vehicle daily inspection by operator HSE&
CONS,
Theft and Standard PPE (including hi-vis vest)
equipment/ Skin deterioration
vandalism Limited plant and equipment on site
machinery as fire cause.
Assets.
Unauthorised
people entering
the site
i.
exit.
Security inspection of trucks – Drivers and
passengers’ ID’s will be taken at the gate.
For FORKLIFT:
Licensed driver only allowed to operate
Fork lift driver training to be good
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 14 of 53
understand.
Provide competent Site Supervision and
qualified Operator to check and define
all of (pre-start safety checks, safe
operation, loads, and methods (or
devices) for determining load mass and
dimensions, driving, ramps and loading
docks, fuel handling and storage,
battery charging and changing and safe
work areas) for forklift before process.
Daily recorded inspection for
equipment.
Recommended avoid curved road unless
slow down speed
Avoid raising of load more 20cm
No maintenance activity without
permission to ensure blocking of
potential energy sources.
Approved Lifting plan to in place and
Lifting PTW to be issued prior to start
the activity
Perform TBT to discuss risks in RA
prior to start the activity
Ensure equipment is tested with 3rd
party certified.
No signs of hydraulic leaks area.
Do not exceed the load above SWL of
the equipment.
Ensure access way visible during the
vehicle movement.
Switch off the vehicle and remove key
with parking gear engaged when not in
use.
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 15 of 53
4- Whole bode
failure of plant or Leg, arm fracture 5 5 25 Plant/ equipment to have valid certificates/ 2 2 4 HSE&
Unloading equipment colour coded. CONS,
of
containers Daily inspection of equipment required (not
using Untrained recorded)
crane/ operators or SWL of crane and equipment will not be
lifting riggers exceeded.
operation
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 17 of 53
Unstable ground Sever injury Rigger will ensure that no person is under
leading to crane Property damage the load
collapse or unsafe Safe lifting procedures to be fully complied
unloading
Safe lifting breach is a zero tolerance.
Attaching and
detaching lifting All operator and riggers will have their
equipment position on the written on ID card.
Uncontrolled All cranes will have (foot) plates available
movement of the for all out riggers
load All operator and riggers will be approved
Operator will perform visual inspection prior
to extending outriggers.
Rigger will access top of container by
ladder.
Rigger will be in full harness attached to 5th
sling with self-retracting life line/ fall
arrestor whichever available
Taglines will be fitted to all loads so that the
rigger can access the line during the lift.
All lifting operations must be under the
control of a competent Lifting Supervisor.
ALSTOM Lifting Permit shall be obtained.
RA to be communicated with the working
force and TBTI shall be conducted.
Exclusion zone should be identified and
isolated.
All lifting gears, tools and tackles should be
inspected, colour coded and should have
valid 3rd party certificate.
Prior to lifting specific lifting plan to be
placed and should consider the weight of the
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 18 of 53
authorized by ALSTOM.
Use and engage crane / forklift as per the
load intended to be lifted
Pre-assessment checklist for Lifting activity
has to be filled and signed by contractor
before Erection.
Ground of the crane operating area to be
firm / compacted and levelled
Mobile crane operator must have a valid
heavy equipment driving license and
operator competency certificate by 3rd party.
Daily inspection checklist of crane to be
maintained by the operator.
Area to be barricaded while the equipment is
in operation with caution sign boards.
Follow the load chard in the crane as per
manufacturer recommendation
Ensure limit switches are in proper working
condition
Adequate training for all team related with
Lifting Operation.
Adequate communication between crane
operator and rigger (hand signals, talky,
mobile, etc.)
Accepted weather condition.
Work shall be stopped if wind speed more
than 30 km/h.
Proper lifting accessories storage in order to
prevent from damage.
The safe working load and the maximum
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 20 of 53
7- Working Stork
4 5 20 PTW/ T.B.T to be effectively obtained/ 1 4 4 Cons/
at height& Whole body conducted pre start. HSE
Skin fire
Blood/ internal Close supervision/ accountable
scaffolding bleeding personnel to be in site all time.
accessibilit Properly damage Only trained employees/ workers with
y province of competent/ skill tested
Unloading allowed to be in height.
Truck
Only approved access ways shall be
provided to access elevated work areas.
Sever injury All work platforms whether permanent
Falling object Fatality or temporary (scaffold type) shall be
truck overturning approved, tagged and protected against
Falling from
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 30 of 53
For SCAFFOLDING:
Scaffolding must be Constructed
according engineering department
design
Periodical inspection by a competent
person
Apply Scaff tagging system.
Effective supervision to prevent
overloading
Ensure that personnel who working at
height not suffering from vertigo or
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 33 of 53
guardrail system:
Toe-board minimum 10 cm
Ensure MS/RA is clearly discussed
with the work force.
WAH Training to be given to the
working force before starting work
Access the scaffold platforms through
ladder only
Do not access the scaffolding by
climbing over the scaffold component
(Ledger / standards etc.)
Do not use homemade ladders.
Ensure the ladder is of adequate
strength and sound construction.
The ladder must be set on a firm level
footing not bricks.
Ladders to be registered
Check bottom of the safety shoes for
any oily / slippery substances.
Do not move the mobile scaffold
keeping person on the top of the
scaffold
Provide proper access through inner
side of the mobile scaffold
When ascending/descending a ladder,
the worker must face the ladder
Wooden ladders must not be used at site
Do not try to stretch too far on sides
whilst standing on the ladder.
Overreaching is not allowed
Ladders with missing rugs must not be
used.
Ladders must be used only for the
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 35 of 53
person
*Provision of proper supervision
*Stop untrained peoples from
welding activity
*Trained employees only allowed to
operate grinding machine
*All tools shall be inspected before
use
*Appropriate PPE shall be used
*Adequate supervision
*Grinding tools and blades shall be
fitted properly
*Minimize the no. of employees
*Check the grinding machine and
other hand tools before use
*Welding sets must be earthed.
*No cracking or burn mark is on
cable
*Keep fire extinguishers nearby
*Barricade the area
*Check the machine before use
*Experienced personal shall do the
work.
The entry of equipment/mobile
plant are to be authorized under
appropriate PTW including
inspection and certification
All contaminated soil will be
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 42 of 53
unauthorized personnel.
Manual handling training to be
given to all TBT by the person in-
charge.
Ensure hand is not struck with the
permanent objects nearby the work
area
Do not jerk keep proper control of
the load.
When turning to the side do not
twist the trunk.
Keep the load close to the trunk for
as long as possible.
Keep the heaviest side of the load
next to the trunk of pallet trolley.
Put down, and then adjust. If you
required changing the position, but
put it down first, and then slide it
into the required position.
While shifting the lengthy materials,
take precautions not to hit any by
passers.
Sufficient manpower to be allotted
Keep the access and egress clear off
obstruction from the load to be
shifted
Personnel involved must wear
safety helmet, safety shoes, high
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 44 of 53
applicable.
Assess physical capacity of the
persons involved in lifting.
While lifting, keep bend, straight
back and stand close to the load.
While lifting, load must be given in
the lower part of the body, but not
on the back to prevent back injury
Inspect regularly
Regularly inspect your tools to
make sure that they are in good
condition.
Wear gloves
Always wear appropriate personal
protective equipment.
Carry with care
Never carry tools up a ladder.
If you need to take tools up to a
height use a bag or hoist them up in
a bucket.
Don't pocket sharp objects
Never carry sharp or pointed tools
in your pocket.
Instead, carry them in a toolbox.
Be aware of your surroundings
Always be aware of the people
around you when using tools.
Use the right tools
Always use the right tools for the
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 46 of 53
job.
Never use a tool for a different
purpose than it was intended.
You risk damaging the tools and
injuring yourself.
Follow instructions
Only operate tools according to
manufacturers' instructions.
Clean and return
After using a tool, clean it and
return it to its proper storage place.
Oily hands are dangerous
Don't work with greasy or oily
hands.
Protect your eyes
Always wear eye protection.
HEAT STRESS:
ntal Brain strok
Impacts Cooling arrangements made and room
temperature to be maintained in all
rooms.
Cool drinking water facilities to be
made available in all working locations.
Rehydrated salts to be made available.
Lone working is not allowed.
Mid-Day Break to be followed.
Encourage employees to take water at
regular intervals.
DSTI to be performed prior to starting
activity.
Hazards related to heat stress to be
communicated to all employees.
Job rotation system to be followed.
Cotton light coloured cloths to be
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 48 of 53
preferred.
Ensure sufficient rest areas with cooling
arrangements made available at site
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 49 of 53
P.M
Deliver site Certified Truck and Qualified driver CONS/
(Diesel Truck) Spillage Safe Truck according to licences and
Emitted gases HSE/
Start Operating Collision inspection SEC
Leakages Check the valves to avoid leakage
Filling
Provide Spill-kit
Inhalation of gases Drip tray to be provided to prevent any
spillage during refuelling and generators
to be filled with drip tray underneath
(ENCLOSURE) with capacity 110%
from the generator diesel and oil
capacity.
Check the hose before refuelling
Whole body Switch off the cart during refuelling
14- Leg/ arm fracture Proper PPEs during refuelling
Refuelling Skin deterioration Proper connection to hose and vales
as fire cause. 5 5 25 2 5 10
& Gas Provide safe MEWP
Emission Burn
Pneumonia proper maintenance of the engine and
exhaust system
Check engine exhaust filters and
changing it if needed
tailpipe exhaust ventilation
Proper PPEs
always open the generator doors before
starting vehicles;
keep garage doors open (weather
permitting) for at least 10 minutes
following operation (generators room)
perform regular engine maintenance on
the vehicles to minimize Diesel Engine
Exhaust Emissions;
Form Ref.: F-HSE-001
Risk Assessment Form Rev.: 01
Page: 52 of 53
Note:
For normal circumstances the risk management shall be reviewed on annual basis, and depending on the magnitude of risks and the potential severity of hazards, these should be immediately reviewed by competent staff. As a
typical issue for these reviews one should verify if the base assumptions have changed since the original design was implemented or since the risks were reviewed previously i.e.:
If the Plant/equipment performance lived up to the expectations of the original design in terms of accidents, incidents and equipment uptime.
If there are changes in the work environment or the work practices concerning the hazard which the risk assessment addressed.
There is evidence that the risk assessment is no longer valid.
If someone is harmed from exposure to the hazard that the assessment dealt with.
Are the Legislation and/or public perceptions changed regarding what is now considered acceptable/unacceptable?