Professional Documents
Culture Documents
Corrigendumto RPFdocumentfor EPCTender
Corrigendumto RPFdocumentfor EPCTender
Corrigendumto RPFdocumentfor EPCTender
2.2.2.5(i)d The value of self-construction during five Financial The value of self-construction during the past 5 (five)
Years, immediately preceding the application due completed financial years and current financial year
date, in projects which are considered as eligible preceding the Bid Due date, in projects which are considered
projects in terms of Clauses (a) to (c) above will as eligible projects in terms of Clauses (a) to (c) above will be
be considered for the purpose of experience. considered for the purpose of experience.
2.2.2.5(ii) For a project to qualify as an Eligible Project For a project to qualify as an Eligible Project under
under Categories 3&4: Categories 3&4:
A) For New lines, Gauge conversion, Doubling, The Bidder should have received cumulative payments from
Signature Not 3rd line, Bridges, ROB, Tunnels etc., works: The its client(s) for construction works executed fully or partially,
Verified
Digitally signed by
MAHESWARI B 1
Date: 2023.01.12
12:31:26 IST
Reason: IREPS-CRIS
Location: New Delhi
Bidder should have received cumulative payments during the past 5 (five) completed financial years and current
from its client(s) for construction works executed financial year preceding the Bid Due date, and only the
fully or partially, during the 5(five) Financial Years amounts (gross) actually received during such 5(five)
immediately preceding the Bid Due date, and only Financial Year shall qualify for purposes of computing the
the amounts (gross) actually Technical Capacity Technical Capacity. However, total receipts of less than (10%
However, total receipts of less than (10% of the of the Estimated Project Cost) shall not be reckoned as
Estimated Projects Cost) shall not be reckoned as receipts for Eligible Projects. For the avoidance of doubt,
receipts for Eligible Projects. For the avoidance of construction works shall not include supply of goods or
doubt, construction works shall not include supply equipment except when such goods or equipment form part
of goods or equipment except when such goods or of a turn-key construction contract/EPC contract for the
equipment form part of a turn-key construction project. Further, the cost of land shall not be included
contract/EPC contract for the project. Further, the hereunder.
cost of land shall not be included hereunder.
2.2.2.6(i) The Bidder should furnish the details of Eligible The Bidder should furnish the details of Eligible Experience
Experience for the last 5 (five) Financial years for the past 5 (five) completed financial years and current
immediately preceding the Bid Due date. financial year preceding the Bid Due date.
3.1.6.1(h) New Copies of duly audited complete Balance sheets and P&L
Statements of the bidder or of each member (in case of Joint
Venture / Consortium) for past 5 (five) completed financial
years.
Annexure III of Year 1 will be the latest completed Financial Year, Year 1 will be the latest completed Financial Year, preceding
Appendix IA- preceding the Bidding. Year 2 shall be the year the Bidding. Year 2 shall be the year immediately preceding
Instructions- 4 immediately preceding Year 1 and so on. In case Year 1 and so on. In case the Bid due date falls within 3
the Bid due date falls within 3 (three) months of (three) months after the close of the latest completed
Financial Year, refer to Clause 2.1.13
2
the close of the latest Financial Year, refer to
Clause 2.1.13.
Annexure IV The total payments received and/or expenditure The total payments received and/or expenditure incurred on
of Appendix- incurred on construction works undertaken by construction works undertaken by itself in a PPP project are
IA- itself in a PPP project are to be stated for each to be stated for each Eligible Project in Annex-II of this
Instructions- Eligible Project in Annex-II of this Appendix-IA. Appendix-IA. The figures to be provided here should indicate
6+ The figures to be provided here should indicate the break-up for the past 5(five) completed financial years and
the break-up for the past 5(five) Financial Years. current financial year preceding the Bid Due date. Year 1
Year 1 refers to the Financial Year immediately refers to the Current Financial Year immediately preceding
preceding the Bid Due date. Year 2 refers to the the Bid Due date. Year 2 refers to the year before Year1, Year
years before Year1, Year 2 refers to the year 3 refers to the year before year 2, and so on (Refer Clause
before year 2, and so on (Refer Clause 2.1.13) For 2.1.13) For Categories 1 and 2 expenditure on construction
Categories 1 and 2 expenditure on construction of of the project by the Applicant itself should be provided, but
the project by the Applicant itself should be only in respect of projects having an estimated capital cost
provided, but only in respect of projects having an exceeding the amount specified in Clause 2.2.2.5(i)/(c). In
estimated capital cost exceeding the amount case of Categories 3 and 4 payments received only in
specified in Clause 2.2.2.5(i)/(c). In cage of respect of construction should be provided, but only if the
Categories 3 and 4 payments received only in amount received exceeds the minimum specified in Clause
respect of construction should be provided, but 2.2.2.5(ii). Receipts for construction works` should only
only if the amount received exceeds the minimum include capital expenditure, and should not include
specified in Clause 2.2.2.5(ii). Receipts for expenditure on repairs and maintenance.
construction works should only include capital
expenditure, and should not include expenditure
on repairs and maintenance.