Professional Documents
Culture Documents
Screenshot 2024-04-13 at 00.22.06
Screenshot 2024-04-13 at 00.22.06
Screenshot 2024-04-13 at 00.22.06
majidalbana@hotmail.com
job title
Structural
Drawings
SCALE As Shown
DATE 4 /2024
15
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet x
Nylon Sheet
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
0
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615& A616 OR A617 BARS SHOULD BE GRADE x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
x
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORTPREPARED BY THE 2Ø10
& RESEARCH ( ( ) 2023 \ 1 \ \ 4 ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS(10K/m²) AT DEPTH OF (-2.00m)
MEMBER (mm)
ON GROUND SLAB Typical Sec. Of Ramp
BELOW THE EXISTING N.G.L.
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK ASINDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40 2Ø16
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF Ø10 @ 200
COLUMNS 40 Ø10 @ 200
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D) 2Ø16
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40
CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS,BEAMS&GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.
AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB/ FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THETYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAPAS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURALDRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND.
WATER STOPS SHOULD BE FACTORY MOLDED. A
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B
h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
2
sheet no.
drawn
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
A B C D E
20.00
5.60 5.70 5.60 2.70
1 C2 C2 C2
C1
3.75
3.68
6.00
2.25 5.13
10.00
C2
2 C1 C1
Ø25@200 B&T. MESH
4.00
C1
C2
3 5.60 3.55 2.05 5.70
C1 2.30
20.00
A B C D E
20.00
REBAR TIED REBAR TIED REBAR TIED
5.60 H.B 3.00 5.70 H.B 3.00 5.60 H.B 2.70
3.00
ADDITIONAL ADDITIONAL ADDITIONAL
12Ø25@200mm 12Ø25@200mm 12Ø25@200mm
CONCRETE COVERS
-SLABS = 25 mm
6.00
2 -WALLS = 25 mm
-SLAB ON GRADE = 50 mm
3.0
3.0
3.0
-RAFT FOUNDATION
= 75 mm
3.0 3.0 3.0
4.00
3
REBAR TIED REBAR TIED REBAR TIED
H.B H.B H.B
ADDITIONAL ADDITIONAL ADDITIONAL
8Ø25@200mm 8Ø25@200mm 8Ø25@200mm
L=3m L=3m L=3m
E H.B 12Ø25
L=3m
H.B Ø25@200
ADDITIONAL
L=3m
Ø25@200mm
BOTTOM L=3m
3.0
10 12 16 18 20 22 25 (A)
BAR DIA.(mm)
drawing title
Foundation Plan
LAP LENGTH (mm) IN 400 500 600 650 700 800 900 PLAN OF FOUNDATION
COLUMNS REINFORCEMENT&SEC.
LAP LENGTH (mm) IN 400 600 700 800 900 1000 1250
designed
ENG : DR-Majid Albana
project manager
approved
job no.
3
sheet no.
ST/D/04
A B C D E
20.00
5.60 5.60 5.70 2.70
2.00
مص عد
3.50
2.0x2.3
6.00
+18.80
1.80
10.00
2
3.70
ب راد
احتي اط
4.00
9.00
7.74
3 2.30
20.00
A B C D E
20.00
5.60 5.60 5.70 2.70
1 2.30
2.00
مص عد
2.0x2.3
6.00
+21.00
10.00
2
no. date initials revision
4.00
job title
3 2.30
drawing title
20.00
drawn
scale
job no.
1-100
date
sheet no.
approved
A B C D E
20.00
5.60 5.60 5.70 2.70
2.00
W.C
مص عد
ب راد
3.50
2.0x2.3
6.00
مطب خ
+12.60
1.80
10.00
2
3.70
ب راد
احتي اط
4.00
9.00
7.74
3 2.30
20.00
A B C D E
20.00
5.60 5.60 5.70 2.70
مص عد
ب راد
3.50
2.0x2.3
6.00
+15.80
1.80
10.00
2
3.70
9.00
4.00
7.74
job title
3 2.30
drawing title
20.00
drawn
scale
job no.
1-100
date
sheet no.
approved
A B C D E
20.00
5.60 5.60 5.70 2.70
2.00
W.C
مص عد
ب راد
3.50
2.0x2.3
6.00
مطب خ
+6.20
1.80
10.00
2
3.70
ب راد
احتي اط
4.00
9.00
7.74
3 2.30
20.00
A B C D E
20.00
5.60 5.60 5.70 2.70
مص عد
ب راد
3.50
2.0x2.3
6.00
+9.40
1.80
10.00
2
3.70
9.00
4.00
7.74
job title
3 2.30
drawing title
20.00
drawn
scale
job no.
1-100
date
sheet no.
approved
A B C D E
20.00
5.60 5.60 5.70 2.70
2.00
W.C
مص عد
ب راد
3.50
2.0x2.3
6.00
مطب خ
1.80
10.00
2
3.70
+3.20
ادارة
4.00
9.00
5.44
3 2.30
20.00
mezzanine floor
A B C D E
20.00
5.60 5.60 5.70 2.70
1 7.65 2.30
2.00
مص عد
ب راد
3.50
2.0x2.3
6.00
1.80
10.00
2
3.70
ادارة 3.40
job title
3 2.30
drawn
scale
job no.
1-100
date
sheet no.
approved
A B'
12 No. Ø12
0
15
6@
Ø1
0
20
2@
Ø1
Ø12mm@200
Slab Reinf.
Ø12@150
15
0 Slab Reinf.
6@
Ø1
Ø12@200 20
0 Slab Reinf.
2@
Ø1 20
0
2@
Ø1
Ø12@200
CONCRETE COVERS
SECTION A'-A' (between slab & landing ) 200mm
-SLABS = 25 mm
-BEAMS = 40 mm
no. date initials revision
-COLUMNS = 40 mm
-WALLS = 25 mm
-SLAB ON GRADE = 50 mm
job title
-RAFT FOUNDATION = 75 mm
(A)
drawing title
Stairs detail
all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 4 /2024
4
drawn job no. sheet no.
approved ST/D/07
A B C D E
20.00
5.60 5.70 5.60 2.70
1 C2 C2 C2
C1
3.75
3.68
6.00
C3 C3 C3
2.25 5.13
10.00
C2 C2
2 C1 C1
4.00
C1
C2 C3
3 5.60 3.55 2.05 5.70
C1 2.30
20.00
COLUMNS SIZE
C1 1000 400
C2 800 400
C3 1000 250
job title
(A)
drawing title
8
sheet no.
approved
Main Bar 20 - Ø25 16 - Ø25 12- Ø25 8- Ø25
Column Reinf.
Rest See
C 50 1000 1000
800
600
Section
2 nd Floor
Main Bar 2nd Floor 20 - Ø25 16- Ø25 12- Ø25 8- Ø25
Ground Level
foundation 250 250
400 400
level
job title
(A)
drawing title
SCHEDULE OF COLUMN
Typ. Sec. For Column
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 4 /2024
drawn job no.
approved
Reinf. conc. Raft Ø12@15cm C/C
foundation .
5 cm plain concrete Ø12@20cm C/C
2layers Bitumen 1cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding 1 .26
1 .89
25cm Bolder
Sub grade ( stiff & stable ) 2 .52
(A)
drawing title
10
drawn job no. sheet no.
approved ST/D/08
L1 (CLEAR SPAN) L2 (CLEAR SPAN) L3 (CLEAR SPAN)
SAME LAYER
SAME LAYER
GREATER OF TWO GREATER OF TWO GREATER OF TWO GREATER OF TWO
BAR D
TOP AT DISC. BAR E BAR E BAR F
SUPPORT BAR C BAR C BAR C
TOP BARS TOP AT TOP BARS TOP AT TOP BARS TOP AT
SUPPORT SUPPORT SUPPORT
50 50
40Ø
17Ø
17Ø
40Ø 40mm CLEAR 40Ø
90° ACI
90° ACI
D
D
COVER (TYP.) HOOK
17Ø
17Ø
HOOK SPLICE SPLICE SPLICE
SAME LAYER
EQ EQ EQ EQ EQ EQ
BOT. BARS
50
FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
NOTES:
1. REFER TO BEAM SCHEDULE FOR No. AND SIZE OF TOP AND BOTTOM BARS REQUIRED PER BEAM.
2. PROVIDE 60mm CENTRE TO CENTRE WHEN SCHEDULES CALL FOR 2 LAYERS OF REBARS. TYPICAL BEAM LONGITUDINAL SECTION
3. FOR CANTILEVER BEAMS OR RIBS, BARS SHOULD BE EXTENDED UP TO ONE HALF THE CANTILEVER SPAN. NOT TO SCALE
W
D
D
D
W W
Type (2)
TYPICAL INTERNAL BEAM SECTION
N.T.S
TYPICAL EDGE BEAM SECTION
N.T.S
Type (4)
job title
TYPICAL EDGE INV. BEAM SECTION TYPICAL BEAM LONGITUDIN
N.T.S (A)
drawing title
approved
11
A B C D E
20.00
5.60 5.70 5.60 2.70
1 40 mm
Ø12@200T
camber
Ø12@150 B. MESH
Ø12@200 T. MESH
Ø12@200T Ø12@200T
6.00
Ø12@200 T. MESH
Ø12@150 B. MESH 40 mm first floor
Ø12@200T
2 camber
Ø12@200T
4.00
Ø12@200T
40 mm
3 camber
A B C D E
20.00
5.60 5.70 5.60 2.70
1
Ø12@200T
Ø12@200T Ø12@200T
6.00
Ø12@200T
2 mezzanine floor
4.00
Ø12@200T
25 mm colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- job title
approved
12 ST/D/11
A B C D E
20.00
5.60 5.70 5.60 2.70
B2
1
6.00
E
B2
10.00
2
B3
3Ø16
CONCRETE COVERS
4.00
-SLABS = 25 mm
-BEAMS = 40 mm
-COLUMNS = 40 mm
3 -WALLS = 25 mm
B2 -SLAB ON GRADE
0.40
= 50 mm
Ø12@250mm -RAFT FOUNDATION= 75 mm
0.40
A B C D E
20.00
5.60 5.70 5.60 2.70
3Ø16
1 0.30
-THE GEOTECHNICAL
B5 :Sect:1
INVESTIGATION REPORT DIDN'T
6.00
THE GEOTECHNICAL
2 mezzanine floor INVESTIGATION AND THE
BEARING CAPACITY OF THE SOIL
ASSUMED TO 100 kN/m2
4.00
add 2Ø 16 L=3m
4Ø16 4Ø16 4Ø16
0.80
0.60
job title
3Ø16
scale date
checked
13
job no. sheet no.
approved ST/D/08
A B C D E
20.0
3
2
1
3-25 6-25
3Ø25
B1:Elevation
Notes
2 2 2
-BEAMS = 40 mm
-COLUMNS = 40 mm
4Ø16 4Ø16 4Ø16 -WALLS = 25 mm
0.80
-SLAB ON GRADE = 50 mm
0.60
-RAFT FOUNDATION = 75 mm
Ø12@250mm Ø12@250mm Ø12@250mm
-THE GEOTECHNICAL INVESTIGATION REPORT DIDN'T
DONE BY THE CLIENT,AND ALL FOUNDATIONS SHOULD
A B C D E
3
2
B2:Elevation
1 1 1
0.60
(A)
3Ø25 3Ø25 3Ø25
drawing title
0.40
B2:Sect:1 B2:Sect:2
ENG : DR-Majid Albana
B2:Sect:3 checked scale date
14
job no. sheet no.
approved ST/D/08
1 2 3
10.0
4.0 6.0
1
12@250 mm 12@250 mm
B3:Elevation
Notes
B B
2Ø25 2Ø25
-SLABS = 25 mm
-BEAMS = 40 mm
-COLUMNS = 40 mm
4Ø16 4Ø16 -WALLS = 25 mm
0.80
0.80
-SLAB ON GRADE = 50 mm
-RAFT FOUNDATION = 75 mm
0.60
0.60
Ø12@250mm Ø12@250mm
-THE GEOTECHNICAL INVESTIGATION REPORT DIDN'T
add 1Ø25 L=3m DONE BY THE CLIENT,AND ALL FOUNDATIONS SHOULD
0.40 0.40
INVESTIGATION AND THE BEARING CAPACITY OF THE
SOIL ASSUMED TO 100 kN/m2
-THE BUILDING IS DESIGNED FOR GROUND FLOOR +
2FLOORS + PENT-HOUSE
B3:Sect:1 B3:Sect:2
1 2 3
10.0
4.0 6.0
1
12@250 mm 12@250 mm
B4:Elevation
A A
0.80
0.60
0.60
Ø12@250mm Ø12@250mm
job title
(A)
4Ø25 6Ø25
0.40 0.40
drawing title
B4:Sect:1 B4:Sect:2
ENG : DR-Majid Albana
checked scale date
15
job no. sheet no.
approved ST/D/08
A B C D E
20.00
5.60 5.70 5.60 2.70
1 40 mm
Ø12@200T
camber
Ø12@150 B. MESH
Ø12@200 T. MESH
Ø12@200T Ø12@200T
6.00
Ø12@200 T. MESH
(CANTILEVER SLAB)
Ø12@150 B. MESH 40 mm
typical floor
Ø12@200T
2 camber
100% SUPPORTING
Ø12@200T
OLD SLAB
50% SUPPORTING
40 mm
3 camber
FREE END SLAB
(CANTILEVER SLAB)
OLD SLAB
A B C D E COLUMN COLUMN
25% SUPPORTING
1 40 mm
camber
DETAIL FOR SLAB SUPPORTING
(BACK PROPPING)
COLUMN COLUMN
6.00
40 mm
2 camber
40 mm
3 camber
BAR DIA.(mm) 10 12 16 18 20 22 25
(A)
TOP REINFORCEMENT
Slab Reinf.
LAP LENGTH (mm) IN
COLUMNS 400 500 600 650 700 800 900 drawing title
approved
16 ST/D/12
A B C D E
20.00
5.60 5.60 5.70 2.70
1
Ø12@200T
2.30
2.00
Ø12@200 T. MESH
Ø12@150 B. MESH
Ø12@200T
500
5Ø10/m
2Ø16
4.00
250
DB1
Ø12@200T
0.4
3 2.30 (DB1)
20.00 1.0
3.0 6Ø12
10@250 mm
0.4
3Ø16
0.30
250
250
Ø12@150
400
B2
25 mm
Camber slab camber 25 mm
250
300
1000
3Ø12T&B
Ø10@200 Ø12@150
+19.95
Ø12@200 H
250
Ø16@200 H
SLAB REINFORCEMENT (PEN HOUSE FLOOR )
SLAB THICKNESS = 250 mm
Section 5-5
no. date initials revision
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
scale date
1-100 4 /2024
drawn job no. sheet no.
approved
17