PREPARE BY ENG Majid Albana

majidalbana@hotmail.com

THE COPYRIGHTS OF THESE PLANS AND DRAWINGS ARE RESERVED


FOR
DR-MAJID AL BANA
Notes

THE BUILDING SYSTEM WILL BE


CONSIDER BUILDING WITH
COLUMNS AND THE SLAB WILL BE
AS SOLID SLAB WITH DROP
BEAM.THE SOFTWARE USED IN
DESIGN (CSI ETABS 2023, AND CSI
SAFE 2022&PROKON) IS THE
GENERAL PROGRAM USED IN THIS
DESIGN

job title

(Meat cold stores )


Structural

Structural
Drawings

DESIGNED BY DR-Majid Albana


CHECKED BY

SCALE As Shown

DATE 4 /2024

SHEET NO. Str. 1


ABBREVIATIONS :-
GENERAL :- REINFORCED CONCRETE :- ADD ADDITIONAL
ARCH ARCHITECTURAL
1. ALL DIMENSIONS TO TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, SECTIONS AND 1. COMPRESIVE STRENGTH OF CONCRETE SHOULD BE DETERMIND BY THE TABLE BELOW :- Walk Way B BEAM
B.R.C (no. 63)
DETAILS, (DO NOT SCALE FROM DRAWINGS). Out Door Yard BOTT BOTTOM
1 LAYER OF B.R.C(gage 63) 2Ø10 C1 COLUMN TYP C1
MINIMUM 28 DAYS Joint Every 25 m²
x
B.R.C (no. 63)
2. ALL DIMENSIONS ARE IN MILLIMETRES AND ALL LEVELS IN METRES (UNO). LOCATIONS x CANT CANTILEVER
CUBE COMPRESSIVE x
CJ CONSTRUCTION JOIN
AGGREGATE X X X X X
3. THE STRUCTURAL DRAWINGS SHOULD BE USED IN CONJUNCTION WITH THEARCHITECTURAL, STRENGTH(Fcu) X X X X X X X X X X X X Nylon Sheet CL CENTRE
MEMBER MAX. SIZE Ø10/200
MECHANICAL,CIVIL,PLUMBING AND ELECTRICAL DRAWINGS. C COULMN
TYPE ( MPa ) 2Ø12
150mmSub-base 90%
CONC CONCRETE
4. ALL OPENINGS SIZE AND LOCATION SHOULD BE VERIFIED AND CHECKED WITH SERVICES DET DETAIL
SCREED 20 10 mm Nylon Sheet 150mmSub-base 90%
DRAWINGS,WHERE OPENINGS SIZES ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS, DIM DIMENSION
SITE ENGINEER SHALL INTRODUCE SUCH OPENINGS WITH PROPER FRAMING INCLUDING BLINDING OR LEAN CONCRETE 20 20 mm DWG DRAWING
ANY REVISION TO THE SIZES SHOWN ON THE DRAWINGS. D DEPTH
SLABS 40 20 mm Typical Detail Of Out Door Yard Typical Sec. For Stair On Earth E.A EACH
5. DESIGN STANDARED & LOADS :-
PILES - 20-38 mm E.F EACH FACE
DESIGN & CONSTRUCTION OF REINFORCED CONCRETE STRUCTURES MEMBERS SHALL E.J EXPANSION JOINT
FOUNDATIONS 40 20 mm ELEV ELEVATION
IN ACCORDANCE WITH ACI-318-95 (ULTIMATE STRENGTH DESIGN METHOD).
COLUMNS AND SHEAR WALLS 50 20 mm E.W EACH WAY
ALL RETANING WALL STRUCTURE SHOULD BE AS BRITISH 897- 110 or ACI - 93 - 318. EXP EXPANSION
SUSPENDED SLAB, BEAMS F FOOTING
AND WALLS 40 20 mm
MASONARY BRICK OR CONCRETE BLOCK ACCORDING TO B.S 5
- 628. F1 FOOTING TYPE-1
WATER RETAINING STRUCTURES - 20 mm FDN FOUNDATION
6. LOADING :- F.F.L FINISH FLOOR LEVEL
PLAIN CONCRETE 25 20 mm GEN GENERAL
MINIMUM DESIGN LOAD (LIVE LOAD) ACCORDING TO IBC-09. B.R.C No.63 x x GL GRID LINE
x
SEISMIC LOAD ACCORDING TO IRAQI SEISMIC CODE 1997. x LL LIVE LOAD
100mm plain conc. x MAX MAXIMIM
WIND LOAD ACCORDING TO ASCE-05. 2. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN
B.R.C No.63 x
MECH MECHANICAL

15
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet x
Nylon Sheet
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM

0
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615& A616 OR A617 BARS SHOULD BE GRADE x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
x
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORTPREPARED BY THE 2Ø10
& RESEARCH ( ( ) 2023 \ 1 \ \ 4 ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS(10K/m²) AT DEPTH OF (-2.00m)
MEMBER (mm)
ON GROUND SLAB Typical Sec. Of Ramp
BELOW THE EXISTING N.G.L.
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK ASINDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40 2Ø16
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF Ø10 @ 200
COLUMNS 40 Ø10 @ 200
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D) 2Ø16
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40

LIQUID LIMIT ≤ 25%.


FORMED FOUNDATION 50 Arround all windos for loovers
NON-FORMED FOUNDATION 75
PLASTICITY INDEX ≤ 6%. 3-Ø16(typ.)
ORGANIC MATERIAL≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø16
CLEAR SPACING BETWEEN PARALLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø16@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS, NOT EXCEEDING 250mm LOOSE THICKNESS BAR DIA.(mm) 10 12 16 18 20 22 25
TO 90% OF MAXIMUM PROCTOR DENSITY. LAP LENGTH (mm) IN 400 500 600 650 700 800 900
COLUMNS
LAP LENGTH (mm) IN PROVID 2-Ø6 PLATE (300 * 250 * 3 )
400 600 700 800 900 10001250
ELSE WHERE AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-

CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS,BEAMS&GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.

AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB/ FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THETYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAPAS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURALDRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND.
WATER STOPS SHOULD BE FACTORY MOLDED. A
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B
h

(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B

all dim. from ARCH D.W.G.


11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THELONG SEC. ( a - a ) GENERAL NOTES
DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF. L<2000, h=200 , A=B=2-Ø12 designed project manager
EXTENDING IN THE SHORT DIRECTION. L<5000, h=400 , A=2-Ø12 , B=2-Ø16 ENG : DR-Majid Albana
checked scale date
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5)
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESSSPECIFICALLY LINTEL REINFORCEMENT job no.

2
sheet no.
drawn
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
A B C D E
20.00
5.60 5.70 5.60 2.70

1 C2 C2 C2
C1
3.75

3.68
6.00

2.25 5.13
10.00

Ø25@200 B&T. MESH

C2
2 C1 C1
Ø25@200 B&T. MESH
4.00

C1
C2
3 5.60 3.55 2.05 5.70
C1 2.30

20.00

A B C D E
20.00
REBAR TIED REBAR TIED REBAR TIED
5.60 H.B 3.00 5.70 H.B 3.00 5.60 H.B 2.70
3.00
ADDITIONAL ADDITIONAL ADDITIONAL
12Ø25@200mm 12Ø25@200mm 12Ø25@200mm

1 L=3m L=3m L=3m

CONCRETE COVERS
-SLABS = 25 mm
6.00

ADDITIONAL ADDITIONAL ADDITIONAL


-BEAMS = 40 mm
-COLUMNS = 40 mm
Ø25@200mm Ø25@200mm Ø25@200mm
BOTTOM L=3m BOTTOM L=3m BOTTOM L=3m
10.00

2 -WALLS = 25 mm
-SLAB ON GRADE = 50 mm
3.0

3.0
3.0

-RAFT FOUNDATION
= 75 mm
3.0 3.0 3.0
4.00

3
REBAR TIED REBAR TIED REBAR TIED
H.B H.B H.B
ADDITIONAL ADDITIONAL ADDITIONAL
8Ø25@200mm 8Ø25@200mm 8Ø25@200mm
L=3m L=3m L=3m

E H.B 12Ø25
L=3m

H.B Ø25@200
ADDITIONAL
L=3m
Ø25@200mm
BOTTOM L=3m

no. date initials revision


3.0

MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-


job title

3.0
10 12 16 18 20 22 25 (A)
BAR DIA.(mm)
drawing title

Foundation Plan
LAP LENGTH (mm) IN 400 500 600 650 700 800 900 PLAN OF FOUNDATION
COLUMNS REINFORCEMENT&SEC.
LAP LENGTH (mm) IN 400 600 700 800 900 1000 1250
designed
ENG : DR-Majid Albana
project manager

ELSE WHERE checked scale date

all dim. from ARCH D.W.G. 1-100 4 /2024

THICK. = 1000 mm drawn

approved
job no.

3
sheet no.

ST/D/04
A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 1.25 2.30

2.00
‫مص عد‬
3.50

2.0x2.3
6.00

+18.80
1.80
10.00

2
3.70

‫ب راد‬
‫احتي اط‬
4.00

9.00

7.74

3 2.30

20.00

A B C D E
20.00
5.60 5.60 5.70 2.70

1 2.30
2.00

‫مص عد‬
2.0x2.3
6.00

+21.00
10.00

2
no. date initials revision
4.00

job title

3 2.30
drawing title

20.00

designed project manager

ROOF FLOOR checked

drawn
scale

job no.
1-100
date

sheet no.

approved
A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 1.25 2.30

2.00
W.C
‫مص عد‬
‫ب راد‬
3.50

2.0x2.3
6.00

‫مطب خ‬

+12.60
1.80
10.00

2
3.70

‫ب راد‬
‫احتي اط‬
4.00

9.00

7.74

3 2.30

20.00

A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 1.25 2.30


2.00

‫مص عد‬
‫ب راد‬
3.50

2.0x2.3
6.00

+15.80
1.80
10.00

2
3.70

no. date initials revision

9.00
4.00

7.74

job title

3 2.30
drawing title

20.00

designed project manager

SECOND FLOOR checked

drawn
scale

job no.
1-100
date

sheet no.

approved
A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 1.25 2.30

2.00
W.C
‫مص عد‬
‫ب راد‬
3.50

2.0x2.3
6.00

‫مطب خ‬

+6.20
1.80
10.00

2
3.70

‫ب راد‬
‫احتي اط‬
4.00

9.00

7.74

3 2.30

20.00

A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 1.25 2.30


2.00

‫مص عد‬
‫ب راد‬
3.50

2.0x2.3
6.00

+9.40
1.80
10.00

2
3.70

no. date initials revision

9.00
4.00

7.74

job title

3 2.30
drawing title

20.00

designed project manager

FIRST FLOOR checked

drawn
scale

job no.
1-100
date

sheet no.

approved
A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 1.25 2.30

2.00
W.C
‫مص عد‬
‫ب راد‬
3.50

2.0x2.3
6.00

‫مطب خ‬
1.80
10.00

2
3.70

+3.20
‫ادارة‬
4.00

9.00

5.44

3 2.30

20.00

mezzanine floor

A B C D E
20.00
5.60 5.60 5.70 2.70

1 7.65 2.30
2.00

‫مص عد‬
‫ب راد‬
3.50

2.0x2.3
6.00

1.80
10.00

2
3.70

‫مكت ب مبيع ات‬ +0.0


9.00
4.00

no. date initials revision

‫ادارة‬ 3.40

job title

3 2.30

20.00 drawing title

designed project manager

GROUND FLOOR checked

drawn
scale

job no.
1-100
date

sheet no.

approved
A B'

12 No. Ø12
0
15
6@
Ø1

0
20
2@
Ø1

Ø12mm@200

SECTION A'-A' (between Foundation & landing )

Slab Reinf.

Ø12@150

15
0 Slab Reinf.
6@
Ø1
Ø12@200 20
0 Slab Reinf.
2@
Ø1 20
0
2@
Ø1
Ø12@200

200 Slab Reinf.


2Ø16

CONCRETE COVERS
SECTION A'-A' (between slab & landing ) 200mm
-SLABS = 25 mm

-BEAMS = 40 mm
no. date initials revision
-COLUMNS = 40 mm

-WALLS = 25 mm

-SLAB ON GRADE = 50 mm
job title

-RAFT FOUNDATION = 75 mm
(A)
drawing title

Stairs detail
all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager

scale date
1-100 4 /2024

4
drawn job no. sheet no.

approved ST/D/07
A B C D E
20.00
5.60 5.70 5.60 2.70

1 C2 C2 C2
C1
3.75

3.68
6.00

C3 C3 C3
2.25 5.13
10.00

C2 C2
2 C1 C1
4.00

C1
C2 C3
3 5.60 3.55 2.05 5.70
C1 2.30

20.00

SCHEDULE OF COLUMNS AND WALLS

COLUMNS SIZE

OR WALLS LENGTH WIDTH REMARK


ID (mm) (mm)

C1 1000 400

C2 800 400

C3 1000 250

C4 600 250 Notes

no. date initials revision

job title

(A)
drawing title

COLUMNS KEY PLAN


COLUMNS KEY PLAN
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 4 /2024
drawn job no.

8
sheet no.

approved
Main Bar 20 - Ø25 16 - Ø25 12- Ø25 8- Ø25

Ø12@200 Ø12@200 Ø12@200 Ø12@200


Ties Roof Floor 3Ties/Set 3Ties/Set 3Ties/Set 2Ties/Set

Column Reinf.
Rest See
C 50 1000 1000
800

600
Section

400 400 250 250

2 nd Floor

Main Bar 2nd Floor 20 - Ø25 16- Ø25 12- Ø25 8- Ø25

Ties Ø12@200 Ø12@200 Ø12@200 Ø12@200


3Ties/Set 3Ties/Set 3Ties/Set 2Ties/Set

Rest See Column Reinf.


C 50
1000
1000
800
Section 600

Ground Level
foundation 250 250
400 400
level

20 - Ø25 16 - Ø25 12 - Ø25 8 - Ø25


Dowels
C1 C2 C3 C4
Rest See Column Reinf.

no. date initials revision

job title

(A)
drawing title

SCHEDULE OF COLUMN
Typ. Sec. For Column
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 4 /2024
drawn job no.

all dim. from ARCH D.W.G. 9


sheet no.

approved
Reinf. conc. Raft Ø12@15cm C/C
foundation .
5 cm plain concrete Ø12@20cm C/C
2layers Bitumen 1cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding 1 .26

w/c = 0.45 , coarse agg. 5-19 mm


25cm Sub base 95% comp.
1 .13

1 .89

25cm Bolder
Sub grade ( stiff & stable ) 2 .52

no. date initials revision

SECTION IN RAFT FOUNDATION &


STAIR NECK
Foundation Plan
job title

(A)
drawing title

SECTION IN RAFT FOUNDATION &

THICK. = 1000 mm designed


STAIR NECK

ENG : DR-Majid Albana


project manager

checked scale date

all dim. from ARCH D.W.G. 1-100 4/2024

10
drawn job no. sheet no.

approved ST/D/08
L1 (CLEAR SPAN) L2 (CLEAR SPAN) L3 (CLEAR SPAN)

0.30 L1 OR 0.30 L2 0.30 L2 OR 0.30 L1 0.30 L2 OR 0.30 L3 0.30 L3 OR 0.30 L2


0.3 L1 0.3 L3
SAME LAYER

SAME LAYER

SAME LAYER
GREATER OF TWO GREATER OF TWO GREATER OF TWO GREATER OF TWO

BAR D
TOP AT DISC. BAR E BAR E BAR F
SUPPORT BAR C BAR C BAR C
TOP BARS TOP AT TOP BARS TOP AT TOP BARS TOP AT
SUPPORT SUPPORT SUPPORT
50 50

40Ø
17Ø

17Ø
40Ø 40mm CLEAR 40Ø
90° ACI
90° ACI
D

D
COVER (TYP.) HOOK
17Ø

17Ø
HOOK SPLICE SPLICE SPLICE

BAR A BAR B BAR A BAR B BAR B


BOT. BARS BOT. BARS BOT. BARS
BAR A BOT. BARS BOT. BARS
BOT. BARS BAR A
SAME LAYER

SAME LAYER

EQ EQ EQ EQ EQ EQ
BOT. BARS

CANTILEVER 0.05 L1 0.10 L1 0.10 L2 0.10 L3 0.05 L3


0.10 L2

50
FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE

FOR STIRRUPS DISCONTINUOUS CONTINUOUS BEAM CONTINUOUS BEAM DISCONTINUOUS


SEE SCHEDULE BEAM END SUPPORT END SUPPORT END SUPPORT END SUPPORT

NOTES:
1. REFER TO BEAM SCHEDULE FOR No. AND SIZE OF TOP AND BOTTOM BARS REQUIRED PER BEAM.
2. PROVIDE 60mm CENTRE TO CENTRE WHEN SCHEDULES CALL FOR 2 LAYERS OF REBARS. TYPICAL BEAM LONGITUDINAL SECTION
3. FOR CANTILEVER BEAMS OR RIBS, BARS SHOULD BE EXTENDED UP TO ONE HALF THE CANTILEVER SPAN. NOT TO SCALE

W
D

D
D

W W

Type (1) no. date initials revision

Type (2)
TYPICAL INTERNAL BEAM SECTION
N.T.S
TYPICAL EDGE BEAM SECTION
N.T.S
Type (4)
job title
TYPICAL EDGE INV. BEAM SECTION TYPICAL BEAM LONGITUDIN
N.T.S (A)
drawing title

designed project manager


ENG : DR-Majid Albana
checked scale date
1-100 4 /2024
drawn job no. sheet no.

approved
11
A B C D E
20.00
5.60 5.70 5.60 2.70

1 40 mm
Ø12@200T

camber
Ø12@150 B. MESH
Ø12@200 T. MESH

Ø12@200T Ø12@200T
6.00

Ø16@200 T. add L=6m


+9.2
10.00

Ø12@200 T. MESH
Ø12@150 B. MESH 40 mm first floor
Ø12@200T

2 camber

Ø12@200T
4.00

Ø12@200T

40 mm
3 camber

A B C D E
20.00
5.60 5.70 5.60 2.70

1
Ø12@200T

Ø12@200T Ø12@200T
6.00

Ø12@200 B& T. MESH


10.00

Ø12@200T

2 mezzanine floor
4.00

Ø12@200T

SLAB REINFORCEMENT (GROUND FLOOR) no. date initials revision

SLAB THICKNESS = 200 mm

25 mm colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- job title

Camber slab camber 25 mm TOP REINFORCEMENT BAR DIA.(mm) 10 12 16 18 20 22 25


Slab Reinf. (A)
LAP LENGTH (mm) IN
COLUMNS 400 500 600 650 700 800 900
drawing title
LAP LENGTH (mm) 400 600 700 800 900 10001250
IN & BEAMS
SLAB
PLAN OF SLAB
BOTTOM REINFORCEMENT
REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana

all dim. from ARCH D.W.G. checked scale


1-100
date
4 /2024
drawn job no. sheet no.

approved
12 ST/D/11
A B C D E
20.00
5.60 5.70 5.60 2.70

B2
1
6.00

E
B2
10.00

B1 first floor Notes

2
B3

3Ø16
CONCRETE COVERS
4.00

-SLABS = 25 mm
-BEAMS = 40 mm
-COLUMNS = 40 mm
3 -WALLS = 25 mm
B2 -SLAB ON GRADE

0.40
= 50 mm
Ø12@250mm -RAFT FOUNDATION= 75 mm

0.40
A B C D E
20.00
5.60 5.70 5.60 2.70
3Ø16
1 0.30

-THE GEOTECHNICAL
B5 :Sect:1
INVESTIGATION REPORT DIDN'T
6.00

DONE BY THE CLIENT,AND ALL


FOUNDATIONS SHOULD BE
REDESIGNED AFTER FINISHING
B5 B5
10.00

THE GEOTECHNICAL
2 mezzanine floor INVESTIGATION AND THE
BEARING CAPACITY OF THE SOIL
ASSUMED TO 100 kN/m2
4.00

-THE BUILDING IS DESIGNED FOR


GROUND FLOOR + 2FLOORS +
PENT-HOUSE
3
E
2 B 1
add 4Ø25 L=3m add 4Ø25 L=3m add 2Ø25 L=3m
2Ø25 2Ø25 2Ø25
3Ø16

add 2Ø 16 L=3m
4Ø16 4Ø16 4Ø16
0.80

0.60

Ø12@250mm Ø12@250mm Ø12@250mm


0.60

Ø12@250mm no. date initials revision


0.40

3Ø25 4Ø25 3Ø25


0.40

job title
3Ø16

B1:Sect:2 B3:Sect:1 B2:Sect:2 0.30 (A)


drawing title

BEAM KEY PLAN


B5 :Sect:2
BEAM KEY PLAN designed
ENG : DR-Majid Albana
project manager

scale date
checked

all dim. from ARCH D.W.G. drawn


1-100 4 /2024

13
job no. sheet no.

approved ST/D/08
A B C D E

20.0

5.60 5.70 5.60 2.70

3
2

1
3-25 6-25

12@250 mm 12-12@250 mm 12@250 mm 12@250 mm

3Ø25

B1:Elevation
Notes

2 2 2

add 4Ø25 L=3m add 6Ø25 L=3m CONCRETE COVERS


2Ø25 2Ø25 2Ø25
-SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm
4Ø16 4Ø16 4Ø16 -WALLS = 25 mm
0.80

-SLAB ON GRADE = 50 mm
0.60

-RAFT FOUNDATION = 75 mm
Ø12@250mm Ø12@250mm Ø12@250mm
-THE GEOTECHNICAL INVESTIGATION REPORT DIDN'T
DONE BY THE CLIENT,AND ALL FOUNDATIONS SHOULD

3Ø25 3Ø25 3Ø25 BE REDESIGNED AFTER FINISHING THE GEOTECHNICAL

0.40 INVESTIGATION AND THE BEARING CAPACITY OF THE


SOIL ASSUMED TO 100 kN/m2
-THE BUILDING IS DESIGNED FOR GROUND FLOOR +
2FLOORS + PENT-HOUSE
B1:Sect:1 B1:Sect:2 B1:Sect:3

A B C D E
3
2

2-25 2-25 2-25 3-25 6-25

12@250 mm 12-12@250 mm 12@250 mm 12@250 mm

2-25 2-25 2-25

B2:Elevation

1 1 1

add 2Ø25 L=3m add 4Ø25 L=3m


2Ø25 2Ø25 2Ø25

4Ø16 4Ø16 4Ø16 no. date initials revision


0.80

0.60

Ø12@250mm Ø12@250mm Ø12@250mm


job title

(A)
3Ø25 3Ø25 3Ø25
drawing title
0.40

BEAM KEY PLAN


designed project manager

B2:Sect:1 B2:Sect:2
ENG : DR-Majid Albana
B2:Sect:3 checked scale date

all dim. from ARCH D.W.G. drawn


1-100 4 /2024

14
job no. sheet no.

approved ST/D/08
1 2 3

10.0

4.0 6.0
1

12@250 mm 12@250 mm

B3:Elevation
Notes

B B

add 4Ø25 L=3m CONCRETE COVERS

2Ø25 2Ø25
-SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm
4Ø16 4Ø16 -WALLS = 25 mm
0.80

0.80

-SLAB ON GRADE = 50 mm

-RAFT FOUNDATION = 75 mm
0.60

0.60

Ø12@250mm Ø12@250mm
-THE GEOTECHNICAL INVESTIGATION REPORT DIDN'T
add 1Ø25 L=3m DONE BY THE CLIENT,AND ALL FOUNDATIONS SHOULD

4Ø25 4Ø25 BE REDESIGNED AFTER FINISHING THE GEOTECHNICAL

0.40 0.40
INVESTIGATION AND THE BEARING CAPACITY OF THE
SOIL ASSUMED TO 100 kN/m2
-THE BUILDING IS DESIGNED FOR GROUND FLOOR +
2FLOORS + PENT-HOUSE
B3:Sect:1 B3:Sect:2

1 2 3

10.0

4.0 6.0
1

12@250 mm 12@250 mm

B4:Elevation

A A

add 2Ø25 L=3m


2Ø25 2Ø25

4Ø16 4Ø16 no. date initials revision


0.80

0.80
0.60

0.60

Ø12@250mm Ø12@250mm
job title

(A)
4Ø25 6Ø25
0.40 0.40
drawing title

BEAM KEY PLAN


designed project manager

B4:Sect:1 B4:Sect:2
ENG : DR-Majid Albana
checked scale date

all dim. from ARCH D.W.G. drawn


1-100 4 /2024

15
job no. sheet no.

approved ST/D/08
A B C D E
20.00
5.60 5.70 5.60 2.70

1 40 mm
Ø12@200T

camber
Ø12@150 B. MESH
Ø12@200 T. MESH

Ø12@200T Ø12@200T
6.00

Ø16@200 T. add L=6m


NEW SLAB TO BE POURED FREE END SLAB
+9.2
10.00

Ø12@200 T. MESH
(CANTILEVER SLAB)

Ø12@150 B. MESH 40 mm
typical floor
Ø12@200T

2 camber
100% SUPPORTING

Ø12@200T FREE END SLAB


(CANTILEVER SLAB)
4.00

Ø12@200T

OLD SLAB
50% SUPPORTING

40 mm
3 camber
FREE END SLAB
(CANTILEVER SLAB)

OLD SLAB

A B C D E COLUMN COLUMN
25% SUPPORTING

FREE END SLAB


(CANTILEVER SLAB)
20.00
5.60 5.70 5.60 2.70

1 40 mm
camber
DETAIL FOR SLAB SUPPORTING
(BACK PROPPING)
COLUMN COLUMN
6.00

Ø16@200 T. add L=6m

Ø12@200 B&T. MESH +9.2


10.00

40 mm
2 camber

typical mezzanine floor


4.00

40 mm
3 camber

no. date initials revision

25 mm SLAB REINFORCEMENT (1st+2nd FLOOR)


Camber slab camber 25 mm SLAB THICKNESS = 200 mm
job title
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-

BAR DIA.(mm) 10 12 16 18 20 22 25
(A)
TOP REINFORCEMENT
Slab Reinf.
LAP LENGTH (mm) IN
COLUMNS 400 500 600 650 700 800 900 drawing title

LAP LENGTH (mm) 400 600 700 800 900 10001250


IN & BEAMS
SLAB PLAN OF SLAB
BOTTOM REINFORCEMENT
REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
checked scale date
all dim. from ARCH D.W.G. drawn
1-100
job no.
4 /2024
sheet no.

approved
16 ST/D/12
A B C D E
20.00
5.60 5.60 5.70 2.70

1
Ø12@200T

2.30
2.00

Ø12@200T ‫مص عد‬


2.0x2.3
6.00

Ø12@200 T. MESH
Ø12@150 B. MESH

Ø16@200 T. add L=6m


Ø12@200T +21.00 3.0 6Ø16mm
10.00

Ø12@200T

500
5Ø10/m
2Ø16
4.00

250
DB1
Ø12@200T

0.4

3 2.30 (DB1)
20.00 1.0
3.0 6Ø12

10@250 mm
0.4

3Ø16
0.30
250
250

Ø12@150
400

B2

None Bearing Wall None Bearing Wall


Brick Wall 24cm Brick Wall 24cm

25 mm
Camber slab camber 25 mm
250
300

1000

3Ø12T&B
Ø10@200 Ø12@150
+19.95

Ø12@200 H
250

Beam Ø16@200 V Beam

Ø16@200 H
SLAB REINFORCEMENT (PEN HOUSE FLOOR )
SLAB THICKNESS = 250 mm

Section 5-5
no. date initials revision

colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-

TOP REINFORCEMENT BAR DIA.(mm) 10 12 16 18 20 22 25 job title


Slab Reinf.
LAP LENGTH (mm) IN
COLUMNS 400 500 600 650 700 800 900

LAP LENGTH (mm) 400 600 700 800 900 10001250


IN & BEAMS
SLAB (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF PENTHOUSE SLAB
REINFORCEMENT&SEC.
Typica SLAB reinforcement all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager

scale date
1-100 4 /2024
drawn job no. sheet no.

approved
17