Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

From: Kamlesh Patel

Sent: Thursday, 31 August, 2023 05:19 PM


To: Ravi Bansal <Ravi.Bansal@GUJARATGAS.com>
Subject: RE: IRN of surya roshni pipes

Ravi,

PFA.

Kamlesh

From: Kamlesh Patel


Sent: 31 August 2023 14:51
To: Ravi Bansal
Subject: RE: IRN of surya roshni pipes

Ravi,

Documents are kept at below link.

scan (\\dfsavdhesh\Storage_Avdhesh\OfficeCommon) (S:) > Kamlesh

Regards,
Kamlesh

From: Kamlesh Patel


Sent: 31 August 2023 14:46
To: Ravi Bansal
Subject: IRN of surya roshni pipes

Dear Ravi,

PFA IRN as required, other documents I will kept in office common drive..

Regards,
Kamlesh

Registered Office:
Gujarat Gas Limited
Gujarat Gas CNG Station. Sector 5/C,
Gandhinagar - 382006,
Gujarat, India

Corporate Office:
Gujarat Gas Limited
Shanti Sadan Society, Opp Parimal Garden,
Nr Ellis Bridge, Ahmedabad- 380 006,
Gujarat, India
CIN: L40200GJ2012SGC069118
Website: http://www.gujaratgas.com
---------------------------------------------------------------------
This e-mail is intended only for the addressee named above. As this e-mail may contain confidential or privileged
information, please advise us immediately if you are not the named addressee or the person responsible for
delivering the message to the named addressee. The contents should not be disclosed to any other person nor
copies taken. If the content of this email or attachment is personal or unconnected with our business, Gujarat Gas
Limited accepts no liability or responsibility for it. Please also note that we make every effort to keep our network
free from viruses and this email has been scanned accordingly. Gujarat Gas Limited accepts no responsibility for
viruses once an email has been transmitted.

IR-07 for Su…tnamani.pdf


1.7 MB

Doc. No.: VQS/OP/F/17, R0


VCS QUALITY SERVICES PVT. LTD.

505, 5th Floor, 360 Degree Business Park, Mulund (W), Mumbai - 400080 Issue Date: 01.03.2018

INSPECTION DISPATCH CLEARANCE (IDC)


IDC No.: MU/009124/IDC-04 IDC Date:06.10.2018
Client: M/S SURYA ROSHNI LTD. ANJAR. Contractor: NA
Order No. and Date: SRL/WO/16-17/GGL/01 Dtd. 24.12.2016.
Project: Inspection of Raw Material, Bare & Coated ERW Pipes
for M/s. Gujarat Gas Ltd.
Vendor: M/S SURYA ROSHNI LTD. PO No. & Date: B4500007427 AMD-3 DTD.
Location: Bhuvad, Anjar, Gujarat 19.06.2018
Sub Vendor: NA Vendor SO no. & Date: NA
Location: NA
IR No.: 04& Dtd. 28.09.2018 & 05 Dtd. 03.10.2018 QAP/ITP No.: QAP/3LPE/4916000016/01 Rev 02
dtd 19.09.2018
VCS job no.: VI03920
PO Item Accepted Balance
Item Description P.O .Qty. Product Identification
No. Qty. Qty.

01 PIPE SIZE: 323.90 mm Manufacturer’s Name, API


OD x 6.4 mm WT, API 5L 45000.00 38865.16 6134.840 monogram, Month & Year of
X 52M, PSL2, BE, ERW Mtrs. Mtrs. Mtrs. Manufacturing, L360M/X52M,
(HFW), 3LPE COATED (3141 Nos.) PSL-2, HFW, Tested (MPA),
PIPES &
As per attached Tally Sheet for
Pipe No, Heat No., Length
(Mtrs.), Weight (Kg).

REMARKS: IDC does not relieve contractor / supplier from fulfilling contractual requirements as per terms of supply and
guaranteeing from pending work / task.
01 PIPE SIZE: 323.90 mm Manufacturer’s Name, API
OD x 6.4 mm WT, API 5L 45000.00 38865.16 6134.840 monogram, Month & Year of
X 52M, PSL2, BE, ERW Mtrs. Mtrs. Mtrs. Manufacturing, L360M/X52M,
(HFW), 3LPE COATED (3141 Nos.) PSL-2, HFW, Tested (MPA),
PIPES &
As per attached Tally Sheet for
Pipe No, Heat No., Length
(Mtrs.), Weight (Kg).

REMARKS: IDC does not relieve contractor / supplier from fulfilling contractual requirements as per terms of supply and
guaranteeing from pending work / task.

This inspection dispatch clearance does not relieve the supplier or manufacturer from any responsibility, or any contractual
obligations or guarantees, nor shall it be interpreted in any way so to imply acceptance of the goods. Inspection is performed to the
best of our ability, knowledge and belief and in accordance with the purchase order and technical documentation issued to us.

This IDC shall not be reproduced without approval of VCS Quality and the client.

Issuing Authority: (HOD / Deputy)


Item constitute
Name: Kashyap Sinha / Nageshwara Rao
Part Order

Distribution:
1. Client
2. Office
Sign: 3. Inspector
Date: 06.10.2018 Stamp: 4. Vendor

vcsquality.com Page 1 of 1
Copyrights VCS Quality – All rights reserved

Doc. No.: VQS/OP/F/17, R0


VCS QUALITY SERVICES PVT. LTD.

505, 5th Floor, 360 Degree Business Park, Mulund (W), Mumbai - 400080 Issue Date: 01.03.2018

INSPECTION DISPATCH CLEARANCE (IDC)


IDC No.: MU/009130/IDC-06 IDC Date:10.10.2018
Client: M/S SURYA ROSHNI LTD. ANJAR. Contractor: NA
Order No. and Date: SRL/WO/16-17/GGL/01 Dtd. 24.12.2016.
Project: Inspection of Raw Material, Bare & Coated ERW Pipes
for M/s. Gujarat Gas Ltd.
Vendor: M/S SURYA ROSHNI LTD. PO No. & Date: 4500007427 Dated 29.12.2016
Location: Bhuvad, Anjar, Gujarat Amendment-3 Dated 19.06.2018

Sub Vendor: M/s Ratnamani Metals & Tubes Ltd. Vendor SO no. & Date: SGSTL/16-
Location : Bhuvad, Anjar, Gujarat 17/PO/Coating/4458 dtd 24.12.2016

IR No.: 04 -Dtd. 28.09.2018 ,05- Dtd. 03.10.2018 , 06 Dtd. QAP/ITP No.: QAP/3LPE/4916000016/01 Rev 02
10.10.2018 & 07 Dtd. 10.10.2018 dtd 19.09.2018
VCS job no.: VI03920
PO Item Accepted Balance
Item Description P.O .Qty. Product Identification
No. Qty. Qty.

01 PIPE SIZE: 323.90 mm Manufacturer’s Name, API


OD x 6.4 mm WT, API 5L 15000.000 15017 Mtrs. Nil monogram, Month & Year of
X 52M, PSL2, BE, ERW Mtrs. (1213 Nos.) Manufacturing, L360M/X52M,
(HFW), 3LPE COATED PSL-2, HFW, Tested (MPA),
PIPES &
As per attached Tally Sheet for
Pipe No, Heat No., Length
(Mtrs.), Weight (Kg).

REMARKS: IDC does not relieve contractor / supplier from fulfilling contractual requirements as per terms of supply and
PO Item Accepted Balance
Item Description P.O .Qty. Product Identification
No. Qty. Qty.

01 PIPE SIZE: 323.90 mm Manufacturer’s Name, API


OD x 6.4 mm WT, API 5L 15000.000 15017 Mtrs. Nil monogram, Month & Year of
X 52M, PSL2, BE, ERW Mtrs. (1213 Nos.) Manufacturing, L360M/X52M,
(HFW), 3LPE COATED PSL-2, HFW, Tested (MPA),
PIPES &
As per attached Tally Sheet for
Pipe No, Heat No., Length
(Mtrs.), Weight (Kg).

REMARKS: IDC does not relieve contractor / supplier from fulfilling contractual requirements as per terms of supply and
guaranteeing from pending work / task.

This inspection dispatch clearance does not relieve the supplier or manufacturer from any responsibility, or any contractual
obligations or guarantees, nor shall it be interpreted in any way so to imply acceptance of the goods. Inspection is performed to the
best of our ability, knowledge and belief and in accordance with the purchase order and technical documentation issued to us.

This IDC shall not be reproduced without approval of VCS Quality and the client.

Issuing Authority: (HOD / Deputy)


Item constitute
Name: Kashyap Sinha / Nageshwara Rao
Part Order

Distribution:
Sign: 1. Client
Date: 10.10.2018 2. Office
Stamp: 3. Inspector
4. Vendor

vcsquality.com Page 1 of 1