DATE :- 7/23/2014
Boxup of deaerator & vapour tank to be Manpower/ Activity was not completed due to un-availability
2 Engineer NC
done. Engineer/Tools of manpower due to heavy rain.
Manpower/
4 Trial of MSSV valve from Local Engineer NC Supply Power cable is not terminated at MSSV.
Engineer/Tools
Soot blower trials to be done in manual Manpower/ Activity was not completed due to un-availability
5 Engineer NC
mode. Engineer/Tools of manpower due to heavy rain.
Skilled Manpower
1 Box-up of steam drum to be done Manpower/Engineer Engineer
/Tools.
Skilled
Checkinhg for the BMS & BCS controler Manpower/Engineer
3 panel to be done & control panel /Commissioning Engineer
charging to be done Tools/UPS Power
supply/Walky Talky
Skilled
Manpower/Engineer
4 Trial of MSSV valve from Local Engineer
/Commissioning
Tools/Walky Talky