PICCADILLY GRAND

DDP ARCHITECTS LLP


SHOP DRAWINGS REVIEW
This review is for general compliance with design concept and Contract
Documents. The Contractor is responsible for the correctness of
dimensions, details and materials used.
Comments/Corrections made on this shop drawing do not relieve the
5-5 R-5-5a Contractor(s)/Sub-Contractor(s) fo their contractual responsibilities and
from compliance with the Specifications as stated in the Contract/Sub-
5-A R-5-A3 Contract. Neither does this review relieve the Contractor(s) / Sub-
Contractor(s) of his/her responsibilities for all errors and ommisions in
UPPER FLOOR FL UPPER FLOOR FL this submission regardless of wether the errors and / or omissions were
indentified and commented upon during the review.
No exception taken To amed and resubmit

Make correction noted Rejected (see remarks)


CL01

750
CL01 CL03 Signature: _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _
CL01

405
CH = 2805 FCU UNIT CH= 2400
CH = 2805
WF01 1 TW-ASIA CONSULTANT PTE LTD
Minor Comment
No exception taken
CL02 WF01 CL02 Resubmission Not Required
259

369

375
ACMV TRUNKING 307 2 600 2 600 2 297
CH= 2400 CH= 2400
BALANCE BALANCE Rejected For Record Purposes

2
W1 Review & Resubmit
2590x2985 150
Reviewed By: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

600
W1
2590x2985 Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

900
Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

CH= 2805

CH= 2805

FROM BATHROOM FL
2
Checking is only for general compliance with design concept and
MASTER BEDROOM +1100mm RAILING FROM LIVING ROOM FL

CH = 2400
Contract Documents. The Contractor remains responsible for the

CH= 2400

CH= 2425
+1100mm TOW FROM LIVING ROOM FL D1 D3
MASTER BEDROOM 1010x2350 MASTER BATH correctness of dimensins and details, compatibility & techniques of
1014x2350

600
+0 +0 construction, coordination of the work with all other trades and the
TL06 TL06 satisfactory performance of the work.
CT-B01 The Comments/Corrections made on this shop drawing does not
relieve the Contractor of his contractual obligations & responsibilities
WF01

2
WF01 from compliance to Contract Documents, Plan, Specifications and
Authorities' requirements.

FLOOR TILE
This Shop Drawing has been inspected by:

1095

CTR OF
600
A/C LEDGE
1 Rankine & Hill (S) Pte Ltd
and is returned as follows:
SK01 WD01 ______________________________________________

248 2
WD01
UNIT FFL THB01 TL05a UNIT FFL No exception taken
FL +0.00 FL +0.000 FL -0.025 200

SOP
50
Make correction noted. No resubmission required

45 75
To amend and resubmit
______________________________________________
Where Re-submission is required, submit revised drawings for re-
inspection before proceeding with the work.
_______________________________________________

This inspection does not attend to setting out of work and it does not
relieve the Contractor of Responsibilities.
7 UNIT TYPE A1 SECTION 07 8 UNIT TYPE A1 SECTION 08 Work shall confirm also to the specification, other Drawings and Job
Discussions, and also to all the Requirements of the Builders.
SCALE 1 : 25 SCALE 1 : 25 _______________________________________________

Signature: _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _
_______________________________________________
Drawing No. Revision

5-5 R-5-5a R-5-A3


R-5-5a 5-5 R-5-A3
UPPER FLOOR FL UPPER FLOOR FL UPPER FLOOR FL UPPER FLOOR FL

REVISED AS PER CONSULTANT'S


1 10.03.2023 Ericka
COMMENT
REV DATE BY DESCRIPTION

750
750

750

750

750
1
600X320
165 LAND OWNER & DEVELOPER
1 KNOCK OFF PANEL 1
446 2 302 600 2 456 MCL LAND CITY DEVELOPMENTS LIMITED
50

307 2 600 2 600 2 297 One Raffles Quay 9 Raffles Place


CL03 RAIN SHOWER
369

CL03

369
BALANCE BALANCE South Tower #22-10 #12-01 Republic Plaza

375
369
375

375

TL06 CH= 2400 TL05b CH= 2400 CL03 CL03 SINGAPORE 048583 SINGAPORE 048619
2 369

2 369
TL06 CH= 2400 CH= 2400 TL06 TEL : 6238 1121 TEL : 6877 8228
NOTE:
2

2
EQ EQ ROBE HOOK TO BE

TILE
CTR
FRAMELESS SHOWER SCREEN CONFIRMED ON SITE. 150 ARCHITECT:
150 400
IN 10mm THK CLEAR GLASS

DDPARCHITECTS
TL05b
600

600

600

600

600
(TEMPERED HEAT SOAKED)
TL05b LLP

900
900

900

MASTER BATH 230 700 130 59-A TANJONG PAGAR ROAD SINGAPORE 088480
TELEPHONE : 62202153 FAX : 63254918
FROM BATHROOM FL

2
D3

FROM SHOWER FL
FROM SHOWER FL

MASTER BATH MASTER BATH 1014x2350


MASTER BATH PROJECT E-MAIL : northumberlandroad@addp-doprojects.com

CH= 2400
600 2 278
CH= 2425

CH= 2425
+0
CH= 2450

D3
TL05b TL05b 1014x2350 TL06
600

600

600

600

600
+0 CIVIL / STRUCTURAL CONSULTANT:
298 2 600 2 600 2 306 50 TL06 CT-B01

300
300

CT-B01 CT-B01 210


TW-ASIA consultants pte ltd

1750
SOP
2

2
100

250 50 No. 28 SING MING LANE #04-137 MIDVIEW CITY


TL05b
60 SINGAPORE 573972 TEL : 6291 6292 FAX : 6293 2196

FLOOR TILE
1150

CTR OF
600

455
600

600

600

600

600
1025

1 278 2 600 356 2 477 1 MECHANICAL & ELECTRICAL CONSULTANT :


850
875

1 1 BALANCE 1
455

455
248 2

248 2

248 2

248 2
TL05a TL05a UNIT FFL TL05a UNIT FFL TL05b TL05b UNIT FFL TL05a 200 UNIT FFL Rnkine & Hill (Sinapore) Pet Ltd
273

273

FL -0.025 FL -0.025. FL -0.025 FL -0.025

SOP
FL -0.050 FL -0.050
510 Thomson Road, #07-00 SLF Building Singapore 298135
Tel: (65) 6278 9588 Fax: (65) 6273 5290

MAIN CONTRACTOR:

9 UNIT TYPE A1 SECTION 09 10 UNIT TYPE A1 SECTION 10 11 UNIT TYPE A1 SECTION 11 12 UNIT TYPE A1 SECTION 12
SCALE 1 : 25 SCALE 1 : 25 SCALE 1 : 25 SCALE 1 : 25 182 Cecil Street #31-01, Frasers Tower
Singapore 069547
Tel: (65) 6227 4537 Fax: (65) 6227 5073

PROJECT TITLE :
PROPOSED RESIDENTIAL FLATS DEVELOPMENT
COMPRISING OF 3 BLOCKS OF 23-STOREY
APARTMENTS (TOTAL : 407 UNITS) WITH CARPARK
AND COMMUNAL FACILITIES, CHILDCARE CENTRE
AND COMMERCIAL AT 1st STOREY WITH BASEMENT
ON LOT 02853T TS18 AT NORTHUMBERLAND ROAD
(KALLANG PLANNING AREA)

DRAWING TITLE

BLOCK 5
UNIT TYPE A1
SECTION DETAILS
CHECKED BY: BERNARD/ZAW SIGNATURE :

NOTE: REFER TO M&E APPROVED CSD DRAWING CHECKED BY:

CHECKED BY:
KANG XIN SIGNATURE :

SIGNATURE :
VINCENT
FOR ALL THE LIGHT SWITCHES AND POWER DRAWN BY: ERICKA DATE : 01.12.2023

POINTS SETTING-OUT AND DIMENSIONS. SCALE: 1 : 25 A1 REV.

DRAWING NO.: CCDC_NTL_AR_UNA1_SC_02 1