Project : One (1) Job Contract for the Construction of Concrete Bridge of Brgy.

Bita-ogan-Cabunga, Passi City, Iloilo


Location : Passi City, Iloilo
NTP : August 2, 2023
Duration : 148 Calendar days

B.5
SPL-2
SPL-1
100(2)a
100(1)
S 2
6 cd

Item Description Revised Amount % Wt A

A. Bridge Approaches and Completion


100(1) Clearing and Grubbing (with Stripping) 4,037.92 102,563.17 0.28% 0 0 0 0 0
Individual Removal of trees (Small a, 150-
100(2)a 300mm ø) 50.00 95,250.00 0.26% 0 0 0 0 0
102(1) Roadway Excavation(unsuitable) 1,881.92 478,007.68 1.32%
120(2)a Radway Excavtion (Surplus Common) 1,185.84 301,203.36 0.83%
103(1)a Structure Excavation (Common Soil) 248.10 63,017.40 0.17%
Structure Excavation ( Abuttment
103(1)c Protection Solid Rock) 225.00 57,150.00 0.16%
103(6) Pipe Culvert and Drain Excavation 45.00 14,287.50 0.04%
104 Embankment From borrow 5,298.82 2,018,850.42 5.57%

104(1)b Embankment From Roadway Excavation 1,185.84 376,504.20 1.04%

105(1) Subgrade Preparation (Common Material) 4,655.16 147,801.33 0.41%


200 Aggregate Subbase Course 678.94 500,107.20 1.38%
Portland Cement Concrete pavement
311 (PCCP 230mm thick) 1,780.00 2,712,720.00 7.49%
404(a) Reinforcing Steel Bar, Grade 60 - - 0.00%
a. Approach Slab 3,382.00 322,135.50 0.89%
405(1)a Structural Concrete Class A (28mpa) - - 0.00%
a. Approach Slab 16.96 193,852.80 0.53%
500(1)c Pipe Culverts, 910mm dia (360"Ø) 20.00 165,100.00 0.46%
Grouted riprap (Slope Protection/Line
105(5)a Ditch) 816.89 3,631,076.05 10.02%
506 Stone Masonry 95.60 546,354.00 1.51%
Permanent marker (Brass Plate with
SPL A Concrete Standard Solar lights) 2.00 152,400.00 0.42%
SPL B Special Fill 1,881.92 1,195,019.20 3.30%

507 Rubble Concrete (abuttment Protection) 326.20 1,449,959.00 4.00%


Metal Guard Rails (metal Beam) Including
603(3)3a Post 180.00 548,640.00 1.51%
1032(1)a Painting Works (Concrete Works) 699.00 266,319.00 0.73%
SPL-1 Mobilization/Demobilization 1.00 317,500.00 0.88% 0 0 0 0 0
SPL-2 Project Billboard 2.00 25,400.00 0.07% 0 0 0 0 0
SPL-3 Bunk house 1.00 63,423.80 0.18%
###
###
###
###
###
SPL-4 Construction Safety and Health 1.00 63,500.00 0.18%
###
###
###
###
###
C. CONCRETE BRIDGE PROPER - - 0.00%
100(1) Clearing and grubbing (with Stripping) 1,000.00 31,750.00 0.09%
Individual Removal of Treess (small a. 150-
100(2)a 300mmø) 10.00 19,050.00 0.05%
101(2) Removal Streel Bridge Structures 1,000.00 1,905,000.00 5.26%
102(1) Roadway Excavation (Unsuitable) 1,156.00 220,218.00 0.61%

102(1) Roadway Excavation (Common Materials) 1,000.00 190,500.00 0.53%


Structure Excavation (Abuttment
103(1c) Protection Solid Rock 212.05 53,860.70 0.15%
103(4) Cribbing/Cofferdaming 1.00 635,000.00 1.75%
104 Embankment 2,048.40 1,300,734.00 3.59%

104(1)b Embankment From Roadway Excavation 1,000.00 317,500.00 0.88%

105 Subgrade Preparation (Common Material) 320.00 10,160.00 0.03%


200 Aggregate Subbase Course 64.00 65,024.00 0.18%
Pre Cast Concrete Pile Furnish (450mm x
400(14)b 450mm) 352.00 1,564,640.00 4.32%

400(14)b Pre Cast Concrete Pile Driven (Hard Strata) 352.00 536,448.00 1.48%
Test Pile, Furnish & Driven (450mm x
400(16)a 450mm) 32.00 487,680.00 1.35%
Concrete Railing, Post and Sidewalk
401(b) (Standard) 31.56 96,194.88 0.27%
404(a) Reinforcing Steel Bar, Grade 40 - - 0.00%
a. Post Railing, Sidewalk 2,715.46 224,161.22 0.62%
b. Abuttment, Slab/Deck Diaphram 2,130.97 175,911.57 0.49%
404(b) Reinforcement Steel bar, Grade 60 - - 0.00%
a. post Railing, Sidewalks 1,833.63 163,009.71 0.45%
b. abuttment, Slab/Deck Diaphram 37,070.00 3,295,523.00 9.09%
c. Approach Slab 3,382.00 343,611.20 0.95%
405(1)a Structural Concrete Class A (28mpa) - - 0.00%
a. Deck Slab and Diaphram 79.34 503,809.00 1.39%
b. Approach Slab 16.96 107,696.00 0.30%

Structural Concrete Class A (Major


405(1)b Structure) bridge Substructure 20.70 Mpa 64.60 492,252.00 1.36%
Structural Concrete Members (Girder Type
406(1)d.1 IV-B-11.45m) - - 0.00%
407(8) Lean Concrete 4.50 34,290.00 0.09%
506 Stone Masonry - - 0.00%

507 Rubble Concrete (Abuttment Protection) - - 0.00%


1032(1)a Painting Works (Concrete Works) 309.45 98,250.38 0.27%
SPL-A Special Fill (Lime Soil) 2,206.00 1,260,729.00 3.48%
SPL-1 Mobilization/Demobilization 1.00 215,900.00 0.60% 0 0 0 0 0
B.5 Project Billboard 2.00 25,400.00 0.07% 0 0 0 0 0
SPL-B Bunk House 1.00 101,600.00 0.28%
###
###
###
###
###
SPL-C Craneway Service 1.00 762,000.00 2.10% 0 0 0 0 0
B.7 Construction Safety and Health 1.00 400,401.92 1.10%
###
###
###
###
###
RCDG
Reinforcing Steel Bar , Grade 40 (Deck
404(a)
Girder) 906.01 74,791.13 0.21%
Reinforcing Steel Bar , Grade 60 (Deck
404(a)
Girder) 19,807.31 2,012,422.70 5.55%
Structural Concrete Class A (Deck Girder,
405(1)a
28mpa) 57.17 363,029.50 1.00%
Reinforcing Steel Bar , Grade 60
404(a)
(Abbutment Protection) 12,062.31 1,225,530.38 3.38%
Structural Concrete Class A (Abbutment
405(1)a
Protection, 28mpa) 176.09 1,118,146.10 3.09%
36,240,365.99 100.00%
Monthly
Physical Accomplishment
Cumulative
Monthly
Physical Accomplishment
Cumulative

Prepared by: Checked by:

LEONARDO BELASA
Authorized Managing Representative
STELLAR BUILDERS
Passi City, Iloilo

102(1) SPL B 105(5)a


120(2)a 103(1)c 500(1)c 104(1)b 506
103(1)a 103(6) 4 105(1) 6 200 104 9 311
15 cd 9 cd 16 cd

103(4)
103(1c)
100(2)a 102(1) 400(16)a
100(2)a 100(1) 102(1) 400(14)b 404(a).b 404(b).b
2 3 101(2) 5 400(14)b 7
5 cd 12 cd 12 cd 25 cd

105 8 104(1)b
21 cd 20 cd

Augus2 2-31, 2023 September

0
000000000000000
000000000000000
000000000000000

000000000000000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0000000000000000

0000000000000000

000000000
0000000000000000

000000000000
000000000000

000000000

0000000000000000000000000000
0000000000000000000000000000

0000000000000000

0
0
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

00000

00000
000000000000
000000000000

000000000000

000000000000
000000000000
00000000000000

00000000000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

000000000000

000000000000
000000000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

00000000000000000000000

0
0
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
00000000000000000000000000000000000000000000000000000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
19.31% 31.11%
19.31% 50.42%
6,997,691.77 11,274,484.00
6,997,691.77 18,272,175.77

Checked by:

EDMUND A. PAMA
Engineer III
105(5)a
404(a).a 506 13 405(1)a.a 16
37 cd 28 cd

405(1)b 405(1)a 405(1)a


407(8) 404(a) 404(a).b 404(b).b
404(b).b 404(a).b 404(a) 405(1)b
10 14
31 cd 30 cd

401(b)
104 11 200 SPL-A 12
404(a).a 404(b).a 15
19 cd 22 cd

SPL-3 SPL-4 B.7 SPL-C SPL-B


148 cd

October November

0000000000000000000000000
0000000000000000000000000

0000000000000000000000000000

0000000000000000000000000
0000000000000000000000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

000000

000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0000000000000000000000

0000000000000000000000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

0000000000000000000000
00000000000000000000000000000000000000000000000000000

000000000000000000000000000000000000000000000000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
0000000000000000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
00000000000000000000000000000000000000000000000000000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

000000000000000000000000000000000000000000000000000

000000000000000000000000000000000000000000000000000

0000000

0000000
20.44% 14.98%
70.86% 85.83%
11,274,484.00 7,407,058.97 5,427,
18,272,175.77 25,679,234.74 31,106,

Approved by: Approved by:

MOISES A. ITURIAGA Atty. STEPHEN A


City Engineer I City mayor
507
16 603(3)3a 18 1032(1)a
20 cd 12 cd

404(b).c 405(1)a.a 405(1)a.b SPL-1


17 19 F
22 cd 5 cd

404(a) 1032(1)a 405(1)a


38 cd

ember December 1 - 27, 2023

100%
000000000000000

0 0 0 0 0 0 0 0 0 00000000000000

0 0 0 0 0 0 0 0 0 00000000000000
000000000000000
000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

50%
###
###
###
###
###
###
###
###
###
###

0000000000
0000000000000000000000000000

0000000000000000000000000000
0000000000000000000000000000

0000000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

000000

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0 0 0 0 0 0 0 0 0 00000000000000000000000000000000000
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###

0000000000

0000000000

0 0 0 0 0 0 0 0 0 00000000000000000000000000000

0 0 0 0 0 0 0 0 0 00000000000000000000000000000 0%
.98% 14.17%
.83% 100.00%
5,427,536.21 5,133,595.03
31,106,770.95 36,240,365.99

Approved by:

Atty. STEPHEN A. PALMARES


City mayor
date cast 28 days Testing Date
pccp 27-Sep 25-Oct 26-Oct-23
Approach slab 24-Oct 21-Nov 21-Nov-23
a. Deck Slab and Diaphram 01-Dec 29-Dec 30-Dec-23
b. Approach Slab 01-Dec 29-Dec 30-Dec-23

Structural Concrete Class A (Major


Structure) bridge Substructure 20.70 Mpa 01-Oct 29-Oct 30-Oct-23
Lean Concrete 01-Oct 29-Oct 30-Oct-23
Structural Concrete Class A (Deck Girder,
28mpa) 01-Oct 29-Oct 30-Oct-23
Structural Concrete Class A (Abbutment
Protection, 28mpa) 15-Oct 12-Nov 13-Nov-23

date tested
pccp Grade 60 05-Sep
Approach slab Grade 60 05-Sep
a. Post Railing, Sidewalk Grade 40 16-Oct
b. Abuttment, Slab/Deck Diaphram Grade
40 05-Sep
a. post Railing, Sidewalks Grade 60 16-Oct
b. abuttment, Slab/Deck Diaphram Grade
60 05-Sep
c. Approach Slab 20-Nov
Reinforcing Steel Bar , Grade 40 (Deck
Girder) 20-Sep
Reinforcing Steel Bar , Grade 60 (Deck
Girder) 20-Sep
Reinforcing Steel Bar , Grade 60
(Abbutment Protection) 10-Oct
318 63.6

287
21 308
date tested
pccp Grade 60 05-Sep
Approach slab Grade 60 05-Sep
a. Post Railing, Sidewalk Grade 40 16-Oct
b. Abuttment, Slab/Deck Diaphram
Grade 40 05-Sep
a. post Railing, Sidewalks Grade 60 16-Oct
b. abuttment, Slab/Deck Diaphram
Grade 60 05-Sep
c. Approach Slab 20-Nov
Reinforcing Steel Bar , Grade 40 (Deck
Girder) 20-Sep
Reinforcing Steel Bar , Grade 60 (Deck
Girder) 20-Sep
Reinforcing Steel Bar , Grade 60
(Abbutment Protection) 10-Oct