RFI Log
RFI Log
RFI Log
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Please provide us with Client & Consultants Company
Please find attached the Logo as
Logo preferable in jp.file for Project Signage
requested. To adjust and
JSB/1889/ALID/23/01 6/1/2023 7/12/2023
make sure the Logo resolution can fit
with the signage size.
Seeking advice as the client has just requested that the
entire external metal deck be changed to a plain metal
sheet in order to enhance the graphic display on canvas
which is going to be installed later. With all the safety
concern, the changes wouldn’t only be made to the
JSB/1889/ALID/23/02 6/13/2023 GDP is OK with metal deck
material, the entire structure and framing would be
also affected which involve time and cost.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
As per site visit on 20/6/23 at Bowling Area, we found
out that :-
1) The plaster ceiling consists of an existing pendant
sprinklers which are not indicated on the Construction
Drawing.
2) One of the existing Hose Reel also is not indicated on
Construction Drawing.
For the above site condition (item 1 & 2), are the item to
be remained or demolished?
Please advise accordingly.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Kindly advise the color selection in particular to all
aluminium work as listed below :
Ref. Code Queries
B Q D.9/3(A)/B CL-6
Dwg 08-01-102 (Ceiling Panel System) 1. LG level new column wrap in ACP -
Location : Plaza Mall - Internal and External Ceiling Off White ( Milk White colour) in
B Q B.10/4(A)/A CL-5 ALucobest PVDF standard colour chart
B Q E.10/2/A (Baffle Ceiling) - to match new repainting of rc column
Dwg 30-01-101 Location : Plaza Level (Plaza Mall and 2. Plaza Level - new column ACP
Cinema) B Q G.5/2(A)/A CL-5 cladding to be Alucobest PVDF
Dwg 30-02-201 (Baffle Ceiling) Moondust Mica (See attached approved
Location : Esplanade Canopy colour by ALucobest)
B Q G.6/4(A)/B Extrusion Aluminium existing RC column repainting to match
Dwg 30-02-201Louver this moon dust mica
Location : Esplanade Canopy 3. Plaza Level external coloumns
JSB/1889/ALID/23/05 7/4/2023 B Q B.8/5(A)/A,B,C ACP (curved layout) - Moon Dust Mica 7/14/2023
B Q E.12/3(A)/C Alucobest PVDF (See attached
Dwg 14-04-500 approved colour by ALucobest)
NOTE : Please refer to the submitted hardcopy for 4. Aluminium Window Frames - Plaza
actual colour. shop front, LG & GF Big Glass Facade,
colour selection. GF Shop front & big wall aluminium fin
Pleaserefertotheenclosedcolourchartfrom MED for - Jotun Super Durable Powder Coated
colour selection. (see sample)
Location:CladdingtoSteelColumnandMetalDeck COPR2019090226
Roofing SD 2003 - Brown
5. Please refer our comment in
attached file.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
ALUMINIUM FRAMED GLASS WALL & FIXED PANELS
(SHOPFRONT 01, 02, 03, 04, 05 and 06)
Regarding the aforementioned,, we would like to request
the following information for our sample preparation. 1. Aluminium Window/Glass Frames -
1.RAL code for all the aluminum framed. Plaza shop front, LG Glass Facade &
2.For Glass Module 06 (EWS 6), kindly provide us the GF Big Glass Facade, GF Shop front
design of 50% ceramic frit as stated in the drawing color code as follow :
JSB/1889/ALID/23/06 7/4/2023 number 10-03-105. 8/28/2023
COPR2019090226 (SD 2003 - Brown)
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
EXHAUST DUCTS IN THE BOWLING ALLEY WHICH
ARE NOT IN THE DEMOLITION DRAWING :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
As per final check with Alamanda Maintenance Team,
on 26/6/23 at LG Floor, Plaza Level and Ground Level,
we found out that :-
1) The old main gas panel is using SV4B module which
can communicate with Oldham detector only. The
detector unit has been missing as check at LG floor.
The main panel recommend to modify or replace with
new set for which panel involved centralize signal with
new lot?
2) All the existing main panel not communicate with
control room. The new installation do we need to
communicate with control room or just centralize
monitoring at main panel only?
3) The existing riser to LG floor is without ball valve. 1. Please follow based on contract
There only solenoid valve and ESV provided. By scope of works.
providing the ball valve, the supply can be off and lock 2. Please submit the existing
properly. Please advise. dilapidation report to illustrate the
JSB/1889/ALID/23/10 7/14/2023 4) The existing main pipe with faded (Plaza Level – 7/25/2023
existing condition of M&E services at
loading dock) and oily stain (LG level-old food court), do site to unable us to understand the
we need to repaint or not? condition of existing services if they are
5) Piping serve to Riser at GF floor through loading dock in working condition
area is recommended to install with ball valve. By
providing the ball valve, the old pipe riser can be
dismantling and make new further arrangement of
installation. This only involve one time of main line shut
down related to this zone. Since the new riser
installation will use the same area, the replacement can
be done safely by shut off the propose valve. Please
advise.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR NATURAL GAS DROPPER PIPE &
CONTROL PANEL :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR SMOKE DETECTOR & FIRE
ALARM RELAY AT LG LEVEL :-
3) Existing fire alarm relay module for CP-AHU-FC-L2.4 1. To update the actual smoke detector
address 188/189 either to remain or dismantle? (refer qty on site and provide the as-built
attachment Item 3) drawing in the dilapidation report.
JSB/1889/ALID/23/13 7/24/2023 2. Please proceed to dismantle the 8/28/2023
4) Existing fire alarm relay module for sliding door mentioned relay as the existing AHU
address 210 either to remain or dismantle? and sliding door will be demolished as
(refer attachment Item 4) per contract.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR NATURAL GAS PIPING AT LG
RISER :-
Please clarify on the following matters :-
1. The corrode pipe riser which is need to be replaced
shall be careful hack to prevent gas leak from the
corrode pipe riser. There is no main valve provide to LG
floor. The supply to these area can be isolated from the
main gas supply (gas station). Please advise.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING WET RISER
SUPPORT & BRACKET AT LG (Grid Line D8-D9 /
C10-C11) :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
We would like to request for information regarding 2nos
of existing planter box at Lower Ground which is
content with full of existing debris.
Planter Box size : 2000mmW x 2000mmL x 1100mmD.
Site observation and findings:
Area:Lower Ground -Food Court
Kindly refer attach location and photo in relation to 2
numbers existing planterbox found with building debris T-Corp:
infill. All existing debris in the 2 nos. of
JSB/1889/ALID/23/16 8/11/2023 Please advice next course of action to be taken. 8/18/2023
planter boxes to be removed prior to
sealing of planter boxes.
Kindly advise existing wall at Grid Line D8 - D9 to be To demolish the existing wall as per
JSB/1889/ALID/23/17 15-Aug-23 demolish or retain - refer self explain layout attach. 9/8/2023
contract drawing requirement.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING DROPPER FOR
PENDANT SPRINKLER AT BOWLING AREA :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
COLUMN STRENGTHENING WORKS CLASH WITH
EXISTING M&E SERVICES AT P01, BOWLING AREA :-
Attached herewith the following for your reference :- 1. Please relocate the services for the
column strengthening works to be
1) Photos of the M&E services affected at each column. carried out, There will be 100mm thick
2) Construction Drawing (PL/01) with column RC thickening with new rebars around
numbering. the existing column.
2. Contractor to confirm the suggested
JSB/1889/ALID/23/19 18-Aug-23 8/28/2023
We require your further clarification and please advise 200mm to 300mm clearance around
accordingly. the column perimeter is feasible for
installing the new rebars, steel
formwork, grouting space, curing of
concrete & etc, for the proposed
column strengthening.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
FRESH AIR SUPPLY DUCT IN THE LG LEVEL,
CORRIDOR BOTH SIDE (AT SITE OFFICE & OPPOSITE
SITE OFFICE) WHICH ARE NOT TALLY IN THE
DEMOLITION DRAWING
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
RISER DUCT FOR FRESH AIR & KITCHEN EXHAUST
IN THE LG LEVEL (OPPOSITE SITE OFFICE) WHICH
ARE NOT IN THE DEMOLITION DRAWING
Please confirm either the Riser Duct to be demolished Refer to drawing no. 2151/MV/L2/102
for the details of the riser duct
JSB/1889/ALID/23/21 8/22/2023 or not? 9/11/2023
mentioned above. Existing duct to be
Your quick response is highly appreciated. demolished.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING M&E SERVICES
(PLAZA LEVEL) WHICH POSITIONED AT THE BOTTOM
OF LG FLOOR RC SLAB TO BE DEMOLISHED
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR AHU & VENTILATION FAN TO BE
DEMOLISHED OR OVERHAULED AS FLOOR SLAB
WILL BE DEMOLISHED AT AHU ROOM ,CINEMA, (LG
LEVEL)
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR DUCT, CHILL WATER PIPE,
EXHAUST AND DAMPER IN CINEMA (PLAZA LEVEL)
WHICH ARE NOT IN THE DEMOLITION DRAWING
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR SMOKE SPILL FAN AT CINEMA
DOME/ROOF WHICH IS NOT IN THE ACMV
DEMOLITION DRAWING
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
FURTHER QUERY FOR COLUMN STRENGTHENING
WORKS CLASH WITH EXISTING M&E SERVICES AT
P01, BOWLING AREA :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING FIRE ALARM SYSTEM
AT CINEMA :-
Reference is made to the above. Please refer to our
enquiry as below :-
1) As per site condition, there is one (1) fire alarm sub-
panel at Plaza Level, Cinema (GL D9-D10/C15a-
C16) to be relocated or maintained? Please advise and
confirm.
2) Got discrepancy of Break Glass at Plaza Level, 1. to demolish the repeater fire alarm
Cinema to be relocated between Construction sub panel that belongs to the previous
Drawing (GL D8/C16a) and actual at site. The Break cinema tenant as the wall
Glass is not on site as indicated in attached is being demolished
layout. Please advise and confirm. 2. To ignore the breakglass and alarm
For item 1) & 2), please refer Attachment 1. bell as there is one set serving for the
JSB/1889/ALID/23/27 13-Sep-23 3) Existing fire alarm devices at Projector Room, hose reel on the right. 9/25/2023
Ground Floor Cinema are not indicated in the 3. To maintain all the fire alarm devices
Construction Drawing as shown in Attachment 2. located at projector room floor level as
Please confirm, is it to be dismantled or its not mentioned
maintained? in the design drawings.
Your immediate respond on the above is appreciated. please include all the devices condition
Thanks. and drawing into dilap report
Kindly find this discrepancies between construction 1. To maintain the existing wall for the
drawing and actual site observation. existing AHU units duct risers (AHU-
Attached self explain drawing actual physical wall line CN-L1-3A & AHU-CN-L1A-1A). Please
marked in red which are not shown in the refer
JSB/1889/ALID/23/28 15-Sep-23 construction drawing. to the following screenshot of the duct 10/14/2023
Refer grid line C12a, D9 & D10 -D11. risers from floor above (mezzanine
Please advice next course of action. floor).
2. Please refer our comment in
attached drawings.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
We observe the following Cinema Hall Number 3,4,5,6,7
& 8, the existing floor screed are found with cracks and
hollow. Kindy refer attached location and photos for
your reference and record. Please advice next course of 1. Carry out confirmatory investigation
action. works at 2 selected Cinema Halls as
per attached sketch below
inclusive of reinstatement upon
completion.
Note : Based on your investigation
works which were carried out via
hacking to the cracks at the Cinema
Decks on 21/9/2023, our
JSB/1889/ALID/23/29 15-Sep-23 summary of findings is the cracks are 9/25/2023
non-structural crack lines which were
limited to the mass concrete cinema
deck profile/topping.
Structural capacity of the sloping RC
slab supporting the Cinema Decks is
not affected.Cracks on surface of
cinema decks may be
sealed/reinstated via pressurized
injection of SikaGrout®-215.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CONFIRMATION ON DEMOLISHING FOR EXHAUTS
DUCT, CHILL WATER PIPE &
DAMPER AT CINEMA PLAZA LEVEL
With reference to the above matter, replying for your
answer in RFI JSB-1889-ALID-23-24 dated 8/9/23,
the exhaust duct, chill water pipe and damper need
confirmation if required to be demolished. For your
information, all the above item serves the Cinema Plaza
Level. Please refer to the attachment in drawing &
photos for more information.
Your quick response and confirmation on the above will To demolish the exhaust ductwork,
JSB/1889/ALID/23/30 21-Sep-23 be highly appreciated. chilled water pipe and damper serving 10/4/2023
the existing restaurant tenant lot.
Thank you.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CONFIRMATION ON CHWP, AHU DUCT & OTHER M&E
SERVICES TO BE DEMOLISHED
AT CINEMA PLAZA LEVEL
With reference to the above matter, additional
information is required if we should demolish the
existing 1. To proceed demolition of slab as
ACMV Duct, CHWP and other M&E Services at Cinema marked area only (refer to sketch
Plaza Level as the slab above will be demolished below)
(refer Structural Demolition Works Layout; no : 2. To dismantle the existing cold water
JSB/1889/ALID/23/32 26-Sep-23 TC/22/553/STRU/CD/02). copper pipe up to the existing gate 10/17/2023
Please refer to the attachment below. valve. To provide temporary protection
Your immediate confirmation will be highly appreciated. to the
affected existing cold water pipe
during slab demolition.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CONFIRMATION FOR INCOMING GAS PIPE AT CINEMA
SHOP LOTS AREA (GRID LINE D12-D13/C18-C19)
Please confirm on the following: -
1) Existing incoming gas pipe at Cinema shop lots area
need to dismantle c/w cap off?
2) To cap off at floor level? Or inside floor slab?
3) Prior cap off the point, gas need to be shut down at
Gas Station area. Please confirm due it requires
To cut and bind off at the existing gas
permit/liaison from Alamanda Management and Gas
station which connect to the gas point
Malaysia Bhd.
mentioned in the attached RFI.
JSB/1889/ALID/23/34 26-Sep-23 4) Wiring for gas detector need to be dismantled or not? 10/4/2023
Existing pipe burried underground
Please refer to the attachment below.
shall be welded seal off. All gas point
Your immediate confirmation will be highly appreciated.
and detector shall be dismantled.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
DAMAGED / UNUSABLE GREASE TRAP (NO. 2) AT
THE BACK OF CHICKEN RICE SHOP,
PLAZA LEVEL :-
With reference to the above matter, we found out that
the Grease Trap (No. 2) as per site condition as
below :-
1) Piping at the Grease Trap is damaged.
2) Overflowing grease and waste item.
3) Unpleasant smell coming from around the Grease
Trap.
Additional information and official instruction are Existing grease interceptor to be rectify
JSB/1889/ALID/23/35 29-Sep-23 required if we should demolish, clean and change the by existing mall operation team as 11/29/2023
existing grease trap as these are not indicated in the conclude in meeting with client.
contract. We attach herewith the photos for your
reference.
Please advise accordingly.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
FURTHER QUERY FOR COLUMN STRENGTHENING
WORKS CLASH WITH EXISTING M&E SERVICES AT
P01, BOWLING AREA (3rd. RFI) :-
Reference is made to your reply for RFI in
JSB/1889/ALID/23/RFI/26 – Transmittal 183 dated
11/09/2023 which was emailed to us on 22/09/2023,
we would like to get more information and clear
direction for the relocation of existing M&E services at
the Columns for strengthening works as below: -
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
FURTHER QUERY FOR COLUMN STRENGTHENING
WORKS CLASH WITH EXISTING M&E SERVICES AT
P01, BOWLING AREA (3rd. RFI) :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Plaza Level – Cinema
As per site condition we noticed that, column C15-
C15a/D9-D10 found to be rectangle (estimated 220mm
x 500mm) instead of round and square column as per To maintain until 9 January 2024.The
details given. existing wall is to support the existing
JSB/1889/ALID/23/38 11-Oct-23 Kindly re-confirm on the strengthening of this column kitchen exhaust for Nandos below. 10/27/2023
and please provide strengthening details drawing for To demolish the existing wall 10
rectangle column. Thanks in advance. January 2024 onward.
LEVEL - CEILING
We noticed that, there is a discrepancy on the column
located at gridline D5/C7.
For better understanding kindly find as per attached 415mm clear gap from gridline D5 to
JSB/1889/ALID/23/41 17-Oct-23 drawing. the edge of steel beam not from centre 10/27/2023
Kindly advise us on the above-mentioned issue. Thanks of steel beam
in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
REQUEST FOR ELECTRCAL SERVICES
CONSTRUCTION DRAWINGS FOR THE HUB
LANDSCAPE AREA :-
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CONFIRMATION OF RISER DUCT TO BE
DEMOLISHED AT LG LEVEL BESIDE AND OPPOSITE
SITE OFFICE: -
Thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
LOWER ROOF – CINEMA
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
REQUEST TO MAINTAIN LOCALIZED LG FLOOR SLAB
AREA DUE TO EXISTING OF ACMV CHWP AND
INCOMING WATER PIPES AT CINEMA PLAZA LEVEL
With reference to the above matter and below:-
1) RFI respond by GDP, JSB/1889/ALID/23/RFI/32 –
Transmittal 225 dated 17/10/2023
2) Structural Demolition Works Layout; no :
TC/22/553/STRU/CD/02.
As per discussed with Mr. Colin, T-Corp Engineers SB
yesterday (19/10/23), there is localized LG slab at
Cinema area that need to maintain due to existing of
JSB/1889/ALID/23/46 24-Oct-23 main ACMV CHWP & incoming water pipes attached to OMIT - DOUBLE ISSUED
the soffit slab as per attachment details.
Your immediate confirmation will be highly appreciated.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Landscape and Structure: The Hub Deck and Staircase
Structural support
1.0
Refer in green mark-up
Kindly provide structural detail support for brickworks
along the following area :
A -Structural support on existing water feature slab.
B -Structural support on excavated soil alongside of Item 1.0 - Location for new open deck’s
existing handrail enclosure wall at A & B can be as
2.0 attached instead of to erect the new
Mark in Red walls at earth area that required new
Existing Cable Manhole- as observe the existing concrete footing.
JSB/1889/ALID/23/48 25-Oct-23 11/27/2023
inspection manhole house numbers of data and power Item 2.0 - Jalex to verify and provide
cables connecting to feeder pillar along the lake side report on the existing cable in manhole
walkway- Kindly advice do we provide excess manhole mentioned in RFI on its incoming from
on the deck surface and extension of the manhole to which panel and outgoing serve to
the underside of the propose decking. which area.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
REQUEST TO MAINTAIN LOCALIZED LG FLOOR SLAB
AREA DUE TO EXISTING OF
ACMV CHWP AND INCOMING WATER PIPES AT
CINEMA PLAZA LEVEL
With reference to the above matter and below:-
1) RFI respond by GDP, JSB/1889/ALID/23/RFI/32 –
Transmittal 225 dated 17/10/2023
2) Structural Demolition Works Layout; no :
TC/22/553/STRU/CD/02. 1. To demolish the chilled water pipe
As per discussed with Mr. Colin, T-Corp Engineers SB and cold water pipe for slab demolition.
yesterday (19/10/23), there is localized LG slab at 2. To reinstate back the piping after
Cinema area that need to maintain due to existing of new slab completion with pressure test
JSB/1889/ALID/23/49 26-Oct-23 main ACMV CHWP & incoming water pipes attached for review and approval. 11/8/2023
to the soffit slab as per attachment details. 3. Chilled water pipe demolition shall
Your immediate confirmation will be highly appreciated. be after the freezing scope of work
during the installation of BTU meter
at the incoming CHWS&R pipe.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
TO RE-USE OF DISMANTLED EXISTING COPPER
WATER PIPE FROM CINEMA, PLAZA
LEVEL :-
With reference to the above matter and as below: -
1) As per Verbal Instruction from Mr. Henry (JRP) at
site on 19/10/23 (Thursday). 1. To safekeep and protect the
2) Reply from GDP for RFI No 32, dismantled existing copper pipe for slab
JSB/1889/ALID/23/RFI/32 – Transmittal 225 dated demolition. To reinstate
17/10/2023. the copper pipe after new slab
Unfortunately, we are unable to ensure the demolished completion c/w pressure test for
existing copper water pipe still good to re-use as it review. 11/2/2023
may have pinholes that cause leaking and corrosion in 2. Verified the storage area with
inner pipe. Please refer photos as attached. appropriate protection.
Please advise accordingly. 3. To check and verified the condition
Your immediate confirmation will be highly appreciated. before dismantling (ie. while pressured
water still inside).
JSB/1889/ALID/23/50 27-Oct-23
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Removal of the existing seating platform and tree, the
floor will be retile matching the existing floor finish.
The contract only allow for cement sand floor screed to
review floor tiles.
Kindly provide the R.C Base Slab detail and
1. Please refer attached R.C slab detail
requirement in preparation to receive the following
for your further action.
finishing.
JSB/1889/ALID/23/51 27-Oct-23 2. To 1/19/2024
Refer attach :
dismantle all the existing cable at
Drawing number PL014-TD-L-21-1584
esplanade planter's area.
BQ 853 –Bill No.1.2 item A
BQ 853 –Bill No 1.5-Floor Finishes –Item A
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Landscape and Structure: Drain line clarifications
Please advise which drain line to be follow or both to be
constructed accordingly.
Drain detail, propose gradient and necessary
requirement.
Refer:
Both drains need to be constructed
Orange line –Drain line as in T-Corp Construction
accordingly as per tender/contract
drawing
JSB/1889/ALID/23/53 10-Nov-23 dwg. Kindly submit drainage shop dwg 12/8/2023
–detail section LW1
with existng drain
Yellow Line –Drain line as in Pentago construction
discharge for approval.
drawing
–detail section 03 steps and finishes detail
Existing Elements :
Please advise action to be taken on the following
existing fixture elements on site:
1
Existing 3 numbers steel bench 1. Keep the 3 nos of existing benches.
2 Not affected by on site construction.
JSB/1889/ALID/23/54 17-Nov-23 Existing Directional Pylon Signage 12/4/2023
2. Dismantle the signage and safekeep
Refer below for location and photo for your reference for future use.
and record
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Plaza Level - Cinema Lobby
As per site condition, we noticed that micropiling and
pilecap works (MA21) location clashing with live
existing sewerage manhole and pipeline which we
unable proceed our work to avoid damage to existing
Refer to response and comments in
JSB/1889/ALID/23/56 29-Nov-23 pilecap and micropiling 12/1/2023
Please refer to attachment for further understanding. attached sketch below.
Kindly advice and thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Plaza Level – Bowling Area
As per site condition we noticed that, at gridline
D1/C12-C13A, there is 6 nos point for micropiling
works which is clashing with the existing tree at
bowling area.
JSB/1889/ALID/23/59 1-Dec-23 To cut the existing trees. 12/4/2023
Kindly refer to the attachment for better understanding.
Your fast respond kindly appreciate.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Part Print of Drawing No : TC/22/553/STRU/CD/01 –
Structural Demolition at Plaza Level
We wish to bring to your attention that as the Plaza
Slab demolition works commenced at Gridline
C14-C15/D3-D4, the slab thickness was found to be
~470mm thick.
Thus, we would like to seek for your confirmation / site
instruction or demolition of the ~470mm thick
JSB/1889/ALID/23/62 6-Dec-23 plaza slab as our as built drawing given during tender Please refer our response below. 1/3/2024
is 150mm – 200mm thick slab.
We seek for your attention and advice. Kindly refer to
the photographs enclosed for your better
understanding.
Level LG
By referring to commented drawing on 25th October
2023 we noticed that there is an additional staircase to
be constructed at grid line D9/C13a.
Kindly provide us the details for the staircase for our
Please refer our revised detail for your
JSB/1889/ALID/23/64 12-Dec-23 further action. 1/15/2024
Please refer to the attachment below for better further action
understanding. Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Plaza Level – Bowling Area
By referring to Engineer Instruction mentioned that to
proceed with controlled excavation for exposed existing
2nos CHWP pipe routine at bowling area.
We noticed that the existing CHWP pipe routine Refer to attached sketch by TCorp
clashing with 2 nos of micropiling work and capping Engineer.
beam works. 1. MP1, MP2, MP3 and adjust capping
JSB/1889/ALID/23/65 18-Dec-23 For better understanding please refer to the beams as indicated in attached sketch 12/19/2023
attachment. 2. All other points and works at
Kindly advice and thanks in advance. affected area to be mainted and to
proceed accordingly
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
1) These columns (highlighted in Green colour) where
the Corbel is required, should have already
strengthened by sectional enlargement from 600mm to
800mm diameter. However the corbel details is based
on 600mm diameter column size. Kindly provide the
details for corbel 800mm column. Please advise
Please refer to our comments below and
JSB/1889/ALID/23/67 26-Dec-23 accordingly. 1/2/2024
2) Please advise the top level of the Corbel required to in attached drawing.
suit to the New Slab, Steel Beam & Bearings.
Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING CABLES IN
MANHOLES AS PER RFI N0. 48-THE HUB DECK AND
STAIRCASE STRUCTURAL SUPPORT: -
Reference is made to the above and comment from GDP
for RFI no. 48-The Hub Deck and Staircase
Structural Support dated 27/11/2023 which says “Item
2.0 - Jalex to verify and provide report on the existing
cable in manhole mentioned in RFI on its incoming
from which panel and outgoing serve to which area”.
Therefore, our findings as below: -
1) Electrical cabling in the manholes come from existing
Feeder Pillar Landscape (FP/LS2
LANDSCAPE) located outside hoarding, nearby lake
area. The Feeder Pillar serves for outgoing supply for
previous pole lightings, staircase lightings, socket
outlets etc. mostly at colourful staircase
landscape area and few wall light at DIY area. Please
JSB/1889/ALID/23/68 27-Dec-23 refer layout below and attached Dilap Report Maintain the cabling and manhole. 1/8/2024
Landscape by our electrical contractor for your further
reference.
2) As informed by client side (En. Shahril) during our
Site Walk on Thursday (30/11/23), he decided that the
Manholes should be maintained.
For the above reason, your clarification and final
confirmation is required either to maintain the cabling
and manholes or to demolish it.
Your immediate reply on the above is appreciated.
Many thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
FURTHER QUERY FOR ELECTRCAL SERVICES
CONSTRUCTION DRAWINGS FOR THE HUB
LANDSCAPE AREA :-
Reference is made to GDP replied for RFI 42 dated
8/12/2023 & its attachment Construction Drawings,
LANDSCAPE LAYOUT PLAN, LIGHTING LAYOUT PLAN,
THE HUB & SCHEMETIC WIRING
DIAGRAM (Drawing No: 2151/EL/LS/201, Revision:
00, Date: NOV 2023), we would like to request
further details of Electrical Services Construction
Drawings for The Hub Landscape Area as below: -
1) Please confirm either Feeder Pillar (FP-LS) is a new
item or dismantled FP? 1. That is existing Feeder Pillar (not
If using dismantled FP, confirmation and further shown as dismantle item in our
instruction from your side is required as its drawing).
condition to be checked first, to be sent and tested 2. The cabel size follow existing cabel
JSB/1889/ALID/23/69 4-Jan-24 1/26/2024
(functional test etc. c/w with testing result) at size, power source, follow existing
switch board manufacturer factory. Feeder Pillar.
2) No details of incoming cables size and power source 3. Contractor to identify and verify
for the above Feeder Pillar. Please advise & clarify. the existing cable size on site.
Please refer to Attachment 1 below for a better
understanding.
Your immediate feedback on the above is appreciated.
Many thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
We would like to request for information regarding
existing glass canopy at P06, Plaza Level which is not
indicate in either construction layout plan or demolition
plan. Area marked on plan and site photo attachd for
JSB/1889/ALID/23/71 9-Jan-24 your reference. To maintained 1/17/2024
Please advice next course of action to be taken.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
We would like to request for information regarding
existing cantilever RC slab at Ground Level Grildine:
D3a/C6-C13 and D7a/C6-C13 which is obstruct new
To maintain the existing cantilever R.C
Lower Ground perimeter ceiling box up,refer
slab.
JSB/1889/ALID/23/75 16-Jan-24 drawing and site photo attached. 2/14/2024
GDP will update and issue revised box
Please advice next course of action to be taken.
up ceiling.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING M&E SERVICES (LG
LEVEL) AT UNDERNEATH OF
G FLOOR RC SLAB TO BE DEMOLISHED
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR BEAM STRENGTHENING WORK
CLASH WITH EXISTING RWDP
AT LG FLOOR
PLAZA
Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
PLAZA
Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CLARIFICATION FOR EXISTING M&E SERVICES
(PLAZA LEVEL) AT UNDERNEATH OF
LG FLOOR RC SLAB CLASH WITH LIFT CORE & WALL
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
SANITARY PLUMBING WORKS FOR LG TOILETS
OBSTRUCTED BY EXISTING CEILING
PANELS AT DROP OFF AREA, PLAZA LEVEL: -
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
CEILING TO BE DISMANTLED FOR AHU DUCT VOID
INSPECTION & AHU INSTALLATION
AT MEZZANINE FLOOR, CINEMA: -
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
LG – CLARRIFICATION FOR CANTILEVER SLAB AT LG
CLASHING WITH STEEL
STRUCTURE
Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Previously we use drilled through method and this Structurally acceptable, but with no
JSB/1889/ALID/23/86 19-Feb-24 2/21/2024
method is not suitable to the limited space of additional time and cost implication.
working and the rebar arrangement shall not able to
meet as per requirement.
Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued PLAZA –NEW GROUND
Info Request
BEAM Description
CLASHING WITH Info Received Description Order Yes / Extension Yes
Received
EXISTING STUMP AND GROUND BEAM No / No
AT P06 & P05
Based on site condition, we notice that new ground
beam clashing with existing stump and ground
beam at P05 & P06. By referring to construction
drawing (TC/22/553/STRU/CD/01) the existing To plant starter bars for the new
JSB/1889/ALID/23/89 25-Feb-24 ground beam shall be remain. ground beams to connect to the 3/1/2024
Please advise on the termination for the clashing area existing stump and ground beam.
as per stated above.
Attached also photo for your understanding. Kindly
advise and your fast action is really appreciate.
Thanks in advance.
Existing Roller Shutter not in Demolition Plan.
2 nos of
JSB/1889/ALID/23/90 1-Mar-24 To Demolish the existing Roller Shutter. 11-03-24
existing Roller Shutter at Grid Line C10 - C12/D5 not
in Demolition Plan and 1 of them is obstruct
new full height block wall.
Please advice next course of action to be taken.
Attached below plan and site photo for your reference.
Many Thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
ACMV DUCT OBSTRUCTION FOR NEW STIFFENERS
INSTALLATION AT GROUND
LEVEL: -
Thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Thanks in advance.
Refer to construction drawing, 4nos of new door on
existing wall not in demolition plan, at Grid Line :1)
C5/D3-D3a and C3-C4/D7a-D8 (Lower Ground Level)
2) C5/D3-D3a and C5/D7a-D8 (Ground Floor Level)
Please refer to the applicable typical
Please advise accordingly include hacking demarcation
detail for full height wall with fire door
JSB/1889/ALID/23/98 14-Mar-24 area and details of Stiffener & Lintol for framing of 3/15/2024
as provided in Construction Drawing:
the new door.
TC/22/553/STRU/FS/01.
Attached below layout and site photo for your reference.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Position of Recessed Dirt Control Carpet Entry Mat
Plaza Level –
JSB/1889/ALID/23/104 15-Mar-24 PENDING REPLY
Position of Recessed Dirt Control Carpet Entry Mat
Kindly advice the location of Recessed Dirt Control
Carpet Entry Mat base on the latest construction
drawings issued on 9 March 2024 for Lower Ground
and
BeamPlaza
StripLevel.
Hacking Request for Structural
Reinforcement details and requirements - Planter box,
upstand elements and floor slab
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Clarification for obstruction MB1
PLAZA - HUB
By referring to site condition, we noticed that pilecap
MB1 still got obstruction from existing structure which Kindly refer to our response in attached
JSB/1889/ALID/23/106 25-Mar-24 we unable to proceed with micropiling and pilecap Drawing: 3/29/2024
works for the previous SI-002 mentioned that to remove TC/553/STRU/PCKG1/RFI/11
using backhoe breaker but the existing structure too
deep and big which unable to reach using backhoe
breacker.
Confirm
AttachedLocation of 3
also photo fordifferent Column Cladding
your understanding. Kindly
advice and your fast action is really appreciate.
Thanks in advance.
Column
Cladding –Typical Internal and External Detail
Request for
Revise Sanitary Ware Schedule Drawings to replace
UPDATED TILL 08 APRIL 2024
Drawing Number 10-08-100/10-08-101/10-08-102
Thank you
REQUEST FOR INFORMATION (RFI) LOG
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Many thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Thanks in advance.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Many thanks,
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
New Drawing filed as “20240325 Lower Ground
Bulkhead & Ground Floor Plan”
JSB/1889/ALID/23/113 1-Apr-24 PENDING REPLY
Please provide more information on the item marked in
red in the enclosed drawing, as it is not reflected in
section 03 drawing ref. 06-01-101.
Refer to
construction drawing for Esplanade Canopy, Rain
Water Down Pipe(RWDP) at Grid Line A26 and B14 is
JSB/1889/ALID/23/115 2-Apr-24 PENDING REPLY
located on the service corridor wall which is inside the
building. On actual site condition, to connect the RWDP
from the gutter to the service corridor wall, the pipe
need to punch thru existing RC Beam which is
technically not allowed.
Please advice next course of action to be taken.
Attached below plan for your reference.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
WC at LG Toilet
JSB/1889/ALID/23/117 2-Apr-24 As per our site inspection we notice that PENDING REPLY
existing WC at LG Toilet is using S Trap, but our new
WC selection is using P Trap, We would like to request
for the piping routing for the WC discharge out let.
Please advice next course of action to be taken.
Attached below plan and site photo for your reference.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
JSB/1889/ALID/23/122 15-Apr-24 1. Slab thickening, new beams and slabs as shown in PENDING REPLY
drawing ref. TC/22/553/STRU/ES/LG/01] Gridline
C12a-C13 / D10-D11
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Plaza Level –
JSB/1889/ALID/23/104 15-Mar-24 PENDING REPLY
Position of Recessed Dirt Control Carpet Entry Mat
Kindly advice the location of Recessed Dirt Control
Carpet Entry Mat base on the latest construction
drawings issued on 9 March 2024 for Lower Ground
and Plaza Level.
Request for
Revise Sanitary Ware Schedule Drawings to replace
Drawing Number 10-08-100/10-08-101/10-08-102
Thank you
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Many thanks.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Many thanks,
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
New Drawing filed as “20240325 Lower Ground
Bulkhead & Ground Floor Plan”
JSB/1889/ALID/23/113 1-Apr-24 PENDING REPLY
Please provide more information on the item marked in
red in the enclosed drawing, as it is not reflected in
section 03 drawing ref. 06-01-101.
Refer to
construction drawing for Esplanade Canopy, Rain
Water Down Pipe(RWDP) at Grid Line A26 and B14 is
JSB/1889/ALID/23/115 2-Apr-24 PENDING REPLY
located on the service corridor wall which is inside the
building. On actual site condition, to connect the RWDP
from the gutter to the service corridor wall, the pipe
need to punch thru existing RC Beam which is
technically not allowed.
Please advice next course of action to be taken.
Attached below plan for your reference.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
WC at LG Toilet
JSB/1889/ALID/23/117 2-Apr-24 As per our site inspection we notice that PENDING REPLY
existing WC at LG Toilet is using S Trap, but our new
WC selection is using P Trap, We would like to request
for the piping routing for the WC discharge out let.
Please advice next course of action to be taken.
Attached below plan and site photo for your reference.
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
Variation Time
Date Info
Info Req. (Q&A) No. Date Issued Info Request Description Info Received Description Order Yes / Extension Yes
Received
No / No
JSB/1889/ALID/23/122 15-Apr-24 1. Slab thickening, new beams and slabs as shown in PENDING REPLY
drawing ref. TC/22/553/STRU/ES/LG/01] Gridline
C12a-C13 / D10-D11