AIRCARE SYSTEM & SOLUTION INDIA PVT. LTD.

GAT NO. 1323/1, SANE INDUSTRIES, NEAR ZHENDA CHOWK.

MOREWASTI CHIKHALI, TAL- HAVELI, DIST- PUNE - 411062


PROJECT NAME - UNITAS DEVLOPERS
SNAG POINTS COMPLETED DATE :-
14.04.2024
ADDRESS- KONDHWA

SR. NO SNAG DISCRIPTION BEFORE AFTER REMARK

SLOTTED CHANNEL SHOULD BE REVERSE


DIRECTION AND THICKER THAN EXISTING THAT
1 IT WILL COMPLETED
BEAR LOAD WITHOUT BENDING

DUCT SHOULD BE IN THE CENTER OF THE


2 SLOTTED CHANNEL, SO THAT LOAD WILL COMPLETED
BALANCE

DISTANCE BETWEEN 2 SUPPORTS SHOULD BE


3 MAXIMUM 1.8MTRS AS PER DISCUSSED. COMPLETED

4 RODS SHOULD BE IN STRAIGHT. COMPLETED

5 GRILLS FINISHING LIKE FIRST ONE COMPLETED

USELESS GRILL DO PROPER EXTENSION.

6 COMPLETED

TEAR NITRILE RUBBER AND NO MASKING TAPE


7 AT THE JOINTS. COMPLETED

8 GRILLS ON WALLS SHOULD BE SHIFTED COMPLETED


9 RODS SHOULD BE IN ONE LINE COMPLETED
10 SUPPORTINGS DISTANCE TOO MUCH COMPLETED

11 TEAR NITRILE RUBBER COMPLETED

12 CHANNEL PATTI ON FLAT SIDE NOT ON SLOPE. COMPLETED

13 NO INSULATION APPLIED ON GRILLS COLLAR COMPLETED

14 GRILLS ON WALLS TO BE SHIFTED COMPLETED

DUCT LINE SHOULD BE IN ONE LINE NO


15 ANDULATIONS ACCEPTED COMPLETED

TEAR OF NITRILE RUBBER FINISHED TO BE


16 PROPER COMPLETED

SILICON NOT APPLIED PROPERLY LEAKAGE IS


17 NOT STOPPED AFTER APPLYING SILICON. FIX IT COMPLETED
PROPERLY

TEAR NITRILE RUBBER AND NO MASKING TAPE


18 APPLIED COMPLETED

*LINELEVEL OF DUCTS COMPLETED

*SUPPORTINGS OF DUCTS _____________________________________________________


_____________________________________________________ COMPLETED
*PROPER EXTENSIONS IN EVERY SHOPS _____________________________________________________
_____________________________________________________ COMPLETED

*REMOVE GRILLS FROM WALLS _____________________________________________________


_____________________________________________________ COMPLETED