B At Load Condition
B1
B2
Approximate distance travel before brake activate
Approximate distance travel before brake activate
ioiooe
B3 Approximate distance travel before brake activate
B4 Starting Current (100Amps +/- 10%)
BS Running Current (40Amps t/- 10%)
B6 Starting Voltage (415Volt +/- 10%)
B7 Running Voltage (415Volt +/- 10%)
C Electrical Safety
C Top limit switch
Bottom Limit switch
C3 Door interlocking safety limit switches (3 nos.)
*C4 Speed reducing limit switches (upward &downward)
C5 Free fall emergency brake arrangement
C6 Overload protection with load sensor Dh
*C7 VFD Details
C8 Extreme emergency top limit switch
C9 Insulating resistance of electrical cable used
Declaration: We hereby confirm that the machines have been manufactured in accordance with
standards listed above and that the specified test and inspections have been aNed out. The
machine was found to be electrically & mechanically in order.
Prepared By Approved By:
Observation Remarks
SI. Checking Area
No.
1 Foundation
Founcati on alignment checking
12 Foundation spring function checking
2 Mechanical alignment
2.1 Tower alignment check
2.2 Rack alignment checking
2.3 Cable trolley aignment checking
2.4 Rack and pinion alignment with emergency brake device
3 Others
3.1 Motor pinion and fitment checking
3.2 Load cell pin fitment checking.
3.3 Anchor position and fitment checking
3.4 Enclosure positional checking
3.5 Cage three door functional checking
3.6 Gear oil levelchecking
3.7 Mast pipe quality Ok
3.8 Mast pipe thickness
3.9 Welding of Mast
3.10 Overall finish and painting
Declaration : We hereby confirm that the machines have been manufactured in accordance with
standards listed above and that the specified test and inspections have been carried out. The
machine was found to be electricaly & mechanically in order.