Coastal Protection, Landscaping and Infrastructural Works in Mauritius, 2021-2025

Geotechnical Investigations – Scope of Works


Site 2: Albion

Scope of works

1. Drilling of 3 nos. coreholes up to a maximum depth of 6m and detailed logging of each core.
2. Carrying out SPT at every 1m interval in each corehole
3. Carrying out laboratory tests on samples collected at sea bed (at each corehole position) as
follows:
a. Particle Size Distribution Test

Proposed Corehole Locations

Page 1 of 3
Site 5: Le Morne

Scope of works

1. Drilling of 7 nos. coreholes up to a maximum depth of 6m and detailed logging of each core.
2. Carrying out SPT at every 1m interval in each corehole
3. Carrying out laboratory tests on samples collected at sea bed (at each corehole position) as
follows:
b. Particle Size Distribution Test

Proposed Corehole Locations

Page 2 of 3
Site 6: La Prairie

Scope of works

1. Drilling of 4 nos. coreholes up to a maximum depth of 6m and detailed logging of each core.
2. Carrying out SPT at every 1m interval in each corehole
3. Carrying out laboratory tests on samples collected at sea bed (at each corehole position) as
follows:
c. Particle Size Distribution Test

Proposed Corehole Locations