Download as pdf
Download as pdf
You are on page 1of 8
Wj VAINSA GRIFERIA Y SANITARIOS Frame-Structure Concealed Cistern Installation Manual Manual de Instalacion para Inodoros Suspendidos: V2szA21 Inedoro suspendido redondo, linea Klass, incluye botonera dual cromada, estructura y tanque para instalacion, Sv25YA21 Inedoro suspendido cuadradso, linea Klass, incluye botonera dual cromada, estructura y tanque para instalacion, sv27Za21 Inodoro al piso redondo, linea klass, incluye botonera dual cromada, estructura y tanque para instalacion Manual de Instalacion para Inodoros Suspendidos para fluxémetros (Manual de Referencia): 8v26ZA21 Inedoro suspendido redondo, linea klass, para fluxémetro. sv26YA21 Incdoro suspendido cuadrado, linea klass, para fluxémetro. List of main installation accessories 16 15 14 13 No. Description Qty » _ Function Expansion screw {__| Mounting of ame and'wall bracket 1_[ Wall bracket . 7_| Fixation offrame [Angle valve [| Filvalve inlet and anata + _[Cistern cover |__| Ritproof tank and mounting of Tocking bracket 3_| Socket head screw ‘| Mounting offrame and locking into wall bracket | Plastic holder [| Toreserve space for installation of actuator at wall Bung 1 _| Plastic holder cover [_[ Teprevent dist and impuritastato tankat wall bulleing #_|_ Connecting screw 7] To mount ceramic bowl 9-_| Protective cover 1__| Toprotect connecting screw at wall bulaing L_| Ceramic bow fixing accessories |) | To mount ceramic bow TL_[ Straight tube | To joint cistern into ceramic bowl (cutting in accordance {2_| Connecting pipe T | mith wall thickness) [13 [Piping stopper {]_| To reserve space for straight tube and connecting Pe ‘14 | Draining syphon _| 1 [Te discharge Hquid and solid waste Irom ceramic bowl 1§-_|_ Draining syphon holder t iE Mate aE CE] Temountdrtningsyphon |= Important instruction: 1. Please adhere to the following installation instructions,We shall not be responsible for failures and loss that are contributed to improper installation. 2, Please confirm the fixation location of frame n prior to installation and obtain the finished floor With drawing. surface, Draw FEL on installation wall and follow Finished Floor. itas baseline from ZERO (0) level. Lv me 3. The instructions have been composed based in the latest product specifications. We reserve the Tight to make modifications to the packaging and specifications without providing prior notification. NOTES: 1, Mount before bricks building. 2. All size unit in MM. 3. Follow the material product, should there is an unconformity 1. General dimension and water supply drawing Water supply from top (water supply should be connected to angle valve inside cistern) Mounting frame founting wall |= ——~} 603 Dimension of Hi & H2 subject to available parts. ~1- 2, Drill holes on mounting wall and floor and install expansion screws A dimension according to practical location of. flushing pipe sxNote: Above drilling are theoretical dimensions of frame mounting. Please follow by the practical location of frame. asd 1 spouted il syauaaieg anata naam soso Praia) bathe wat Drillahole of 510*75 me insert expansion serewmme pecker into wall ir B® giox1s Drillahole of 10475 —e- insert expansion screw 4, Installation of draining syphon “ai FEN i) f eS Locate the bracket —e mount draining syphon —« lock holder @ 4, Adjustment of socket head screw and floor fixing accessories Move adjusting leg to desired position . Adjustment and fixation of mounting frame Pretighten the nut and when frame location is seated, lock the nut. pi and when frame location is seated, lock screw. §, Mounting of installation accesso1 1, Wall thickness range 20-60mm (from frame outside surface to finished wall) — a a 20~ 60mm jounting frame <3nm 8, Mounting of ceramic bowl Filly nserethe straight tube Into cistern ashing outlet and connecting pipe into discharging CO S Draw the lines as above pletur®, Apply lubricant on rubber washers of straight tube and connecting pipe, then Insert into ceramic holes. Draw the lines as above picture. ® by Xe ca As per drawing, Lis distance between the two lines on straight tube. Lis distance between the two lines on connecting pipe. © a 1a Lissa Lsdam Cut the straight tube and connecting pipe as per above drawing. Polishing the cutiing surface to get chamfer angle as per drawing and deburring : Applic lubricant on joint surface of straight tbe and connecting pipe ‘Adjust length of connecting bolt tobe d+20mm Firstly insert connecting pipe Into discharging outlet and straight tube into ceramic hole Mounting the ceramic bow! Locking the ceramie bowl 9, Internal flushing mechanism assembly drawing The internal flushing mechanism are already = well-assembled and above picture only for reference. ~T- —

You might also like