HVAC BOILER

QUALITY CONTROL REPORT

Project Title: Date:


Building/Structure: Report No.:
INSTRUCTIONS: Before making inspections, the quality-control inspector should have reviewed the drawings
and specifications and should be sure that he understands them. Clarify all questions with the engineering office
that prepared them. Provide a copy of the completed report to the construction overseer, quality-control
coordinator, and any others as directed.

ITEM(S) COVERED BY THIS TEST

CHECKLIST
1.  Yes  No  N/A Have the systems been installed in accordance with the drawings and
specifications?
If no, please explain why:

2.  Yes  No  N/A Are the systems ready to be tested, adjusted, and balanced?
3.  Yes  No  N/A Have the boilers been started and tested for proper and safe operation in
accordance with the manufacturer’s instructions?
4.  Yes  No  N/A Have all safety, temperature, pressure, and operating controls been tested,
adjusted, and set for proper operation?
5.  Yes  No  N/A Are all combustion air-openings and barometric or draft-control dampers for the
boilers been installed?
6.  Yes  No  N/A Has the piping to air vents, air-elimination fittings, and compression tanks been
checked for their proper locations?
7.  Yes  No  N/A Has all air been bled from the system?

Signature of Quality-Control Inspector Signature of Crew Overseer

Quality Control Report HVAC Boiler


11/03 Page 1