BHP BILLITON

SPENCE-GROWTH OPTIONS PROJECT

SPENCE SGO PROJECT,


PROJECT CALCULATION SHEET
POWER SYSTEM STUDIES

20.12.2018 Wilfredo Muñoz

Nˆ PLANO SYNERGY Nˆ PLANO TNT Rev.

3057-2100-CALC-1001 4-V1-2100-EL-CAL-101001 2

Comments

2 03-Dec-18 RE-ISSUED FOR CONSTRUCTION KAP KSM HGD


1 23-May-18 RE-ISSUED FOR CONSTRUCTION KSM KAP HGD
0 24-Apr-18 ISSUED FOR CONSTRUCTION KAP KSM HGD
B 22-Mar-18 ISSUED FOR INFORMATION KAP KSM HGD
A 30-Jan-18 ISSUED FOR INTERNAL REVIEW KAP KSM HGD

REV. DATE REVISION DESCRIPTION DR CH APP.

1
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

CONTENTS:

1- Introduction………………………………………………………………………………4
2- Scope of Facilities………………………………………………………………………4
3- Scope of this Document……………………………………………………………..4
4- Project Power Distribution…………………………………………………………5
5- Purpose of Network Study………………………………………………………….6
6- Reference Project Documents and Equipment Details……………..…7
7- Standards…………………………………………………………………………………..7
8- Power System Data ……………………………………………………………….…..8
9- Case Studies …………………………………………………………………………..…10
10- Voltage Regulation Criteria……………………………………………..……....12
11- Loads and Factors……………………………………………………………..……..12
12- Short Circuit Results for Selection Equipment……………………....….13
13- Conclusion and Comments…………………………………………………...….13
14- Notes……………….………………………………………………………………..…….15
15- Load Flow Report (Used Data & Results) …………………………..……..16
• Bus input data……………………………………………………..………..………18
• Line/Cable input data………………………………………………………..…..22
• Transformer data……………………………………………………………….….25
• Branch connections…………………………………………………………....…26
• Bus loading summary report……………………………………………….…35
• Branch (cable and transformer) loading summary report……...38
• Branch losses and voltage drop summary report…………………..41
• Summary of total generation, loading and demand…………….…45
16- Load Flow Results on SLD………………………………………………….…..…46
17- Short Circuit Report – Maximum Level (Used Data & Results).….54
• Power grid input data……………………………………………………...…..66
• Induction motor input data……………………………………………….….67
• Lumped load input data………………………………………………….…….69
• Short circuit report (Contribution ½ cycle & 1.5-4 cycles)…….…70
• Momentary duty summary report………………………………….…...187
• Interrupting duty summary report………………………………..….….191
18- Short-Circuit Results – Maximum Level on SLD…………………..……196
19- Short Circuit Report – Minimum Level (Used Data & Results)…..204
• Power grid input data……………………………………………………….….216
• Lumped load input data……………………………………………………….219
• Short circuit report…………………………………………………………….…220
• Momentary duty summary report………………………………………..337

2
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

• Interrupting duty summary report…………………………………….341


20- Short-Circuit Results – Minimum Level on SLD……………….…….346
21- Motor Starting Report (Used Data & Results) ………………..…….354
• Bus input data…………………………………………………………………..356
• Machine input data…………………………………………………………..367
• Switching motors………………………………………………………………368
• Sequence of events……………………………………………………..……369
• Load flow report @ T=0.000 sec………………………………………..370
• Load flow report @ T=1.000 sec…………………………………..…..377
• Load flow report @ T=5.000 sec……………………………………....384
• Load flow report @ T=10.000 sec………………………………….....391
• Alert setting………………………………………………………………….....398
• Critical alert report…………………………………………………………..399
22- Plots of Starting current, voltage of Primary Crusher Motor…400
23- Plots of Starting current, voltage of Dust Collector Motor..….401
24- Plots of critical bus voltages during Starting the Motors………402
25- Motor Starting Results on SLD – in T=5.50 sec …..…………….….403
26- Coordination Study………………………………………………………………411

3
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

1 Introduction

BHP Billiton’s Spence Growth Option (SGO) Project has been broken down into several horizontal
and vertical work packages, one of such work packages is Vertical Work Package N° 1 (VWP01)
associated to the Material Handling Facilities of the Project.

2 Scope of Facilities

The VWP01 is comprised of the following Facilities:

• Primary Crusher with an ore crushing capacity of 5,278 t / h (balanced), designed for
6,069 t / h, open size setting (OSS) of 203 mm, 75% runtime

• Sacrificial Conveyor with a load conveying capacity of 6,251 tons per hour of wet material

• Overland Conveyor with a load conveying capacity of 6,251 tons per hour of wet material
and

• Support infrastructure including roads, electrical power distribution, water storage/


distribution and fire protection

Additionally, the VWP01 scope includes the removal and relocation of following Site
Interferences (the Interferences):

• 23 kV power line to powder magazine

• HDPE pipelines to powder magazine

• Road to powder magazine

3 Scope of this Document

Performing Power System Studies on the following area, below-mentioned network and
equipment is the scope of work:

1. Outdoor substations, Medium and Low voltage SWGR/MCCs and auxiliary transformers with
underneath tag numbers:

o 2110-US-001

4
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

o 2130-US-001

o 2110-SG-001

o 2110-MC-001

o 2110-MC-501

o 2130-SG-001

o 2130-MC-001

o 2130-MC-501

2. All downstream cable network feeding electrical loads to the primary crusher, sacrificial
conveyor and over-land conveyor which are outgoing feeders of above SWGR and MCC are
included.

3. All step-down transformers and their circuit breakers feeding the above SWGR and MCC with
their incoming and outgoing cables included, within Synergy battery limits.

4. Overhead Line and cable branches from 23KV OHL PRIM. CRUSHER which feed VWP01 Scope.

5. All electrical loads fed by above MCCs and SWGRs.

4 Project Power Distribution

23KV, 3Phase, 50Hz cable tap-off from the Overhead Line (AAAC CAIRO 465MCM conductor), is
assumed to feed the Outdoor Substations through underground duct bank. The Overhead line
and the upstream 23KV Main Electrical Room (2841-ER-001) both are out of scope of work. Four
stepdown transformers will be powered through substations 2110-US-001 & 2130-US-001 to
distribute required Medium voltage & Low voltage power for SWGRs and MCCs in both E-Rooms
(2110-ER-001 and 2130-ER-001). All electrical equipment and consumers at the areas of Primary
Crusher, Sacrificial Conveyor and Overland Conveyor are being charged via radial cable networks.

Upstream network consists of a High Voltage Substation 220/23KV with two 90/120/150MVA
transformers which are powered by Spence Substation via a 220KV -4.5km Transmission line.
(Reference document A6YF-V5-2841-EL-CAL-0007)

5
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

5 Purpose of Network Study

1. Load Flow (LF) study:

The Load-flow study is performed to determine the steady-state operation of the electric power
distribution system of VWP01 of Spence Growth Option (SGO) Project. This study is used to
calculate the voltage drop on each feeder, the voltage at each bus, the voltage at each consumer
terminal and the power flow in all branch and feeder circuits.

The study is also performed to determine if system voltages remain within specified limits under
various contingency conditions, and whether equipment such as transformers, cables, breakers
and conductors are overloaded.

2. Short circuit (SC) study:

The Short-circuit Study is performed to verify proper design of electrical power systems and
equipment for new facilities of VWP01 of Spence Growth Option (SGO) Project. It will indicate
that all distribution equipment is suitable for continuous operation at full load and will be
capable of withstanding thermal and electromagnetic forces due to short-circuit and fault
conditions.

The calculated short-circuit current values will be used for selecting or to confirm previous
selection of interrupting devices of adequate short-circuit rating, to check the ability of
components of the system to withstand mechanical and thermal stresses.

This study is performed to calculate the 3-phase short circuit level in MCCs, SWGRs,
Transformer/Motor Terminal Boxes and other consumer incoming panels.

Short-circuit results in this study are used to review of short circuit capacity of MCCs, SWGRs,
Motor Terminal Boxes, Cables, Transformers and Circuit Breakers. Also, based on contribution
currents at the fault points, it could be used to coordinate the protection relays.

3. Starting motor (SM) study:

The purpose of the motor starting study is to determine the performance of the electric power
distribution system of VWP01 of the Spence Growth Option (SGO) Project during the starting of
the largest motors.

The Starting Motor Study is performed to determine the maximum voltage drop on the starting
motor’s terminal and all other buses and motors’ and consumers’ terminal at the same time.

6
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

The study is also performed to determine if system voltages remain within specified limits under
various and worst case contingency conditions.

During this starting motor study it is assumed that only the steady state continuous running
motors/ loads are in operation.

6 Reference Project Documents and Equipment Detail

This study was performed according to the following drawings and document:

1. 4-V1-2137-EL-ESS-103001 to 4-SLD-Overland Conveyor E-House LV (Rev.0)/MV Power (Rev.2)

2. 4-V1-2115-EL-ESS-101001 to 8-SLD-Crusher E- House LV (Rev.0)/MV Power (Rev.2)

3. 4-V1-2117-EL-DAS-102001-Rev.A-DATA SHEET-368KW-4KV- Sacrificial Conveyor Hydraulic


Pump Motor

4. 4-V1-2137-EL-DAS-103001-Rev.A-DATA SHEET-1865KW-4KV- Overland Conveyor Drive Motor

5. 4-V1-2114-EL-DAS-101012-Rev.A-DATA SHEET- 750KW-4KV- Primary Crusher Drive Motor

6. 25951-220-E1-0000-00101-Rev.Q-SLD-Main Electrical Substation 220/23KV

7. 25951-220-p4-2831-00501-Rev.P-Concentrator Piping Key Plan

8. 4-V1-2137-ME-GGA-103100 to 105 & 301-Rev.Q-Overland Conveyor General Arrangement

9. 4-V1-2115-ME-GGA-101100 to 104-Rev.B-Primary Crusher General Arrangement

10. 25951-220-3DR-E12-00001-Rev. Q- Electrical Design Criteria

7 Standards

1. ETAP 16.1 Software and user guide

a. Load Flow and Starting Motor: Adaptive Newton-Raphson

b. Short Circuit: ANSI/IEEE C37 Series

c. Cable Ampacity: NEC, IEEE 399 and ICEA P-54-440

7
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

2. IEEE STD 141-1993 IEEE Recommended Practice for Electric Power Distribution for Industrial
Plants.

3. IEEE STD 399-1997 IEEE Recommended Practice for Industrial and Commercial Power Systems
Analysis.

8 Power System Data

1. Power Supply:

23KV, 3Phase, 50Hz from Primary Crusher Over Head Line at 2134-SW-250 (Disconnector) of
VWP05 of SGO Project
Maximum and minimum level of short circuit currents at busbar 2130-VL-001 is 20.818kA
(X/R=5.06), 15.687kA (X/R=5.78) respectively. Based on that ETAP calculates Maximum and
minimum short circuit levels as follows:
a. 829.33 MVA (20.818 KA, X/R=5.06) as maximum short circuit level

b. 624.93 MVA (15.687 KA, X/R=5.78) as minimum short circuit level

2. Upstream Network:

a. High Voltage Substation 220/23KV and 90/120/150VA Transformers

b. 2841-SG-001 Concentrator SWGR, 23KV, 3Phase, 3Wire, 200A resistance grounded

c. Pole mounted 23KV OHL with CAIRO (465 MCM AAAC) wire with 2.8m phase distance

3. Step down transformers:

a. Transformer KVA rating: As per Single Line Diagrams

b. All Positive Impedance Z%: From supplier Data sheets

c. Zero Impedance and Ratio X/R: ETAP Typical value

d. Distribution and Power Transformer Type: Liquid filled

e. Lighting and Control Transformers Type: Dry

4. Low Voltage and Medium Voltage Motors:

8
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

a. Motor rating: As per Single Line Diagrams

i. 80% of nominal current have been supposed for continuous working for all motors

b. Motor Electrical details: ETAP typical

5. High Powered Motors:

a. Rated Current, locked rotor current, locked rotor torque, breakdown torque, power
factor, efficiencies have been extracted from Data-sheet documents (Manufacture’s
data).

b. Equivalent Impedances and other required data have been calculated by ETAP software.

6. Circuit breaker and Switches:

a. All medium and low voltage circuit breakers and Switches have been inserted and rated
per the single line diagrams.

b. According to Power Study Results, those have been rated again to meet the following
criteria:

i. Nominal Current: Minimum 35% over the continuous current for each branch up to
the next nominal current rating.

ii. Short Circuit Rating: To be over than maximum level of short circuit and another
calculated requirement by ETAP.

7. Low Voltage and Medium Voltage Cables:

a. All medium and low voltage cables were added and rated as per the single line diagrams.

b. Cable lengths were extracted from items 8 and 9 of part 6 (Reference Drawings)

c. According to Power Study Results, these have been rated again to meet the following
criteria:

i. Ampacity: Maximum 60% of their ampacity which have been calculated by ETAP
(Based on arrangement, installation, cable size, ambient temperature), was used for
continuous branch currents.

ii. Minimum utilized size for low voltage cable is #12 AWG and for high voltage cable is
#1 AWG.

d. MV Cable 4.16KV: EPR 90, 5KV, 133% insulation

e. MV Cable 23KV: EPR 90, 25KV, 100% insulation

9
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

f. LV Cable: 600V, XHHW, 90 XLPE

8. VFD:

a. The manufacturer’s data regarding FLA, efficiency have been used and ETAP data base
was used for other required data.

9 Case Studies

1. Load Flow:

a. All Motors consume 80% of nominal power rating continuously.

b. All auxiliary transformers (lighting and control) are loaded 75% and load packages are
loaded 80% of nominal rating.

c. Only the steady state continuous loads are considered.

2. Short Circuit:

a. All conditions applied for above load flow case study (a-c), applicable for this study as
well.

b. Motors’ contribution fault current has been calculated.

c. Maximum short circuit level is calculated with the underneath points:

i. Short circuit level at 2130-VL-001 bus from 23KV OHL side is 829.23 MVA

ii. All loads are connected.

d. Minimum short circuit level is calculated with the underneath points:

i. Short circuit level at 2130-VL-001 bus from 23KV OHL side is 624.93 MVA

3. Motor Starting:

a. This study is done as static motor starting with motors modelled as impedance during
their starting time with a constant locked Rotor Current.

b. All conditions applied for above load flow case study (a-c), applicable for this study as
well.

10
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

c. Short circuit level at 2130-VL-001 bus from 23KV OHL side is 624.93 MVA considered as
minimum short circuit level.

d. Motors which are utilized in worst case study:

i. Largest (in terms of KW) MV and LV motors with Direct on Line starting are selected
for this study.

ii. The largest MV Motor (DOL) is Primary Crusher Main Motor (2110-CR001-A) of
750KW 4KV.

iii. The biggest LV Motor with Direct on line starting is Primary Crusher Dust Collector
(2110-DC-001) which is 56KW, 460V.

iv. Minimum short circuit level has been selected for maximum voltage drop during
motor starting.

e. Case study defines with following steps:

i. T=0 sec, all consumers are in their continuous mode except two selected motors
mentioned in section d.

ii. T=1 sec, Primary Crusher Main Motor (2110-CR001-A) is started with 5 sec starting
time and 590% (based on data sheet) starting current. Motor will reach its full load
current when T=6sec.

iii. T=5 sec, Primary Crusher Dust Collector Motor (2110-DC-001) is started with 2 sec
starting time and 600% starting current. Its current change to normal continuous
current at T=7sec

iv. T=10, the study is finished.

f. Motor terminal voltages during motor starting are within the acceptable limit as per
section 10.5.a.

g. Worst case scenario occurs during T=1sec and T=5.98 sec when both MV and LV motors
(2110-CR-001A & 2110-DC-001) are accelerating, where the bus voltages drop to 84.5%
(during T=1 sec to 5.98 sec) to & 84.9% (during T=5 sec to 5.98sec).

10 Voltage Regulation Criteria

This study tries to keep voltage on consumers’ terminal and busbars according to Electrical
Design Criteria document with following procedure:

11
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

1. Transformers’ No Load secondary voltages are rated approximately 5% above the


nominal voltage of consumers which mentioned on Electrical Design Criteria document.
(Ex: 23KV/480V rated transformer for 460V motors)

2. Based on Electrical Design Criteria, rated utilization voltages are:

a. 4 KV for medium voltage motors

b. 460 V for low voltage motors

c. 415V,380V,220V and 208V for HVAC, lighting and distribution panel consumers

d. 115V for control circuits in this scope of study

3. After cable sizing based on load flow results and continuous load branches, voltage drop
was checked and kept with the rated utilization voltage base. Voltage Regulation is
assumed in range of ±5%.

4. Voltage regulation of Off-load Tap-Changers on main connected bus bar is about ±3%.

5. Motor Starting Study is based on following criteria for voltage regulation:

a. Starting Motor Terminal Voltage: 80%

b. Bus Voltage Starting Motor Bus: 85%

c. Medium Voltage Bus Voltage: 85%

d. Low Voltage Bus Voltage: 85%

If any results exceeding the above range, cable sizes, transformer impedances/sizes and
off-load tap positions should be reviewed and adjusted to maintain within the limit.

11 Loads and Factors

1. All Motors consume power with 80% of nominal rating continuously.

2. All auxiliary transformers (lighting and control) are loaded 75% and load packages are
loaded 80% of nominal rating.

12 Short Circuit results for selection of equipment ratings

1. Interrupting Duty:

12
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

Interrupting currents of interrupting devices (such as circuit breakers and MV fuses) were
rated by calculating the adjacent Symmetrical KA rms.

2. Momentary Duty:

By calculating Asymmetrical KA rms and Asymmetrical KA Peak, MCC and SWGR Busbars
were rated. Also, Disconnectors and Circuit Breaker have been rated accordingly.

3. Short-Circuit Report:

Similarly, protection relays can be coordinated for instantaneous and time-delay


elements by calculating contribution currents in ½ cycle and 1.5 to 4 cycle.

13 Conclusion and Comments

ETAP single line diagram has been modified according to the revised substation design as per the
latest Single line diagrams & substation layouts.

1. Load Flow:

Primary crusher motor (2110-CR-001A) is rated 750kW and also there will be two sacrificial
conveyor drive motors of 368kW each (2110-CV001-A and –B). Also Primary crusher Air
compressor (2110-CP-001) rating has increased to 257kW. Accordingly incoming cable sizes were
modified.

Even though Transformer 2110-XF-001 is capable of supplying the downstream motor loads at
steady state without considerable voltage drop (below 5%) at motor buses, in order to avoid
under voltage conditions during motor starting, -5% tap change of 2110-XF-001 primary side is
recommended.(also mentioned in section 13.3 Motor starting)

2110-XF-501 Transformer (1.75MVA) is adequate to cater to LV motor control center 2110-MCC-


501 downstream effectively. But due to longer cables lengths, voltage drop at some load ends
are below the 5% set level. In order to avoid these undervoltages, off-load tap setting of the
2110-XF-501 primary has been changed to -5%.

Motor rating of overland conveyor drive motors 2130-CV-002A & -002B (SRC) are 1865kW each
and the upstream transformer 2130-XF-001 (23kV/4.16kV, 5MVA) is capable of catering the
demand.

13
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

If the transformer 2130-XF-501 (23kV/480V, 500kVA) is operated without any tap changing there
will be undervoltage conditions at some loads downstream. Therefore -2.5% off-load tap setting
of the 2130-XF-501 transformer primary is suggested.

After the above mentioned modifications the maximum loading at buses are within the
acceptable levels. Cable sizes and circuit breaker rating are within the permitted levels for the
given loads. Further the voltage drop at the load end is within acceptable limits.

2. Short Circuit:

Short-Circuit ratings of MCCs, SWGRs, Circuit Breakers, Switches and Fuses on SLDs are above the
SC calculated level and are acceptable.

3. Motor Starting:

In order to avoid under voltage conditions during the highest rated MV & LV DOL motor starting,
-5% tap setting of the 2110-XF-001 transformer primary side is recommended.

Worst case scenario occurs when minimum short circuit level presents in the network during the
following situations and as tabulated below.

a. When Primary Crusher drive motor (2110-CR001-A) is started (during T=1sec to 5.98
sec)

b. When both Primary Crusher drive motor & Primary crusher dust collector motor
(2110-DC-001) run simultaneously (during T=5sec to 5.98sec)

Affected Bus Rated Operating % Operating Undervoltage Undervoltage


Voltage bus voltage begins @ duration
kV kV (T=x sec) (sec)
a.Primary crusher drive 4.16 3.516 84.5% 1 4.98
motor bus
(2110-CR001-A)
b.Sacrificial conveyor 4.16 3.533 84.9% 5 0.98
hydraulic pumps 1 & 2
buses (2110-CV001HU-
01A & -01B)

14
BHP Billiton – MINERA SPENCE S.A.
SPENCE GROWTH OPTION PROJECT – VWP01 Material Handling System
POWER SYSTEM STUDIES
Doc. No (Synergy Engineering Ltd) 3057-2100-CALC-1001 Rev. 2
Deliverable Reference No (TyVChile) 4-V1-2100-EL-CAL-101001 Rev. 2

As per the ETAP study, except the above two bus undervoltage situations which will last only
until 5.98sec of Primary Crusher Drive motor starting , system meets required voltage regulation
criteria described in section 10.5.

(Refer page 400 & 401 of this report for Bus and Motor terminal voltage plots during motor
starting of Primary Crusher drive motor & Primary crusher dust collector motor)

14 Notes

1. Changes in equipment specifications or system configuration will invalidate this report. New
study to be performed if any change in equipment settings or system configuration is made.

2. Some changes in cable size and interrupter size have been done during this study from the
SLD reference that should be taken into account by electrical designer.

3. All reports have been generated based on ETAP’s inputs and outputs format:

a. Tables of input data

b. Tables of output data (LF, SC & SM)

c. Output data on SLDs (LF, SC & SM)

d. Plots (SM)

15
Project: SPENCE GROWTH OPTION PROJECT
Page: 1

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 108 109

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 12 0 0 86 0 10 108

Method of Solution: Adaptive Newton-Raphson Method


System Frequency: 50.00 Hz

Unit System: English

Project Filename: 3057-ETAP-1001_2 MAX SC

16
Project: SPENCE GROWTH OPTION PROJECT
Page: 2

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual

17
Project: SPENCE GROWTH OPTION PROJECT
Page: 3

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID V Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

2130-B03 4160 1 100.0 0.0 1.983 0.799

2130-B04 4160 1 100.0 0.0 1.983 0.799

2130-VL-001 23000 1 100.0 0.0

BS-5A/1 480 1 100.0 0.0

BUS-1A/1 480 1 100.0 0.0

BUS-1A/2 380 1 100.0 0.0

BUS-1A/3 380 1 100.0 0.0 0.048 0.029 0.012 0.007

BUS-2A/1 480 1 100.0 0.0

BUS-2A/2 240 1 100.0 0.0

BUS-2A/3 240 1 100.0 0.0 0.014 0.008 0.003 0.002

BUS-3A/1 480 1 100.0 0.0

BUS-3A/2 380 1 100.0 0.0

BUS-3A/3 380 1 100.0 0.0 0.019 0.012 0.005 0.003

BUS-4A/1 480 1 100.0 0.0

BUS-4A/2 415 1 100.0 0.0

BUS-4A/3 415 1 100.0 0.0 0.037 0.023 0.009 0.006

BUS-5A/2 480 1 100.0 0.0 0.008 0.004

BUS-5A/3 480 1 100.0 0.0 0.008 0.004

BUS-6A/1 480 1 100.0 0.0 0.012 0.000 0.003 0.000

BUS-8A/1 480 1 100.0 0.0

BUS-10A/1 480 1 100.0 0.0 0.056 0.026

BUS-11A/1 480 1 100.0 0.0 0.346 0.148

BUS-12A/1 480 1 100.0 0.0 0.008 0.005 0.002 0.001

BUS-14A/1 480 1 100.0 0.0 0.029 0.014

BUS-16A/1 480 1 100.0 0.0 0.052 0.024

BUS-17A/1 480 1 100.0 0.0

BUS-17A/2 480 1 100.0 0.0 0.003 0.002

BUS-17A/3 480 1 100.0 0.0 0.003 0.002

BUS-17A/4 480 1 100.0 0.0 0.003 0.002

BUS-17A/5 480 1 100.0 0.0 0.003 0.002

BUS-18A/1 480 1 100.0 0.0 0.092 0.041

BUS-19A/1 480 1 100.0 0.0 0.047 0.022

BUS-20A/1 480 1 100.0 0.0 0.027 0.017 0.007 0.004

18
Project: SPENCE GROWTH OPTION PROJECT
Page: 4

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID V Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BUS-21A/1 480 1 100.0 0.0 0.012 0.008 0.003 0.002

BUS-22A/1 480 1 100.0 0.0 0.008 0.005 0.002 0.001

BUS-23A/1 480 1 100.0 0.0 0.037 0.018

BUS-24A/1 480 1 100.0 0.0 0.001 0.001

BUS-24A/2 480 1 100.0 0.0 0.001 0.001

BUS-24A/3 480 1 100.0 0.0 0.001 0.001

BUS-24A/5 480 1 100.0 0.0 0.017 0.011 0.004 0.003

BUS-25A/1 480 1 100.0 0.0 0.046 0.022

BUS-26A/1 480 1 100.0 0.0

BUS-27A/1 480 1 100.0 0.0

BUS-28A/2 480 1 100.0 0.0 0.003 0.002

BUS-29A/1 480 1 100.0 0.0 0.003 0.002

BUS-2110MC501-A 480 1 100.0 0.0

BUS-2110MC501-B 480 1 100.0 0.0

BUS-2110MC501-C 480 1 100.0 0.0

BUS-2110MC501-D 480 1 100.0 0.0

BUS-2110MC501-E 480 1 100.0 0.0

BUS-2110MC501-F 480 1 100.0 0.0

BUS-2130MC501-A 480 1 100.0 0.0

BUS-2130MC501-B 480 1 100.0 0.0

BUS-A1 23000 1 100.0 0.0

BUS-A01 23000 1 100.0 0.0

BUS-A03 480 1 100.0 0.0

BUS-A05 4160 1 100.0 0.0

BUS-A06 23000 1 100.0 0.0

BUS-B01 4160 1 100.0 0.0

BUS-B1/1 480 1 100.0 0.0 0.005 0.003

BUS-B02 4160 1 100.0 0.0

BUS-B2/1 480 1 100.0 0.0 0.008 0.004

BUS-B3/1 480 1 100.0 0.0 0.008 0.004

BUS-B4/1 480 1 100.0 0.0 0.029 0.014

BUS-B6/1 480 1 100.0 0.0 0.029 0.014

BUS-B7/1 480 1 100.0 0.0 0.002 0.002

BUS-B8/1 480 1 100.0 0.0 0.003 0.002

BUS-B9/1 480 1 100.0 0.0 0.070 0.031

19
Project: SPENCE GROWTH OPTION PROJECT
Page: 5

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID V Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BUS-B11/1 480 1 100.0 0.0 0.019 0.010

BUS-B12/1 480 1 100.0 0.0 0.019 0.010

BUS-B13/1 480 1 100.0 0.0 0.019 0.010

BUS-B16/1 480 1 100.0 0.0 0.029 0.014

BUS-B18/1 480 1 100.0 0.0

BUS-B20/1 480 1 100.0 0.0 0.007 0.004

BUS-B20/3 480 1 100.0 0.0

BUS-C01 23000 1 100.0 0.0

BUS-C03 480 1 100.0 0.0

BUS-C04 4160 1 100.0 0.0

BUS-C05 23000 1 100.0 0.0

BUS-D01 4160 1 100.0 0.0

BUS-D03 4160 1 100.0 0.0 0.624 0.691

BUS-D04 4160 1 100.0 0.0 0.395 0.167

BUS-D05 4160 1 100.0 0.0 0.395 0.167

Bus-E01 480 1 100.0 0.0

BUS-E2 480 1 100.0 0.0 0.008 0.005 0.002 0.001

BUS-E03 480 1 100.0 0.0

Bus-E3 480 1 100.0 0.0 0.003 0.002

BUS-E04 380 1 100.0 0.0

Bus-E4 480 1 100.0 0.0 0.005 0.003

BUS-E05 380 1 100.0 0.0 0.044 0.027 0.011 0.007

Bus-E5 480 1 100.0 0.0

BUS-E06 480 1 100.0 0.0

BUS-E07 240 1 100.0 0.0

BUS-E08 240 1 100.0 0.0 0.016 0.010 0.004 0.003

BUS-E09 480 1 100.0 0.0

BUS-E10 380 1 100.0 0.0

BUS-E11 380 1 100.0 0.0 0.024 0.015 0.006 0.004

BUS-E12 480 1 100.0 0.0 0.003 0.002

BUS-E14 480 1 100.0 0.0 0.012 0.007

BUS-E15 480 1 100.0 0.0 0.016 0.010 0.004 0.003

BUS-E16 480 1 100.0 0.0

BUS-E17 480 1 100.0 0.0

Bus-E18 480 1 100.0 0.0 0.005 0.003

20
Project: SPENCE GROWTH OPTION PROJECT
Page: 6

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID V Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus-F01 480 1 100.0 0.0

BUS-F7A/1 480 1 100.0 0.0

BUS-F9A/1 480 1 100.0 0.0 0.132 0.058

BUS-F22 415 1 100.0 0.0 0.054 0.034 0.014 0.008

BUS-F30 415 1 100.0 0.0

BUS-F31 480 1 100.0 0.0

Total Number of Buses: 109 6.894 3.384 0.094 0.056 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID V Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

2130-VL-001 23000 Swing 1 100.0 0.0

0.000 0.000

21
Project: SPENCE GROWTH OPTION PROJECT
Page: 7

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Line/Cable Input Data

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110BL001A-P01 0.6MCUN3 10 82.0 0.0 1 75 1.039400 0.028275

2110BL001B-P01 0.6MCUN3 10 114.8 0.0 1 75 1.039400 0.028275

2110CH016-P01 0.6MCUN3 8 426.5 0.0 1 75 0.811000 0.048083

2110CH251-P01 0.6MCUN3 8 531.5 0.0 1 75 0.811000 0.048083

2110CN014-P01 0.6MCUN3 350 551.2 0.0 1 75 0.037800 0.031083

2110CP001-P1 0.6MCUN3 350 492.1 0.0 2 75 0.037800 0.031083

2110CR001A-E01 5.0MCUS3 3/0 557.7 0.0 1 75 0.081400 0.038583

2110CR001B-P01 0.6MCUN3 10 479.0 0.0 1 75 1.039400 0.028275

2110CR0101A-P01 0.6MCUN3 4 459.3 0.0 1 75 0.321000 0.040250

2110CR0101B-P01 0.6MCUN3 4 459.3 0.0 1 75 0.321000 0.040250

2110CR0101C-P01 0.6MCUN3 12 479.0 0.0 1 75 2.050000 0.043983

2110CR00101HE-P01 0.6MCUN3 6 465.9 0.0 1 75 0.510000 0.043750

2110CR0102A-P01 0.6MCUN3 10 459.3 0.0 1 75 1.039400 0.028275

2110CR0102B-P01 0.6MCUN3 10 459.3 0.0 1 75 1.039400 0.028275

2110CR0103A-P01 0.6MCUN3 10 479.0 0.0 1 75 1.039400 0.028275

2110CR0103B-P01 0.6MCUN3 10 479.0 0.0 1 75 1.039400 0.028275

2110CR0105A-P01 0.6MCUN3 12 544.6 0.0 1 75 2.050000 0.043983

2110CV001B-E01 5.0MCUS3 4 498.7 0.0 1 75 0.321000 0.047333

2110CV001HU01A-E01 5.0MCUS3 4 498.7 0.0 1 75 0.321000 0.047333

2110CV001HU01C-P01 0.6MCUN3 6 505.2 0.0 1 75 0.510000 0.043750

2110CV001HU01D-P01 0.6MCUN3 6 508.5 0.0 1 75 0.510000 0.043750

2110CV00102-P01 0.6MCUN3 4 262.5 0.0 1 75 0.321000 0.040250

2110CV00107-P01 0.6MCUN3 4 524.9 0.0 1 75 0.321000 0.040250

2110DC001A-P01 0.6MCUN3 1/0 459.3 0.0 1 75 0.128000 0.034500

2110DP501-P01 0.6MCUN3 4 65.6 0.0 1 75 0.321000 0.040250

2110DP502-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.102000 0.033917

2110DP505-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.102000 0.033917

2110DS001-P01 0.6MCUN3 6 269.0 0.0 1 75 0.510000 0.043750

2110DX501-P01 0.6MCUN3 6 82.0 0.0 1 75 0.510000 0.043750

2110DX502-P01 0.6MCUN3 6 82.0 0.0 1 75 0.510000 0.043750

2110DX503-P01 0.6MCUN3 1/0 82.0 0.0 1 75 0.128000 0.034500

2110HU001A-P01 0.6MCUN3 6 459.3 0.0 1 75 0.510000 0.043750

2110LP501-P01 0.6MCUN3 4/0 82.0 0.0 1 75 0.064000 0.031750

2110LX501-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.102000 0.033917

22
Project: SPENCE GROWTH OPTION PROJECT
Page: 8

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110MA001RC-P01 0.6MCUN3 1 538.1 0.0 1 75 0.160000 0.036333

2110MA001TFC-P01 0.6MCUN3 4 607.0 0.0 1 75 0.321000 0.040250

2110MA00101A-P01 0.6MCUN3 12 65.6 0.0 1 75 2.050000 0.043983

2110MA00101B-P01 0.6MCUN3 12 65.6 0.0 1 75 2.050000 0.043983

2110MA00101C-P01 0.6MCUN3 12 65.6 0.0 1 75 2.050000 0.043983

2110MA00101D-P01 0.6MCUN3 12 65.6 0.0 1 75 2.050000 0.043983

2110MC501-P01~P15 0.6MCUN1 750 82.0 0.0 5 75 0.021000 0.040000

2110RB001-P01 0.6MCUN3 4/0 557.7 0.0 1 75 0.064000 0.031750

2110SG001-E01~E03 5.0MCUS1 350 82.0 0.0 1 75 0.038600 0.046833

2110UP501-P01 0.6MCUN3 10 131.2 0.0 1 75 1.039400 0.028275

2110US001A-E01 25MCUS3 1 328.1 0.0 1 75 0.154512 0.050000

2110US001B-E01 25MCUS3 1 45.9 0.0 1 75 0.154512 0.050000

2110WR001-P01 0.6MCUN3 4 459.3 0.0 1 75 0.321000 0.040250

2110WR002-P01 0.6MCUN3 4 459.3 0.0 1 75 0.321000 0.040250

2110WR003-P01 0.6MCUN3 4 531.5 0.0 1 75 0.321000 0.040250

2110WR004-P01 0.6MCUN3 4 521.7 0.0 1 75 0.321000 0.040250

2110ZM250-P01 0.6MCUN3 1 492.1 0.0 1 75 0.160000 0.036333

2130BL001A-P01 0.6MCUN3 12 262.5 0.0 1 75 2.050000 0.043983

2130BL001B-P01 0.6MCUN3 12 262.5 0.0 1 75 2.050000 0.043983

2130CH003-P01 0.6MCUN3 4 643.0 0.0 1 75 0.321000 0.040250

2130CH004-P01 0.6MCUN3 2 885.8 0.0 1 75 0.202000 0.037333

2130CH005-P01 0.6MCUN3 4 1181.1 0.0 1 75 0.321000 0.040250

2130CV002A-E01 5.0MCUS3 500 216.5 0.0 1 75 0.030000 0.032833

2130CV002A01A-P01 0.6MCUN3 12 360.9 0.0 1 75 2.050000 0.043983

2130CV002B-E01 5.0MCUS3 500 154.2 0.0 1 75 0.030000 0.032833

2130CV002B01A-P01 0.6MCUN3 12 311.7 0.0 1 75 2.050000 0.043983

2130CV00202-P01 0.6MCUN3 1 803.8 0.0 1 75 0.160000 0.036333

2130CV00207-P01 0.6MCUN3 2 771.0 0.0 1 75 0.202000 0.037333

2130CV00208-P01 0.6MCUN3 2 820.2 0.0 1 75 0.202000 0.037333

2130DC002A-P01 0.6MCUN3 1 744.8 0.0 1 75 0.160000 0.036333

2130DP501-P01 0.6MCUN3 4 82.0 0.0 1 75 0.321000 0.040250

2130DP502-P01 0.6MCUN3 6 82.0 0.0 1 75 0.510000 0.043750

2130DP505-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.102000 0.033917

2130DX501-P01 0.6MCUN3 6 82.0 0.0 1 75 0.510000 0.043750

2130DX502-P01 0.6MCUN3 2 82.0 0.0 1 75 0.202000 0.037333

2130DX503-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.102000 0.033917

23
Project: SPENCE GROWTH OPTION PROJECT
Page: 9

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2130LP501-P01 0.6MCUN3 4/0 32.8 0.0 1 75 0.064000 0.031750

2130LX501-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.102000 0.033917

2130MC501-P01~P06 0.6MCUN1 750 108.3 0.0 2 75 0.021000 0.040000

2130SC25101-P01 0.6MCUN3 10 820.2 0.0 1 75 1.039400 0.028275

2130SC25102-P01 0.6MCUN3 10 820.2 0.0 1 75 1.039400 0.028275

2130SG001-E01~E06 5.0MCUS1 500 85.3 0.0 2 75 0.030000 0.043833

2130ST05501-P01 0.6MCUN3 4 1230.3 0.0 1 75 0.321000 0.040250

2130UP501-P01 0.6MCUN3 12 229.7 0.0 1 75 2.050000 0.043983

2130US001A-E01 25MCUS3 2/0 367.5 0.0 1 75 0.097285 0.045833

2130US001B-E01 25MCUS3 2/0 45.9 0.0 1 75 0.097285 0.045833

2130WR001-P01 0.6MCUN3 4 213.3 0.0 1 75 0.321000 0.040250

2130WR002-P01 0.6MCUN3 1/0 1148.3 0.0 1 75 0.128000 0.034500

2130ZM253-P01 0.6MCUN3 10 393.7 0.0 1 75 1.039400 0.028275

2831ZM02404-P01 0.6MCUN3 10 524.9 0.0 1 75 1.039400 0.028275

2831ZM02404-P2 0.6MCUN3 500 262.5 0.0 1 75 0.029400 0.029083

2110US001-E02 465 9186.4 0.0 1 75 0.050826 0.117396 0.0000009

Line / Cable resistances are listed at the specified temperatures.

24
Project: SPENCE GROWTH OPTION PROJECT
Page: 10

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. V Sec. V % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

2110-DX-501 3-Phase 0.030 480 240 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-DX-502 3-Phase 0.045 480 380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
2110-DX-503 3-Phase 0.100 480 415 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-LX-501 3-Phase 0.100 480 380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-XF-001 3-Phase 2.250 23000 4160 5.40 6.00 0 0 0 -5.000 0 5.4000 Dyn 0.000

2110-XF-501 3-Phase 1.750 23000 480 5.50 6.00 0 0 0 -5.000 0 5.5000 Dyn 0.000

2130-DX-501 3-Phase 0.030 480 240 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-DX-502 3-Phase 0.045 480 380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
2130-DX-503 3-Phase 0.100 480 415 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-LX-501 3-Phase 0.075 480 380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-XF-001 3-Phase 5.000 23000 4160 5.50 8.50 0 0 0 0 0 5.5000 Dyn 0.000

2130-XF-501 3-Phase 0.500 23000 480 5.40 1.50 0 0 0 -2.500 0 5.4000 Dyn 0.000

25
Project: SPENCE GROWTH OPTION PROJECT
Page: 11

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

2110-DX-501 2W XFMR BUS-2A/1 BUS-2A/2 7396.00 11094.00 13333.33

2110-DX-502 2W XFMR BUS-3A/1 BUS-3A/2 4930.67 7396.00 8888.89

2110-DX-503 2W XFMR BUS-4A/1 BUS-4A/2 2218.80 3328.20 4000.00

2110-LX-501 2W XFMR BUS-1A/1 BUS-1A/2 2218.80 3328.20 4000.00

2110-XF-001 2W XFMR BUS-C01 BUS-C04 37.48 224.90 228.00

2110-XF-501 2W XFMR BUS-A1 BUS-C03 49.08 294.51 298.57

2130-DX-501 2W XFMR BUS-E06 BUS-E07 7396.00 11094.00 13333.33

2130-DX-502 2W XFMR BUS-E09 BUS-E10 4930.67 7396.00 8888.89

2130-DX-503 2W XFMR BUS-F31 BUS-F30 2218.80 3328.20 4000.00

2130-LX-501 2W XFMR BUS-E03 BUS-E04 2958.40 4437.60 5333.33

2130-XF-001 2W XFMR BUS-A01 BUS-A05 12.85 109.25 110.00

2130-XF-501 2W XFMR BUS-A06 BUS-A03 584.10 876.15 1053.00

2110BL001A-P01 Cable BUS-2110MC501-F BUS-28A/2 3700.20 100.66 3701.57

2110BL001B-P01 Cable BUS-2110MC501-F BUS-B18/1 5180.28 140.92 5182.20

2110CH016-P01 Cable BUS-2110MC501-E BUS-21A/1 15012.98 890.10 15039.34

2110CH251-P01 Cable BUS-2110MC501-C BUS-12A/1 18708.48 1109.21 18741.33

2110CN014-P01 Cable BUS-2110MC501-C BUS-F9A/1 904.28 743.60 1170.76

2110CP001-P1 Cable BUS-2110MC501-C BUS-11A/1 403.70 331.96 522.66

2110CR001A-E01 Cable BUS-D01 BUS-D03 26.23 12.44 29.03

2110CR001B-P01 Cable BUS-2110MC501-A BUS-B1/1 21609.17 587.84 21617.17

2110CR0101A-P01 Cable BUS-2110MC501-A BUS-B4/1 6399.35 802.41 6449.46

2110CR0101B-P01 Cable BUS-2110MC501-B BUS-B6/1 6399.35 802.41 6449.46

2110CR0101C-P01 Cable BUS-2110MC501-B BUS-B7/1 42619.59 914.42 42629.40

2110CR00101HE-P01 Cable BUS-2110MC501-B BUS-6A/1 10312.43 884.64 10350.31

2110CR0102A-P01 Cable BUS-2110MC501-A BUS-B2/1 20721.13 563.68 20728.79

2110CR0102B-P01 Cable BUS-2110MC501-A BUS-B3/1 20721.13 563.68 20728.79

2110CR0103A-P01 Cable BS-5A/1 BUS-5A/2 21609.17 587.84 21617.17

2110CR0103B-P01 Cable BS-5A/1 BUS-5A/3 21609.17 587.84 21617.17

2110CR0105A-P01 Cable BUS-2110MC501-B BUS-B8/1 48457.89 1039.68 48469.05

2110CV001B-E01 Cable BUS-D01 BUS-D05 92.50 13.64 93.50

2110CV001HU01A-E01 Cable BUS-D01 BUS-D04 92.50 13.64 93.50

2110CV001HU01C-P01 Cable BUS-2110MC501-D BUS-B12/1 11183.91 959.40 11224.98

2110CV001HU01D-P01 Cable BUS-2110MC501-D BUS-B13/1 11256.53 965.63 11297.87

2110CV00102-P01 Cable BUS-2110MC501-E BUS-19A/1 3656.77 458.52 3685.41

2110CV00107-P01 Cable BUS-2110MC501-E BUS-20A/1 7313.54 917.04 7370.81

2110DC001A-P01 Cable BUS-2110MC501-B BUS-B9/1 2551.77 687.78 2642.83

26
Project: SPENCE GROWTH OPTION PROJECT
Page: 12

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

2110DP501-P01 Cable BUS-2A/2 BUS-2A/3 3656.77 458.52 3685.41

2110DP502-P01 Cable BUS-3A/2 BUS-3A/3 579.37 192.65 610.56

2110DP505-P01 Cable BUS-4A/2 BUS-4A/3 485.77 161.53 511.92

2110DS001-P01 Cable BUS-2110MC501-C BUS-14A/1 5955.07 510.85 5976.94

2110DX501-P01 Cable BUS-2110MC501-A BUS-2A/1 1815.57 155.75 1822.24

2110DX502-P01 Cable BUS-2110MC501-A BUS-3A/1 1815.57 155.75 1822.24

2110DX503-P01 Cable BUS-2110MC501-A BUS-4A/1 455.67 122.82 471.93

2110HU001A-P01 Cable BUS-2110MC501-B BUS-B11/1 10167.19 872.19 10204.53

2110LP501-P01 Cable BUS-1A/2 BUS-1A/3 363.53 180.34 405.80

2110LX501-P01 Cable BUS-2110MC501-A BUS-1A/1 363.11 120.74 382.66

2110MA001RC-P01 Cable BUS-2110MC501-C BUS-16A/1 3736.51 848.50 3831.64

2110MA001TFC-P01 Cable BUS-2110MC501-D BUS-17A/1 8456.28 1060.33 8522.50

2110MA00101A-P01 Cable BUS-17A/1 BUS-17A/2 5838.30 125.26 5839.64

2110MA00101B-P01 Cable BUS-17A/1 BUS-17A/3 5838.30 125.26 5839.64

2110MA00101C-P01 Cable BUS-17A/1 BUS-17A/4 5838.30 125.26 5839.64

2110MA00101D-P01 Cable BUS-17A/1 BUS-17A/5 5838.30 125.26 5839.64

2110MC501-P01~P15 Cable BUS-C03 Bus-F01 14.95 28.48 32.17

2110RB001-P01 Cable BUS-2110MC501-D BUS-18A/1 1549.29 768.59 1729.46

2110SG001-E01~E03 Cable BUS-D01 BUS-C04 1.83 2.22 2.88

2110UP501-P01 Cable BUS-2110MC501-F BUS-29A/1 5920.32 161.05 5922.51

2110US001A-E01 Cable BUS-C05 BUS-C01 0.96 0.31 1.01

2110US001B-E01 Cable BUS-C01 BUS-A1 0.13 0.04 0.14

2110WR001-P01 Cable BUS-2110MC501-B BUS-F7A/1 6399.35 802.41 6449.46

2110WR002-P01 Cable BUS-2110MC501-B BUS-8A/1 6399.35 802.41 6449.46

2110WR003-P01 Cable BUS-2110MC501-F BUS-26A/1 7404.96 928.50 7462.94

2110WR004-P01 Cable BUS-2110MC501-F BUS-27A/1 7267.83 911.31 7324.74

2110ZM250-P01 Cable BUS-2110MC501-C BUS-10A/1 3417.54 776.07 3504.55

2130BL001A-P01 Cable BUS-2130MC501-B Bus-E3 23353.20 501.05 23358.58

2130BL001B-P01 Cable BUS-2130MC501-B Bus-E5 23353.20 501.05 23358.58

2130CH003-P01 Cable BUS-2110MC501-E BUS-22A/1 8959.09 1123.37 9029.24

2130CH004-P01 Cable BUS-2130MC501-A BUS-E15 7766.36 1435.37 7897.89

2130CH005-P01 Cable BUS-2130MC501-A BUS-E2 16455.46 2063.34 16584.32

2130CV002A-E01 Cable BUS-B01 2130-B03 3.75 4.11 5.56

2130CV002A01A-P01 Cable BUS-2130MC501-B Bus-E18 32110.65 688.94 32118.04

2130CV002B-E01 Cable BUS-B01 2130-B04 2.67 2.93 3.96

2130CV002B01A-P01 Cable BUS-2130MC501-B Bus-E4 27731.93 595.00 27738.31

2130CV00202-P01 Cable BUS-2110MC501-E BUS-25A/1 5581.99 1267.58 5724.10

2130CV00207-P01 Cable BUS-2110MC501-E BUS-23A/1 6759.61 1249.30 6874.09

2130CV00208-P01 Cable BUS-2110MC501-F BUS-24A/5 7191.08 1329.04 7312.86

27
Project: SPENCE GROWTH OPTION PROJECT
Page: 13

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

2130DC002A-P01 Cable BUS-2110MC501-E BUS-B16/1 5171.88 1174.45 5303.55

2130DP501-P01 Cable BUS-E07 BUS-E08 4570.96 573.15 4606.76

2130DP502-P01 Cable BUS-E10 BUS-E11 2896.86 248.51 2907.50

2130DP505-P01 Cable BUS-F30 BUS-F22 485.77 161.53 511.92

2130DX501-P01 Cable BUS-2130MC501-A BUS-E06 1815.57 155.75 1822.24

2130DX502-P01 Cable BUS-2130MC501-A BUS-E09 719.11 132.90 731.29

2130DX503-P01 Cable BUS-2130MC501-A BUS-F31 363.11 120.74 382.66

2130LP501-P01 Cable BUS-E04 BUS-E05 145.41 72.14 162.32

2130LX501-P01 Cable BUS-2130MC501-A BUS-E03 363.11 120.74 382.66

2130MC501-P01~P06 Cable BUS-A03 Bus-E01 49.34 93.98 106.15

2130SC25101-P01 Cable BUS-2110MC501-F BUS-24A/2 37002.01 1006.57 37015.70

2130SC25102-P01 Cable BUS-2110MC501-F BUS-24A/3 37002.01 1006.57 37015.70

2130SG001-E01~E06 Cable BUS-B02 BUS-A05 0.74 1.08 1.31

2130ST05501-P01 Cable BUS-2130MC501-A BUS-E14 17141.11 2149.31 17275.33

2130UP501-P01 Cable BUS-2130MC501-B BUS-E12 20434.05 438.42 20438.75

2130US001A-E01 Cable 2130-VL-001 BUS-A01 0.68 0.32 0.75

2130US001B-E01 Cable BUS-A01 BUS-A06 0.08 0.04 0.09

2130WR001-P01 Cable BUS-2130MC501-B BUS-E16 2971.13 372.55 2994.39

2130WR002-P01 Cable BUS-2130MC501-B BUS-E17 6379.41 1719.45 6607.07

2130ZM253-P01 Cable BUS-2110MC501-E BUS-24A/1 17760.96 483.16 17767.54

2831ZM02404-P01 Cable BUS-2110MC501-F BUS-B20/1 23681.29 644.21 23690.05

2831ZM02404-P2 Cable BUS-2110MC501-F BUS-B20/3 334.92 331.31 471.10

2110US001-E02 Line 2130-VL-001 BUS-C05 8.83 20.39 22.21 0.0044582

CB-5A Tie Breakr BUS-2110MC501-A BS-5A/1

CB-B01 Tie Breakr BUS-B01 BUS-B02

CB-E01 Tie Breakr Bus-E01 BUS-2130MC501-A

CB-F01 Tie Breakr Bus-F01 BUS-2110MC501-A

SW1 Tie Switch BUS-2110MC501-A BUS-2110MC501-B

SW2 Tie Switch BUS-2110MC501-B BUS-2110MC501-C

SW3 Tie Switch BUS-2110MC501-C BUS-2110MC501-D

SW4 Tie Switch BUS-2110MC501-D BUS-2110MC501-E

SW5 Tie Switch BUS-2110MC501-E BUS-2110MC501-F

SW6 Tie Switch BUS-2130MC501-A BUS-2130MC501-B

28
Project: SPENCE GROWTH OPTION PROJECT
Page: 14

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID V % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

2130-B03 4160 97.398 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 304.7 92.8

2130-B04 4160 97.430 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 304.6 92.8

* 2130-VL-001 23000 100.000 0.0 7.101 3.856 0 0 BUS-A01 4.241 1.973 117.4 90.7

BUS-C05 2.860 1.883 86.0 83.5

BS-5A/1 480 101.261 -2.6 0 0 0 0 BUS-5A/2 0.008 0.005 10.6 86.3

BUS-5A/3 0.008 0.005 10.6 86.3

BUS-2110MC501-A -0.015 -0.009 21.2 86.3

BUS-1A/1 480 100.998 -2.5 0 0 0 0 BUS-2110MC501-A -0.060 -0.038 85.2 84.4

BUS-1A/2 0.060 0.038 85.2 84.4

BUS-1A/2 380 98.415 -3.2 0 0 0 0 BUS-1A/3 0.059 0.037 107.6 85.0

BUS-1A/1 -0.059 -0.037 107.6 85.0

BUS-1A/3 380 98.129 -3.2 0 0 0.059 0.037 BUS-1A/2 -0.059 -0.037 107.6 85.0

BUS-2A/1 480 100.933 -2.5 0 0 0 0 BUS-2110MC501-A -0.017 -0.011 24.4 84.6

BUS-2A/2 0.017 0.011 24.4 84.6

BUS-2A/2 240 98.471 -3.1 0 0 0 0 BUS-2A/3 0.017 0.010 48.8 85.2

BUS-2A/1 -0.017 -0.010 48.8 85.2

BUS-2A/3 240 97.791 -2.9 0 0 0.017 0.010 BUS-2A/2 -0.017 -0.010 48.8 85.0

BUS-3A/1 480 100.804 -2.4 0 0 0 0 BUS-2110MC501-A -0.024 -0.015 34.0 84.5

BUS-3A/2 0.024 0.015 34.0 84.5

BUS-3A/2 380 98.511 -3.0 0 0 0 0 BUS-3A/3 0.024 0.015 43.0 85.0

BUS-3A/1 -0.024 -0.015 43.0 85.0

BUS-3A/3 380 98.343 -3.0 0 0 0.024 0.015 BUS-3A/2 -0.024 -0.015 43.0 85.0

BUS-4A/1 480 101.011 -2.5 0 0 0 0 BUS-2110MC501-A -0.047 -0.030 66.7 84.6

BUS-4A/2 0.047 0.030 66.7 84.6

BUS-4A/2 415 98.990 -3.0 0 0 0 0 BUS-4A/3 0.047 0.029 77.1 85.0

BUS-4A/1 -0.047 -0.029 77.1 85.0

BUS-4A/3 415 98.714 -3.0 0 0 0.047 0.029 BUS-4A/2 -0.047 -0.029 77.1 85.0

BUS-5A/2 480 99.596 -2.0 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.6 85.9

BUS-5A/3 480 99.596 -2.0 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.6 85.9

BUS-6A/1 480 99.712 -2.6 0 0 0.015 0.000 BUS-2110MC501-B -0.015 0.000 18.1 100.0

BUS-8A/1 480 101.261 -2.6 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-10A/1 480 99.140 -2.3 0 0 0.056 0.026 BUS-2110MC501-C -0.056 -0.026 74.4 90.8

BUS-11A/1 480 99.361 -2.9 0 0 0.346 0.148 BUS-2110MC501-C -0.346 -0.148 455.2 91.9

BUS-12A/1 480 99.268 -1.9 0 0 0.010 0.006 BUS-2110MC501-C -0.010 -0.006 14.5 85.0

BUS-14A/1 480 99.474 -2.1 0 0 0.029 0.014 BUS-2110MC501-C -0.029 -0.014 38.7 89.2

BUS-16A/1 480 99.073 -2.3 0 0 0.052 0.024 BUS-2110MC501-C -0.052 -0.024 70.2 90.7

29
Project: SPENCE GROWTH OPTION PROJECT
Page: 15

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Voltage Generation Load Load Flow XFMR

ID V % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BUS-17A/1 480 100.265 -2.3 0 0 0 0 BUS-2110MC501-D -0.011 -0.007 15.6 83.7

BUS-17A/2 0.003 0.002 3.9 83.7

BUS-17A/3 0.003 0.002 3.9 83.7

BUS-17A/4 0.003 0.002 3.9 83.7

BUS-17A/5 0.003 0.002 3.9 83.7

BUS-17A/2 480 100.104 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/3 480 100.104 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/4 480 100.104 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/5 480 100.104 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-18A/1 480 99.514 -2.6 0 0 0.092 0.041 BUS-2110MC501-D -0.092 -0.041 121.6 91.3

BUS-19A/1 480 99.435 -2.2 0 0 0.047 0.022 BUS-2110MC501-E -0.047 -0.022 62.7 90.4

BUS-20A/1 480 98.550 -1.9 0 0 0.034 0.021 BUS-2110MC501-E -0.034 -0.021 48.5 85.0

BUS-21A/1 480 98.855 -1.8 0 0 0.015 0.009 BUS-2110MC501-E -0.015 -0.009 21.8 85.0

BUS-22A/1 480 100.277 -2.3 0 0 0.010 0.006 BUS-2110MC501-E -0.010 -0.006 14.4 85.0

BUS-23A/1 480 98.455 -2.1 0 0 0.037 0.018 BUS-2110MC501-E -0.037 -0.018 50.9 89.9

BUS-24A/1 480 100.994 -2.5 0 0 0.001 0.001 BUS-2110MC501-E -0.001 -0.001 2.1 85.0

BUS-24A/2 480 100.703 -2.4 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/3 480 100.703 -2.4 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/5 480 99.551 -2.2 0 0 0.021 0.013 BUS-2110MC501-F -0.021 -0.013 30.2 85.0

BUS-25A/1 480 98.339 -2.2 0 0 0.046 0.022 BUS-2110MC501-E -0.046 -0.022 62.9 90.4

BUS-26A/1 480 101.261 -2.6 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-27A/1 480 101.261 -2.6 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-28A/2 480 101.139 -2.5 0 0 0.003 0.002 BUS-2110MC501-F -0.003 -0.002 4.6 83.7

BUS-29A/1 480 101.007 -2.5 0 0 0.004 0.003 BUS-2110MC501-F -0.004 -0.003 6.0 85.0

BUS-2110MC501-A 480 101.261 -2.6 0 0 0 0 BUS-B1/1 0.006 0.003 7.8 85.4

BUS-B4/1 0.029 0.015 38.8 89.5

BUS-B2/1 0.008 0.005 10.6 86.3

BUS-B3/1 0.008 0.005 10.6 86.3

BUS-2A/1 0.017 0.011 24.4 84.7

BUS-3A/1 0.024 0.015 34.0 84.6

BUS-4A/1 0.047 0.030 66.7 84.6

BUS-1A/1 0.061 0.038 85.2 84.4

BS-5A/1 0.015 0.009 21.2 86.3

Bus-F01 -1.402 -0.684 1852.6 89.9

BUS-2110MC501-B 1.186 0.554 1555.1 90.6

BUS-2110MC501-B 480 101.261 -2.6 0 0 0 0 BUS-B6/1 0.029 0.015 38.8 89.5

BUS-B7/1 0.002 0.002 3.3 83.1

BUS-6A/1 0.015 0.000 18.1 100.0

BUS-B8/1 0.003 0.002 4.5 84.2

30
Project: SPENCE GROWTH OPTION PROJECT
Page: 16

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Voltage Generation Load Load Flow XFMR

ID V % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BUS-B9/1 0.071 0.032 92.8 91.5

BUS-B11/1 0.020 0.010 26.2 88.6

BUS-F7A/1 0.000 0.000 0.0 0.0

BUS-8A/1 0.000 0.000 0.0 0.0

BUS-2110MC501-A -1.186 -0.554 1555.1 90.6

BUS-2110MC501-C 1.045 0.494 1373.3 90.4

BUS-2110MC501-C 480 101.261 -2.6 0 0 0 0 BUS-12A/1 0.010 0.006 14.5 85.6

BUS-F9A/1 0.134 0.060 174.2 91.2

BUS-11A/1 0.351 0.153 455.2 91.7

BUS-14A/1 0.029 0.015 38.7 89.5

BUS-16A/1 0.054 0.025 70.2 90.9

BUS-10A/1 0.057 0.026 74.4 91.0

BUS-2110MC501-B -1.045 -0.494 1373.3 90.4

BUS-2110MC501-D 0.410 0.209 546.6 89.0

BUS-2110MC501-D 480 101.261 -2.6 0 0 0 0 BUS-B12/1 0.020 0.010 26.3 88.7

BUS-B13/1 0.020 0.010 26.3 88.7

BUS-17A/1 0.011 0.007 15.6 83.9

BUS-18A/1 0.093 0.042 121.6 91.3

BUS-2110MC501-C -0.410 -0.209 546.6 89.0

BUS-2110MC501-E 0.266 0.140 357.0 88.5

BUS-2110MC501-E 480 101.261 -2.6 0 0 0 0 BUS-21A/1 0.016 0.009 21.8 85.7

BUS-19A/1 0.048 0.022 62.7 90.6

BUS-20A/1 0.035 0.021 48.5 85.6

BUS-22A/1 0.010 0.006 14.4 85.2

BUS-25A/1 0.048 0.022 62.9 90.6

BUS-23A/1 0.039 0.018 50.9 90.2

BUS-B16/1 0.029 0.015 38.7 89.4

BUS-24A/1 0.001 0.001 2.1 85.1

BUS-2110MC501-D -0.266 -0.140 357.0 88.5

BUS-2110MC501-F 0.040 0.024 55.5 85.2

BUS-2110MC501-F 480 101.261 -2.6 0 0 0 0 BUS-28A/2 0.003 0.002 4.6 83.8

BUS-B18/1 0.001 0.001 1.0 79.6

BUS-29A/1 0.004 0.003 6.0 85.1

BUS-26A/1 0.000 0.000 0.0 0.0

BUS-27A/1 0.000 0.000 0.0 0.0

BUS-24A/5 0.022 0.013 30.2 85.3

BUS-24A/2 0.002 0.001 2.1 85.2

BUS-24A/3 0.002 0.001 2.1 85.2

BUS-B20/1 0.007 0.004 9.5 86.1

31
Project: SPENCE GROWTH OPTION PROJECT
Page: 17

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Voltage Generation Load Load Flow XFMR

ID V % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BUS-B20/3 0.000 0.000 0.0 0.0

BUS-2110MC501-E -0.040 -0.024 55.5 85.2

BUS-2130MC501-A 480 99.469 -0.8 0 0 0 0 BUS-E15 0.021 0.013 29.3 85.4

BUS-E2 0.010 0.006 14.6 85.4

BUS-E06 0.021 0.013 29.8 84.6

BUS-E09 0.031 0.020 44.6 84.6

BUS-F31 0.069 0.044 98.8 84.4

BUS-E03 0.056 0.036 80.2 84.2

BUS-E14 0.012 0.007 16.7 87.4

Bus-E01 -0.239 -0.150 340.6 84.7

BUS-2130MC501-B 0.019 0.012 26.6 84.9

BUS-2130MC501-B 480 99.469 -0.8 0 0 0 0 Bus-E3 0.003 0.002 4.8 84.0

Bus-E5 0.001 0.001 1.0 79.6

Bus-E18 0.005 0.003 7.4 85.4

Bus-E4 0.005 0.003 7.4 85.3

BUS-E12 0.004 0.003 6.1 85.3

BUS-E16 0.000 0.000 0.0 0.0

BUS-E17 0.000 0.000 0.0 0.0

BUS-2130MC501-A -0.019 -0.012 26.6 84.9

BUS-A1 23000 99.329 -0.2 0 0 0 0 BUS-C01 -1.417 -0.765 40.7 88.0

BUS-C03 1.417 0.765 40.7 88.0 -5.000

BUS-A01 23000 99.965 0.0 0 0 0 0 2130-VL-001 -4.239 -1.972 117.4 90.7

BUS-A06 0.244 0.158 7.3 84.0

BUS-A05 3.995 1.814 110.2 91.1

BUS-A03 480 99.729 -0.7 0 0 0 0 Bus-E01 0.239 0.150 340.6 84.6

BUS-A06 -0.239 -0.150 340.6 84.6

BUS-A05 4160 97.556 -2.4 0 0 0 0 BUS-B02 3.970 1.604 609.2 92.7

BUS-A01 -3.970 -1.604 609.2 92.7

BUS-A06 23000 99.965 0.0 0 0 0 0 BUS-A01 -0.244 -0.158 7.3 84.0

BUS-A03 0.244 0.158 7.3 84.0 -2.500

BUS-B01 4160 97.508 -2.4 0 0 0 0 2130-B03 1.985 0.801 304.7 92.7

2130-B04 1.984 0.801 304.6 92.7

BUS-B02 -3.969 -1.602 609.2 92.7

BUS-B1/1 480 100.053 -2.2 0 0 0.005 0.003 BUS-2110MC501-A -0.005 -0.003 7.8 85.1

BUS-B02 4160 97.508 -2.4 0 0 0 0 BUS-A05 -3.969 -1.602 609.2 92.7

BUS-B01 3.969 1.602 609.2 92.7

BUS-B2/1 480 99.666 -2.1 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.6 85.9

BUS-B3/1 480 99.666 -2.1 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.6 85.9

BUS-B4/1 480 99.301 -2.2 0 0 0.029 0.014 BUS-2110MC501-A -0.029 -0.014 38.8 89.2

32
Project: SPENCE GROWTH OPTION PROJECT
Page: 18

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Voltage Generation Load Load Flow XFMR

ID V % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BUS-B6/1 480 99.301 -2.2 0 0 0.029 0.014 BUS-2110MC501-B -0.029 -0.014 38.8 89.2

BUS-B7/1 480 100.291 -2.2 0 0 0.002 0.002 BUS-2110MC501-B -0.002 -0.002 3.3 82.7

BUS-B8/1 480 99.709 -2.0 0 0 0.003 0.002 BUS-2110MC501-B -0.003 -0.002 4.5 83.6

BUS-B9/1 480 99.246 -2.4 0 0 0.070 0.031 BUS-2110MC501-B -0.070 -0.031 92.8 91.4

BUS-B11/1 480 99.212 -2.1 0 0 0.019 0.010 BUS-2110MC501-B -0.019 -0.010 26.2 88.2

BUS-B12/1 480 99.001 -2.0 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.3 88.2

BUS-B13/1 480 98.986 -2.0 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.3 88.2

BUS-B16/1 480 99.606 -2.3 0 0 0.029 0.014 BUS-2110MC501-E -0.029 -0.014 38.7 89.2

BUS-B18/1 480 101.226 -2.5 0 0 0 0 BUS-2110MC501-F -0.001 -0.001 1.0 79.6

BUS-B20/1 480 99.622 -2.0 0 0 0.007 0.004 BUS-2110MC501-F -0.007 -0.004 9.5 85.6

BUS-B20/3 480 101.261 -2.6 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-C01 23000 99.331 -0.2 0 0 0 0 BUS-C05 -2.849 -1.863 86.0 83.7

BUS-A1 1.417 0.765 40.7 88.0

BUS-C04 1.431 1.098 45.6 79.3 -5.000

BUS-C03 480 101.661 -2.4 0 0 0 0 Bus-F01 1.405 0.691 1852.6 89.7

BUS-A1 -1.405 -0.691 1852.6 89.7

BUS-C04 4160 101.571 -1.8 0 0 0 0 BUS-D01 1.420 1.028 239.5 81.0

BUS-C01 -1.420 -1.028 239.5 81.0

BUS-C05 23000 99.364 -0.2 0 0 0 0 BUS-C01 2.850 1.863 86.0 83.7

2130-VL-001 -2.850 -1.863 86.0 83.7

BUS-D01 4160 101.523 -1.8 0 0 0 0 BUS-D03 0.626 0.692 127.6 67.1

BUS-D05 0.396 0.167 58.8 92.1

BUS-D04 0.396 0.167 58.8 92.1

BUS-C04 -1.419 -1.027 239.5 81.0

BUS-D03 4160 101.277 -1.8 0 0 0.624 0.691 BUS-D01 -0.624 -0.691 127.6 67.0

BUS-D04 4160 101.139 -1.8 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 58.8 92.1

BUS-D05 4160 101.139 -1.8 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 58.8 92.1

Bus-E01 480 99.469 -0.8 0 0 0 0 BUS-A03 -0.239 -0.150 340.6 84.7

BUS-2130MC501-A 0.239 0.150 340.6 84.7

BUS-E2 480 97.630 -0.3 0 0 0.010 0.006 BUS-2130MC501-A -0.010 -0.006 14.6 85.0

BUS-E03 480 99.222 -0.7 0 0 0 0 BUS-2130MC501-A -0.056 -0.036 80.2 84.2

BUS-E04 0.056 0.036 80.2 84.2

Bus-E3 480 98.683 -0.5 0 0 0.003 0.002 BUS-2130MC501-B -0.003 -0.002 4.8 83.7

BUS-E04 380 95.974 -1.6 0 0 0 0 BUS-E05 0.054 0.034 101.3 85.0

BUS-E03 -0.054 -0.034 101.3 85.0

Bus-E4 480 98.001 -0.3 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

BUS-E05 380 95.866 -1.6 0 0 0.054 0.034 BUS-E04 -0.054 -0.034 101.3 85.0

Bus-E5 480 99.309 -0.7 0 0 0 0 BUS-2130MC501-B -0.001 -0.001 1.0 79.6

BUS-E06 480 99.068 -0.7 0 0 0 0 BUS-2130MC501-A -0.021 -0.013 29.8 84.5

33
Project: SPENCE GROWTH OPTION PROJECT
Page: 19

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Voltage Generation Load Load Flow XFMR

ID V % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BUS-E07 0.021 0.013 29.8 84.5

BUS-E07 240 96.061 -1.5 0 0 0 0 BUS-E08 0.020 0.012 59.6 85.3

BUS-E06 -0.020 -0.012 59.6 85.3

BUS-E08 240 95.023 -1.2 0 0 0.020 0.012 BUS-E07 -0.020 -0.012 59.6 85.0

BUS-E09 480 99.217 -0.7 0 0 0 0 BUS-2130MC501-A -0.031 -0.020 44.6 84.5

BUS-E10 0.031 0.020 44.6 84.5

BUS-E10 380 96.215 -1.5 0 0 0 0 BUS-E11 0.030 0.019 56.4 85.3

BUS-E09 -0.030 -0.019 56.4 85.3

BUS-E11 380 95.252 -1.2 0 0 0.030 0.019 BUS-E10 -0.030 -0.019 56.4 85.0

BUS-E12 480 98.580 -0.5 0 0 0.004 0.003 BUS-2130MC501-B -0.004 -0.003 6.1 85.0

BUS-E14 480 97.254 -0.3 0 0 0.012 0.007 BUS-2130MC501-A -0.012 -0.007 16.7 87.0

BUS-E15 480 97.676 -0.4 0 0 0.020 0.013 BUS-2130MC501-A -0.020 -0.013 29.3 85.0

BUS-E16 480 99.469 -0.8 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

BUS-E17 480 99.469 -0.8 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

Bus-E18 480 97.764 -0.2 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

Bus-F01 480 101.261 -2.6 0 0 0 0 BUS-C03 -1.402 -0.684 1852.6 89.9

BUS-2110MC501-A 1.402 0.684 1852.6 89.9

BUS-F7A/1 480 101.261 -2.6 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-F9A/1 480 99.626 -2.8 0 0 0.132 0.058 BUS-2110MC501-C -0.132 -0.058 174.2 91.4

BUS-F22 415 95.757 -1.5 0 0 0.067 0.041 BUS-F30 -0.067 -0.041 114.3 85.0

BUS-F30 415 96.166 -1.5 0 0 0 0 BUS-F22 0.067 0.042 114.3 85.1

BUS-F31 -0.067 -0.042 114.3 85.1

BUS-F31 480 99.164 -0.7 0 0 0 0 BUS-2130MC501-A -0.069 -0.044 98.8 84.3

BUS-F30 0.069 0.044 98.8 84.3


* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA

34
Project: SPENCE GROWTH OPTION PROJECT
Page: 20

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID V Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

2130-B03 4160.00 1.983 0.799 2.138 92.8 304.7


2130-B04 4160.00 1.983 0.799 2.138 92.8 304.6
2130-VL-001 23000.00 8.080 87.9 202.8
BS-5A/1 480.00 0.018 86.3 21.2
BUS-1A/1 480.00 0.072 84.4 85.2
BUS-1A/2 380.00 0.070 85.0 107.6
BUS-1A/3 380.00 0.048 0.029 0.011 0.007 0.069 85.0 107.6
BUS-2A/1 480.00 0.020 84.6 24.4
BUS-2A/2 240.00 0.020 85.2 48.8
BUS-2A/3 240.00 0.014 0.008 0.003 0.002 0.020 85.0 48.8
BUS-3A/1 480.00 0.029 84.5 34.0
BUS-3A/2 380.00 0.028 85.0 43.0
BUS-3A/3 380.00 0.019 0.012 0.005 0.003 0.028 85.0 43.0
BUS-4A/1 480.00 0.056 84.6 66.7
BUS-4A/2 415.00 0.055 85.0 77.1
BUS-4A/3 415.00 0.037 0.023 0.009 0.006 0.055 85.0 77.1
BUS-5A/2 480.00 0.008 0.004 0.009 85.9 10.6
BUS-5A/3 480.00 0.008 0.004 0.009 85.9 10.6
BUS-6A/1 480.00 0.012 0.003 0.015 100.0 18.1
BUS-8A/1 480.00
BUS-10A/1 480.00 0.056 0.026 0.061 90.8 74.4
BUS-11A/1 480.00 0.346 0.148 0.376 91.9 455.2
BUS-12A/1 480.00 0.008 0.005 0.002 0.001 0.012 85.0 14.5
BUS-14A/1 480.00 0.029 0.014 0.032 89.2 38.7
BUS-16A/1 480.00 0.052 0.024 0.058 90.7 70.2
BUS-17A/1 480.00 0.013 83.7 15.6
BUS-17A/2 480.00 0.003 0.002 0.003 83.6 3.9
BUS-17A/3 480.00 0.003 0.002 0.003 83.6 3.9
BUS-17A/4 480.00 0.003 0.002 0.003 83.6 3.9
BUS-17A/5 480.00 0.003 0.002 0.003 83.6 3.9
BUS-18A/1 480.00 0.092 0.041 0.101 91.3 121.6
BUS-19A/1 480.00 0.047 0.022 0.052 90.4 62.7
BUS-20A/1 480.00 0.027 0.017 0.007 0.004 0.040 85.0 48.5
BUS-21A/1 480.00 0.012 0.008 0.003 0.002 0.018 85.0 21.8
BUS-22A/1 480.00 0.008 0.005 0.002 0.001 0.012 85.0 14.4
BUS-23A/1 480.00 0.037 0.018 0.042 89.9 50.9
BUS-24A/1 480.00 0.001 0.001 0.000 - 0.002 85.0 2.1
BUS-24A/2 480.00 0.001 0.001 0.000 - 0.002 85.0 2.1
BUS-24A/3 480.00 0.001 0.001 0.000 - 0.002 85.0 2.1

35
Project: SPENCE GROWTH OPTION PROJECT
Page: 21

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID V Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

BUS-24A/5 480.00 0.017 0.011 0.004 0.003 0.025 85.0 30.2


BUS-25A/1 480.00 0.046 0.022 0.051 90.4 62.9
BUS-26A/1 480.00
BUS-27A/1 480.00
BUS-28A/2 480.00 0.003 0.002 0.004 83.7 4.6
BUS-29A/1 480.00 0.003 0.002 0.001 0.001 0.005 85.0 6.0
BUS-2110MC501-A 480.00 1.560 89.9 1852.6
BUS-2110MC501-B 480.00 1.309 90.6 1555.1
BUS-2110MC501-C 480.00 1.156 90.4 1373.3
BUS-2110MC501-D 480.00 0.460 89.0 546.6
BUS-2110MC501-E 480.00 0.301 88.5 357.0
BUS-2110MC501-F 480.00 0.047 85.2 55.5
BUS-2130MC501-A 480.00 0.282 84.7 340.6
BUS-2130MC501-B 480.00 0.022 84.9 26.6
BUS-A1 23000.00 1.610 88.0 40.7
BUS-A01 23000.00 1200.0 4.675 90.7 117.4 9.8
BUS-A03 480.00 0.282 84.6 340.6
BUS-A05 4160.00 4.282 92.7 609.2
BUS-A06 23000.00 0.290 84.0 7.3
BUS-B01 4160.00 1200.0 4.280 92.7 609.2 50.8
BUS-B1/1 480.00 0.005 0.003 0.006 85.1 7.8
BUS-B02 4160.00 4.280 92.7 609.2
BUS-B2/1 480.00 0.008 0.004 0.009 85.9 10.6
BUS-B3/1 480.00 0.008 0.004 0.009 85.9 10.6
BUS-B4/1 480.00 0.029 0.014 0.032 89.2 38.8
BUS-B6/1 480.00 0.029 0.014 0.032 89.2 38.8
BUS-B7/1 480.00 0.002 0.002 0.003 82.7 3.3
BUS-B8/1 480.00 0.003 0.002 0.004 83.6 4.5
BUS-B9/1 480.00 0.070 0.031 0.077 91.4 92.8
BUS-B11/1 480.00 0.019 0.010 0.022 88.2 26.2
BUS-B12/1 480.00 0.019 0.010 0.022 88.2 26.3
BUS-B13/1 480.00 0.019 0.010 0.022 88.2 26.3
BUS-B16/1 480.00 0.029 0.014 0.032 89.2 38.7
BUS-B18/1 480.00 0.001 0.001 0.001 79.6 1.0
BUS-B20/1 480.00 0.007 0.004 0.008 85.6 9.5
BUS-B20/3 480.00
BUS-C01 23000.00 1200.0 3.404 83.7 86.0 7.2
BUS-C03 480.00 1.566 89.7 1852.6
BUS-C04 4160.00 1.753 81.0 239.5
BUS-C05 23000.00 3.405 83.7 86.0
BUS-D01 4160.00 1200.0 1.752 81.0 239.5 20.0
BUS-D03 4160.00 0.624 0.691 0.931 67.0 127.6

36
Project: SPENCE GROWTH OPTION PROJECT
Page: 22

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID V Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

BUS-D04 4160.00 0.395 0.167 0.429 92.1 58.8


BUS-D05 4160.00 0.395 0.167 0.429 92.1 58.8
Bus-E01 480.00 1200.0 0.282 84.7 340.6 28.4
BUS-E2 480.00 0.008 0.005 0.002 0.001 0.012 85.0 14.6
BUS-E03 480.00 0.066 84.2 80.2
Bus-E3 480.00 0.003 0.002 0.004 83.7 4.8
BUS-E04 380.00 0.064 85.0 101.3
Bus-E4 480.00 0.005 0.003 0.006 84.9 7.4
BUS-E05 380.00 0.044 0.027 0.010 0.006 0.064 85.0 101.3
Bus-E5 480.00 0.001 0.001 0.001 79.6 1.0
BUS-E06 480.00 0.025 84.5 29.8
BUS-E07 240.00 0.024 85.3 59.6
BUS-E08 240.00 0.016 0.010 0.004 0.002 0.024 85.0 59.6
BUS-E09 480.00 0.037 84.5 44.6
BUS-E10 380.00 0.036 85.3 56.4
BUS-E11 380.00 0.024 0.015 0.006 0.003 0.035 85.0 56.4
BUS-E12 480.00 0.003 0.002 0.001 0.001 0.005 85.0 6.1
BUS-E14 480.00 0.012 0.007 0.013 87.0 16.7
BUS-E15 480.00 0.016 0.010 0.004 0.002 0.024 85.0 29.3
BUS-E16 480.00
BUS-E17 480.00
Bus-E18 480.00 0.005 0.003 0.006 84.9 7.4
Bus-F01 480.00 2500.0 1.560 89.9 1852.6 74.1
BUS-F7A/1 480.00
BUS-F9A/1 480.00 0.132 0.058 0.000 0.144 91.4 174.2
BUS-F22 415.00 0.054 0.034 0.012 0.008 0.079 85.0 114.3
BUS-F30 415.00 0.079 85.1 114.3
BUS-F31 480.00 0.081 84.3 98.8

* Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).

37
Project: SPENCE GROWTH OPTION PROJECT
Page: 23

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

2110BL001A-P01 Cable 30.00 4.64 15.48

2110BL001B-P01 Cable 30.00 1.00 3.34

2110CH016-P01 Cable 56.44 21.80 38.63

2110CH251-P01 Cable 50.16 14.50 28.90

2110CN014-P01 Cable 319.20 174.24 54.59

2110CP001-P1 Cable 672.00 455.24 67.74

2110CR001A-E01 Cable 195.00 127.60 65.44

2110CR001B-P01 Cable 30.00 7.76 25.87

2110CR0101A-P01 Cable 86.64 38.80 44.79

2110CR0101B-P01 Cable 86.64 38.80 44.79

2110CR0101C-P01 Cable 20.00 3.26 16.28

2110CR00101HE-P01 Cable 68.40 18.07 26.42

2110CR0102A-P01 Cable 30.00 10.59 35.29

2110CR0102B-P01 Cable 30.00 10.59 35.29

2110CR0103A-P01 Cable 30.00 10.60 35.32

2110CR0103B-P01 Cable 30.00 10.60 35.32

2110CR0105A-P01 Cable 20.00 4.53 22.65

2110CV001B-E01 Cable 77.00 58.84 76.41

2110CV001HU01A-E01 Cable 77.00 58.84 76.41

2110CV001HU01C-P01 Cable 76.96 26.29 34.16

2110CV001HU01D-P01 Cable 76.96 26.30 34.17

2110CV00102-P01 Cable 97.48 62.67 64.29

2110CV00107-P01 Cable 97.48 48.54 49.79

2110DC001A-P01 Cable 155.04 92.80 59.86

2110DP501-P01 Cable 97.48 48.77 50.03

2110DP502-P01 Cable 177.84 42.97 24.16

2110DP505-P01 Cable 155.14 77.12 49.71

2110DS001-P01 Cable 68.40 38.73 56.63

2110DX501-P01 Cable 68.40 24.38 35.65

2110DX502-P01 Cable 68.40 34.02 49.74

2110DX503-P01 Cable 155.04 66.67 43.00

2110HU001A-P01 Cable 68.40 26.24 38.36

2110LP501-P01 Cable 225.94 107.58 47.61

38
Project: SPENCE GROWTH OPTION PROJECT
Page: 24

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

2110LX501-P01 Cable 177.84 85.17 47.89

2110MA001RC-P01 Cable 136.80 70.22 51.33

2110MA001TFC-P01 Cable 97.48 15.64 16.04

2110MA00101A-P01 Cable 20.00 3.91 19.55

2110MA00101B-P01 Cable 20.00 3.91 19.55

2110MA00101C-P01 Cable 20.00 3.91 19.55

2110MA00101D-P01 Cable 20.00 3.91 19.55

2110MC501-P01~P15 Cable 2957.60 1852.64 62.64

2110RB001-P01 Cable 237.12 121.63 51.30

2110SG001-E01~E03 Cable 403.79 239.48 59.31

2110UP501-P01 Cable 30.00 5.98 19.93

2110US001A-E01 Cable 150.69 86.02 57.08

2110US001B-E01 Cable 150.69 40.70 27.01

2110WR001-P01 Cable 97.48

2110WR002-P01 Cable 86.64

2110WR003-P01 Cable 97.48

2110WR004-P01 Cable 97.48

2110ZM250-P01 Cable 136.80 74.36 54.36

2130BL001A-P01 Cable 20.00 4.76 23.80

2130BL001B-P01 Cable 20.00 1.02 5.10

2130CH003-P01 Cable 86.64 14.41 16.63

2130CH004-P01 Cable 133.40 29.28 21.95

2130CH005-P01 Cable 86.64 14.65 16.90

2130CV002A-E01 Cable 430.00 304.65 70.85

2130CV002A01A-P01 Cable 20.00 7.41 37.03

2130CV002B-E01 Cable 430.00 304.55 70.83

2130CV002B01A-P01 Cable 20.00 7.39 36.94

2130CV00202-P01 Cable 153.92 62.86 40.84

2130CV00207-P01 Cable 133.40 50.91 38.16

2130CV00208-P01 Cable 118.56 30.15 25.43

2130DC002A-P01 Cable 136.80 38.68 28.28

2130DP501-P01 Cable 86.64 59.58 68.77

2130DP502-P01 Cable 72.00 56.36 78.28

2130DP505-P01 Cable 200.09 114.30 57.12

2130DX501-P01 Cable 68.40 29.79 43.55

39
Project: SPENCE GROWTH OPTION PROJECT
Page: 25

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

2130DX502-P01 Cable 118.56 44.62 37.63

2130DX503-P01 Cable 195.00 98.82 50.68

2130LP501-P01 Cable 237.12 101.35 42.74

2130LX501-P01 Cable 177.84 80.23 45.12

2130MC501-P01~P06 Cable 1183.04 340.64 28.79

2130SC25101-P01 Cable 30.00 2.10 6.99

2130SC25102-P01 Cable 30.00 2.10 6.99

2130SG001-E01~E06 Cable 1020.49 609.20 59.70

2130ST05501-P01 Cable 86.64 16.65 19.22

2130UP501-P01 Cable 20.00 6.07 30.33

2130US001A-E01 Cable 195.01 117.40 60.20

2130US001B-E01 Cable 195.01 7.29 3.74

2130WR001-P01 Cable 86.64

2130WR002-P01 Cable 155.04

2130ZM253-P01 Cable 30.00 2.09 6.98

2831ZM02404-P01 Cable 30.00 9.54 31.81

2831ZM02404-P2 Cable 392.16

2110-DX-501 Transformer 0.030 0.020 68.2 0.020 66.5

2110-DX-502 Transformer 0.045 0.029 63.4 0.028 61.9

2110-DX-503 Transformer 0.075 0.056 74.7 0.055 73.2

2110-LX-501 Transformer 0.100 0.072 71.5 0.070 69.7

2110-XF-001 Transformer 2.250 1.804 80.2 1.753 77.9

2110-XF-501 Transformer 1.750 1.610 92.0 1.566 89.5

2130-DX-501 Transformer 0.030 0.025 81.8 0.024 79.3

2130-DX-502 Transformer 0.045 0.037 81.8 0.036 79.3

2130-DX-503 Transformer 0.100 0.081 81.5 0.079 79.0

2130-LX-501 Transformer 0.075 0.066 88.2 0.064 85.4

2130-XF-001 Transformer 5.000 4.388 87.8 4.282 85.6

2130-XF-501 Transformer 0.500 0.290 58.1 0.282 56.5

* Indicates a branch with operating load exceeding the branch capability.

40
Project: SPENCE GROWTH OPTION PROJECT
Page: 26

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

2130CV002A-E01 -1.983 -0.799 1.985 0.801 1.8 2.0 97.4 97.5 0.11

2130CV002B-E01 -1.983 -0.799 1.984 0.801 1.3 1.4 97.4 97.5 0.08

2130US001A-E01 4.241 1.973 -4.239 -1.972 1.5 0.7 100.0 100.0 0.03

2110US001-E02 2.860 1.883 -2.850 -1.863 10.4 19.5 100.0 99.4 0.64

2110CR0103A-P01 0.008 0.005 -0.008 -0.004 0.2 0.0 101.3 99.6 1.67

2110CR0103B-P01 0.008 0.005 -0.008 -0.004 0.2 0.0 101.3 99.6 1.67

2110LX501-P01 -0.060 -0.038 0.061 0.038 0.2 0.1 101.0 101.3 0.26

2110-LX-501 0.060 0.038 -0.059 -0.037 1.1 1.7 101.0 98.4 2.58

2110LP501-P01 0.059 0.037 -0.059 -0.037 0.2 0.1 98.4 98.1 0.29

2110DX501-P01 -0.017 -0.011 0.017 0.011 0.1 0.0 100.9 101.3 0.33

2110-DX-501 0.017 0.011 -0.017 -0.010 0.3 0.5 100.9 98.5 2.46

2110DP501-P01 0.017 0.010 -0.017 -0.010 0.2 0.0 98.5 97.8 0.68

2110DX502-P01 -0.024 -0.015 0.024 0.015 0.1 0.0 100.8 101.3 0.46

2110-DX-502 0.024 0.015 -0.024 -0.015 0.4 0.6 100.8 98.5 2.29

2110DP502-P01 0.024 0.015 -0.024 -0.015 0.0 0.0 98.5 98.3 0.17

2110DX503-P01 -0.047 -0.030 0.047 0.030 0.1 0.0 101.0 101.3 0.25

2110-DX-503 0.047 0.030 -0.047 -0.029 0.7 1.0 101.0 99.0 2.02

2110DP505-P01 0.047 0.029 -0.047 -0.029 0.1 0.0 99.0 98.7 0.28

2110CR00101HE-P01 -0.015 0.000 0.015 0.000 0.2 0.0 99.7 101.3 1.55

2110WR002-P01 0.000 0.000 0.000 0.000 101.3 101.3

2110ZM250-P01 -0.056 -0.026 0.057 0.026 1.3 0.3 99.1 101.3 2.12

2110CP001-P1 -0.346 -0.148 0.351 0.153 5.8 4.8 99.4 101.3 1.90

2110CH251-P01 -0.010 -0.006 0.010 0.006 0.3 0.0 99.3 101.3 1.99

2110DS001-P01 -0.029 -0.014 0.029 0.015 0.6 0.1 99.5 101.3 1.79

2110MA001RC-P01 -0.052 -0.024 0.054 0.025 1.3 0.3 99.1 101.3 2.19

2110MA001TFC-P01 -0.011 -0.007 0.011 0.007 0.1 0.0 100.3 101.3 1.00

2110MA00101A-P01 0.003 0.002 -0.003 -0.002 0.0 0.0 100.3 100.1 0.16

2110MA00101B-P01 0.003 0.002 -0.003 -0.002 0.0 0.0 100.3 100.1 0.16

2110MA00101C-P01 0.003 0.002 -0.003 -0.002 0.0 0.0 100.3 100.1 0.16

2110MA00101D-P01 0.003 0.002 -0.003 -0.002 0.0 0.0 100.3 100.1 0.16

2110RB001-P01 -0.092 -0.041 0.093 0.042 1.6 0.8 99.5 101.3 1.75

2110CV00102-P01 -0.047 -0.022 0.048 0.022 1.0 0.1 99.4 101.3 1.83

2110CV00107-P01 -0.034 -0.021 0.035 0.021 1.2 0.1 98.5 101.3 2.71

2110CH016-P01 -0.015 -0.009 0.016 0.009 0.5 0.0 98.9 101.3 2.41

41
Project: SPENCE GROWTH OPTION PROJECT
Page: 27

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

2130CH003-P01 -0.010 -0.006 0.010 0.006 0.1 0.0 100.3 101.3 0.98

2130CV00207-P01 -0.037 -0.018 0.039 0.018 1.2 0.2 98.5 101.3 2.81

2130ZM253-P01 -0.001 -0.001 0.001 0.001 0.0 0.0 101.0 101.3 0.27

2130SC25101-P01 -0.001 -0.001 0.002 0.001 0.0 0.0 100.7 101.3 0.56

2130SC25102-P01 -0.001 -0.001 0.002 0.001 0.0 0.0 100.7 101.3 0.56

2130CV00208-P01 -0.021 -0.013 0.022 0.013 0.5 0.1 99.6 101.3 1.71

2130CV00202-P01 -0.046 -0.022 0.048 0.022 1.5 0.3 98.3 101.3 2.92

2110WR003-P01 0.000 0.000 0.000 0.000 101.3 101.3

2110WR004-P01 0.000 0.000 0.000 0.000 101.3 101.3

2110BL001A-P01 -0.003 -0.002 0.003 0.002 0.0 0.0 101.1 101.3 0.12

2110UP501-P01 -0.004 -0.003 0.004 0.003 0.0 0.0 101.0 101.3 0.25

2110CR001B-P01 0.006 0.003 -0.005 -0.003 0.1 0.0 101.3 100.1 1.21

2110CR0101A-P01 0.029 0.015 -0.029 -0.014 0.7 0.1 101.3 99.3 1.96

2110CR0102A-P01 0.008 0.005 -0.008 -0.004 0.2 0.0 101.3 99.7 1.60

2110CR0102B-P01 0.008 0.005 -0.008 -0.004 0.2 0.0 101.3 99.7 1.60

2110CR0101B-P01 0.029 0.015 -0.029 -0.014 0.7 0.1 101.3 99.3 1.96

2110CR0101C-P01 0.002 0.002 -0.002 -0.002 0.0 0.0 101.3 100.3 0.97

2110CR0105A-P01 0.003 0.002 -0.003 -0.002 0.1 0.0 101.3 99.7 1.55

2110DC001A-P01 0.071 0.032 -0.070 -0.031 1.5 0.4 101.3 99.2 2.01

2110HU001A-P01 0.020 0.010 -0.019 -0.010 0.5 0.0 101.3 99.2 2.05

2110WR001-P01 0.000 0.000 0.000 0.000 101.3 101.3

2110CN014-P01 0.134 0.060 -0.132 -0.058 1.9 1.6 101.3 99.6 1.64

2110CV001HU01C-P01 0.020 0.010 -0.019 -0.010 0.5 0.0 101.3 99.0 2.26

2110CV001HU01D-P01 0.020 0.010 -0.019 -0.010 0.5 0.0 101.3 99.0 2.27

2130DC002A-P01 0.029 0.015 -0.029 -0.014 0.5 0.1 101.3 99.6 1.66

2110BL001B-P01 0.001 0.001 -0.001 -0.001 0.0 0.0 101.3 101.2 0.04

2831ZM02404-P01 0.007 0.004 -0.007 -0.004 0.1 0.0 101.3 99.6 1.64

2831ZM02404-P2 0.000 0.000 0.000 0.000 101.3 101.3

2130CH004-P01 0.021 0.013 -0.020 -0.013 0.5 0.1 99.5 97.7 1.79

2130CH005-P01 0.010 0.006 -0.010 -0.006 0.2 0.0 99.5 97.6 1.84

2130DX501-P01 0.021 0.013 -0.021 -0.013 0.1 0.0 99.5 99.1 0.40

2130DX502-P01 0.031 0.020 -0.031 -0.020 0.1 0.0 99.5 99.2 0.25

2130DX503-P01 0.069 0.044 -0.069 -0.044 0.2 0.1 99.5 99.2 0.30

2130LX501-P01 0.056 0.036 -0.056 -0.036 0.2 0.1 99.5 99.2 0.25

2130ST05501-P01 0.012 0.007 -0.012 -0.007 0.3 0.0 99.5 97.3 2.22

2130BL001A-P01 0.003 0.002 -0.003 -0.002 0.0 0.0 99.5 98.7 0.79

2130BL001B-P01 0.001 0.001 -0.001 -0.001 0.0 0.0 99.5 99.3 0.16

42
Project: SPENCE GROWTH OPTION PROJECT
Page: 28

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

2130CV002A01A-P01 0.005 0.003 -0.005 -0.003 0.1 0.0 99.5 97.8 1.71

2130CV002B01A-P01 0.005 0.003 -0.005 -0.003 0.1 0.0 99.5 98.0 1.47

2130UP501-P01 0.004 0.003 -0.004 -0.003 0.1 0.0 99.5 98.6 0.89

2130WR001-P01 0.000 0.000 0.000 0.000 99.5 99.5

2130WR002-P01 0.000 0.000 0.000 0.000 99.5 99.5

2110US001B-E01 -1.417 -0.765 1.417 0.765 0.0 0.0 99.3 99.3 0.00

2110-XF-501 1.417 0.765 -1.405 -0.691 12.3 73.5 99.3 101.7 2.33

2130US001B-E01 0.244 0.158 -0.244 -0.158 0.0 0.0 100.0 100.0 0.00

2130-XF-001 3.995 1.814 -3.970 -1.604 24.8 210.5 100.0 97.6 2.41

2130MC501-P01~P06 0.239 0.150 -0.239 -0.150 0.4 0.8 99.7 99.5 0.26

2130-XF-501 -0.239 -0.150 0.244 0.158 4.8 7.2 99.7 100.0 0.24

2130SG001-E01~E06 3.970 1.604 -3.969 -1.602 1.4 2.1 97.6 97.5 0.05

2110US001A-E01 -2.849 -1.863 2.850 1.863 1.1 0.4 99.3 99.4 0.03

2110-XF-001 1.431 1.098 -1.420 -1.028 11.7 70.5 99.3 101.6 2.24

2110MC501-P01~P15 1.405 0.691 -1.402 -0.684 3.5 6.8 101.7 101.3 0.40

2110SG001-E01~E03 1.420 1.028 -1.419 -1.027 0.5 0.7 101.6 101.5 0.05

2110CR001A-E01 0.626 0.692 -0.624 -0.691 2.2 1.1 101.5 101.3 0.25

2110CV001B-E01 0.396 0.167 -0.395 -0.167 1.7 0.2 101.5 101.1 0.38

2110CV001HU01A-E01 0.396 0.167 -0.395 -0.167 1.7 0.2 101.5 101.1 0.38

2130-LX-501 0.056 0.036 -0.054 -0.034 1.3 2.0 99.2 96.0 3.25

2130LP501-P01 0.054 0.034 -0.054 -0.034 0.1 0.0 96.0 95.9 0.11

2130-DX-501 0.021 0.013 -0.020 -0.012 0.5 0.7 99.1 96.1 3.01

2130DP501-P01 0.020 0.012 -0.020 -0.012 0.3 0.0 96.1 95.0 1.04

2130-DX-502 0.031 0.020 -0.030 -0.019 0.7 1.0 99.2 96.2 3.00

2130DP502-P01 0.030 0.019 -0.030 -0.019 0.4 0.0 96.2 95.3 0.96

2130DP505-P01 -0.067 -0.041 0.067 0.042 0.3 0.1 95.8 96.2 0.41

2130-DX-503 -0.067 -0.042 0.069 0.044 1.5 2.2 96.2 99.2 3.00

116.8 417.6

43
Project: SPENCE GROWTH OPTION PROJECT
Page: 29

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 95.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

44
Project: SPENCE GROWTH OPTION PROJECT
Page: 30

Date: 11-05-2018

ETAP Ver. 16.1.1C


LOAD FLOW STUDY

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 7.101 3.856 8.080 87.88 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 7.101 3.856 8.080 87.88 Lagging

Total Motor Load: 6.894 3.384 7.680 89.77 Lagging

Total Static Load: 0.090 0.054 0.105 85.83 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.117 0.418

System Mismatch: 0.000 0.000

Number of Iterations: 3

45
One-Line Diagram - OLV1 (Load Flow Analysis)
U1
829. 33 MVAsc

8080 kVA
202. 8 A
2130-VL-001 23 kV 87. 88% PF

4677 kVA
200 A 117. 4 A
Fuse1 90. 67% PF

2130-US-001 2130-SG-001 2130-MC-001


BUS-A01 BUS-B01 4. 16 kV
23 kV 290. 4 kVA 4388 kVA 2140 kVA 2140 kVA
7. 3 A 110. 2 A 304. 7 A 304. 6 A
83. 98% PF 91. 05% PF SW-B01 SW-B02
CB-B01 92. 73% PF 92. 74% PF
2130US001B-E01 1200 A
1-3/C 2/0
14 m o
FU-B01 FU-B02
CT-A01
558 A 558 A
o

BUS-A06
23 kV CT-B01
290. 4 kVA
7. 3 A GE369-1 GE369-2
83. 98% PF CB-A01 T60-1 o o

1200 A R
MR MR
ZCT-B01 ZCT-B02
SW-A01
o o

4280 kVA CT-B02 CT-B03


609. 2 A
FU-A01 BUS-B02 92. 73% PF
20 A 4. 16 kV
-2. 5% TapP
2130-XF-501
0. 5 MVA 2130-XF-001
23/0. 48 kV 5 MVA
23/4. 16 kV

BUS-A03 BUS-A05
0. 48 kV 4. 16 kV
282. 4 kVA 4282 kVA
340. 6 A 609. 2 A
84. 64% PF 92. 72% PF

2130-B04
2130-B03

4. 16 kV 2138 kVA 4. 16 kV 2138 kVA


304. 7 A 304. 6 A
92. 75% PF 92. 75% PF

2130-MC-501 2130-CV002-B
2130-CV002-A
1865 kW
1865 kW
46
One-Line Diagram - OLV1 (Load Flow Analysis)

3424 kVA
86 A
83. 53% PF

BUS-C05
23 kV
3405 kVA
150 A 86 A
Fuse2 83. 7% PF

2110US001A-E01
1-3/C 1
100 m

2110-US-001
2110-SG-001 2110-MC-001
BUS-C01 BUS-D01 4. 16 kV

23 kV 1610 kVA 1804 kVA 933. 4 kVA 430. 4 kVA 430. 4 kVA
40. 7 A 45. 6 A 127. 6 A 58. 8 A 58. 8 A
88. 01% PF o
79. 33% PF 67. 07% PF SW-D02 92. 12% PF SW-D03 92. 12% PF
CT-C01 CB-D01 SW-D01
1200 A
2110US001B-E01
1-3/C 1
FU-D01 FU-D02 FU-D03
14 m 170 A
360 A 170 A
BUS-A1 CB-C01
23 kV 1200 A
1610 kVA
40. 7 A T60-2 GE369-3 GE369-4 GE369-5
88. 01% PF o
o o

R MR MR
MR ZCT-D02 ZCT-D2
SW-C01 ZCT-D01
o o o
o

CT-D01 CT-D03 CT-D2


CT-D02
FU-C01
63 A

-5% TapP -5% TapP

2110-XF-501 2110-XF-001
2. 25 MVA
1. 75 MVA
23/4. 16 kV
23/0. 48 kV

BUS-C04
BUS-C03 4. 16 kV
0. 48 kV
1566 kVA 1753 kVA
1853 A 239. 5 A
89. 74% PF 81% PF

BUS-D03 BUS-D04 BUS-D05


4. 16 kV 931. 2 kVA 4. 16 kV 428. 8 kVA 4. 16 kV 428. 8 kVA
127. 6 A 58. 8 A 58. 8 A
67% PF 92. 08% PF 92. 08% PF

2110-MC-501 2110-CR001-A 2110-CV001HU-01A 2110-CV001HU-01B


750 kW 368 kW 368 kW
47
One-Line Diagram - OLV1=>2130-MC-501 (Load Flow Analysis)

2130MC501-P01~P06

Bus-E01
0. 48 kV
281. 7 kVA
340. 6 A
84. 72% PF

CB-E01
1200 A

BUS-2130MC501-A
0. 48 kV

66. 4 kVA 24. 6 kVA 36. 9 kVA 81. 7 kVA 24. 2 kVA 12. 1 kVA 13. 8 kVA 22 kVA
80. 2 A 29. 8 A 44. 6 A 98. 8 A 29. 3 A 14. 6 A 16. 7 A 26. 6 A
84. 25% PF 84. 63% PF 84. 58% PF CB-F5 84. 36% PF 85. 37% PF 85. 44% PF 87. 44% PF 84. 9% PF
CB-E02 CB-E03 CB-E04 125 A
175 A CB-E08
50 A 70 A
CB-E2 20 A
CB-E05 30 A
40 A

SW6

SW6 SWICTH IS SHOWN ONLY AS


A MEANS OF BUSBAR
CONTINUATION IN CREATING
THIS SINGLE LINE. IT DOES
NOT EXIST IN 2130MC-501.

BUS-E03 BUS-E06 BUS-E09


BUS-F31
0. 48 kV 0. 48 kV 0. 48 kV
66. 2 kVA 24. 5 kVA 36. 8 kVA 0. 48 kV
81. 5 kVA
80. 2 A 29. 8 A 44. 6 A
84. 21% PF 98. 8 A
84. 52% PF 84. 53% PF
84. 32% PF

2130-LX-501 2130-DX-501 2130-DX-502


30 kVA 45 kVA 2130-DX-503
75 kVA 100 kVA
0. 48/0. 24 kV 0. 48/0. 38 kV
0. 48/0. 38 kV 0. 48/0. 415 kV

BUS-E04 BUS-E07 BUS-E10


BUS-F30
0. 38 kV 0. 24 kV 0. 38 kV
64 kVA 23. 8 kVA 35. 7 kVA 0. 415 kV
79 kVA
101. 3 A 59. 6 A 56. 4 A 114. 3 A
85. 01% PF 85. 26% PF 85. 27% PF
85. 05% PF

BUS-E08 BUS-E11 BUS-F22 BUS-E2


BUS-E05 BUS-E14
0. 415 kV BUS-E15
0. 38 kV 78. 7 kVA 0. 48 kV
63. 9 kVA 23. 5 kVA 0. 38 kV 35. 3 kVA 0. 48 kV 11. 9 kVA 0. 48 kV
101. 3 A 0. 24 kV 56. 4 A 114. 3 A 23. 8 kVA 14. 6 A 13. 5 kVA
59. 6 A
85% PF 85% PF 29. 3 A 16. 7 A
85% PF 85% PF 85% PF
85% PF 86. 99% PF

2130-ST055-01
2130-DP-505 9 kW
2130-LP-501 2130-DP-501 2130-DP-502 2130-CH-005
65 kVA 24 kVA 80 kVA 2130-CH-004
36 kVA 12 kVA
24 kVA

48
One-Line Diagram - OLV1=>2130-MC-501 (Load Flow Analysis)

BUS-2130MC501 CONTINUATION
FROM SHEET 1.

BUS-2130MC501-B
0. 48 kV

6. 12 kVA 6. 11 kVA 3. 94 kVA 0. 844 kVA 5. 02 kVA


7. 4 A 7. 4 A 4. 8 A 1 A 6. 1 A
85. 4% PF 85. 33% PF MCP-E2 84% PF 79. 63% PF MCP-E01 85. 28% PF
CB-E07 MCP-E3 20 A MCP-E4
MCP-E03 15 A
20 A 20 A
CB-E06 20 A
60 A
60 A

BUS-E12
Bus-E3
Bus-E5 0. 48 kV
0. 48 kV
3. 91 kVA 0. 48 kV
Bus-E4 4. 8 A 0. 842 kVA
BUS-E16 Bus-E18 4. 97 kVA
BUS-E17 83. 73% PF 1 A
0. 48 kV 6. 1 A
0. 48 kV 0. 48 kV 6. 02 kVA 79. 56% PF
0. 48 kV 6. 02 kVA 85% PF
7. 4 A
7. 4 A
84. 87% PF
84. 87% PF

2130-BL001-A
2130-BL001-B 2130-UP-501
2. 3 kW
0. 4 kW 5 kVA
2130-WR-001 2130-CV002B-01A
2130-WR-002 2130-CV002A-01A
35 kVA 3. 7 kW
35 kVA 3. 7 kW

49
One-Line Diagram - OLV1=>2110-MC-501 (Load Flow Analysis)

2110MC501-P01~P15

Bus-F01
0. 48 kV
1560 kVA
1853 A
89. 86% PF

CB-F01
2000 A

BUS-2110MC501-A
0. 48 kV

71. 7 kVA 20. 5 kVA 28. 6 kVA 56. 1 kVA 6. 53 kVA 8. 91 kVA 8. 91 kVA 17. 8 kVA 32. 7 kVA 1309 kVA
85. 2 A 24. 4 A 34 A 66. 7 A MCP-B1 7. 8 A MCP-B2 10. 6 A 10. 6 A 21. 2 A 38. 8 A 1555 A
84. 43% PF 84. 66% PF 84. 6% PF 84. 59% PF 30 A 85. 42% PF 86. 31% PF MCP-B3 86. 31% PF 86. 33% PF MCP-B4 89. 49% PF 90. 61% PF
CB-1A CB-3A CB-4A 30 A CB-5A SW1
CB-2A 125 A 30 A 100 A
175 A 70 A 30 A
50 A

AFD1 SW1 SWICTH IS


BS-5A/1 SHOWN ONLY AS A
MEANS OF BUSBAR
8. 92 kVA 8. 92 kVA CONTINUATION IN
0. 48 kV
10. 6 A 10. 6 A CREATING THIS
86. 33% PF 86. 33% PF SINGLE LINE. IT
DOES NOT EXIST
IN 2110MC-501.

BUS-1A/1 BUS-3A/1 BUS-4A/1


BUS-2A/1
0. 48 kV 0. 48 kV 0. 48 kV
71. 5 kVA 0. 48 kV 28. 5 kVA 56 kVA
85. 2 A 20. 5 kVA 34 A 66. 7 A
84. 4% PF 24. 4 A 84. 47% PF 84. 55% PF
84. 57% PF

2110-LX-501 2110-DX-502
2110-DX-501
100 kVA 45 kVA
30 kVA 2110-DX-503
0. 48/0. 38 kV 0. 48/0. 38 kV
0. 48/0. 24 kV 100 kVA
0. 48/0. 415 kV

BUS-4A/2
BUS-1A/2 BUS-3A/2
BUS-2A/2 0. 415 kV
0. 38 kV
0. 24 kV 0. 38 kV 27. 9 kVA 54. 9 kVA
20 kVA 77. 1 A
69. 7 kVA 48. 8 A 43 A
85. 02% PF 85. 03% PF
107. 6 A 85. 17% PF
85. 01% PF

BUS-B1/1
BUS-B2/1 BUS-5A/2
BUS-B3/1 BUS-5A/3 BUS-B4/1
0. 48 kV
6. 46 kVA
7. 8 A 0. 48 kV 8. 77 kVA 0. 48 kV 8. 77 kVA 0. 48 kV 8. 77 kVA
0. 48 kV 0. 48 kV 32 kVA
85. 06% PF 10. 6 A 10. 6 A 10. 6 A 8. 77 kVA
85. 86% PF 10. 6 A 38. 8 A
85. 86% PF 85. 86% PF 89. 18% PF
85. 86% PF

BUS-1A/3 2110-CR001-B
BUS-2A/3 BUS-3A/3 BUS-4A/3 2110-CR01-02A
0. 38 kV 4 kW 2110-CR01-02B 2110-CR01-03A
0. 24 kV 0. 38 kV 0. 415 kV 5. 6 kW 5. 6 kW 5. 6 kW 2110-CR01-03B 2110-CR01-01A
69. 5 kVA 27. 8 kVA 54. 7 kVA 22. 5 kW
107. 6 A 19. 8 kVA 77. 1 A 5. 6 kW
48. 8 A 43 A
85% PF 85% PF 85% PF
85% PF

2110-DP-501
2110-LP-501 20 kVA 2110-DP-502 2110-DP-505
70 kVA 28 kVA 55 kVA

50
One-Line Diagram - OLV1=>2110-MC-501 (Load Flow Analysis)

BUS-2110MC501
BUS-2110MC501-B
CONTINUATION FROM SHEET 1.
0. 48 kV

32. 7 kVA 15. 2 kVA 2. 74 kVA 3. 81 kVA 78. 1 kVA 22. 1 kVA 1156 kVA
38. 8 A 18. 1 A 3. 3 A 4. 5 A 92. 8 A 26. 2 A 1373 A
MCP-B6 89. 49% PF 100% PF 83. 06% PF 84. 15% PF 91. 49% PF 88. 61% PF 90. 42% PF
CB-6A CB-7A CB-8A
100 A MCP-B7 MCP-B8 MCP-B11
50 A 60 A 60 A 30 A MCP-B9
30 A 50 A
150 A

SW2

BUS-6A/1
BUS-B6/1 BUS-F7A/1 BUS-8A/1 BUS-B8/1
0. 48 kV 4. 99 kVA 4. 99 kVA 4. 99 kVA BUS-B7/1 BUS-B9/1 BUS-B11/1
0. 48 kV 32 kVA 6 A 6 A 6 A 0. 48 kV 0. 48 kV 0. 48 kV 21. 6 kVA
0. 48 kV 2. 71 kVA 0. 48 kV 3. 76 kVA
38. 8 A 100% PF 100% PF 100% PF 0. 48 kV 76. 6 kVA 26. 2 A
89. 18% PF 3. 3 A 4. 5 A 92. 8 A 88. 21% PF
82. 71% PF 83. 63% PF 91. 36% PF

2110-CR00101-HE1 2110-CR00101-HE2 2110-CR00101-HE3 2110-HU001-A


2110-CR01-01B
22. 5 kW 5 kVA 5 kVA 5 kVA 2110-CR001-01C 2110-WR-001 2110-CR01-05A 2110-DC-001 15 kW
1. 5 kW 2110-WR-002 56 kW
35 kVA 2. 2 kW
35 kVA

BUS-2110MC501-C
0. 48 kV

146. 7 kVA 62. 6 kVA 383. 3 kVA 12. 2 kVA 32. 6 kVA 59. 1 kVA 460. 1 kVA
174. 2 A 74. 4 A 455. 2 A 14. 5 A 38. 7 A 70. 2 A 546. 6 A
91. 24% PF 91% PF 91. 71% PF 85. 55% PF CB-14A 89. 5% PF 90. 87% PF 89. 04% PF
CB-10A CB-11A CB-12A CB-16A
30 A 60 A 100 A
CB-9A 100 A 600 A
225 A

SW3

BUS-F9A/1 BUS-14A/1 BUS-16A/1


BUS-10A/1 BUS-12A/1
0. 48 kV 135. 6 kVA 7. 91 kVA 0. 499 kVA 0. 499 kVA BUS-11A/1
0. 48 kV 0. 48 kV 12 kVA 0. 48 kV 32 kVA 0. 48 kV
163. 7 A 9. 5 A 0. 603 A 0. 603 A 61. 3 kVA 0. 48 kV 57. 8 kVA
376. 1 kVA 14. 5 A 38. 7 A 70. 2 A
91. 6% PF 85. 59% PF 100% PF 100% PF 74. 4 A 455. 2 A 89. 18% PF
90. 82% PF 85% PF 90. 67% PF
91. 93% PF

2110-DS-001 2110-MA001-RC
2110-ZM-250 2110-CP-001 2110-CH-251 42 kW
2110-CN014-A 2110-CN014-B 22. 5 kW
5 kW 2110-CN014-HE1 2110-CN014-HE2 44. 7 kW 257 kW 12 kVA
115 kW
0. 5 kVA 0. 5 kVA

51
One-Line Diagram - OLV1=>2110-MC-501 (Load Flow Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 2.
BUS-2110MC501-D
0. 48 kV

13. 2 kVA 102. 4 kVA 22. 1 kVA 22. 1 kVA 300. 5 kVA
15. 6 A 121. 6 A 26. 3 A 26. 3 A 357 A
83. 95% PF 91. 29% PF MCP-B12 88. 66% PF MCP-B13 88. 66% PF 88. 48% PF
CB-17A
CB-18A 50 A 50 A
20 A
225 A

SW4

BUS-17A/1 0. 48 kV
3. 26 kVA 3. 26 kVA 3. 26 kVA 3. 26 kVA
3. 9 A 3. 9 A 3. 9 A 3. 9 A
83. 68% PF 83. 68% PF 83. 68% PF 83. 68% PF

BUS-B12/1 BUS-B13/1
BUS-18A/1
0. 48 kV 21. 6 kVA 0. 48 kV 21. 6 kVA
0. 48 kV 99. 4 kVA 1. 28 kVA 26. 3 A 26. 3 A
120. 1 A 1. 5 A 88. 21% PF
91. 42% PF 81. 21% PF 88. 21% PF

2110-RB001-B 2110-CV001HU-01C 2110-CV001HU-01D


2110-RB001-A
BUS-17A/2 BUS-17A/3 15 kW 15 kW
BUS-17A/4 75 kW 0. 8 kW
0. 48 kV 3. 25 kVA 0. 48 kV 3. 25 kVA BUS-17A/5
0. 48 kV 3. 25 kVA
3. 9 A 3. 9 A 3. 9 A 0. 48 kV 3. 25 kVA
83. 63% PF 83. 63% PF 83. 63% PF 3. 9 A
83. 63% PF

2110-MA001-A 2110-MA001-B
2. 2 kW 2110-MA001-01C
2. 2 kW 2110-MA001-01D
2. 2 kW
2. 2 kW

BUS-2110MC501-E
0. 48 kV

52. 8 kVA 40. 9 kVA 18. 4 kVA 12. 1 kVA 42. 9 kVA 32. 6 kVA 1. 76 kVA 52. 9 kVA 46. 7 kVA
62. 7 A 48. 5 A 21. 8 A 14. 4 A 50. 9 A 38. 7 A 2. 1 A 62. 9 A 55. 5 A
CB-19A 90. 64% PF CB-20A 85. 64% PF 85. 67% PF 85. 23% PF CB-23A 90. 2% PF 89. 36% PF 85. 08% PF 90. 64% PF 85. 2% PF
CB-21A CB-22A MCP-B16 CB-24A
100 A CB-25A
100 A 30 A 30 A 100 A 100 A 15 A 100 A

SW5

BUS-19A/1 BUS-20A/1 BUS-21A/1 BUS-22A/1 BUS-23A/1 BUS-B16/1 BUS-24A/1


BUS-25A/1
0. 48 kV 51. 8 kVA 0. 48 kV 39. 8 kVA 0. 48 kV 17. 9 kVA 0. 48 kV 12 kVA 0. 48 kV 41. 7 kVA 0. 48 kV 32 kVA 0. 48 kV 1. 76 kVA
62. 7 A 21. 8 A 14. 4 A 50. 9 A 38. 7 A 2. 1 A 0. 48 kV 51. 4 kVA
48. 5 A 62. 9 A
90. 39% PF 85% PF 85% PF 85% PF 89. 87% PF 89. 18% PF 85% PF
90. 37% PF

2110-CV001-02 2110-CV001-07
37. 3 kW 2110-CH-016 2130-CV002-07 2130-CV002-02
40 kVA 2130-CH-003 2130-DC-002 2130-ZM-253
18 kVA 30 kW 37 kW
12 kVA 22. 5 kW 1. 75 kVA
52
One-Line Diagram - OLV1=>2110-MC-501 (Load Flow Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 3.
BUS-2110MC501-F
0. 48 kV

3. 91 kVA 0. 842 kVA 8. 04 kVA 5. 03 kVA CB-30A 1. 76 kVA CB-31A 1. 76 kVA 25. 4 kVA
4. 6 A 1 A MCP-B20 9. 5 A 6 A 2. 1 A 2. 1 A 30. 2 A
CB-28A MCP-B18 CB-29A CB-31A2
CB-26A CB-27A 83. 77% PF 79. 58% PF MCP-B21 86. 06% PF 85. 08% PF 15 A 85. 17% PF 15 A 85. 17% PF 85. 34% PF
60 A 60 A 15 A 15 A 30 A 20 A 60 A
400 A

AFD-02
BUS-28A/1

0. 48 kV

BUS-26A/1 BUS-27A/1 BUS-B20/1 BUS-29A/1


BUS-28A/2 BUS-B18/1 BUS-24A/3
BUS-24A/2
BUS-B20/3 BUS-24A/5
0. 48 kV 0. 48 kV 3. 91 kVA 0. 48 kV 7. 91 kVA 0. 48 kV 5. 02 kVA
0. 48 kV 0. 48 kV 0. 842 kVA 6 A 1. 75 kVA 0. 48 kV 1. 75 kVA
4. 6 A 1 A 0. 48 kV 9. 5 A 0. 48 kV 25 kVA
85. 59% PF 85% PF 2. 1 A 2. 1 A 0. 48 kV
83. 73% PF 79. 56% PF 85% PF 85% PF 30. 2 A
85% PF

2110-BL001-A 2110-BL001-B 2831-ZM-024-04 2110-UP-501 2130-SC251-02


2130-SC251-01
2110-WR-003 2110-WR-004 2. 3 kW 0. 4 kW 2831-ZM-024-03 5 kW 1. 75 kVA 2130-CV002-08
5 kVA 1. 75 kVA
35 kVA 35 kVA 149 kW 25 kVA

53
Project: SPENCE GROWTH OPTION PROJECT

Page: 1

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 108 109

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 12 0 0 86 0 10 108

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 43 31 75

System Frequency: 50.00

Unit System: English

Project Filename: 3057-ETAP-1001_2 MAX SC

54
Project: SPENCE GROWTH OPTION PROJECT

Page: 2

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual

55
Project: SPENCE GROWTH OPTION PROJECT

Page: 3

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

2130-B03 Load 4.160 4.160 1 100.00 0.00


2130-B04 Load 4.160 4.160 1 100.00 0.00
2130-VL-001 SWNG 23.000 23.000 1 100.00 0.00
BS-5A/1 Load 0.480 0.505 1 100.00 0.00
BUS-1A/1 Load 0.480 0.505 1 100.00 0.00
BUS-1A/2 Load 0.380 0.400 1 100.00 0.00
BUS-1A/3 Load 0.380 0.400 1 100.00 0.00
BUS-2A/1 Load 0.480 0.505 1 100.00 0.00
BUS-2A/2 Load 0.240 0.253 1 100.00 0.00
BUS-2A/3 Load 0.240 0.253 1 100.00 0.00
BUS-3A/1 Load 0.480 0.505 1 100.00 0.00
BUS-3A/2 Load 0.380 0.400 1 100.00 0.00
BUS-3A/3 Load 0.380 0.400 1 100.00 0.00
BUS-4A/1 Load 0.480 0.505 1 100.00 0.00
BUS-4A/2 Load 0.415 0.437 1 100.00 0.00
BUS-4A/3 Load 0.415 0.437 1 100.00 0.00
BUS-5A/2 Load 0.480 0.505 1 100.00 0.00
BUS-5A/3 Load 0.480 0.505 1 100.00 0.00
BUS-6A/1 Load 0.480 0.505 1 100.00 0.00
BUS-8A/1 Load 0.480 0.505 1 100.00 0.00
BUS-10A/1 Load 0.480 0.505 1 100.00 0.00
BUS-11A/1 Load 0.480 0.505 1 100.00 0.00
BUS-12A/1 Load 0.480 0.505 1 100.00 0.00
BUS-14A/1 Load 0.480 0.505 1 100.00 0.00
BUS-16A/1 Load 0.480 0.505 1 100.00 0.00
BUS-17A/1 Load 0.480 0.505 1 100.00 0.00
BUS-17A/2 Load 0.480 0.505 1 100.00 0.00
BUS-17A/3 Load 0.480 0.505 1 100.00 0.00
BUS-17A/4 Load 0.480 0.505 1 100.00 0.00
BUS-17A/5 Load 0.480 0.505 1 100.00 0.00
BUS-18A/1 Load 0.480 0.505 1 100.00 0.00
BUS-19A/1 Load 0.480 0.505 1 100.00 0.00
BUS-20A/1 Load 0.480 0.505 1 100.00 0.00
BUS-21A/1 Load 0.480 0.505 1 100.00 0.00
BUS-22A/1 Load 0.480 0.505 1 100.00 0.00
BUS-23A/1 Load 0.480 0.505 1 100.00 0.00
BUS-24A/1 Load 0.480 0.505 1 100.00 0.00
BUS-24A/2 Load 0.480 0.505 1 100.00 0.00
BUS-24A/3 Load 0.480 0.505 1 100.00 0.00
BUS-24A/5 Load 0.480 0.505 1 100.00 0.00
BUS-25A/1 Load 0.480 0.505 1 100.00 0.00

56
Project: SPENCE GROWTH OPTION PROJECT

Page: 4

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BUS-26A/1 Load 0.480 0.505 1 100.00 0.00


BUS-27A/1 Load 0.480 0.505 1 100.00 0.00
BUS-28A/2 Load 0.480 0.505 1 100.00 0.00
BUS-29A/1 Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-A Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-B Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-C Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-D Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-E Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-F Load 0.480 0.505 1 100.00 0.00
BUS-2130MC501-A Load 0.480 0.492 1 100.00 0.00
BUS-2130MC501-B Load 0.480 0.492 1 100.00 0.00
BUS-A1 Load 23.000 23.000 1 100.00 0.00
BUS-A01 Load 23.000 23.000 1 100.00 0.00
BUS-A03 Load 0.480 0.492 1 100.00 0.00
BUS-A05 Load 4.160 4.160 1 100.00 0.00
BUS-A06 Load 23.000 23.000 1 100.00 0.00
BUS-B01 Load 4.160 4.160 1 100.00 0.00
BUS-B1/1 Load 0.480 0.505 1 100.00 0.00
BUS-B02 Load 4.160 4.160 1 100.00 0.00
BUS-B2/1 Load 0.480 0.505 1 100.00 0.00
BUS-B3/1 Load 0.480 0.505 1 100.00 0.00
BUS-B4/1 Load 0.480 0.505 1 100.00 0.00
BUS-B6/1 Load 0.480 0.505 1 100.00 0.00
BUS-B7/1 Load 0.480 0.505 1 100.00 0.00
BUS-B8/1 Load 0.480 0.505 1 100.00 0.00
BUS-B9/1 Load 0.480 0.505 1 100.00 0.00
BUS-B11/1 Load 0.480 0.505 1 100.00 0.00
BUS-B12/1 Load 0.480 0.505 1 100.00 0.00
BUS-B13/1 Load 0.480 0.505 1 100.00 0.00
BUS-B16/1 Load 0.480 0.505 1 100.00 0.00
BUS-B18/1 Load 0.480 0.505 1 100.00 0.00
BUS-B20/1 Load 0.480 0.505 1 100.00 0.00
BUS-B20/3 Load 0.480 0.505 1 100.00 0.00
BUS-C01 Load 23.000 23.000 1 100.00 0.00
BUS-C03 Load 0.480 0.505 1 100.00 0.00
BUS-C04 Load 4.160 4.379 1 100.00 0.00
BUS-C05 Load 23.000 23.000 1 100.00 0.00
BUS-D01 Load 4.160 4.379 1 100.00 0.00
BUS-D03 Load 4.160 4.379 1 100.00 0.00
BUS-D04 Load 4.160 4.379 1 100.00 0.00
BUS-D05 Load 4.160 4.379 1 100.00 0.00
Bus-E01 Load 0.480 0.492 1 100.00 0.00

57
Project: SPENCE GROWTH OPTION PROJECT

Page: 5

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BUS-E2 Load 0.480 0.492 1 100.00 0.00


BUS-E03 Load 0.480 0.492 1 100.00 0.00
Bus-E3 Load 0.480 0.492 1 100.00 0.00
BUS-E04 Load 0.380 0.390 1 100.00 0.00
Bus-E4 Load 0.480 0.492 1 100.00 0.00
BUS-E05 Load 0.380 0.390 1 100.00 0.00
Bus-E5 Load 0.480 0.492 1 100.00 0.00
BUS-E06 Load 0.480 0.492 1 100.00 0.00
BUS-E07 Load 0.240 0.246 1 100.00 0.00
BUS-E08 Load 0.240 0.246 1 100.00 0.00
BUS-E09 Load 0.480 0.492 1 100.00 0.00
BUS-E10 Load 0.380 0.390 1 100.00 0.00
BUS-E11 Load 0.380 0.390 1 100.00 0.00
BUS-E12 Load 0.480 0.492 1 100.00 0.00
BUS-E14 Load 0.480 0.492 1 100.00 0.00
BUS-E15 Load 0.480 0.492 1 100.00 0.00
BUS-E16 Load 0.480 0.492 1 100.00 0.00
BUS-E17 Load 0.480 0.492 1 100.00 0.00
Bus-E18 Load 0.480 0.492 1 100.00 0.00
Bus-F01 Load 0.480 0.505 1 100.00 0.00
BUS-F7A/1 Load 0.480 0.505 1 100.00 0.00
BUS-F9A/1 Load 0.480 0.505 1 100.00 0.00
BUS-F22 Load 0.415 0.426 1 100.00 0.00
BUS-F30 Load 0.415 0.426 1 100.00 0.00
BUS-F31 Load 0.480 0.492 1 100.00 0.00

109 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.

58
Project: SPENCE GROWTH OPTION PROJECT

Page: 6

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Line/Cable Input Data

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110BL001A-P01 0.6MCUN3 10 82.0 0 1 75 1.03940 0.02828 0.0000000

2110BL001B-P01 0.6MCUN3 10 114.8 0 1 75 1.03940 0.02828 0.0000000

2110CH016-P01 0.6MCUN3 8 426.5 0 1 75 0.81100 0.04808 0.0000000

2110CH251-P01 0.6MCUN3 8 531.5 0 1 75 0.81100 0.04808 0.0000000

2110CN014-P01 0.6MCUN3 350 551.2 0 1 75 0.03780 0.03108 0.0000000

2110CP001-P1 0.6MCUN3 350 492.1 0 2 75 0.03780 0.03108 0.0000000

2110CR001A-E01 5.0MCUS3 3/0 557.7 0 1 75 0.08140 0.03858 0.0000000

2110CR001B-P01 0.6MCUN3 10 479.0 0 1 75 1.03940 0.02828 0.0000000

2110CR0101A-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110CR0101B-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110CR0101C-P01 0.6MCUN3 12 479.0 0 1 75 2.05000 0.04398 0.0000000

2110CR00101HE-P01 0.6MCUN3 6 465.9 0 1 75 0.51000 0.04375 0.0000000

2110CR0102A-P01 0.6MCUN3 10 459.3 0 1 75 1.03940 0.02828 0.0000000

2110CR0102B-P01 0.6MCUN3 10 459.3 0 1 75 1.03940 0.02828 0.0000000

2110CR0103A-P01 0.6MCUN3 10 479.0 0 1 75 1.03940 0.02828 0.0000000

2110CR0103B-P01 0.6MCUN3 10 479.0 0 1 75 1.03940 0.02828 0.0000000

2110CR0105A-P01 0.6MCUN3 12 544.6 0 1 75 2.05000 0.04398 0.0000000

2110CV001B-E01 5.0MCUS3 4 498.7 0 1 75 0.32100 0.04733 0.0000000

2110CV001HU01A-E01 5.0MCUS3 4 498.7 0 1 75 0.32100 0.04733 0.0000000

2110CV001HU01C-P01 0.6MCUN3 6 505.2 0 1 75 0.51000 0.04375 0.0000000

2110CV001HU01D-P01 0.6MCUN3 6 508.5 0 1 75 0.51000 0.04375 0.0000000

2110CV00102-P01 0.6MCUN3 4 262.5 0 1 75 0.32100 0.04025 0.0000000

2110CV00107-P01 0.6MCUN3 4 524.9 0 1 75 0.32100 0.04025 0.0000000

2110DC001A-P01 0.6MCUN3 1/0 459.3 0 1 75 0.12800 0.03450 0.0000000

2110DP501-P01 0.6MCUN3 4 65.6 0 1 75 0.32100 0.04025 0.0000000

2110DP502-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2110DP505-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2110DS001-P01 0.6MCUN3 6 269.0 0 1 75 0.51000 0.04375 0.0000000

2110DX501-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2110DX502-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2110DX503-P01 0.6MCUN3 1/0 82.0 0 1 75 0.12800 0.03450 0.0000000

2110HU001A-P01 0.6MCUN3 6 459.3 0 1 75 0.51000 0.04375 0.0000000

2110LP501-P01 0.6MCUN3 4/0 82.0 0 1 75 0.06400 0.03175 0.0000000

2110LX501-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2110MA001RC-P01 0.6MCUN3 1 538.1 0 1 75 0.16000 0.03633 0.0000000

2110MA001TFC-P01 0.6MCUN3 4 607.0 0 1 75 0.32100 0.04025 0.0000000

2110MA00101A-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

59
Project: SPENCE GROWTH OPTION PROJECT

Page: 7

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110MA00101B-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

2110MA00101C-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

2110MA00101D-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

2110MC501-P01~P15 0.6MCUN1 750 82.0 0 5 75 0.02100 0.04000 0.0000000

2110RB001-P01 0.6MCUN3 4/0 557.7 0 1 75 0.06400 0.03175 0.0000000

2110SG001-E01~E03 5.0MCUS1 350 82.0 0 1 75 0.03860 0.04683 0.0000000

2110UP501-P01 0.6MCUN3 10 131.2 0 1 75 1.03940 0.02828 0.0000000

2110US001A-E01 25MCUS3 1 328.1 0 1 75 0.15451 0.05000 0.0000000

2110US001B-E01 25MCUS3 1 45.9 0 1 75 0.15451 0.05000 0.0000000

2110WR001-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110WR002-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110WR003-P01 0.6MCUN3 4 531.5 0 1 75 0.32100 0.04025 0.0000000

2110WR004-P01 0.6MCUN3 4 521.7 0 1 75 0.32100 0.04025 0.0000000

2110ZM250-P01 0.6MCUN3 1 492.1 0 1 75 0.16000 0.03633 0.0000000

2130BL001A-P01 0.6MCUN3 12 262.5 0 1 75 2.05000 0.04398 0.0000000

2130BL001B-P01 0.6MCUN3 12 262.5 0 1 75 2.05000 0.04398 0.0000000

2130CH003-P01 0.6MCUN3 4 643.0 0 1 75 0.32100 0.04025 0.0000000

2130CH004-P01 0.6MCUN3 2 885.8 0 1 75 0.20200 0.03733 0.0000000

2130CH005-P01 0.6MCUN3 4 1181.1 0 1 75 0.32100 0.04025 0.0000000

2130CV002A-E01 5.0MCUS3 500 216.5 0 1 75 0.03000 0.03283 0.0000000

2130CV002A01A-P01 0.6MCUN3 12 360.9 0 1 75 2.05000 0.04398 0.0000000

2130CV002B-E01 5.0MCUS3 500 154.2 0 1 75 0.03000 0.03283 0.0000000

2130CV002B01A-P01 0.6MCUN3 12 311.7 0 1 75 2.05000 0.04398 0.0000000

2130CV00202-P01 0.6MCUN3 1 803.8 0 1 75 0.16000 0.03633 0.0000000

2130CV00207-P01 0.6MCUN3 2 771.0 0 1 75 0.20200 0.03733 0.0000000

2130CV00208-P01 0.6MCUN3 2 820.2 0 1 75 0.20200 0.03733 0.0000000

2130DC002A-P01 0.6MCUN3 1 744.8 0 1 75 0.16000 0.03633 0.0000000

2130DP501-P01 0.6MCUN3 4 82.0 0 1 75 0.32100 0.04025 0.0000000

2130DP502-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2130DP505-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2130DX501-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2130DX502-P01 0.6MCUN3 2 82.0 0 1 75 0.20200 0.03733 0.0000000

2130DX503-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2130LP501-P01 0.6MCUN3 4/0 32.8 0 1 75 0.06400 0.03175 0.0000000

2130LX501-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2130MC501-P01~P06 0.6MCUN1 750 108.3 0 2 75 0.02100 0.04000 0.0000000

2130SC25101-P01 0.6MCUN3 10 820.2 0 1 75 1.03940 0.02828 0.0000000

2130SC25102-P01 0.6MCUN3 10 820.2 0 1 75 1.03940 0.02828 0.0000000

2130SG001-E01~E06 5.0MCUS1 500 85.3 0 2 75 0.03000 0.04383 0.0000000

60
Project: SPENCE GROWTH OPTION PROJECT

Page: 8

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2130ST05501-P01 0.6MCUN3 4 1230.3 0 1 75 0.32100 0.04025 0.0000000

2130UP501-P01 0.6MCUN3 12 229.7 0 1 75 2.05000 0.04398 0.0000000

2130US001A-E01 25MCUS3 2/0 367.5 0 1 75 0.09729 0.04583 0.0000000

2130US001B-E01 25MCUS3 2/0 45.9 0 1 75 0.09729 0.04583 0.0000000

2130WR001-P01 0.6MCUN3 4 213.3 0 1 75 0.32100 0.04025 0.0000000

2130WR002-P01 0.6MCUN3 1/0 1148.3 0 1 75 0.12800 0.03450 0.0000000

2130ZM253-P01 0.6MCUN3 10 393.7 0 1 75 1.03940 0.02828 0.0000000

2831ZM02404-P01 0.6MCUN3 10 524.9 0 1 75 1.03940 0.02828 0.0000000

2831ZM02404-P2 0.6MCUN3 500 262.5 0 1 75 0.02940 0.02908 0.0000000

2110US001-E02 465 9186.4 0 1 75 0.05083 0.11740 0.0000009

Line / Cable resistances are listed at the specified temperatures.

61
Project: SPENCE GROWTH OPTION PROJECT

Page: 9

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

2110-DX-501 0.030 0.480 0.240 4.00 1.50 0 0 0 0 0 4.0000

2110-DX-502 0.045 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2110-DX-503 0.100 0.480 0.415 4.00 1.50 0 0 0 0 0 4.0000

2110-LX-501 0.100 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2110-XF-001 2.250 23.000 4.160 5.40 6.00 0 0 0 -5.000 0 5.4000

2110-XF-501 1.750 23.000 0.480 5.50 6.00 0 0 0 -5.000 0 5.5000

2130-DX-501 0.030 0.480 0.240 4.00 1.50 0 0 0 0 0 4.0000

2130-DX-502 0.045 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2130-DX-503 0.100 0.480 0.415 4.00 1.50 0 0 0 0 0 4.0000

2130-LX-501 0.075 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2130-XF-001 5.000 23.000 4.160 5.50 8.50 0 0 0 0 0 5.5000

2130-XF-501 0.500 23.000 0.480 5.40 1.50 0 0 0 -2.500 0 5.4000

62
Project: SPENCE GROWTH OPTION PROJECT

Page: 10

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2110-DX-501 2W XFMR BUS-2A/1 BUS-2A/2 6674.89 10012.34 12033.33

2110-DX-502 2W XFMR BUS-3A/1 BUS-3A/2 4449.93 6674.89 8022.22

2110-DX-503 2W XFMR BUS-4A/1 BUS-4A/2 2002.47 3003.70 3610.00

2110-LX-501 2W XFMR BUS-1A/1 BUS-1A/2 2002.47 3003.70 3610.00

2110-XF-001 2W XFMR BUS-C01 BUS-C04 35.61 213.65 216.60

2110-XF-501 2W XFMR BUS-A1 BUS-C03 46.63 279.78 283.64

2130-DX-501 2W XFMR BUS-E06 BUS-E07 7030.83 10546.24 12675.00

2130-DX-502 2W XFMR BUS-E09 BUS-E10 4687.22 7030.83 8450.00

2130-DX-503 2W XFMR BUS-F31 BUS-F30 2109.25 3163.87 3802.50

2130-LX-501 2W XFMR BUS-E03 BUS-E04 2812.33 4218.50 5070.00

2130-XF-001 2W XFMR BUS-A01 BUS-A05 12.85 109.25 110.00

2130-XF-501 2W XFMR BUS-A06 BUS-A03 569.50 854.25 1026.68

2110BL001A-P01 Cable BUS-2110MC501-F BUS-28A/2 3339.43 90.84 3340.67

2110BL001B-P01 Cable BUS-2110MC501-F BUS-B18/1 4675.20 127.18 4676.93

2110CH016-P01 Cable BUS-2110MC501-E BUS-21A/1 13549.21 803.32 13573.00

2110CH251-P01 Cable BUS-2110MC501-C BUS-12A/1 16884.40 1001.06 16914.05

2110CN014-P01 Cable BUS-2110MC501-C BUS-F9A/1 816.11 671.10 1056.61

2110CP001-P1 Cable BUS-2110MC501-C BUS-11A/1 364.34 299.60 471.70

2110CR001A-E01 Cable BUS-D01 BUS-D03 23.68 11.22 26.20

2110CR001B-P01 Cable BUS-2110MC501-A BUS-B1/1 19502.28 530.52 19509.49

2110CR0101A-P01 Cable BUS-2110MC501-A BUS-B4/1 5775.41 724.18 5820.64

2110CR0101B-P01 Cable BUS-2110MC501-B BUS-B6/1 5775.41 724.18 5820.64

2110CR0101C-P01 Cable BUS-2110MC501-B BUS-B7/1 38464.18 825.26 38473.04

2110CR00101HE-P01 Cable BUS-2110MC501-B BUS-6A/1 9306.97 798.39 9341.15

2110CR0102A-P01 Cable BUS-2110MC501-A BUS-B2/1 18700.81 508.72 18707.73

2110CR0102B-P01 Cable BUS-2110MC501-A BUS-B3/1 18700.81 508.72 18707.73

2110CR0103A-P01 Cable BS-5A/1 BUS-5A/2 19502.28 530.52 19509.49

2110CR0103B-P01 Cable BS-5A/1 BUS-5A/3 19502.28 530.52 19509.49

2110CR0105A-P01 Cable BUS-2110MC501-B BUS-B8/1 43733.25 938.31 43743.31

2110CV001B-E01 Cable BUS-D01 BUS-D05 83.48 12.31 84.38

2110CV001HU01A-E01 Cable BUS-D01 BUS-D04 83.48 12.31 84.38

2110CV001HU01C-P01 Cable BUS-2110MC501-D BUS-B12/1 10093.47 865.86 10130.54

2110CV001HU01D-P01 Cable BUS-2110MC501-D BUS-B13/1 10159.02 871.48 10196.33

2110CV00102-P01 Cable BUS-2110MC501-E BUS-19A/1 3300.24 413.81 3326.08

2110CV00107-P01 Cable BUS-2110MC501-E BUS-20A/1 6600.47 827.63 6652.16

2110DC001A-P01 Cable BUS-2110MC501-B BUS-B9/1 2302.97 620.72 2385.15

63
Project: SPENCE GROWTH OPTION PROJECT

Page: 11

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2110DP501-P01 Cable BUS-2A/2 BUS-2A/3 3300.24 413.81 3326.08

2110DP502-P01 Cable BUS-3A/2 BUS-3A/3 522.88 173.87 551.03

2110DP505-P01 Cable BUS-4A/2 BUS-4A/3 438.41 145.78 462.01

2110DS001-P01 Cable BUS-2110MC501-C BUS-14A/1 5374.45 461.04 5394.19

2110DX501-P01 Cable BUS-2110MC501-A BUS-2A/1 1638.55 140.56 1644.57

2110DX502-P01 Cable BUS-2110MC501-A BUS-3A/1 1638.55 140.56 1644.57

2110DX503-P01 Cable BUS-2110MC501-A BUS-4A/1 411.24 110.84 425.92

2110HU001A-P01 Cable BUS-2110MC501-B BUS-B11/1 9175.89 787.15 9209.59

2110LP501-P01 Cable BUS-1A/2 BUS-1A/3 328.08 162.76 366.24

2110LX501-P01 Cable BUS-2110MC501-A BUS-1A/1 327.71 108.97 345.35

2110MA001RC-P01 Cable BUS-2110MC501-C BUS-16A/1 3372.20 765.77 3458.06

2110MA001TFC-P01 Cable BUS-2110MC501-D BUS-17A/1 7631.79 956.95 7691.55

2110MA00101A-P01 Cable BUS-17A/1 BUS-17A/2 5269.07 113.05 5270.28

2110MA00101B-P01 Cable BUS-17A/1 BUS-17A/3 5269.07 113.05 5270.28

2110MA00101C-P01 Cable BUS-17A/1 BUS-17A/4 5269.07 113.05 5270.28

2110MA00101D-P01 Cable BUS-17A/1 BUS-17A/5 5269.07 113.05 5270.28

2110MC501-P01~P15 Cable BUS-C03 Bus-F01 13.49 25.70 29.03

2110RB001-P01 Cable BUS-2110MC501-D BUS-18A/1 1398.23 693.65 1560.83

2110SG001-E01~E03 Cable BUS-D01 BUS-C04 1.65 2.00 2.60

2110UP501-P01 Cable BUS-2110MC501-F BUS-29A/1 5343.09 145.35 5345.07

2110US001A-E01 Cable BUS-C05 BUS-C01 0.96 0.31 1.01

2110US001B-E01 Cable BUS-C01 BUS-A1 0.13 0.04 0.14

2110WR001-P01 Cable BUS-2110MC501-B BUS-F7A/1 5775.41 724.18 5820.64

2110WR002-P01 Cable BUS-2110MC501-B BUS-8A/1 5775.41 724.18 5820.64

2110WR003-P01 Cable BUS-2110MC501-F BUS-26A/1 6682.98 837.97 6735.31

2110WR004-P01 Cable BUS-2110MC501-F BUS-27A/1 6559.22 822.46 6610.58

2110ZM250-P01 Cable BUS-2110MC501-C BUS-10A/1 3084.33 700.40 3162.86

2130BL001A-P01 Cable BUS-2130MC501-B Bus-E3 22200.14 476.31 22205.25

2130BL001B-P01 Cable BUS-2130MC501-B Bus-E5 22200.14 476.31 22205.25

2130CH003-P01 Cable BUS-2110MC501-E BUS-22A/1 8085.58 1013.85 8148.89

2130CH004-P01 Cable BUS-2130MC501-A BUS-E15 7382.90 1364.50 7507.93

2130CH005-P01 Cable BUS-2130MC501-A BUS-E2 15642.98 1961.46 15765.47

2130CV002A-E01 Cable BUS-B01 2130-B03 3.75 4.11 5.56

2130CV002A01A-P01 Cable BUS-2130MC501-B Bus-E18 30525.19 654.93 30532.22

2130CV002B-E01 Cable BUS-B01 2130-B04 2.67 2.93 3.96

2130CV002B01A-P01 Cable BUS-2130MC501-B Bus-E4 26362.66 565.62 26368.73

2130CV00202-P01 Cable BUS-2110MC501-E BUS-25A/1 5037.74 1143.99 5166.00

2130CV00207-P01 Cable BUS-2110MC501-E BUS-23A/1 6100.55 1127.49 6203.87

2130CV00208-P01 Cable BUS-2110MC501-F BUS-24A/5 6489.95 1199.46 6599.86

64
Project: SPENCE GROWTH OPTION PROJECT

Page: 12

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2130DC002A-P01 Cable BUS-2110MC501-E BUS-B16/1 4667.62 1059.94 4786.46

2130DP501-P01 Cable BUS-E07 BUS-E08 4345.27 544.85 4379.30

2130DP502-P01 Cable BUS-E10 BUS-E11 2753.83 236.24 2763.95

2130DP505-P01 Cable BUS-F30 BUS-F22 461.78 153.55 486.64

2130DX501-P01 Cable BUS-2130MC501-A BUS-E06 1725.93 148.06 1732.26

2130DX502-P01 Cable BUS-2130MC501-A BUS-E09 683.60 126.34 695.18

2130DX503-P01 Cable BUS-2130MC501-A BUS-F31 345.19 114.78 363.77

2130LP501-P01 Cable BUS-E04 BUS-E05 138.23 68.58 154.31

2130LX501-P01 Cable BUS-2130MC501-A BUS-E03 345.19 114.78 363.77

2130MC501-P01~P06 Cable BUS-A03 Bus-E01 46.90 89.34 100.91

2130SC25101-P01 Cable BUS-2110MC501-F BUS-24A/2 33394.31 908.43 33406.66

2130SC25102-P01 Cable BUS-2110MC501-F BUS-24A/3 33394.31 908.43 33406.66

2130SG001-E01~E06 Cable BUS-B02 BUS-A05 0.74 1.08 1.31

2130ST05501-P01 Cable BUS-2130MC501-A BUS-E14 16294.77 2043.19 16422.37

2130UP501-P01 Cable BUS-2130MC501-B BUS-E12 19425.12 416.77 19429.59

2130US001A-E01 Cable 2130-VL-001 BUS-A01 0.68 0.32 0.75

2130US001B-E01 Cable BUS-A01 BUS-A06 0.08 0.04 0.09

2130WR001-P01 Cable BUS-2130MC501-B BUS-E16 2824.43 354.15 2846.54

2130WR002-P01 Cable BUS-2130MC501-B BUS-E17 6064.43 1634.55 6280.85

2130ZM253-P01 Cable BUS-2110MC501-E BUS-24A/1 16029.27 436.05 16035.20

2831ZM02404-P01 Cable BUS-2110MC501-F BUS-B20/1 21372.36 581.40 21380.27

2831ZM02404-P2 Cable BUS-2110MC501-F BUS-B20/3 302.26 299.01 425.17

2110US001-E02 Line 2130-VL-001 BUS-C05 8.83 20.39 22.21

CB-5A Tie Breaker BUS-2110MC501-A BS-5A/1

CB-B01 Tie Breaker BUS-B01 BUS-B02

CB-E01 Tie Breaker Bus-E01 BUS-2130MC501-A

CB-F01 Tie Breaker Bus-F01 BUS-2110MC501-A

SW1 Tie Switch BUS-2110MC501-A BUS-2110MC501-B

SW2 Tie Switch BUS-2110MC501-B BUS-2110MC501-C

SW3 Tie Switch BUS-2110MC501-C BUS-2110MC501-D

SW4 Tie Switch BUS-2110MC501-D BUS-2110MC501-E

SW5 Tie Switch BUS-2110MC501-E BUS-2110MC501-F

SW6 Tie Switch BUS-2130MC501-A BUS-2130MC501-B

65
Project: SPENCE GROWTH OPTION PROJECT

Page: 13

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV X/R R X

U1 2130-VL-001 829.330 23.000 5.07 2.33334 11.83001

Total Connected Power Grids (= 1 ): 829.330 MVA

66
Project: SPENCE GROWTH OPTION PROJECT

Page: 14

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Induction Machine Input Data

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
2130-CV002-A 1 2130-B03 1865.00 2137.99 4.000 1500 32.60 32.60 0.47 15.38 23.08
2130-CV002-B 1 2130-B04 1865.00 2137.99 4.000 1500 32.60 32.60 0.47 15.38 23.08
2110-CR001-A 1 BUS-D03 750.00 1163.94 4.000 500 24.25 24.25 0.70 16.95 25.42
2110-CV001HU-01A 1 BUS-D04 368.00 428.77 4.000 1500 17.30 17.30 1.07 18.46 46.15
2110-CV001HU-01B 1 BUS-D05 368.00 428.77 4.000 1500 17.30 17.30 1.07 18.46 46.15
2110-CR01-03A 1 BUS-5A/2 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-CR01-03B 1 BUS-5A/3 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-ZM-250 1 BUS-10A/1 44.70 61.29 0.460 1500 6.03 6.03 3.32 20.00 50.00
2110-CP-001 1 BUS-11A/1 257.00 376.06 0.460 1500 14.46 14.46 1.38 20.00 50.00
2110-DS-001 1 BUS-14A/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-MA001-RC 1 BUS-16A/1 42.00 57.84 0.460 1500 5.84 5.84 3.42 20.00 50.00
2110-MA001-A 1 BUS-17A/2 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-MA001-B 1 BUS-17A/3 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-MA001-01C 1 BUS-17A/4 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-MA001-01D 1 BUS-17A/5 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-RB001-A 1 BUS-18A/1 75.00 99.38 0.460 1500 7.81 7.81 2.56 20.00 50.00
2110-RB001-B 1 BUS-18A/1 0.80 1.28 0.460 1500 0.81 0.81 34.50 27.83 9999.00
2110-CV001-02 1 BUS-19A/1 37.30 51.81 0.460 1500 5.51 5.51 3.63 20.00 50.00
2130-CV002-07 1 BUS-23A/1 30.00 41.67 0.460 1500 4.94 4.94 5.63 27.83 9999.00
2130-CV002-02 1 BUS-25A/1 37.00 51.39 0.460 1500 5.49 5.49 5.07 27.83 9999.00
2110-BL001-A 1 BUS-28A/2 2.30 3.91 0.460 1500 1.37 1.37 20.35 27.83 9999.00
2110-CR001-B 1 BUS-B1/1 4.00 6.46 0.460 1500 1.80 1.80 15.43 27.83 9999.00
2110-CR01-02A 1 BUS-B2/1 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-CR01-02B 1 BUS-B3/1 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-CR01-01A 1 BUS-B4/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-CR01-01B 1 BUS-B6/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-CR001-01C 1 BUS-B7/1 1.50 2.71 0.460 1500 1.10 1.10 25.20 27.83 9999.00
2110-CR01-05A 1 BUS-B8/1 2.20 3.76 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-DC-001 1 BUS-B9/1 56.00 76.57 0.460 1500 6.75 6.75 2.96 20.00 50.00
2110-HU001-A 1 BUS-B11/1 15.00 21.64 0.460 1500 3.49 3.49 7.97 27.83 9999.00
2110-CV001HU-01C 1 BUS-B12/1 15.00 21.64 0.460 1500 3.49 3.49 7.97 27.83 9999.00
2110-CV001HU-01D 1 BUS-B13/1 15.00 21.64 0.460 1500 3.49 3.49 7.97 27.83 9999.00
2130-DC-002 1 BUS-B16/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-BL001-B 1 BUS-B18/1 0.40 0.84 0.460 1500 0.57 0.57 48.80 27.83 9999.00
2831-ZM-024-04 1 BUS-B20/1 5.00 7.91 0.460 1500 2.02 2.02 13.80 27.83 9999.00
2831-ZM-024-03 1 BUS-B20/3 149.00 198.66 0.460 1500 8.70 8.70 2.30 20.00 50.00
2130-BL001-A 1 Bus-E3 2.30 3.91 0.460 1500 1.37 1.37 20.35 27.83 9999.00
2130-CV002B-01A 1 Bus-E4 3.70 6.02 0.460 1500 1.73 1.73 16.04 27.83 9999.00
2130-BL001-B 1 Bus-E5 0.40 0.84 0.460 1500 0.57 0.57 48.80 27.83 9999.00

67
Project: SPENCE GROWTH OPTION PROJECT

Page: 15

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
2130-ST055-01 1 BUS-E14 9.00 13.46 0.460 1500 2.71 2.71 10.29 27.83 9999.00
2130-CV002A-01A 1 Bus-E18 3.70 6.02 0.460 1500 1.73 1.73 16.04 27.83 9999.00
2110-CN014-A 1 BUS-F9A/1 115.00 135.56 0.460 1500 9.67 9.67 2.07 20.00 50.00
2110-CN014-B 1 BUS-F9A/1 5.00 7.91 0.460 1500 2.02 2.02 13.80 27.83 9999.00

Total Connected Induction Motors ( = 43 ): 7753.9 kVA

68
Project: SPENCE GROWTH OPTION PROJECT

Page: 16

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Lumped Load Input Data

Lumped Load Motor Loads Static Loads


% Impedance
Lumped Load Connected Bus Rating % Load Loading X/R Ratio (Machine Base) Loading
ID ID kVA kV MTR STAT kW kvar X"/R X'/R R X" X' kW kvar

2110-CH-016 BUS-21A/1 18.0 0.480 80 20 12.2 7.6 2.38 2.38 8.403 20.00 50.00 3.06 1.90

2110-CH-251 BUS-12A/1 12.0 0.480 80 20 8.2 5.1 2.38 2.38 8.403 20.00 50.00 2.04 1.26

2110-CN014-HE1 BUS-F9A/1 0.5 0.480 80 20 0.4 0.0 2.38 2.38 8.403 20.00 50.00 0.10 0.00

2110-CN014-HE2 BUS-F9A/1 0.5 0.480 80 20 0.4 0.0 2.38 2.38 8.403 20.00 50.00 0.10 0.00

2110-CR00101-HE1 BUS-6A/1 5.0 0.480 80 20 4.0 0.0 2.38 2.38 8.403 20.00 50.00 1.00 0.00

2110-CR00101-HE2 BUS-6A/1 5.0 0.480 80 20 4.0 0.0 2.38 2.38 8.403 20.00 50.00 1.00 0.00

2110-CR00101-HE3 BUS-6A/1 5.0 0.480 80 20 4.0 0.0 2.38 2.38 8.403 20.00 50.00 1.00 0.00

2110-CV001-07 BUS-20A/1 40.0 0.480 80 20 27.2 16.9 2.38 2.38 8.403 20.00 50.00 6.80 4.21

2110-DP-501 BUS-2A/3 20.0 0.240 80 20 13.6 8.4 2.38 2.38 8.403 20.00 50.00 3.40 2.11

2110-DP-502 BUS-3A/3 28.0 0.380 80 20 19.0 11.8 2.38 2.38 8.403 20.00 50.00 4.76 2.95

2110-DP-505 BUS-4A/3 55.0 0.415 80 20 37.4 23.2 2.38 2.38 8.403 20.00 50.00 9.35 5.79

2110-LP-501 BUS-1A/3 70.0 0.380 80 20 47.6 29.5 2.38 2.38 8.403 20.00 50.00 11.90 7.37

2110-UP-501 BUS-29A/1 5.0 0.480 80 20 3.4 2.1 2.38 2.38 8.403 20.00 50.00 0.85 0.53

2110-WR-001 BUS-F7A/1 35.0 0.480 80 20 23.8 14.7 2.38 2.38 8.403 20.00 50.00 5.95 3.69

2110-WR-002 BUS-8A/1 35.0 0.480 80 20 23.8 14.7 2.38 2.38 8.403 20.00 50.00 5.95 3.69

2110-WR-003 BUS-26A/1 35.0 0.480 80 20 23.8 14.7 2.38 2.38 8.403 20.00 50.00 5.95 3.69

2110-WR-004 BUS-27A/1 35.0 0.480 80 20 23.8 14.7 2.38 2.38 8.403 20.00 50.00 5.95 3.69

2130-CH-003 BUS-22A/1 12.0 0.480 80 20 8.2 5.1 2.38 2.38 8.403 20.00 50.00 2.04 1.26

2130-CH-004 BUS-E15 24.0 0.480 80 20 16.3 10.1 2.38 2.38 8.403 20.00 50.00 4.08 2.53

2130-CH-005 BUS-E2 12.0 0.480 80 20 8.2 5.1 2.38 2.38 8.403 20.00 50.00 2.04 1.26

2130-CV002-08 BUS-24A/5 25.0 0.480 80 20 17.0 10.5 2.38 2.38 8.403 20.00 50.00 4.25 2.63

2130-DP-501 BUS-E08 24.0 0.240 80 20 16.3 10.1 2.38 2.38 8.403 20.00 50.00 4.08 2.53

2130-DP-502 BUS-E11 36.0 0.380 80 20 24.5 15.2 2.38 2.38 8.403 20.00 50.00 6.12 3.79

2130-DP-505 BUS-F22 80.0 0.415 80 20 54.4 33.7 2.38 2.38 8.403 20.00 50.00 13.60 8.43

2130-LP-501 BUS-E05 65.0 0.380 80 20 44.2 27.4 2.38 2.38 8.403 20.00 50.00 11.05 6.85

2130-SC251-01 BUS-24A/2 1.8 0.480 80 20 1.2 0.7 2.38 2.38 8.403 20.00 50.00 0.30 0.18

2130-SC251-02 BUS-24A/3 1.8 0.480 80 20 1.2 0.7 2.38 2.38 8.403 20.00 50.00 0.30 0.18

2130-UP-501 BUS-E12 5.0 0.480 80 20 3.4 2.1 2.38 2.38 8.403 20.00 50.00 0.85 0.53

2130-WR-001 BUS-E16 35.0 0.480 80 20 23.8 14.7 2.38 2.38 8.403 20.00 50.00 5.95 3.69

2130-WR-002 BUS-E17 35.0 0.480 80 20 23.8 14.7 2.38 2.38 8.403 20.00 50.00 5.95 3.69

2130-ZM-253 BUS-24A/1 1.8 0.480 80 20 1.2 0.7 2.38 2.38 8.403 20.00 50.00 0.30 0.18

Total Connected Lumped Loads ( = 31 ): 762.3 kVA

69
Project: SPENCE GROWTH OPTION PROJECT

Page: 17

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

SHORT-CIRCUIT REPORT

3-phase fault at bus: 2130-B03

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

2130-B03 Total 0.00 1.955 -14.703 7.5 14.832 0.00 1.872 -13.367 7.1 13.497

BUS-B01 2130-B03 5.12 1.891 -12.618 6.7 12.759 4.86 1.830 -11.977 6.5 12.116

2130-CV002-A 2130-B03 104.00 0.064 -2.084 32.6 2.085 104.00 0.043 -1.389 32.6 1.390

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

70
Project: SPENCE GROWTH OPTION PROJECT

Page: 18

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: 2130-B04

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

2130-B04 Total 0.00 1.875 -14.870 7.9 14.988 0.00 1.800 -13.520 7.5 13.639

BUS-B01 2130-B04 3.69 1.811 -12.786 7.1 12.913 3.50 1.757 -12.130 6.9 12.257

2130-CV002-B 2130-B04 104.00 0.064 -2.084 32.6 2.085 104.00 0.043 -1.389 32.6 1.390

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

71
Project: SPENCE GROWTH OPTION PROJECT

Page: 19

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: 2130-VL-001

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

2130-VL-001 Total 0.00 4.143 -21.429 5.2 21.826 0.00 4.082 -21.075 5.2 21.466

BUS-A01 2130-VL-001 0.17 0.045 -0.586 13.0 0.588 0.13 0.026 -0.420 16.4 0.421

BUS-C05 2130-VL-001 3.76 0.069 -0.419 6.0 0.424 2.05 0.028 -0.230 8.3 0.232

U1 2130-VL-001 100.00 4.029 -20.425 5.1 20.818 100.00 4.029 -20.425 5.1 20.818

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

72
Project: SPENCE GROWTH OPTION PROJECT

Page: 20

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BS-5A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BS-5A/1 Total 0.00 9.075 -40.370 4.4 41.377

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

73
Project: SPENCE GROWTH OPTION PROJECT

Page: 21

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BS-5A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

*BUS-2110MC501-A BS-5A/1 0.00 9.040 -40.306 4.5 41.308

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-B BUS-2110MC501-A 0.00 2.105 -8.613 4.1 8.866

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.739 -7.587 4.4 7.784

*BUS-2110MC501-D BUS-2110MC501-C 0.00 1.007 -3.590 3.6 3.729

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.786 -2.774 3.5 2.883

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

74
Project: SPENCE GROWTH OPTION PROJECT

Page: 22

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-1A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-1A/1 Total 0.00 14.898 -14.326 1.0 20.668

BUS-2110MC501-A BUS-1A/1 64.93 14.783 -14.071 1.0 20.409

BUS-1A/2 BUS-1A/1 9.31 0.114 -0.255 2.2 0.280

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

75
Project: SPENCE GROWTH OPTION PROJECT

Page: 23

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-1A/2

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-1A/2 Total 0.00 2.072 -3.067 1.5 3.701

BUS-1A/3 BUS-1A/2 1.04 0.153 -0.358 2.3 0.389

BUS-1A/1 BUS-1A/2 87.40 1.919 -2.709 1.4 3.320

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

76
Project: SPENCE GROWTH OPTION PROJECT

Page: 24

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-1A/3

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-1A/3 Total 0.00 2.027 -2.801 1.4 3.458

BUS-1A/2 BUS-1A/3 8.22 1.875 -2.440 1.3 3.077

2110-LP-501 BUS-1A/3 100.00 0.152 -0.362 2.4 0.392

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

77
Project: SPENCE GROWTH OPTION PROJECT

Page: 25

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2A/1 Total 0.00 6.101 -1.493 0.2 6.281

BUS-2110MC501-A BUS-2A/1 94.41 6.068 -1.420 0.2 6.232

BUS-2A/2 BUS-2A/1 8.85 0.034 -0.072 2.1 0.080

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

78
Project: SPENCE GROWTH OPTION PROJECT

Page: 26

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2A/2

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 95.00 % of base (0.253 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2A/2 Total 0.00 1.090 -1.426 1.3 1.795

BUS-2A/3 BUS-2A/2 2.68 0.072 -0.160 2.2 0.175

BUS-2A/1 BUS-2A/2 90.09 1.019 -1.267 1.2 1.625

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

79
Project: SPENCE GROWTH OPTION PROJECT

Page: 27

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2A/3

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 95.00 % of base (0.253 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2A/3 Total 0.00 1.069 -1.091 1.0 1.527

BUS-2A/2 BUS-2A/3 20.90 1.000 -0.927 0.9 1.364

2110-DP-501 BUS-2A/3 100.00 0.069 -0.164 2.4 0.177

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

80
Project: SPENCE GROWTH OPTION PROJECT

Page: 28

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-3A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-3A/1 Total 0.00 6.113 -1.525 0.2 6.301

BUS-2110MC501-A BUS-3A/1 94.41 6.067 -1.421 0.2 6.232

BUS-3A/2 BUS-3A/1 8.39 0.046 -0.104 2.3 0.113

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

81
Project: SPENCE GROWTH OPTION PROJECT

Page: 29

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-3A/2

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-3A/2 Total 0.00 1.021 -1.248 1.2 1.613

BUS-3A/3 BUS-3A/2 0.63 0.061 -0.144 2.3 0.156

BUS-3A/1 BUS-3A/2 85.62 0.960 -1.105 1.2 1.463

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

82
Project: SPENCE GROWTH OPTION PROJECT

Page: 30

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-3A/3

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-3A/3 Total 0.00 1.004 -1.169 1.2 1.541

BUS-3A/2 BUS-3A/3 5.60 0.943 -1.025 1.1 1.392

2110-DP-502 BUS-3A/3 100.00 0.061 -0.145 2.4 0.157

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

83
Project: SPENCE GROWTH OPTION PROJECT

Page: 31

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-4A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-4A/1 Total 0.00 14.412 -11.453 0.8 18.409

BUS-2110MC501-A BUS-4A/1 71.45 14.320 -11.248 0.8 18.210

BUS-4A/2 BUS-4A/1 7.47 0.091 -0.205 2.2 0.224

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

84
Project: SPENCE GROWTH OPTION PROJECT

Page: 32

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-4A/2

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 95.00 % of base (0.437 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-4A/2 Total 0.00 1.886 -2.680 1.4 3.277

BUS-4A/3 BUS-4A/2 1.03 0.111 -0.258 2.3 0.280

BUS-4A/1 BUS-4A/2 86.35 1.775 -2.422 1.4 3.003

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

85
Project: SPENCE GROWTH OPTION PROJECT

Page: 33

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-4A/3

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 95.00 % of base (0.437 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-4A/3 Total 0.00 1.862 -2.379 1.3 3.022

BUS-4A/2 BUS-4A/3 10.12 1.753 -2.119 1.2 2.750

2110-DP-505 BUS-4A/3 100.00 0.109 -0.260 2.4 0.282

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

86
Project: SPENCE GROWTH OPTION PROJECT

Page: 34

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-5A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-5A/2 Total 0.00 0.570 -0.056 0.1 0.573

BS-5A/1 BUS-5A/2 99.66 0.554 -0.022 0.0 0.555

2110-CR01-03A BUS-5A/2 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

87
Project: SPENCE GROWTH OPTION PROJECT

Page: 35

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-5A/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-5A/3 Total 0.00 0.570 -0.056 0.1 0.573

BS-5A/1 BUS-5A/3 99.66 0.554 -0.022 0.0 0.555

2110-CR01-03B BUS-5A/3 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

88
Project: SPENCE GROWTH OPTION PROJECT

Page: 36

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-6A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-6A/1 Total 0.00 1.170 -0.190 0.2 1.186

BUS-2110MC501-B BUS-6A/1 99.12 1.145 -0.129 0.1 1.152

2110-CR00101-HE1 BUS-6A/1 100.00 0.009 -0.020 2.4 0.022

2110-CR00101-HE2 BUS-6A/1 100.00 0.009 -0.020 2.4 0.022

2110-CR00101-HE3 BUS-6A/1 100.00 0.009 -0.020 2.4 0.022

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

89
Project: SPENCE GROWTH OPTION PROJECT

Page: 37

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-8A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-8A/1 Total 0.00 1.870 -0.448 0.2 1.923

BUS-2110MC501-B BUS-8A/1 98.41 1.810 -0.304 0.2 1.835

2110-WR-002 BUS-8A/1 100.00 0.060 -0.143 2.4 0.155

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

90
Project: SPENCE GROWTH OPTION PROJECT

Page: 38

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-10A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-10A/1 Total 0.00 3.225 -1.355 0.4 3.498

BUS-2110MC501-C BUS-10A/1 96.27 3.160 -0.964 0.3 3.304

2110-ZM-250 BUS-10A/1 104.35 0.065 -0.391 6.0 0.396

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

91
Project: SPENCE GROWTH OPTION PROJECT

Page: 39

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-11A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-11A/1 Total 0.00 9.301 -14.659 1.6 17.361

BUS-2110MC501-C BUS-11A/1 66.25 9.132 -12.208 1.3 15.246

2110-CP-001 BUS-11A/1 104.35 0.170 -2.451 14.5 2.457

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

92
Project: SPENCE GROWTH OPTION PROJECT

Page: 40

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-12A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-12A/1 Total 0.00 0.658 -0.096 0.1 0.665

BUS-2110MC501-C BUS-12A/1 99.56 0.637 -0.047 0.1 0.639

2110-CH-251 BUS-12A/1 100.00 0.021 -0.049 2.4 0.053

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

93
Project: SPENCE GROWTH OPTION PROJECT

Page: 41

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-14A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-14A/1 Total 0.00 1.997 -0.402 0.2 2.038

BUS-2110MC501-C BUS-14A/1 98.45 1.964 -0.260 0.1 1.981

2110-DS-001 BUS-14A/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

94
Project: SPENCE GROWTH OPTION PROJECT

Page: 42

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-16A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-16A/1 Total 0.00 2.969 -1.235 0.4 3.216

BUS-2110MC501-C BUS-16A/1 96.60 2.906 -0.867 0.3 3.032

2110-MA001-RC BUS-16A/1 104.35 0.063 -0.368 5.8 0.373

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

95
Project: SPENCE GROWTH OPTION PROJECT

Page: 43

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/1 Total 0.00 1.407 -0.256 0.2 1.430

BUS-2110MC501-D BUS-17A/1 98.81 1.377 -0.217 0.2 1.395

BUS-17A/2 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

BUS-17A/3 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

BUS-17A/4 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

BUS-17A/5 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

96
Project: SPENCE GROWTH OPTION PROJECT

Page: 44

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/2 Total 0.00 0.845 -0.104 0.1 0.852

BUS-17A/1 BUS-17A/2 40.94 0.838 -0.094 0.1 0.843

2110-MA001-A BUS-17A/2 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

97
Project: SPENCE GROWTH OPTION PROJECT

Page: 45

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/3 Total 0.00 0.845 -0.104 0.1 0.852

BUS-17A/1 BUS-17A/3 40.94 0.838 -0.094 0.1 0.843

2110-MA001-B BUS-17A/3 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

98
Project: SPENCE GROWTH OPTION PROJECT

Page: 46

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/4

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/4 Total 0.00 0.845 -0.104 0.1 0.852

BUS-17A/1 BUS-17A/4 40.94 0.838 -0.094 0.1 0.843

2110-MA001-01C BUS-17A/4 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

99
Project: SPENCE GROWTH OPTION PROJECT

Page: 47

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/5

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/5 Total 0.00 0.845 -0.104 0.1 0.852

BUS-17A/1 BUS-17A/5 40.94 0.838 -0.094 0.1 0.843

2110-MA001-01D BUS-17A/5 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 00
Project: SPENCE GROWTH OPTION PROJECT

Page: 48

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-18A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-18A/1 Total 0.00 5.302 -4.057 0.8 6.676

BUS-2110MC501-D BUS-18A/1 89.65 5.217 -3.415 0.7 6.235

2110-RB001-A BUS-18A/1 104.35 0.082 -0.640 7.8 0.646

2110-RB001-B BUS-18A/1 104.35 0.003 -0.002 0.8 0.004

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 01
Project: SPENCE GROWTH OPTION PROJECT

Page: 49

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-19A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-19A/1 Total 0.00 3.168 -0.950 0.3 3.307

BUS-2110MC501-E BUS-19A/1 97.12 3.108 -0.622 0.2 3.170

2110-CV001-02 BUS-19A/1 104.35 0.060 -0.328 5.5 0.334

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 02
Project: SPENCE GROWTH OPTION PROJECT

Page: 50

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-20A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-20A/1 Total 0.00 1.657 -0.422 0.3 1.710

BUS-2110MC501-E BUS-20A/1 98.61 1.588 -0.259 0.2 1.609

2110-CV001-07 BUS-20A/1 100.00 0.069 -0.164 2.4 0.177

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 03
Project: SPENCE GROWTH OPTION PROJECT

Page: 51

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-21A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-21A/1 Total 0.00 0.824 -0.135 0.2 0.835

BUS-2110MC501-E BUS-21A/1 99.45 0.793 -0.062 0.1 0.795

2110-CH-016 BUS-21A/1 100.00 0.031 -0.074 2.4 0.080

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 04
Project: SPENCE GROWTH OPTION PROJECT

Page: 52

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-22A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-22A/1 Total 0.00 1.322 -0.252 0.2 1.346

BUS-2110MC501-E BUS-22A/1 98.88 1.301 -0.203 0.2 1.317

2130-CH-003 BUS-22A/1 100.00 0.021 -0.049 2.4 0.053

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 05
Project: SPENCE GROWTH OPTION PROJECT

Page: 53

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-23A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-23A/1 Total 0.00 1.716 -0.566 0.3 1.807

BUS-2110MC501-E BUS-23A/1 98.29 1.678 -0.377 0.2 1.720

2130-CV002-07 BUS-23A/1 104.35 0.038 -0.188 4.9 0.192

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 06
Project: SPENCE GROWTH OPTION PROJECT

Page: 54

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/1 Total 0.00 0.677 -0.036 0.1 0.678

BUS-2110MC501-E BUS-24A/1 99.59 0.674 -0.029 0.0 0.674

2130-ZM-253 BUS-24A/1 100.00 0.003 -0.007 2.4 0.008

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 07
Project: SPENCE GROWTH OPTION PROJECT

Page: 55

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/2 Total 0.00 0.327 -0.018 0.1 0.328

BUS-2110MC501-F BUS-24A/2 99.80 0.324 -0.011 0.0 0.324

2130-SC251-01 BUS-24A/2 100.00 0.003 -0.007 2.4 0.008

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 08
Project: SPENCE GROWTH OPTION PROJECT

Page: 56

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/3 Total 0.00 0.327 -0.018 0.1 0.328

BUS-2110MC501-F BUS-24A/3 99.80 0.324 -0.011 0.0 0.324

2130-SC251-02 BUS-24A/3 100.00 0.003 -0.007 2.4 0.008

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 09
Project: SPENCE GROWTH OPTION PROJECT

Page: 57

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/5

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/5 Total 0.00 1.623 -0.454 0.3 1.685

BUS-2110MC501-F BUS-24A/5 98.40 1.580 -0.351 0.2 1.618

2130-CV002-08 BUS-24A/5 100.00 0.043 -0.102 2.4 0.111

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

110
Project: SPENCE GROWTH OPTION PROJECT

Page: 58

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-25A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-25A/1 Total 0.00 2.023 -0.779 0.4 2.168

BUS-2110MC501-E BUS-25A/1 97.75 1.981 -0.545 0.3 2.054

2130-CV002-02 BUS-25A/1 104.35 0.043 -0.234 5.5 0.238

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

111
Project: SPENCE GROWTH OPTION PROJECT

Page: 59

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-26A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-26A/1 Total 0.00 1.629 -0.398 0.2 1.677

BUS-2110MC501-F BUS-26A/1 98.63 1.569 -0.255 0.2 1.590

2110-WR-003 BUS-26A/1 100.00 0.060 -0.143 2.4 0.155

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

112
Project: SPENCE GROWTH OPTION PROJECT

Page: 60

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-27A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-27A/1 Total 0.00 1.658 -0.404 0.2 1.707

BUS-2110MC501-F BUS-27A/1 98.60 1.598 -0.261 0.2 1.619

2110-WR-004 BUS-27A/1 100.00 0.060 -0.143 2.4 0.155

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

113
Project: SPENCE GROWTH OPTION PROJECT

Page: 61

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-28A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-28A/2 Total 0.00 3.171 -0.335 0.1 3.189

BUS-2110MC501-F BUS-28A/2 97.83 3.163 -0.323 0.1 3.179

2110-BL001-A BUS-28A/2 104.35 0.009 -0.012 1.4 0.015

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

114
Project: SPENCE GROWTH OPTION PROJECT

Page: 62

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-29A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-29A/1 Total 0.00 2.008 -0.169 0.1 2.015

BUS-2110MC501-F BUS-29A/1 98.70 1.999 -0.149 0.1 2.004

2110-UP-501 BUS-29A/1 100.00 0.009 -0.020 2.4 0.022

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

115
Project: SPENCE GROWTH OPTION PROJECT

Page: 63

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-A

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-A Total 0.00 9.075 -40.370 4.4 41.377

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

116
Project: SPENCE GROWTH OPTION PROJECT

Page: 64

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-A

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-B BUS-2110MC501-A 0.00 2.105 -8.613 4.1 8.866

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.739 -7.587 4.4 7.784

*BUS-2110MC501-D BUS-2110MC501-C 0.00 1.007 -3.590 3.6 3.729

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.786 -2.774 3.5 2.883

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

117
Project: SPENCE GROWTH OPTION PROJECT

Page: 65

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-B

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-B Total 0.00 9.075 -40.370 4.4 41.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

118
Project: SPENCE GROWTH OPTION PROJECT

Page: 66

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-B

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.970 -31.757 4.6 32.513

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.739 -7.587 4.4 7.784

*BUS-2110MC501-D BUS-2110MC501-C 0.00 1.007 -3.590 3.6 3.729

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.786 -2.774 3.5 2.883

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

119
Project: SPENCE GROWTH OPTION PROJECT

Page: 67

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-C

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-C Total 0.00 9.075 -40.370 4.4 41.377

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

1 20
Project: SPENCE GROWTH OPTION PROJECT

Page: 68

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-C

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.970 -31.757 4.6 32.513

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.335 -32.783 4.5 33.594

*BUS-2110MC501-D BUS-2110MC501-C 0.00 1.007 -3.590 3.6 3.729

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.786 -2.774 3.5 2.883

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 21
Project: SPENCE GROWTH OPTION PROJECT

Page: 69

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-D

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-D Total 0.00 9.075 -40.370 4.4 41.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

1 22
Project: SPENCE GROWTH OPTION PROJECT

Page: 70

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-D

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.970 -31.757 4.6 32.513

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.335 -32.783 4.5 33.594

*BUS-2110MC501-C BUS-2110MC501-D 0.00 8.068 -36.780 4.6 37.654

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.786 -2.774 3.5 2.883

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 23
Project: SPENCE GROWTH OPTION PROJECT

Page: 71

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-E

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-E Total 0.00 9.075 -40.370 4.4 41.377

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

1 24
Project: SPENCE GROWTH OPTION PROJECT

Page: 72

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-E

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.970 -31.757 4.6 32.513

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.335 -32.783 4.5 33.594

*BUS-2110MC501-C BUS-2110MC501-D 0.00 8.068 -36.780 4.6 37.654

*BUS-2110MC501-D BUS-2110MC501-E 0.00 8.289 -37.596 4.5 38.499

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 25
Project: SPENCE GROWTH OPTION PROJECT

Page: 73

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-F

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-F Total 0.00 9.075 -40.370 4.4 41.377

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

1 26
Project: SPENCE GROWTH OPTION PROJECT

Page: 74

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-F

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.556 -30.842 4.7 31.531

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.970 -31.757 4.6 32.513

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.335 -32.783 4.5 33.594

*BUS-2110MC501-C BUS-2110MC501-D 0.00 8.068 -36.780 4.6 37.654

*BUS-2110MC501-D BUS-2110MC501-E 0.00 8.289 -37.596 4.5 38.499

*BUS-2110MC501-E BUS-2110MC501-F 0.00 8.672 -38.707 4.5 39.666

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 27
Project: SPENCE GROWTH OPTION PROJECT

Page: 75

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2130MC501-A

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2130MC501-A Total 0.00 6.070 -9.684 1.6 11.429

BUS-E15 BUS-2130MC501-A 6.72 0.045 -0.092 2.0 0.102

BUS-E2 BUS-2130MC501-A 7.07 0.023 -0.046 2.0 0.051

BUS-E06 BUS-2130MC501-A 1.41 0.041 -0.083 2.0 0.093

BUS-E09 BUS-2130MC501-A 0.85 0.061 -0.126 2.0 0.140

BUS-F31 BUS-2130MC501-A 1.00 0.132 -0.284 2.2 0.313

BUS-E03 BUS-2130MC501-A 0.81 0.105 -0.231 2.2 0.254

BUS-E14 BUS-2130MC501-A 8.19 0.024 -0.052 2.2 0.057

Bus-E3 BUS-2130MC501-B 2.83 0.009 -0.012 1.3 0.015

Bus-E5 BUS-2130MC501-B 0.38 0.002 -0.001 0.6 0.002

Bus-E18 BUS-2130MC501-B 6.33 0.013 -0.020 1.5 0.024

Bus-E4 BUS-2130MC501-B 5.49 0.013 -0.020 1.6 0.024

BUS-E12 BUS-2130MC501-B 3.71 0.009 -0.020 2.2 0.022

BUS-E16 BUS-2130MC501-B 3.79 0.064 -0.138 2.2 0.152

BUS-E17 BUS-2130MC501-B 8.09 0.066 -0.132 2.0 0.147

BUS-A03 Bus-E01 8.86 5.464 -8.428 1.5 10.044

*Bus-E01 BUS-2130MC501-A 0.00 5.464 -8.428 1.5 10.044

*BUS-2130MC501-B BUS-2130MC501-A 0.00 0.175 -0.342 2.0 0.384

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 28
Project: SPENCE GROWTH OPTION PROJECT

Page: 76

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2130MC501-B

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2130MC501-B Total 0.00 6.070 -9.684 1.6 11.429

Bus-E3 BUS-2130MC501-B 2.83 0.009 -0.012 1.3 0.015

Bus-E5 BUS-2130MC501-B 0.38 0.002 -0.001 0.6 0.002

Bus-E18 BUS-2130MC501-B 6.33 0.013 -0.020 1.5 0.024

Bus-E4 BUS-2130MC501-B 5.49 0.013 -0.020 1.6 0.024

BUS-E12 BUS-2130MC501-B 3.71 0.009 -0.020 2.2 0.022

BUS-E16 BUS-2130MC501-B 3.79 0.064 -0.138 2.2 0.152

BUS-E17 BUS-2130MC501-B 8.09 0.066 -0.132 2.0 0.147

BUS-E15 BUS-2130MC501-A 6.72 0.045 -0.092 2.0 0.102

BUS-E2 BUS-2130MC501-A 7.07 0.023 -0.046 2.0 0.051

BUS-E06 BUS-2130MC501-A 1.41 0.041 -0.083 2.0 0.093

BUS-E09 BUS-2130MC501-A 0.85 0.061 -0.126 2.0 0.140

BUS-F31 BUS-2130MC501-A 1.00 0.132 -0.284 2.2 0.313

BUS-E03 BUS-2130MC501-A 0.81 0.105 -0.231 2.2 0.254

BUS-E14 BUS-2130MC501-A 8.19 0.024 -0.052 2.2 0.057

BUS-A03 Bus-E01 8.86 5.464 -8.428 1.5 10.044

*Bus-E01 BUS-2130MC501-A 0.00 5.464 -8.428 1.5 10.044

*BUS-2130MC501-A BUS-2130MC501-B 0.00 5.895 -9.341 1.6 11.046

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 29
Project: SPENCE GROWTH OPTION PROJECT

Page: 77

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A1

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A1 Total 0.00 2.636 -7.250 2.7 7.714 0.00 2.587 -7.032 2.7 7.493

BUS-C01 BUS-A1 0.42 2.593 -7.077 2.7 7.537 0.42 2.572 -6.961 2.7 7.421

BUS-C03 BUS-A1 21.14 0.043 -0.172 4.0 0.178 8.61 0.014 -0.071 4.9 0.072

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 30
Project: SPENCE GROWTH OPTION PROJECT

Page: 78

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A01

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A01 Total 0.00 4.968 -20.436 4.1 21.031 0.00 4.894 -20.099 4.1 20.686

2130-VL-001 BUS-A01 6.09 4.924 -19.849 4.0 20.451 6.03 4.868 -19.679 4.0 20.272

BUS-A06 BUS-A01 0.00 0.012 -0.024 2.0 0.027 0.00 0.005 -0.010 2.2 0.011

BUS-A05 BUS-A01 24.69 0.032 -0.563 17.5 0.564 17.98 0.020 -0.410 20.0 0.410

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 31
Project: SPENCE GROWTH OPTION PROJECT

Page: 79

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A03

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-A03 Total 0.00 6.673 -10.430 1.6 12.382

Bus-E01 BUS-A03 1.22 0.599 -1.241 2.1 1.378

BUS-A06 BUS-A03 96.44 6.075 -9.189 1.5 11.016

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 32
Project: SPENCE GROWTH OPTION PROJECT

Page: 80

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A05

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A05 Total 0.00 1.624 -15.396 9.5 15.481 0.00 1.566 -14.016 9.0 14.103

BUS-B02 BUS-A05 0.39 0.155 -4.131 26.7 4.134 0.26 0.097 -2.762 28.4 2.764

BUS-A01 BUS-A05 90.04 1.470 -11.265 7.7 11.360 89.95 1.469 -11.254 7.7 11.349

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 33
Project: SPENCE GROWTH OPTION PROJECT

Page: 81

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A06

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A06 Total 0.00 5.067 -20.305 4.0 20.928 0.00 4.989 -19.973 4.0 20.586

BUS-A01 BUS-A06 0.78 5.055 -20.281 4.0 20.902 0.77 4.984 -19.962 4.0 20.575

BUS-A03 BUS-A06 11.30 0.012 -0.024 2.0 0.027 4.72 0.005 -0.010 2.2 0.011

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 34
Project: SPENCE GROWTH OPTION PROJECT

Page: 82

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B01

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-B01 Total 0.00 1.656 -15.296 9.2 15.385 0.00 1.602 -13.909 8.7 14.001

2130-B03 BUS-B01 0.83 0.075 -2.071 27.7 2.072 0.56 0.047 -1.383 29.2 1.384

2130-B04 BUS-B01 0.59 0.072 -2.074 29.0 2.076 0.40 0.046 -1.385 30.1 1.386

BUS-A05 BUS-B02 1.06 1.510 -11.151 7.4 11.252 1.06 1.508 -11.140 7.4 11.242

*BUS-B02 BUS-B01 0.00 1.510 -11.151 7.4 11.252 0.00 1.508 -11.140 7.4 11.242

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 35
Project: SPENCE GROWTH OPTION PROJECT

Page: 83

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B1/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B1/1 Total 0.00 0.567 -0.046 0.1 0.569

BUS-2110MC501-A BUS-B1/1 99.66 0.554 -0.022 0.0 0.555

2110-CR001-B BUS-B1/1 104.35 0.013 -0.023 1.8 0.027

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 36
Project: SPENCE GROWTH OPTION PROJECT

Page: 84

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B02

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-B02 Total 0.00 1.656 -15.296 9.2 15.385 0.00 1.602 -13.909 8.7 14.001

BUS-A05 BUS-B02 1.06 1.510 -11.151 7.4 11.252 1.06 1.508 -11.140 7.4 11.242

2130-B03 BUS-B01 0.83 0.075 -2.071 27.7 2.072 0.56 0.047 -1.383 29.2 1.384

2130-B04 BUS-B01 0.59 0.072 -2.074 29.0 2.076 0.40 0.046 -1.385 30.1 1.386

*BUS-B01 BUS-B02 0.00 0.146 -4.145 28.3 4.148 0.00 0.094 -2.769 29.6 2.770

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 37
Project: SPENCE GROWTH OPTION PROJECT

Page: 85

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B2/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B2/1 Total 0.00 0.594 -0.057 0.1 0.596

BUS-2110MC501-A BUS-B2/1 99.65 0.578 -0.024 0.0 0.578

2110-CR01-02A BUS-B2/1 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 38
Project: SPENCE GROWTH OPTION PROJECT

Page: 86

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B3/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B3/1 Total 0.00 0.594 -0.057 0.1 0.596

BUS-2110MC501-A BUS-B3/1 99.65 0.578 -0.024 0.0 0.578

2110-CR01-02B BUS-B3/1 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 39
Project: SPENCE GROWTH OPTION PROJECT

Page: 87

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B4/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B4/1 Total 0.00 1.843 -0.447 0.2 1.897

BUS-2110MC501-A BUS-B4/1 98.40 1.810 -0.304 0.2 1.835

2110-CR01-01A BUS-B4/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 40
Project: SPENCE GROWTH OPTION PROJECT

Page: 88

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B6/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B6/1 Total 0.00 1.843 -0.447 0.2 1.897

BUS-2110MC501-B BUS-B6/1 98.40 1.810 -0.304 0.2 1.835

2110-CR01-01B BUS-B6/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 41
Project: SPENCE GROWTH OPTION PROJECT

Page: 89

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B7/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B7/1 Total 0.00 0.288 -0.015 0.1 0.288

BUS-2110MC501-B BUS-B7/1 99.83 0.282 -0.008 0.0 0.282

2110-CR001-01C BUS-B7/1 104.35 0.006 -0.007 1.1 0.009

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 42
Project: SPENCE GROWTH OPTION PROJECT

Page: 90

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B8/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 Total 0.00 0.256 -0.018 0.1 0.257

BUS-2110MC501-B BUS-B8/1 99.85 0.248 -0.007 0.0 0.248

2110-CR01-05A BUS-B8/1 104.35 0.008 -0.011 1.3 0.014

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 43
Project: SPENCE GROWTH OPTION PROJECT

Page: 91

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B9/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B9/1 Total 0.00 4.110 -1.995 0.5 4.568

BUS-2110MC501-B BUS-B9/1 94.66 4.037 -1.504 0.4 4.308

2110-DC-001 BUS-B9/1 104.35 0.073 -0.491 6.7 0.496

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 44
Project: SPENCE GROWTH OPTION PROJECT

Page: 92

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B11/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B11/1 Total 0.00 1.188 -0.225 0.2 1.209

BUS-2110MC501-B BUS-B11/1 99.11 1.161 -0.131 0.1 1.168

2110-HU001-A BUS-B11/1 104.35 0.027 -0.094 3.5 0.098

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 45
Project: SPENCE GROWTH OPTION PROJECT

Page: 93

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B12/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B12/1 Total 0.00 1.083 -0.211 0.2 1.104

BUS-2110MC501-D BUS-B12/1 99.19 1.056 -0.117 0.1 1.063

2110-CV001HU-01C BUS-B12/1 104.35 0.027 -0.094 3.5 0.098

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 46
Project: SPENCE GROWTH OPTION PROJECT

Page: 94

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B13/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B13/1 Total 0.00 1.077 -0.210 0.2 1.097

BUS-2110MC501-D BUS-B13/1 99.20 1.050 -0.116 0.1 1.056

2110-CV001HU-01D BUS-B13/1 104.35 0.027 -0.094 3.5 0.098

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 47
Project: SPENCE GROWTH OPTION PROJECT

Page: 95

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B16/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B16/1 Total 0.00 2.165 -0.737 0.3 2.287

BUS-2110MC501-E BUS-B16/1 97.58 2.132 -0.594 0.3 2.213

2130-DC-002 BUS-B16/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 48
Project: SPENCE GROWTH OPTION PROJECT

Page: 96

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B18/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B18/1 Total 0.00 2.280 -0.185 0.1 2.288

BUS-2110MC501-F BUS-B18/1 98.50 2.279 -0.184 0.1 2.286

2110-BL001-B BUS-B18/1 104.35 0.002 -0.001 0.6 0.002

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 49
Project: SPENCE GROWTH OPTION PROJECT

Page: 97

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B20/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B20/1 Total 0.00 0.521 -0.050 0.1 0.523

BUS-2110MC501-F BUS-B20/1 99.69 0.506 -0.020 0.0 0.506

2831-ZM-024-04 BUS-B20/1 104.35 0.015 -0.030 2.0 0.033

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 50
Project: SPENCE GROWTH OPTION PROJECT

Page: 98

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B20/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B20/3 Total 0.00 8.927 -14.924 1.7 17.390

BUS-2110MC501-F BUS-B20/3 63.53 8.779 -13.640 1.6 16.221

2831-ZM-024-03 BUS-B20/3 104.35 0.148 -1.284 8.7 1.292

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 51
Project: SPENCE GROWTH OPTION PROJECT

Page: 99

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C01

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-C01 Total 0.00 2.619 -7.277 2.8 7.734 0.00 2.570 -7.059 2.7 7.512

BUS-C05 BUS-C01 2.93 2.552 -6.841 2.7 7.301 2.92 2.544 -6.823 2.7 7.282

BUS-A1 BUS-C01 0.01 0.043 -0.172 4.0 0.178 0.00 0.014 -0.071 4.9 0.072

BUS-C04 BUS-C01 24.01 0.024 -0.263 10.8 0.264 14.98 0.012 -0.164 13.5 0.165

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 52
Project: SPENCE GROWTH OPTION PROJECT

Page: 100

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C03

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-C03 Total 0.00 8.807 -42.998 4.9 43.891

Bus-F01 BUS-C03 2.57 2.509 -9.276 3.7 9.609

BUS-A1 BUS-C03 85.16 6.298 -33.723 5.4 34.306

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 53
Project: SPENCE GROWTH OPTION PROJECT

Page: 101

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C04

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-C04 Total 0.00 1.070 -6.629 6.2 6.715 0.00 1.006 -5.872 5.8 5.957

BUS-D01 BUS-C04 0.35 0.120 -1.703 14.2 1.707 0.20 0.056 -0.957 17.0 0.958

BUS-C01 BUS-C04 82.42 0.950 -4.927 5.2 5.017 82.24 0.950 -4.915 5.2 5.006

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 54
Project: SPENCE GROWTH OPTION PROJECT

Page: 102

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C05

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-C05 Total 0.00 2.503 -7.460 3.0 7.869 0.00 2.454 -7.241 3.0 7.646

BUS-C01 BUS-C05 0.18 0.068 -0.435 6.4 0.441 0.09 0.027 -0.235 8.8 0.237

2130-VL-001 BUS-C05 65.80 2.435 -7.025 2.9 7.435 65.62 2.427 -7.006 2.9 7.414

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 55
Project: SPENCE GROWTH OPTION PROJECT

Page: 103

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D01

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D01 Total 0.00 1.082 -6.585 6.1 6.674 0.00 1.021 -5.824 5.7 5.913

BUS-D03 BUS-D01 2.13 0.061 -1.018 16.6 1.020 1.43 0.037 -0.681 18.6 0.682

BUS-D05 BUS-D01 2.33 0.028 -0.345 12.4 0.346 0.94 0.009 -0.139 14.9 0.139

BUS-D04 BUS-D01 2.33 0.028 -0.345 12.4 0.346 0.94 0.009 -0.139 14.9 0.139

BUS-C04 BUS-D01 1.03 0.965 -4.877 5.1 4.972 1.03 0.965 -4.866 5.0 4.961

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 56
Project: SPENCE GROWTH OPTION PROJECT

Page: 104

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D03

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D03 Total 0.00 1.454 -6.110 4.2 6.280 0.00 1.345 -5.408 4.0 5.572

BUS-D01 BUS-D03 11.03 1.412 -5.080 3.6 5.273 10.25 1.316 -4.721 3.6 4.902

2110-CR001-A BUS-D03 104.00 0.042 -1.029 24.2 1.030 104.00 0.028 -0.686 24.2 0.687

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 57
Project: SPENCE GROWTH OPTION PROJECT

Page: 105

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D04

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D04 Total 0.00 2.597 -4.938 1.9 5.580 0.00 2.322 -4.441 1.9 5.011

BUS-D01 BUS-D04 35.47 2.577 -4.591 1.8 5.265 32.91 2.313 -4.302 1.9 4.884

2110-CV001HU-01A BUS-D04 104.00 0.020 -0.347 17.3 0.348 104.00 0.008 -0.139 17.3 0.139

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 58
Project: SPENCE GROWTH OPTION PROJECT

Page: 106

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D05

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D05 Total 0.00 2.597 -4.938 1.9 5.580 0.00 2.322 -4.441 1.9 5.011

BUS-D01 BUS-D05 35.47 2.577 -4.591 1.8 5.265 32.91 2.313 -4.302 1.9 4.884

2110-CV001HU-01B BUS-D05 104.00 0.020 -0.347 17.3 0.348 104.00 0.008 -0.139 17.3 0.139

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 59
Project: SPENCE GROWTH OPTION PROJECT

Page: 107

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E01

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E01 Total 0.00 6.070 -9.684 1.6 11.429

BUS-A03 Bus-E01 8.86 5.464 -8.428 1.5 10.044

BUS-E15 BUS-2130MC501-A 6.72 0.045 -0.092 2.0 0.102

BUS-E2 BUS-2130MC501-A 7.07 0.023 -0.046 2.0 0.051

BUS-E06 BUS-2130MC501-A 1.41 0.041 -0.083 2.0 0.093

BUS-E09 BUS-2130MC501-A 0.85 0.061 -0.126 2.0 0.140

BUS-F31 BUS-2130MC501-A 1.00 0.132 -0.284 2.2 0.313

BUS-E03 BUS-2130MC501-A 0.81 0.105 -0.231 2.2 0.254

BUS-E14 BUS-2130MC501-A 8.19 0.024 -0.052 2.2 0.057

Bus-E3 BUS-2130MC501-B 2.83 0.009 -0.012 1.3 0.015

Bus-E5 BUS-2130MC501-B 0.38 0.002 -0.001 0.6 0.002

Bus-E18 BUS-2130MC501-B 6.33 0.013 -0.020 1.5 0.024

Bus-E4 BUS-2130MC501-B 5.49 0.013 -0.020 1.6 0.024

BUS-E12 BUS-2130MC501-B 3.71 0.009 -0.020 2.2 0.022

BUS-E16 BUS-2130MC501-B 3.79 0.064 -0.138 2.2 0.152

BUS-E17 BUS-2130MC501-B 8.09 0.066 -0.132 2.0 0.147

*BUS-2130MC501-A Bus-E01 0.00 0.606 -1.256 2.1 1.395

*BUS-2130MC501-B BUS-2130MC501-A 0.00 0.175 -0.342 2.0 0.384

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 60
Project: SPENCE GROWTH OPTION PROJECT

Page: 108

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E2 Total 0.00 0.707 -0.168 0.2 0.726

BUS-2130MC501-A BUS-E2 96.02 0.686 -0.119 0.2 0.696

2130-CH-005 BUS-E2 100.00 0.021 -0.049 2.4 0.053

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 61
Project: SPENCE GROWTH OPTION PROJECT

Page: 109

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E03

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E03 Total 0.00 5.912 -6.620 1.1 8.876

BUS-2130MC501-A BUS-E03 27.46 5.808 -6.387 1.1 8.633

BUS-E04 BUS-E03 11.33 0.104 -0.233 2.2 0.255

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 62
Project: SPENCE GROWTH OPTION PROJECT

Page: 110

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E3 Total 0.00 0.510 -0.041 0.1 0.512

BUS-2130MC501-B Bus-E3 97.52 0.501 -0.029 0.1 0.502

2130-BL001-A Bus-E3 104.35 0.009 -0.012 1.4 0.015

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 63
Project: SPENCE GROWTH OPTION PROJECT

Page: 111

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E04

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E04 Total 0.00 1.454 -2.177 1.5 2.619

BUS-E05 BUS-E04 0.39 0.142 -0.334 2.4 0.363

BUS-E03 BUS-E04 79.43 1.313 -1.843 1.4 2.263

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 64
Project: SPENCE GROWTH OPTION PROJECT

Page: 112

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E4

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E4 Total 0.00 0.436 -0.044 0.1 0.438

BUS-2130MC501-B Bus-E4 97.91 0.424 -0.022 0.1 0.425

2130-CV002B-01A Bus-E4 104.35 0.012 -0.021 1.7 0.025

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 65
Project: SPENCE GROWTH OPTION PROJECT

Page: 113

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E05

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E05 Total 0.00 1.447 -2.126 1.5 2.571

BUS-E04 BUS-E05 2.37 1.306 -1.790 1.4 2.215

2130-LP-501 BUS-E05 100.00 0.141 -0.336 2.4 0.364

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 66
Project: SPENCE GROWTH OPTION PROJECT

Page: 114

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E5

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E5 Total 0.00 0.503 -0.030 0.1 0.504

BUS-2130MC501-B Bus-E5 97.52 0.501 -0.029 0.1 0.502

2130-BL001-B Bus-E5 104.35 0.002 -0.001 0.6 0.002

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 67
Project: SPENCE GROWTH OPTION PROJECT

Page: 115

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E06

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E06 Total 0.00 4.266 -1.956 0.5 4.693

BUS-2130MC501-A BUS-E06 70.01 4.225 -1.872 0.4 4.621

BUS-E07 BUS-E06 10.37 0.041 -0.084 2.1 0.094

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 68
Project: SPENCE GROWTH OPTION PROJECT

Page: 116

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E07

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 97.50 % of base (0.246 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E07 Total 0.00 1.055 -1.391 1.3 1.746

BUS-E08 BUS-E07 3.99 0.087 -0.189 2.2 0.209

BUS-E06 BUS-E07 85.51 0.967 -1.202 1.2 1.543

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 69
Project: SPENCE GROWTH OPTION PROJECT

Page: 117

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E08

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 97.50 % of base (0.246 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E08 Total 0.00 1.021 -1.029 1.0 1.449

BUS-E07 BUS-E08 24.03 0.939 -0.832 0.9 1.255

2130-DP-501 BUS-E08 100.00 0.082 -0.196 2.4 0.213

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 70
Project: SPENCE GROWTH OPTION PROJECT

Page: 118

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E09

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E09 Total 0.00 5.737 -4.695 0.8 7.413

BUS-2130MC501-A BUS-E09 44.30 5.677 -4.568 0.8 7.286

BUS-E10 BUS-E09 10.40 0.061 -0.127 2.1 0.141

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 71
Project: SPENCE GROWTH OPTION PROJECT

Page: 119

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E10

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E10 Total 0.00 0.944 -1.347 1.4 1.645

BUS-E11 BUS-E10 3.79 0.083 -0.180 2.2 0.198

BUS-E09 BUS-E10 84.86 0.861 -1.167 1.4 1.450

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 72
Project: SPENCE GROWTH OPTION PROJECT

Page: 120

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E11

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E11 Total 0.00 0.952 -1.019 1.1 1.394

BUS-E10 BUS-E11 23.10 0.874 -0.833 1.0 1.207

2130-DP-502 BUS-E11 100.00 0.078 -0.186 2.4 0.202

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 73
Project: SPENCE GROWTH OPTION PROJECT

Page: 121

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E12

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E12 Total 0.00 0.579 -0.057 0.1 0.582

BUS-2130MC501-B BUS-E12 97.16 0.571 -0.036 0.1 0.572

2130-UP-501 BUS-E12 100.00 0.009 -0.020 2.4 0.022

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 74
Project: SPENCE GROWTH OPTION PROJECT

Page: 122

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E14

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E14 Total 0.00 0.680 -0.169 0.2 0.701

BUS-2130MC501-A BUS-E14 96.17 0.660 -0.114 0.2 0.670

2130-ST055-01 BUS-E14 104.35 0.021 -0.056 2.7 0.059

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 75
Project: SPENCE GROWTH OPTION PROJECT

Page: 123

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E15

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E15 Total 0.00 1.380 -0.473 0.3 1.459

BUS-2130MC501-A BUS-E15 91.28 1.339 -0.375 0.3 1.390

2130-CH-004 BUS-E15 100.00 0.041 -0.098 2.4 0.106

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 76
Project: SPENCE GROWTH OPTION PROJECT

Page: 124

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E16

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E16 Total 0.00 3.068 -1.227 0.4 3.304

BUS-2130MC501-B BUS-E16 79.60 3.008 -1.084 0.4 3.197

2130-WR-001 BUS-E16 100.00 0.060 -0.143 2.4 0.155

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 77
Project: SPENCE GROWTH OPTION PROJECT

Page: 125

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E17

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E17 Total 0.00 1.576 -0.715 0.5 1.730

BUS-2130MC501-B BUS-E17 88.98 1.516 -0.572 0.4 1.620

2130-WR-002 BUS-E17 100.00 0.060 -0.143 2.4 0.155

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 78
Project: SPENCE GROWTH OPTION PROJECT

Page: 126

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E18

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E18 Total 0.00 0.380 -0.039 0.1 0.382

BUS-2130MC501-B Bus-E18 98.19 0.367 -0.018 0.0 0.368

2130-CV002A-01A Bus-E18 104.35 0.012 -0.021 1.7 0.025

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 79
Project: SPENCE GROWTH OPTION PROJECT

Page: 127

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-F01

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-F01 Total 0.00 9.075 -40.370 4.4 41.377

BUS-C03 Bus-F01 8.43 6.556 -30.842 4.7 31.531

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-8A/1 BUS-2110MC501-B 7.97 0.067 -0.133 2.0 0.149

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.92 0.321 -2.260 7.0 2.283

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

1 80
Project: SPENCE GROWTH OPTION PROJECT

Page: 128

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: Bus-F01

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 9.16 0.068 -0.131 1.9 0.148

BUS-27A/1 BUS-2110MC501-F 9.00 0.068 -0.131 1.9 0.148

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 4.87 0.180 -1.230 6.9 1.243

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*BUS-2110MC501-A Bus-F01 0.00 2.519 -9.529 3.8 9.856

*BUS-2110MC501-B BUS-2110MC501-A 0.00 2.105 -8.613 4.1 8.866

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.739 -7.587 4.4 7.784

*BUS-2110MC501-D BUS-2110MC501-C 0.00 1.007 -3.590 3.6 3.729

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.786 -2.774 3.5 2.883

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.403 -1.664 4.1 1.712

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 81
Project: SPENCE GROWTH OPTION PROJECT

Page: 129

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F7A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F7A/1 Total 0.00 1.870 -0.448 0.2 1.923

BUS-2110MC501-B BUS-F7A/1 98.41 1.810 -0.304 0.2 1.835

2110-WR-001 BUS-F7A/1 100.00 0.060 -0.143 2.4 0.155

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 82
Project: SPENCE GROWTH OPTION PROJECT

Page: 130

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F9A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F9A/1 Total 0.00 5.917 -7.102 1.2 9.244

BUS-2110MC501-C BUS-F9A/1 82.63 5.809 -6.190 1.1 8.489

2110-CN014-A BUS-F9A/1 104.35 0.091 -0.878 9.7 0.883

2110-CN014-B BUS-F9A/1 104.35 0.015 -0.030 2.0 0.033

2110-CN014-HE1 BUS-F9A/1 100.00 0.001 -0.002 2.4 0.002

2110-CN014-HE2 BUS-F9A/1 100.00 0.001 -0.002 2.4 0.002

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 83
Project: SPENCE GROWTH OPTION PROJECT

Page: 131

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F22

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 97.50 % of base (0.426 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F22 Total 0.00 1.661 -2.243 1.4 2.791

BUS-F30 BUS-F22 8.81 1.502 -1.864 1.2 2.394

2130-DP-505 BUS-F22 100.00 0.159 -0.378 2.4 0.410

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 84
Project: SPENCE GROWTH OPTION PROJECT

Page: 132

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F30

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 97.50 % of base (0.426 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F30 Total 0.00 1.676 -2.464 1.5 2.980

BUS-F22 BUS-F30 1.50 0.162 -0.373 2.3 0.406

BUS-F31 BUS-F30 74.25 1.515 -2.092 1.4 2.582

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 85
Project: SPENCE GROWTH OPTION PROJECT

Page: 133

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F31

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F31 Total 0.00 5.913 -6.650 1.1 8.898

BUS-2130MC501-A BUS-F31 27.35 5.782 -6.363 1.1 8.598

BUS-F30 BUS-F31 10.48 0.131 -0.287 2.2 0.315

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

1 86
Project: SPENCE GROWTH OPTION PROJECT

Page: 134

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

2130-B03 4.160 2130-B03 Bus 14.832 11.4 1.468 21.773 36.915

2130-B04 4.160 2130-B04 Bus 14.988 11.8 1.475 22.108 37.448

2130-VL-001 23.000 2130-VL-001 Bus 21.826 5.4 1.276 27.843 48.154

BS-5A/1 0.480 BS-5A/1 Bus 41.377 4.7 1.237 51.171 88.623

BUS-1A/1 0.480 BUS-1A/1 Bus 20.668 1.0 1.002 20.700 30.377

BUS-1A/2 0.380 BUS-1A/2 Bus 3.701 1.5 1.015 3.757 5.879

BUS-1A/3 0.380 BUS-1A/3 Bus 3.458 1.4 1.011 3.497 5.416

BUS-2A/1 0.480 BUS-2A/1 Bus 6.281 0.2 1.000 6.281 8.883

BUS-2A/2 0.240 BUS-2A/2 Bus 1.795 1.3 1.009 1.811 2.777

BUS-2A/3 0.240 BUS-2A/3 Bus 1.527 1.1 1.003 1.531 2.270

BUS-3A/1 0.480 BUS-3A/1 Bus 6.301 0.2 1.000 6.301 8.911

BUS-3A/2 0.380 BUS-3A/2 Bus 1.613 1.2 1.006 1.623 2.465

BUS-3A/3 0.380 BUS-3A/3 Bus 1.541 1.2 1.005 1.549 2.336

BUS-4A/1 0.480 BUS-4A/1 Bus 18.409 0.8 1.000 18.416 26.548

BUS-4A/2 0.415 BUS-4A/2 Bus 3.277 1.4 1.013 3.318 5.156

BUS-4A/3 0.415 BUS-4A/3 Bus 3.022 1.3 1.008 3.046 4.656

BUS-5A/2 0.480 BUS-5A/2 Bus 0.573 0.0 1.000 0.573 0.810

BUS-5A/3 0.480 BUS-5A/3 Bus 0.573 0.0 1.000 0.573 0.810

BUS-6A/1 0.480 BUS-6A/1 Bus 1.186 0.1 1.000 1.186 1.677

BUS-8A/1 0.480 BUS-8A/1 Bus 1.923 0.2 1.000 1.923 2.719

BUS-10A/1 0.480 BUS-10A/1 Bus 3.498 0.5 1.000 3.498 4.957

BUS-11A/1 0.480 BUS-11A/1 Bus 17.361 2.8 1.104 19.172 32.686

BUS-12A/1 0.480 BUS-12A/1 Bus 0.665 0.1 1.000 0.665 0.940

BUS-14A/1 0.480 BUS-14A/1 Bus 2.038 0.2 1.000 2.038 2.882

BUS-16A/1 0.480 BUS-16A/1 Bus 3.216 0.5 1.000 3.216 4.555

BUS-17A/1 0.480 BUS-17A/1 Bus 1.430 0.2 1.000 1.430 2.022

BUS-17A/2 0.480 BUS-17A/2 Bus 0.852 0.1 1.000 0.852 1.205

BUS-17A/3 0.480 BUS-17A/3 Bus 0.852 0.1 1.000 0.852 1.205

BUS-17A/4 0.480 BUS-17A/4 Bus 0.852 0.1 1.000 0.852 1.205

BUS-17A/5 0.480 BUS-17A/5 Bus 0.852 0.1 1.000 0.852 1.205

BUS-18A/1 0.480 BUS-18A/1 Bus 6.676 1.0 1.002 6.692 9.904

BUS-19A/1 0.480 BUS-19A/1 Bus 3.307 0.3 1.000 3.307 4.677

1 87
Project: SPENCE GROWTH OPTION PROJECT

Page: 135

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

BUS-20A/1 0.480 BUS-20A/1 Bus 1.710 0.2 1.000 1.710 2.418

BUS-21A/1 0.480 BUS-21A/1 Bus 0.835 0.1 1.000 0.835 1.181

BUS-22A/1 0.480 BUS-22A/1 Bus 1.346 0.2 1.000 1.346 1.903

BUS-23A/1 0.480 BUS-23A/1 Bus 1.807 0.3 1.000 1.807 2.556

BUS-24A/1 0.480 BUS-24A/1 Bus 0.678 0.0 1.000 0.678 0.958

BUS-24A/2 0.480 BUS-24A/2 Bus 0.328 0.0 1.000 0.328 0.463

BUS-24A/3 0.480 BUS-24A/3 Bus 0.328 0.0 1.000 0.328 0.463

BUS-24A/5 0.480 BUS-24A/5 Bus 1.685 0.3 1.000 1.685 2.383

BUS-25A/1 0.480 BUS-25A/1 Bus 2.168 0.4 1.000 2.168 3.068

BUS-26A/1 0.480 BUS-26A/1 Bus 1.677 0.2 1.000 1.677 2.372

BUS-27A/1 0.480 BUS-27A/1 Bus 1.707 0.2 1.000 1.707 2.414

BUS-28A/2 0.480 BUS-28A/2 Bus 3.189 0.1 1.000 3.189 4.510

BUS-29A/1 0.480 BUS-29A/1 Bus 2.015 0.1 1.000 2.015 2.849

BUS-2110MC501-A 0.480 BUS-2110MC501-A Bus 41.377 4.7 1.237 51.171 88.623

BUS-2110MC501-B 0.480 BUS-2110MC501-B Bus 41.377 4.7 1.237 51.171 88.623

BUS-2110MC501-C 0.480 BUS-2110MC501-C Bus 41.377 4.7 1.237 51.171 88.623

BUS-2110MC501-D 0.480 BUS-2110MC501-D Bus 41.377 4.7 1.237 51.171 88.623

BUS-2110MC501-E 0.480 BUS-2110MC501-E Bus 41.377 4.7 1.237 51.171 88.623

BUS-2110MC501-F 0.480 BUS-2110MC501-F Bus 41.377 4.7 1.237 51.171 88.623

BUS-2130MC501-A 0.480 BUS-2130MC501-A Bus 11.429 1.6 1.020 11.654 18.445

BUS-2130MC501-B 0.480 BUS-2130MC501-B Bus 11.429 1.6 1.020 11.654 18.445

BUS-A1 23.000 BUS-A1 Bus 7.714 3.0 1.115 8.600 14.710

BUS-A01 23.000 BUS-A01 Switchgear 21.031 4.4 1.216 25.581 44.305

23.000 CB-A01 3 cy Sym CB 21.031 4.4 1.216 25.581 44.305 40.000 68.000

BUS-A03 0.480 BUS-A03 Bus 12.382 1.6 1.018 12.608 19.885

BUS-A05 4.160 BUS-A05 Bus 15.481 12.7 1.490 23.071 39.000

BUS-A06 23.000 BUS-A06 Bus 20.928 4.3 1.208 25.291 43.796

BUS-B01 4.160 BUS-B01 MCC 15.385 13.0 1.494 22.992 38.844

4.160 CB-B01 3 cy Sym CB 15.385 13.0 1.494 22.992 38.844 58.000 97.000

BUS-B1/1 0.480 BUS-B1/1 Bus 0.569 0.0 1.000 0.569 0.804

BUS-B02 4.160 BUS-B02 Bus 15.385 13.0 1.494 22.992 38.844

4.160 CB-B01 3 cy Sym CB 15.385 13.0 1.494 22.992 38.844 58.000 97.000

BUS-B2/1 0.480 BUS-B2/1 Bus 0.596 0.0 1.000 0.596 0.843

BUS-B3/1 0.480 BUS-B3/1 Bus 0.596 0.0 1.000 0.596 0.843

1 88
Project: SPENCE GROWTH OPTION PROJECT

Page: 136

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

BUS-B4/1 0.480 BUS-B4/1 Bus 1.897 0.2 1.000 1.897 2.682

BUS-B6/1 0.480 BUS-B6/1 Bus 1.897 0.2 1.000 1.897 2.682

BUS-B7/1 0.480 BUS-B7/1 Bus 0.288 0.0 1.000 0.288 0.408

BUS-B8/1 0.480 BUS-B8/1 Bus 0.257 0.0 1.000 0.257 0.363

BUS-B9/1 0.480 BUS-B9/1 Bus 4.568 0.6 1.000 4.569 6.502

BUS-B11/1 0.480 BUS-B11/1 Bus 1.209 0.1 1.000 1.209 1.710

BUS-B12/1 0.480 BUS-B12/1 Bus 1.104 0.1 1.000 1.104 1.561

BUS-B13/1 0.480 BUS-B13/1 Bus 1.097 0.1 1.000 1.097 1.551

BUS-B16/1 0.480 BUS-B16/1 Bus 2.287 0.4 1.000 2.287 3.235

BUS-B18/1 0.480 BUS-B18/1 Bus 2.288 0.1 1.000 2.288 3.236

BUS-B20/1 0.480 BUS-B20/1 Bus 0.523 0.0 1.000 0.523 0.740

BUS-B20/3 0.480 BUS-B20/3 Bus 17.390 2.0 1.043 18.143 29.767

BUS-C01 23.000 BUS-C01 Switchgear 7.734 3.0 1.117 8.641 14.792

23.000 CB-C01 3 cy Sym CB 7.734 3.0 1.117 8.641 14.792 25.600 43.000

BUS-C03 0.480 BUS-C03 Bus 43.891 5.2 1.265 55.513 96.061

BUS-C04 4.160 BUS-C04 Bus 6.715 7.5 1.367 9.179 15.754

BUS-C05 23.000 BUS-C05 Bus 7.869 3.2 1.132 8.905 15.296

BUS-D01 4.160 BUS-D01 MCC 6.674 7.6 1.368 9.129 15.667

4.160 CB-D01 3 cy Sym CB 6.674 7.6 1.368 9.129 15.667 58.000 97.000

BUS-D03 4.160 BUS-D03 Bus 6.280 7.0 1.349 8.470 14.564

BUS-D04 4.160 BUS-D04 Bus 5.580 2.7 1.095 6.108 10.375

BUS-D05 4.160 BUS-D05 Bus 5.580 2.7 1.095 6.108 10.375

Bus-E01 0.480 Bus-E01 MCC 11.429 1.6 1.020 11.654 18.445

BUS-E2 0.480 BUS-E2 Bus 0.726 0.2 1.000 0.726 1.027

BUS-E03 0.480 BUS-E03 Bus 8.876 1.1 1.004 8.910 13.328

Bus-E3 0.480 Bus-E3 Bus 0.512 0.1 1.000 0.512 0.724

BUS-E04 0.380 BUS-E04 Bus 2.619 1.5 1.016 2.661 4.174

Bus-E4 0.480 Bus-E4 Bus 0.438 0.1 1.000 0.438 0.620

BUS-E05 0.380 BUS-E05 Bus 2.571 1.5 1.015 2.610 4.083

Bus-E5 0.480 Bus-E5 Bus 0.504 0.1 1.000 0.504 0.713

BUS-E06 0.480 BUS-E06 Bus 4.693 0.5 1.000 4.693 6.643

BUS-E07 0.240 BUS-E07 Bus 1.746 1.3 1.009 1.762 2.705

BUS-E08 0.240 BUS-E08 Bus 1.449 1.0 1.003 1.453 2.153

BUS-E09 0.480 BUS-E09 Bus 7.413 0.8 1.000 7.417 10.714

1 89
Project: SPENCE GROWTH OPTION PROJECT

Page: 137

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

BUS-E10 0.380 BUS-E10 Bus 1.645 1.4 1.013 1.666 2.591

BUS-E11 0.380 BUS-E11 Bus 1.394 1.1 1.003 1.399 2.089

BUS-E12 0.480 BUS-E12 Bus 0.582 0.1 1.000 0.582 0.823

BUS-E14 0.480 BUS-E14 Bus 0.701 0.2 1.000 0.701 0.992

BUS-E15 0.480 BUS-E15 Bus 1.459 0.3 1.000 1.459 2.063

BUS-E16 0.480 BUS-E16 Bus 3.304 0.4 1.000 3.304 4.675

BUS-E17 0.480 BUS-E17 Bus 1.730 0.4 1.000 1.730 2.449

Bus-E18 0.480 Bus-E18 Bus 0.382 0.1 1.000 0.382 0.540

Bus-F01 0.480 Bus-F01 MCC 41.377 4.7 1.237 51.171 88.623

BUS-F7A/1 0.480 BUS-F7A/1 Bus 1.923 0.2 1.000 1.923 2.719

BUS-F9A/1 0.480 BUS-F9A/1 Bus 9.244 1.7 1.023 9.460 15.084

BUS-F22 0.415 BUS-F22 Bus 2.791 1.4 1.011 2.821 4.356

BUS-F30 0.415 BUS-F30 Bus 2.980 1.5 1.015 3.025 4.730

BUS-F31 0.480 BUS-F31 Bus 8.898 1.1 1.004 8.933 13.373

- Method: IEEE - X/R is calculated from separate R & X networks.


- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

- The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability.

1 90
Project: SPENCE GROWTH OPTION PROJECT

Page: 138

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
2130-B03 4.160 13.497 10.2

2130-B04 4.160 13.639 10.6

2130-VL-001 23.000 Fuse1 Fuse 21.826 5.4 1.000 21.826 25.000 3.95 22.000 22.000

BS-5A/1 0.480 CB-5A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

BUS-1A/1 0.480 20.668 1.0

BUS-1A/2 0.380 3.701 1.5

BUS-1A/3 0.380 3.458 1.4

BUS-2A/1 0.480 6.281 0.2

BUS-2A/2 0.240 1.795 1.3

BUS-2A/3 0.240 1.527 1.1

BUS-3A/1 0.480 6.301 0.2

BUS-3A/2 0.380 1.613 1.2

BUS-3A/3 0.380 1.541 1.2

BUS-4A/1 0.480 18.409 0.8

BUS-4A/2 0.415 3.277 1.4

BUS-4A/3 0.415 3.022 1.3

BUS-5A/2 0.480 0.573 0.0

BUS-5A/3 0.480 0.573 0.0

BUS-6A/1 0.480 1.186 0.1

BUS-8A/1 0.480 1.923 0.2

BUS-10A/1 0.480 3.498 0.5

BUS-11A/1 0.480 17.361 2.8

BUS-12A/1 0.480 0.665 0.1

BUS-14A/1 0.480 2.038 0.2

BUS-16A/1 0.480 3.216 0.5

BUS-17A/1 0.480 1.430 0.2

BUS-17A/2 0.480 0.852 0.1

BUS-17A/3 0.480 0.852 0.1

BUS-17A/4 0.480 0.852 0.1

BUS-17A/5 0.480 0.852 0.1

BUS-18A/1 0.480 6.676 1.0

BUS-19A/1 0.480 3.307 0.3

1 91
Project: SPENCE GROWTH OPTION PROJECT

Page: 139

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-20A/1 0.480 1.710 0.2

BUS-21A/1 0.480 0.835 0.1

BUS-22A/1 0.480 1.346 0.2

BUS-23A/1 0.480 1.807 0.3

BUS-24A/1 0.480 0.678 0.0

BUS-24A/2 0.480 0.328 0.0

BUS-24A/3 0.480 0.328 0.0

BUS-24A/5 0.480 1.685 0.3

BUS-25A/1 0.480 2.168 0.4

BUS-26A/1 0.480 1.677 0.2

BUS-27A/1 0.480 1.707 0.2

BUS-28A/2 0.480 3.189 0.1

BUS-29A/1 0.480 2.015 0.1

BUS-2110MC501-A 0.480 CB-1A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-2A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-3A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-4A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B1 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B2 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B3 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-5A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B4 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-F01 Molded Case 41.377 4.7 1.000 41.377 0.600 20.00 65.000 65.000

BUS-2110MC501-B 0.480 MCP-B6 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-6A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B7 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-7A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-8A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B8 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B9 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 100.000 100.000

MCP-B11 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

BUS-2110MC501-C 0.480 CB-9A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-10A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-11A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

1 92
Project: SPENCE GROWTH OPTION PROJECT

Page: 140

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-2110MC501-C CB-12A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-14A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-16A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

BUS-2110MC501-D 0.480 CB-17A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-18A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B12 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B13 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

BUS-2110MC501-E 0.480 CB-19A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-20A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-21A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-22A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-23A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B16 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-24A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-25A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

BUS-2110MC501-F 0.480 CB-26A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-27A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-28A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B18 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B20 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-29A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

MCP-B21 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-30A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-31A Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

CB-31A2 Molded Case 41.377 4.7 1.000 41.377 0.480 20.00 65.000 65.000

BUS-2130MC501-A 0.480 CB-E02 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-E03 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-E04 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-F5 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-E05 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-E2 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-E08 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

CB-E01 Molded Case 11.429 1.6 1.000 11.429 0.600 20.00 65.000 65.000

BUS-2130MC501-B 0.480 CB-E06 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

1 93
Project: SPENCE GROWTH OPTION PROJECT

Page: 141

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-2130MC501-B CB-E07 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

MCP-E03 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

MCP-E3 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

MCP-E2 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

MCP-E4 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

MCP-E01 Molded Case 11.429 1.6 1.000 11.429 0.480 20.00 65.000 65.000

BUS-A1 23.000 7.493 2.9

BUS-A01 23.000 CB-A01 3 cy Sym CB 2.0 20.686 4.4 1.000 20.686 27.000 25.000 25.000

BUS-A03 0.480 12.382 1.6

BUS-A05 4.160 14.103 11.7

BUS-A06 23.000 20.586 4.3

BUS-B01 4.160 CB-B01 3 cy Sym CB 2.0 14.001 11.8 1.000 14.001 4.760 29.000 33.183

BUS-B1/1 0.480 0.569 0.0

BUS-B02 4.160 CB-B01 3 cy Sym CB 2.0 14.001 11.8 1.000 14.001 4.760 29.000 33.183

BUS-B2/1 0.480 0.596 0.0

BUS-B3/1 0.480 0.596 0.0

BUS-B4/1 0.480 1.897 0.2

BUS-B6/1 0.480 1.897 0.2

BUS-B7/1 0.480 0.288 0.0

BUS-B8/1 0.480 0.257 0.0

BUS-B9/1 0.480 4.568 0.6

BUS-B11/1 0.480 1.209 0.1

BUS-B12/1 0.480 1.104 0.1

BUS-B13/1 0.480 1.097 0.1

BUS-B16/1 0.480 2.287 0.4

BUS-B18/1 0.480 2.288 0.1

BUS-B20/1 0.480 0.523 0.0

BUS-B20/3 0.480 17.390 2.0

BUS-C01 23.000 CB-C01 3 cy Sym CB 2.0 7.512 3.0 1.000 7.512 27.000 16.000 16.000

BUS-C03 0.480 43.891 5.2

BUS-C04 4.160 5.957 7.1

BUS-C05 23.000 Fuse2 Fuse 7.869 3.2 1.000 7.869 25.000 3.95 10.000 10.000

BUS-D01 4.160 CB-D01 3 cy Sym CB 2.0 5.913 7.0 1.000 5.913 4.760 29.000 33.183

BUS-D03 4.160 5.572 6.2

1 94
Project: SPENCE GROWTH OPTION PROJECT

Page: 142

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-D04 4.160 5.011 2.3

BUS-D05 4.160 5.011 2.3

Bus-E01 0.480 CB-E01 Molded Case 11.429 1.6 1.000 11.429 0.600 20.00 65.000 65.000

BUS-E2 0.480 0.726 0.2

BUS-E03 0.480 8.876 1.1

Bus-E3 0.480 0.512 0.1

BUS-E04 0.380 2.619 1.5

Bus-E4 0.480 0.438 0.1

BUS-E05 0.380 2.571 1.5

Bus-E5 0.480 0.504 0.1

BUS-E06 0.480 4.693 0.5

BUS-E07 0.240 1.746 1.3

BUS-E08 0.240 1.449 1.0

BUS-E09 0.480 7.413 0.8

BUS-E10 0.380 1.645 1.4

BUS-E11 0.380 1.394 1.1

BUS-E12 0.480 0.582 0.1

BUS-E14 0.480 0.701 0.2

BUS-E15 0.480 1.459 0.3

BUS-E16 0.480 3.304 0.4

BUS-E17 0.480 1.730 0.4

Bus-E18 0.480 0.382 0.1

Bus-F01 0.480 CB-F01 Molded Case 41.377 4.7 1.000 41.377 0.600 20.00 65.000 65.000

BUS-F7A/1 0.480 1.923 0.2

BUS-F9A/1 0.480 9.244 1.7

BUS-F22 0.415 2.791 1.4

BUS-F30 0.415 2.980 1.5

BUS-F31 0.480 8.898 1.1

- Method: IEEE - X/R is calculated from separate R & X networks.


- HV CB interrupting capability is adjusted based on bus nominal voltage.
- Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

* Indicates a device with interrupting duty exceeding the device capability


** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.

1 95
One-Line Diagram - OLV1 (Short-Circuit Analysis)
U1
829. 33 MVAsc

2130-VL-001 23 kV 20. 818 kA

. 588 kA

2130-US-001 2130-SG-001 2130-MC-001


BUS-A01 20. 451 kA
BUS-B01 4. 16 kV
23 kV . 027 kA . 564 kA 11. 252 kA 2. 072 kA 2. 076 kA

CB-B01
2130US001B-E01

BUS-A06 20. 902 kA


23 kV
. 027 kA
CB-A01 o o

MR MR
R

o o

BUS-B02 4. 148 kA
4. 16 kV
11. 252 kA
2130-XF-501
0. 5 MVA 2130-XF-001
5 MVA

BUS-A03 11. 016 kA BUS-A05 11. 36 kA


0. 48 kV 4. 16 kV
1. 378 kA 4. 134 kA

2130-B04
2130-B03 12. 759 kA 12. 913 kA

4. 16 kV 2. 085 kA 4. 16 kV 2. 085 kA
10. 044 kA

2130-MC-501 2130-CV002-B
2130-CV002-A
1865 kW
1865 kW
1 96
One-Line Diagram - OLV1 (Short-Circuit Analysis)

. 424 kA

BUS-C05
7. 435 kA
23 kV
. 441 kA

2110US001A-E01

2110-US-001
2110-SG-001 2110-MC-001
BUS-C01 7. 301 kA BUS-D01 4. 16 kV

23 kV . 178 kA . 264 kA 4. 972 kA 1. 02 kA . 346 kA . 346 kA


o

CB-D01

2110US001B-E01

BUS-A1 7. 537 kA CB-C01


23 kV
. 178 kA

o o
o
R MR MR
MR

o o o
o

2110-XF-501 2110-XF-001
2. 25 MVA
1. 75 MVA

BUS-C04
BUS-C03 34. 306 kA 4. 16 kV 5. 017 kA
0. 48 kV
9. 609 kA 1. 707 kA

BUS-D03 5. 273 kA BUS-D04 5. 265 kA BUS-D05 5. 265 kA


4. 16 kV 1. 03 kA 4. 16 kV . 348 kA 4. 16 kV . 348 kA
31. 531 kA

2110-MC-501 2110-CR001-A 2110-CV001HU-01A 2110-CV001HU-01B


750 kW 368 kW 368 kW
1 97
One-Line Diagram - OLV1=>2130-MC-501 (Short-Circuit Analysis)

2130MC501-P01~P06

Bus-E01 10. 044 kA


0. 48 kV
1. 395 kA

CB-E01

BUS-2130MC501-A
0. 48 kV 10. 044 kA

. 254 kA . 093 kA . 14 kA . 313 kA . 102 kA . 051 kA . 057 kA . 384 kA


CB-F5
CB-E02 CB-E03 CB-E04
CB-E08
CB-E2
CB-E05

SW6 SWICTH IS SHOWN ONLY AS


A MEANS OF BUSBAR
CONTINUATION IN CREATING
THIS SINGLE LINE. IT DOES
NOT EXIST IN 2130MC-501.

BUS-E03 8. 633 kA BUS-E06 4. 621 kA BUS-E09 7. 286 kA


BUS-F31 8. 598 kA
0. 48 kV 0. 48 kV 0. 48 kV
. 255 kA . 094 kA . 141 kA 0. 48 kV
. 315 kA

2130-LX-501 2130-DX-501 2130-DX-502


30 kVA 45 kVA 2130-DX-503
75 kVA 100 kVA

BUS-E04 2. 263 kA BUS-E07 1. 543 kA BUS-E10 1. 45 kA


BUS-F30 2. 582 kA
0. 38 kV 0. 24 kV 0. 38 kV
. 363 kA . 209 kA . 198 kA 0. 415 kV
. 406 kA

BUS-E08 BUS-E11 BUS-F22 2. 394 kA BUS-E2


BUS-E05 2. 215 kA 1. 255 kA 1. 207 kA . 696 kA BUS-E14
0. 415 kV BUS-E15 1. 39 kA . 67 kA
0. 38 kV . 41 kA 0. 48 kV
. 364 kA . 213 kA 0. 38 kV . 202 kA 0. 48 kV . 053 kA 0. 48 kV
0. 24 kV . 106 kA . 059 kA

2130-ST055-01
2130-DP-505 9 kW
2130-LP-501 2130-DP-501 2130-DP-502 2130-CH-005
65 kVA 24 kVA 80 kVA 2130-CH-004
36 kVA 12 kVA
24 kVA

1 98
One-Line Diagram - OLV1=>2130-MC-501 (Short-Circuit Analysis)

BUS-2130MC501 CONTINUATION
FROM SHEET 1.

BUS-2130MC501-B
0. 48 kV
11. 046 kA

. 152 kA . 147 kA . 024 kA . 024 kA . 015 kA . 002 kA . 022 kA

MCP-E2 MCP-E01
CB-E07 MCP-E3 MCP-E4
MCP-E03
CB-E06

BUS-E12
Bus-E3 . 502 kA
Bus-E5 . 502 kA 0. 48 kV
0. 48 kV . 572 kA
. 015 kA 0. 48 kV
Bus-E4 . 425 kA . 002 kA
BUS-E16 3. 197 kA Bus-E18 . 368 kA . 022 kA
BUS-E17 1. 62 kA 0. 48 kV
0. 48 kV 0. 48 kV . 025 kA
. 155 kA 0. 48 kV . 025 kA
. 155 kA

2130-BL001-A
2130-BL001-B 2130-UP-501
2. 3 kW
0. 4 kW 5 kVA
2130-WR-001 2130-CV002B-01A
2130-WR-002 2130-CV002A-01A
35 kVA 3. 7 kW
35 kVA 3. 7 kW

1 99
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

2110MC501-P01~P15

Bus-F01
31. 531 kA
0. 48 kV
9. 856 kA

CB-F01

BUS-2110MC501-A
0. 48 kV 31. 531 kA
. 278 kA . 079 kA . 113 kA . 223 kA . 026 kA . 036 kA . 036 kA . 072 kA . 143 kA 8. 866 kA
MCP-B1 MCP-B2
CB-1A CB-3A CB-4A MCP-B3 MCP-B4
CB-2A CB-5A

AFD1 SW1 SWICTH IS


BS-5A/1 SHOWN ONLY AS A
41. 308 kA MEANS OF BUSBAR
. 036 kA . 036 kA CONTINUATION IN
0. 48 kV
CREATING THIS
SINGLE LINE. IT
DOES NOT EXIST
IN 2110MC-501.

BUS-1A/1 BUS-3A/1 BUS-4A/1 18. 21 kA


20. 409 kA BUS-2A/1 6. 232 kA
6. 232 kA 0. 48 kV 0. 48 kV
0. 48 kV . 224 kA
. 28 kA 0. 48 kV . 113 kA
. 08 kA

2110-LX-501 2110-DX-502
2110-DX-501
100 kVA 45 kVA
30 kVA 2110-DX-503
100 kVA

BUS-4A/2
BUS-1A/2 BUS-3A/2 1. 463 kA 3. 003 kA
BUS-2A/2 1. 625 kA 0. 415 kV
0. 38 kV 3. 32 kA 0. 24 kV 0. 38 kV . 156 kA . 28 kA
. 175 kA
. 389 kA

BUS-B1/1
. 555 kA BUS-B2/1 BUS-5A/2
. 578 kA BUS-B3/1 . 578 kA . 555 kA BUS-5A/3 BUS-B4/1
0. 48 kV . 555 kA 1. 835 kA
. 027 kA
0. 48 kV . 037 kA 0. 48 kV . 037 kA 0. 48 kV . 037 kA
0. 48 kV 0. 48 kV . 147 kA
. 037 kA

BUS-1A/3 2. 75 kA 2110-CR001-B
3. 077 kA BUS-2A/3 BUS-3A/3 1. 392 kA BUS-4A/3 2110-CR01-02A
0. 38 kV 1. 364 kA 4 kW 2110-CR01-02B 2110-CR01-03A
0. 24 kV 0. 38 kV 0. 415 kV 5. 6 kW 5. 6 kW 5. 6 kW 2110-CR01-03B 2110-CR01-01A
. 392 kA . 157 kA . 282 kA 22. 5 kW
. 177 kA 5. 6 kW

2110-DP-501
2110-LP-501 20 kVA 2110-DP-502 2110-DP-505
70 kVA 28 kVA 55 kVA

200
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

BUS-2110MC501
BUS-2110MC501-B
CONTINUATION FROM SHEET 1.
0. 48 kV 32. 513 kA
. 143 kA . 065 kA . 009 kA . 149 kA . 149 kA . 014 kA . 473 kA . 095 kA 7. 784 kA

MCP-B6
CB-6A CB-7A CB-8A
MCP-B7 MCP-B8 MCP-B11
MCP-B9

BUS-6A/1 1. 152 kA
BUS-B6/1 1. 835 kA BUS-F7A/1 1. 835 kA BUS-8A/1 1. 168 kA
0. 48 kV BUS-B7/1 . 282 kA 1. 835 kA BUS-B8/1 . 248 kA 4. 308 kA BUS-B11/1
. 022 kA . 022 kA . 022 kA BUS-B9/1
0. 48 kV . 147 kA 0. 48 kV 0. 48 kV 0. 48 kV . 098 kA
0. 48 kV . 009 kA . 155 kA . 155 kA 0. 48 kV . 014 kA 0. 48 kV . 496 kA

2110-CR00101-HE1 2110-CR00101-HE2 2110-CR00101-HE3 2110-HU001-A


2110-CR01-01B
22. 5 kW 5 kVA 5 kVA 5 kVA 2110-CR001-01C 2110-WR-001 2110-CR01-05A 2110-DC-001 15 kW
1. 5 kW 2110-WR-002 56 kW
35 kVA 2. 2 kW
35 kVA

BUS-2110MC501-C
0. 48 kV 33. 594 kA
. 861 kA . 377 kA 2. 283 kA . 051 kA . 143 kA . 355 kA 3. 729 kA

CB-12A CB-14A CB-16A


CB-10A CB-11A
CB-9A

BUS-F9A/1 8. 489 kA BUS-14A/1 1. 981 kA BUS-16A/1


BUS-10A/1 3. 304 kA BUS-12A/1 . 639 kA 3. 032 kA
0. 48 kV . 883 kA . 033 kA . 002 kA . 002 kA BUS-11A/1 15. 246 kA
0. 48 kV 0. 48 kV . 053 kA 0. 48 kV . 147 kA 0. 48 kV
. 396 kA 0. 48 kV . 373 kA
2. 457 kA

2110-DS-001 2110-MA001-RC
2110-ZM-250 2110-CP-001 2110-CH-251 42 kW
2110-CN014-A 2110-CN014-B 22. 5 kW
5 kW 2110-CN014-HE1 2110-CN014-HE2 44. 7 kW 257 kW 12 kVA
115 kW
0. 5 kVA 0. 5 kVA

201
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 2.
BUS-2110MC501-D
0. 48 kV 37. 654 kA
. 048 kA . 615 kA . 094 kA . 094 kA 2. 883 kA

MCP-B12 MCP-B13
CB-17A
CB-18A

BUS-17A/1 0. 48 kV 1. 395 kA
. 012 kA . 012 kA . 012 kA . 012 kA

BUS-B12/1 1. 063 kA BUS-B13/1 1. 056 kA


BUS-18A/1 6. 235 kA
0. 48 kV . 098 kA 0. 48 kV . 098 kA
0. 48 kV . 646 kA . 004 kA

2110-RB001-B 2110-CV001HU-01C 2110-CV001HU-01D


2110-RB001-A
BUS-17A/2 . 843 kA BUS-17A/3 . 843 kA 15 kW 15 kW
BUS-17A/4 . 843 kA 75 kW 0. 8 kW
0. 48 kV BUS-17A/5 . 843 kA
. 012 kA 0. 48 kV . 012 kA 0. 48 kV . 012 kA
0. 48 kV . 012 kA

2110-MA001-A 2110-MA001-B
2. 2 kW 2110-MA001-01C
2. 2 kW 2110-MA001-01D
2. 2 kW
2. 2 kW

BUS-2110MC501-E
0. 48 kV 38. 499 kA
. 322 kA . 168 kA . 076 kA . 052 kA . 184 kA . 143 kA . 008 kA . 227 kA 1. 712 kA

CB-19A CB-20A CB-23A


CB-21A CB-22A MCP-B16 CB-24A
CB-25A

BUS-19A/1 BUS-20A/1 BUS-21A/1 BUS-22A/1 BUS-23A/1 BUS-B16/1 BUS-24A/1


3. 17 kA 1. 609 kA . 795 kA 1. 317 kA 1. 72 kA 2. 213 kA . 674 kA BUS-25A/1 2. 054 kA
0. 48 kV . 334 kA 0. 48 kV . 177 kA 0. 48 kV . 08 kA 0. 48 kV . 053 kA 0. 48 kV . 192 kA 0. 48 kV . 147 kA 0. 48 kV . 008 kA
0. 48 kV . 238 kA

2110-CV001-02 2110-CV001-07
37. 3 kW 2110-CH-016 2130-CV002-07 2130-CV002-02
40 kVA 2130-CH-003 2130-DC-002 2130-ZM-253
18 kVA 30 kW 37 kW
12 kVA 22. 5 kW 1. 75 kVA
202
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 3.
BUS-2110MC501-F
0. 48 kV 39. 666 kA
. 148 kA . 148 kA . 015 kA . 002 kA 1. 243 kA . 032 kA . 022 kA CB-30A . 008 kA CB-31A . 008 kA . 107 kA
MCP-B20
CB-28A MCP-B18 CB-29A CB-31A2
CB-26A CB-27A MCP-B21

AFD-02
BUS-28A/1

0. 48 kV

BUS-26A/1 BUS-27A/1 BUS-B20/1 BUS-29A/1


1. 59 kA 1. 619 kA BUS-28A/2 BUS-B18/1 . 506 kA 2. 004 kA BUS-24A/3
3. 179 kA 2. 286 kA BUS-24A/2 . 324 kA . 324 kA
BUS-B20/3 BUS-24A/5
16. 221 kA 0. 48 kV . 033 kA 0. 48 kV . 022 kA 1. 618 kA
0. 48 kV . 155 kA 0. 48 kV . 155 kA 0. 48 kV . 015 kA 0. 48 kV . 002 kA . 008 kA
0. 48 kV . 008 kA 0. 48 kV
0. 48 kV 1. 292 kA 0. 48 kV . 111 kA

2110-BL001-A 2110-BL001-B 2831-ZM-024-04 2110-UP-501 2130-SC251-02


2130-SC251-01
2110-WR-003 2110-WR-004 2. 3 kW 0. 4 kW 2831-ZM-024-03 5 kW 1. 75 kVA 2130-CV002-08
5 kVA 1. 75 kVA
35 kVA 35 kVA 149 kW 25 kVA

203
Project: SPENCE GROWTH OPTION PROJECT

Page: 1

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 108 109

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 12 0 0 86 0 10 108

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 42 25 68

System Frequency: 50.00

Unit System: English

Project Filename: 3057-ETAP-1001_2 MIN SC

204
Project: SPENCE GROWTH OPTION PROJECT

Page: 2

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual

205
Project: SPENCE GROWTH OPTION PROJECT

Page: 3

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

2130-B03 Load 4.160 4.160 1 100.00 0.00


2130-B04 Load 4.160 4.160 1 100.00 0.00
2130-VL-001 SWNG 23.000 23.000 1 100.00 0.00
BS-5A/1 Load 0.480 0.505 1 100.00 0.00
BUS-1A/1 Load 0.480 0.505 1 100.00 0.00
BUS-1A/2 Load 0.380 0.400 1 100.00 0.00
BUS-1A/3 Load 0.380 0.400 1 100.00 0.00
BUS-2A/1 Load 0.480 0.505 1 100.00 0.00
BUS-2A/2 Load 0.240 0.253 1 100.00 0.00
BUS-2A/3 Load 0.240 0.253 1 100.00 0.00
BUS-3A/1 Load 0.480 0.505 1 100.00 0.00
BUS-3A/2 Load 0.380 0.400 1 100.00 0.00
BUS-3A/3 Load 0.380 0.400 1 100.00 0.00
BUS-4A/1 Load 0.480 0.505 1 100.00 0.00
BUS-4A/2 Load 0.415 0.437 1 100.00 0.00
BUS-4A/3 Load 0.415 0.437 1 100.00 0.00
BUS-5A/2 Load 0.480 0.505 1 100.00 0.00
BUS-5A/3 Load 0.480 0.505 1 100.00 0.00
BUS-6A/1 Load 0.480 0.505 1 100.00 0.00
BUS-8A/1 Load 0.480 0.505 1 100.00 0.00
BUS-10A/1 Load 0.480 0.505 1 100.00 0.00
BUS-11A/1 Load 0.480 0.505 1 100.00 0.00
BUS-12A/1 Load 0.480 0.505 1 100.00 0.00
BUS-14A/1 Load 0.480 0.505 1 100.00 0.00
BUS-16A/1 Load 0.480 0.505 1 100.00 0.00
BUS-17A/1 Load 0.480 0.505 1 100.00 0.00
BUS-17A/2 Load 0.480 0.505 1 100.00 0.00
BUS-17A/3 Load 0.480 0.505 1 100.00 0.00
BUS-17A/4 Load 0.480 0.505 1 100.00 0.00
BUS-17A/5 Load 0.480 0.505 1 100.00 0.00
BUS-18A/1 Load 0.480 0.505 1 100.00 0.00
BUS-19A/1 Load 0.480 0.505 1 100.00 0.00
BUS-20A/1 Load 0.480 0.505 1 100.00 0.00
BUS-21A/1 Load 0.480 0.505 1 100.00 0.00
BUS-22A/1 Load 0.480 0.505 1 100.00 0.00
BUS-23A/1 Load 0.480 0.505 1 100.00 0.00
BUS-24A/1 Load 0.480 0.505 1 100.00 0.00
BUS-24A/2 Load 0.480 0.505 1 100.00 0.00
BUS-24A/3 Load 0.480 0.505 1 100.00 0.00
BUS-24A/5 Load 0.480 0.505 1 100.00 0.00
BUS-25A/1 Load 0.480 0.505 1 100.00 0.00

206
Project: SPENCE GROWTH OPTION PROJECT

Page: 4

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BUS-26A/1 Load 0.480 0.505 1 100.00 0.00


BUS-27A/1 Load 0.480 0.505 1 100.00 0.00
BUS-28A/2 Load 0.480 0.505 1 100.00 0.00
BUS-29A/1 Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-A Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-B Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-C Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-D Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-E Load 0.480 0.505 1 100.00 0.00
BUS-2110MC501-F Load 0.480 0.505 1 100.00 0.00
BUS-2130MC501-A Load 0.480 0.492 1 100.00 0.00
BUS-2130MC501-B Load 0.480 0.492 1 100.00 0.00
BUS-A1 Load 23.000 23.000 1 100.00 0.00
BUS-A01 Load 23.000 23.000 1 100.00 0.00
BUS-A03 Load 0.480 0.492 1 100.00 0.00
BUS-A05 Load 4.160 4.160 1 100.00 0.00
BUS-A06 Load 23.000 23.000 1 100.00 0.00
BUS-B01 Load 4.160 4.160 1 100.00 0.00
BUS-B1/1 Load 0.480 0.505 1 100.00 0.00
BUS-B02 Load 4.160 4.160 1 100.00 0.00
BUS-B2/1 Load 0.480 0.505 1 100.00 0.00
BUS-B3/1 Load 0.480 0.505 1 100.00 0.00
BUS-B4/1 Load 0.480 0.505 1 100.00 0.00
BUS-B6/1 Load 0.480 0.505 1 100.00 0.00
BUS-B7/1 Load 0.480 0.505 1 100.00 0.00
BUS-B8/1 Load 0.480 0.505 1 100.00 0.00
BUS-B9/1 Load 0.480 0.505 1 100.00 0.00
BUS-B11/1 Load 0.480 0.505 1 100.00 0.00
BUS-B12/1 Load 0.480 0.505 1 100.00 0.00
BUS-B13/1 Load 0.480 0.505 1 100.00 0.00
BUS-B16/1 Load 0.480 0.505 1 100.00 0.00
BUS-B18/1 Load 0.480 0.505 1 100.00 0.00
BUS-B20/1 Load 0.480 0.505 1 100.00 0.00
BUS-B20/3 Load 0.480 0.505 1 100.00 0.00
BUS-C01 Load 23.000 23.000 1 100.00 0.00
BUS-C03 Load 0.480 0.505 1 100.00 0.00
BUS-C04 Load 4.160 4.379 1 100.00 0.00
BUS-C05 Load 23.000 23.000 1 100.00 0.00
BUS-D01 Load 4.160 4.379 1 100.00 0.00
BUS-D03 Load 4.160 4.379 1 100.00 0.00
BUS-D04 Load 4.160 4.379 1 100.00 0.00
BUS-D05 Load 4.160 4.379 1 100.00 0.00
Bus-E01 Load 0.480 0.492 1 100.00 0.00

207
Project: SPENCE GROWTH OPTION PROJECT

Page: 5

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BUS-E2 Load 0.480 0.492 1 100.00 0.00


BUS-E03 Load 0.480 0.492 1 100.00 0.00
Bus-E3 Load 0.480 0.492 1 100.00 0.00
BUS-E04 Load 0.380 0.390 1 100.00 0.00
Bus-E4 Load 0.480 0.492 1 100.00 0.00
BUS-E05 Load 0.380 0.390 1 100.00 0.00
Bus-E5 Load 0.480 0.492 1 100.00 0.00
BUS-E06 Load 0.480 0.492 1 100.00 0.00
BUS-E07 Load 0.240 0.246 1 100.00 0.00
BUS-E08 Load 0.240 0.246 1 100.00 0.00
BUS-E09 Load 0.480 0.492 1 100.00 0.00
BUS-E10 Load 0.380 0.390 1 100.00 0.00
BUS-E11 Load 0.380 0.390 1 100.00 0.00
BUS-E12 Load 0.480 0.492 1 100.00 0.00
BUS-E14 Load 0.480 0.492 1 100.00 0.00
BUS-E15 Load 0.480 0.492 1 100.00 0.00
BUS-E16 Load 0.480 0.492 1 100.00 0.00
BUS-E17 Load 0.480 0.492 1 100.00 0.00
Bus-E18 Load 0.480 0.492 1 100.00 0.00
Bus-F01 Load 0.480 0.505 1 100.00 0.00
BUS-F7A/1 Load 0.480 0.505 1 100.00 0.00
BUS-F9A/1 Load 0.480 0.505 1 100.00 0.00
BUS-F22 Load 0.415 0.426 1 100.00 0.00
BUS-F30 Load 0.415 0.426 1 100.00 0.00
BUS-F31 Load 0.480 0.492 1 100.00 0.00

109 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.

208
Project: SPENCE GROWTH OPTION PROJECT

Page: 6

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Line/Cable Input Data

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110BL001A-P01 0.6MCUN3 10 82.0 0 1 75 1.03940 0.02828 0.0000000

2110BL001B-P01 0.6MCUN3 10 114.8 0 1 75 1.03940 0.02828 0.0000000

2110CH016-P01 0.6MCUN3 8 426.5 0 1 75 0.81100 0.04808 0.0000000

2110CH251-P01 0.6MCUN3 8 531.5 0 1 75 0.81100 0.04808 0.0000000

2110CN014-P01 0.6MCUN3 350 551.2 0 1 75 0.03780 0.03108 0.0000000

2110CP001-P1 0.6MCUN3 350 492.1 0 2 75 0.03780 0.03108 0.0000000

2110CR001A-E01 5.0MCUS3 3/0 557.7 0 1 75 0.08140 0.03858 0.0000000

2110CR001B-P01 0.6MCUN3 10 479.0 0 1 75 1.03940 0.02828 0.0000000

2110CR0101A-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110CR0101B-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110CR0101C-P01 0.6MCUN3 12 479.0 0 1 75 2.05000 0.04398 0.0000000

2110CR00101HE-P01 0.6MCUN3 6 465.9 0 1 75 0.51000 0.04375 0.0000000

2110CR0102A-P01 0.6MCUN3 10 459.3 0 1 75 1.03940 0.02828 0.0000000

2110CR0102B-P01 0.6MCUN3 10 459.3 0 1 75 1.03940 0.02828 0.0000000

2110CR0103A-P01 0.6MCUN3 10 479.0 0 1 75 1.03940 0.02828 0.0000000

2110CR0103B-P01 0.6MCUN3 10 479.0 0 1 75 1.03940 0.02828 0.0000000

2110CR0105A-P01 0.6MCUN3 12 544.6 0 1 75 2.05000 0.04398 0.0000000

2110CV001B-E01 5.0MCUS3 4 498.7 0 1 75 0.32100 0.04733 0.0000000

2110CV001HU01A-E01 5.0MCUS3 4 498.7 0 1 75 0.32100 0.04733 0.0000000

2110CV001HU01C-P01 0.6MCUN3 6 505.2 0 1 75 0.51000 0.04375 0.0000000

2110CV001HU01D-P01 0.6MCUN3 6 508.5 0 1 75 0.51000 0.04375 0.0000000

2110CV00102-P01 0.6MCUN3 4 262.5 0 1 75 0.32100 0.04025 0.0000000

2110CV00107-P01 0.6MCUN3 4 524.9 0 1 75 0.32100 0.04025 0.0000000

2110DC001A-P01 0.6MCUN3 1/0 459.3 0 1 75 0.12800 0.03450 0.0000000

2110DP501-P01 0.6MCUN3 4 65.6 0 1 75 0.32100 0.04025 0.0000000

2110DP502-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2110DP505-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2110DS001-P01 0.6MCUN3 6 269.0 0 1 75 0.51000 0.04375 0.0000000

2110DX501-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2110DX502-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2110DX503-P01 0.6MCUN3 1/0 82.0 0 1 75 0.12800 0.03450 0.0000000

2110HU001A-P01 0.6MCUN3 6 459.3 0 1 75 0.51000 0.04375 0.0000000

2110LP501-P01 0.6MCUN3 4/0 82.0 0 1 75 0.06400 0.03175 0.0000000

2110LX501-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2110MA001RC-P01 0.6MCUN3 1 538.1 0 1 75 0.16000 0.03633 0.0000000

2110MA001TFC-P01 0.6MCUN3 4 607.0 0 1 75 0.32100 0.04025 0.0000000

2110MA00101A-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

209
Project: SPENCE GROWTH OPTION PROJECT

Page: 7

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110MA00101B-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

2110MA00101C-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

2110MA00101D-P01 0.6MCUN3 12 65.6 0 1 75 2.05000 0.04398 0.0000000

2110MC501-P01~P15 0.6MCUN1 750 82.0 0 5 75 0.02100 0.04000 0.0000000

2110RB001-P01 0.6MCUN3 4/0 557.7 0 1 75 0.06400 0.03175 0.0000000

2110SG001-E01~E03 5.0MCUS1 350 82.0 0 1 75 0.03860 0.04683 0.0000000

2110UP501-P01 0.6MCUN3 10 131.2 0 1 75 1.03940 0.02828 0.0000000

2110US001A-E01 25MCUS3 1 328.1 0 1 75 0.15451 0.05000 0.0000000

2110US001B-E01 25MCUS3 1 45.9 0 1 75 0.15451 0.05000 0.0000000

2110WR001-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110WR002-P01 0.6MCUN3 4 459.3 0 1 75 0.32100 0.04025 0.0000000

2110WR003-P01 0.6MCUN3 4 531.5 0 1 75 0.32100 0.04025 0.0000000

2110WR004-P01 0.6MCUN3 4 521.7 0 1 75 0.32100 0.04025 0.0000000

2110ZM250-P01 0.6MCUN3 1 492.1 0 1 75 0.16000 0.03633 0.0000000

2130BL001A-P01 0.6MCUN3 12 262.5 0 1 75 2.05000 0.04398 0.0000000

2130BL001B-P01 0.6MCUN3 12 262.5 0 1 75 2.05000 0.04398 0.0000000

2130CH003-P01 0.6MCUN3 4 643.0 0 1 75 0.32100 0.04025 0.0000000

2130CH004-P01 0.6MCUN3 2 885.8 0 1 75 0.20200 0.03733 0.0000000

2130CH005-P01 0.6MCUN3 4 1181.1 0 1 75 0.32100 0.04025 0.0000000

2130CV002A-E01 5.0MCUS3 500 216.5 0 1 75 0.03000 0.03283 0.0000000

2130CV002A01A-P01 0.6MCUN3 12 360.9 0 1 75 2.05000 0.04398 0.0000000

2130CV002B-E01 5.0MCUS3 500 154.2 0 1 75 0.03000 0.03283 0.0000000

2130CV002B01A-P01 0.6MCUN3 12 311.7 0 1 75 2.05000 0.04398 0.0000000

2130CV00202-P01 0.6MCUN3 1 803.8 0 1 75 0.16000 0.03633 0.0000000

2130CV00207-P01 0.6MCUN3 2 771.0 0 1 75 0.20200 0.03733 0.0000000

2130CV00208-P01 0.6MCUN3 2 820.2 0 1 75 0.20200 0.03733 0.0000000

2130DC002A-P01 0.6MCUN3 1 744.8 0 1 75 0.16000 0.03633 0.0000000

2130DP501-P01 0.6MCUN3 4 82.0 0 1 75 0.32100 0.04025 0.0000000

2130DP502-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2130DP505-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2130DX501-P01 0.6MCUN3 6 82.0 0 1 75 0.51000 0.04375 0.0000000

2130DX502-P01 0.6MCUN3 2 82.0 0 1 75 0.20200 0.03733 0.0000000

2130DX503-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2130LP501-P01 0.6MCUN3 4/0 32.8 0 1 75 0.06400 0.03175 0.0000000

2130LX501-P01 0.6MCUN3 2/0 82.0 0 1 75 0.10200 0.03392 0.0000000

2130MC501-P01~P06 0.6MCUN1 750 108.3 0 2 75 0.02100 0.04000 0.0000000

2130SC25101-P01 0.6MCUN3 10 820.2 0 1 75 1.03940 0.02828 0.0000000

2130SC25102-P01 0.6MCUN3 10 820.2 0 1 75 1.03940 0.02828 0.0000000

2130SG001-E01~E06 5.0MCUS1 500 85.3 0 2 75 0.03000 0.04383 0.0000000

21 0
Project: SPENCE GROWTH OPTION PROJECT

Page: 8

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2130ST05501-P01 0.6MCUN3 4 1230.3 0 1 75 0.32100 0.04025 0.0000000

2130UP501-P01 0.6MCUN3 12 229.7 0 1 75 2.05000 0.04398 0.0000000

2130US001A-E01 25MCUS3 2/0 367.5 0 1 75 0.09729 0.04583 0.0000000

2130US001B-E01 25MCUS3 2/0 45.9 0 1 75 0.09729 0.04583 0.0000000

2130WR001-P01 0.6MCUN3 4 213.3 0 1 75 0.32100 0.04025 0.0000000

2130WR002-P01 0.6MCUN3 1/0 1148.3 0 1 75 0.12800 0.03450 0.0000000

2130ZM253-P01 0.6MCUN3 10 393.7 0 1 75 1.03940 0.02828 0.0000000

2831ZM02404-P01 0.6MCUN3 10 524.9 0 1 75 1.03940 0.02828 0.0000000

2831ZM02404-P2 0.6MCUN3 500 262.5 0 1 75 0.02940 0.02908 0.0000000

2110US001-E02 465 9186.4 0 1 75 0.05083 0.11740 0.0000009

Line / Cable resistances are listed at the specified temperatures.

21 1
Project: SPENCE GROWTH OPTION PROJECT

Page: 9

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

2110-DX-501 0.030 0.480 0.240 4.00 1.50 0 0 0 0 0 4.0000

2110-DX-502 0.045 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2110-DX-503 0.100 0.480 0.415 4.00 1.50 0 0 0 0 0 4.0000

2110-LX-501 0.100 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2110-XF-001 2.250 23.000 4.160 5.40 6.00 0 0 0 -5.000 0 5.4000

2110-XF-501 1.750 23.000 0.480 5.50 6.00 0 0 0 -5.000 0 5.5000

2130-DX-501 0.030 0.480 0.240 4.00 1.50 0 0 0 0 0 4.0000

2130-DX-502 0.045 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2130-DX-503 0.100 0.480 0.415 4.00 1.50 0 0 0 0 0 4.0000

2130-LX-501 0.075 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000

2130-XF-001 5.000 23.000 4.160 5.50 8.50 0 0 0 0 0 5.5000

2130-XF-501 0.500 23.000 0.480 5.40 1.50 0 0 0 -2.500 0 5.4000

21 2
Project: SPENCE GROWTH OPTION PROJECT

Page: 10

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2110-DX-501 2W XFMR BUS-2A/1 BUS-2A/2 6674.89 10012.34 12033.33

2110-DX-502 2W XFMR BUS-3A/1 BUS-3A/2 4449.93 6674.89 8022.22

2110-DX-503 2W XFMR BUS-4A/1 BUS-4A/2 2002.47 3003.70 3610.00

2110-LX-501 2W XFMR BUS-1A/1 BUS-1A/2 2002.47 3003.70 3610.00

2110-XF-001 2W XFMR BUS-C01 BUS-C04 35.61 213.65 216.60

2110-XF-501 2W XFMR BUS-A1 BUS-C03 46.63 279.78 283.64

2130-DX-501 2W XFMR BUS-E06 BUS-E07 7030.83 10546.24 12675.00

2130-DX-502 2W XFMR BUS-E09 BUS-E10 4687.22 7030.83 8450.00

2130-DX-503 2W XFMR BUS-F31 BUS-F30 2109.25 3163.87 3802.50

2130-LX-501 2W XFMR BUS-E03 BUS-E04 2812.33 4218.50 5070.00

2130-XF-001 2W XFMR BUS-A01 BUS-A05 12.85 109.25 110.00

2130-XF-501 2W XFMR BUS-A06 BUS-A03 569.50 854.25 1026.68

2110BL001A-P01 Cable BUS-2110MC501-F BUS-28A/2 3339.43 90.84 3340.67

2110BL001B-P01 Cable BUS-2110MC501-F BUS-B18/1 4675.20 127.18 4676.93

2110CH016-P01 Cable BUS-2110MC501-E BUS-21A/1 13549.21 803.32 13573.00

2110CH251-P01 Cable BUS-2110MC501-C BUS-12A/1 16884.40 1001.06 16914.05

2110CN014-P01 Cable BUS-2110MC501-C BUS-F9A/1 816.11 671.10 1056.61

2110CP001-P1 Cable BUS-2110MC501-C BUS-11A/1 364.34 299.60 471.70

2110CR001A-E01 Cable BUS-D01 BUS-D03 23.68 11.22 26.20

2110CR001B-P01 Cable BUS-2110MC501-A BUS-B1/1 19502.28 530.52 19509.49

2110CR0101A-P01 Cable BUS-2110MC501-A BUS-B4/1 5775.41 724.18 5820.64

2110CR0101B-P01 Cable BUS-2110MC501-B BUS-B6/1 5775.41 724.18 5820.64

2110CR0101C-P01 Cable BUS-2110MC501-B BUS-B7/1 38464.18 825.26 38473.04

2110CR00101HE-P01 Cable BUS-2110MC501-B BUS-6A/1 9306.97 798.39 9341.15

2110CR0102A-P01 Cable BUS-2110MC501-A BUS-B2/1 18700.81 508.72 18707.73

2110CR0102B-P01 Cable BUS-2110MC501-A BUS-B3/1 18700.81 508.72 18707.73

2110CR0103A-P01 Cable BS-5A/1 BUS-5A/2 19502.28 530.52 19509.49

2110CR0103B-P01 Cable BS-5A/1 BUS-5A/3 19502.28 530.52 19509.49

2110CR0105A-P01 Cable BUS-2110MC501-B BUS-B8/1 43733.25 938.31 43743.31

2110CV001B-E01 Cable BUS-D01 BUS-D05 83.48 12.31 84.38

2110CV001HU01A-E01 Cable BUS-D01 BUS-D04 83.48 12.31 84.38

2110CV001HU01C-P01 Cable BUS-2110MC501-D BUS-B12/1 10093.47 865.86 10130.54

2110CV001HU01D-P01 Cable BUS-2110MC501-D BUS-B13/1 10159.02 871.48 10196.33

2110CV00102-P01 Cable BUS-2110MC501-E BUS-19A/1 3300.24 413.81 3326.08

2110CV00107-P01 Cable BUS-2110MC501-E BUS-20A/1 6600.47 827.63 6652.16

2110DC001A-P01 Cable BUS-2110MC501-B BUS-B9/1 2302.97 620.72 2385.15

21 3
Project: SPENCE GROWTH OPTION PROJECT

Page: 11

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2110DP501-P01 Cable BUS-2A/2 BUS-2A/3 3300.24 413.81 3326.08

2110DP502-P01 Cable BUS-3A/2 BUS-3A/3 522.88 173.87 551.03

2110DP505-P01 Cable BUS-4A/2 BUS-4A/3 438.41 145.78 462.01

2110DS001-P01 Cable BUS-2110MC501-C BUS-14A/1 5374.45 461.04 5394.19

2110DX501-P01 Cable BUS-2110MC501-A BUS-2A/1 1638.55 140.56 1644.57

2110DX502-P01 Cable BUS-2110MC501-A BUS-3A/1 1638.55 140.56 1644.57

2110DX503-P01 Cable BUS-2110MC501-A BUS-4A/1 411.24 110.84 425.92

2110HU001A-P01 Cable BUS-2110MC501-B BUS-B11/1 9175.89 787.15 9209.59

2110LP501-P01 Cable BUS-1A/2 BUS-1A/3 328.08 162.76 366.24

2110LX501-P01 Cable BUS-2110MC501-A BUS-1A/1 327.71 108.97 345.35

2110MA001RC-P01 Cable BUS-2110MC501-C BUS-16A/1 3372.20 765.77 3458.06

2110MA001TFC-P01 Cable BUS-2110MC501-D BUS-17A/1 7631.79 956.95 7691.55

2110MA00101A-P01 Cable BUS-17A/1 BUS-17A/2 5269.07 113.05 5270.28

2110MA00101B-P01 Cable BUS-17A/1 BUS-17A/3 5269.07 113.05 5270.28

2110MA00101C-P01 Cable BUS-17A/1 BUS-17A/4 5269.07 113.05 5270.28

2110MA00101D-P01 Cable BUS-17A/1 BUS-17A/5 5269.07 113.05 5270.28

2110MC501-P01~P15 Cable BUS-C03 Bus-F01 13.49 25.70 29.03

2110RB001-P01 Cable BUS-2110MC501-D BUS-18A/1 1398.23 693.65 1560.83

2110SG001-E01~E03 Cable BUS-D01 BUS-C04 1.65 2.00 2.60

2110UP501-P01 Cable BUS-2110MC501-F BUS-29A/1 5343.09 145.35 5345.07

2110US001A-E01 Cable BUS-C05 BUS-C01 0.96 0.31 1.01

2110US001B-E01 Cable BUS-C01 BUS-A1 0.13 0.04 0.14

2110WR001-P01 Cable BUS-2110MC501-B BUS-F7A/1 5775.41 724.18 5820.64

2110WR002-P01 Cable BUS-2110MC501-B BUS-8A/1 5775.41 724.18 5820.64

2110WR003-P01 Cable BUS-2110MC501-F BUS-26A/1 6682.98 837.97 6735.31

2110WR004-P01 Cable BUS-2110MC501-F BUS-27A/1 6559.22 822.46 6610.58

2110ZM250-P01 Cable BUS-2110MC501-C BUS-10A/1 3084.33 700.40 3162.86

2130BL001A-P01 Cable BUS-2130MC501-B Bus-E3 22200.14 476.31 22205.25

2130BL001B-P01 Cable BUS-2130MC501-B Bus-E5 22200.14 476.31 22205.25

2130CH003-P01 Cable BUS-2110MC501-E BUS-22A/1 8085.58 1013.85 8148.89

2130CH004-P01 Cable BUS-2130MC501-A BUS-E15 7382.90 1364.50 7507.93

2130CH005-P01 Cable BUS-2130MC501-A BUS-E2 15642.98 1961.46 15765.47

2130CV002A-E01 Cable BUS-B01 2130-B03 3.75 4.11 5.56

2130CV002A01A-P01 Cable BUS-2130MC501-B Bus-E18 30525.19 654.93 30532.22

2130CV002B-E01 Cable BUS-B01 2130-B04 2.67 2.93 3.96

2130CV002B01A-P01 Cable BUS-2130MC501-B Bus-E4 26362.66 565.62 26368.73

2130CV00202-P01 Cable BUS-2110MC501-E BUS-25A/1 5037.74 1143.99 5166.00

2130CV00207-P01 Cable BUS-2110MC501-E BUS-23A/1 6100.55 1127.49 6203.87

2130CV00208-P01 Cable BUS-2110MC501-F BUS-24A/5 6489.95 1199.46 6599.86

21 4
Project: SPENCE GROWTH OPTION PROJECT

Page: 12

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2130DC002A-P01 Cable BUS-2110MC501-E BUS-B16/1 4667.62 1059.94 4786.46

2130DP501-P01 Cable BUS-E07 BUS-E08 4345.27 544.85 4379.30

2130DP502-P01 Cable BUS-E10 BUS-E11 2753.83 236.24 2763.95

2130DP505-P01 Cable BUS-F30 BUS-F22 461.78 153.55 486.64

2130DX501-P01 Cable BUS-2130MC501-A BUS-E06 1725.93 148.06 1732.26

2130DX502-P01 Cable BUS-2130MC501-A BUS-E09 683.60 126.34 695.18

2130DX503-P01 Cable BUS-2130MC501-A BUS-F31 345.19 114.78 363.77

2130LP501-P01 Cable BUS-E04 BUS-E05 138.23 68.58 154.31

2130LX501-P01 Cable BUS-2130MC501-A BUS-E03 345.19 114.78 363.77

2130MC501-P01~P06 Cable BUS-A03 Bus-E01 46.90 89.34 100.91

2130SC25101-P01 Cable BUS-2110MC501-F BUS-24A/2 33394.31 908.43 33406.66

2130SC25102-P01 Cable BUS-2110MC501-F BUS-24A/3 33394.31 908.43 33406.66

2130SG001-E01~E06 Cable BUS-B02 BUS-A05 0.74 1.08 1.31

2130ST05501-P01 Cable BUS-2130MC501-A BUS-E14 16294.77 2043.19 16422.37

2130UP501-P01 Cable BUS-2130MC501-B BUS-E12 19425.12 416.77 19429.59

2130US001A-E01 Cable 2130-VL-001 BUS-A01 0.68 0.32 0.75

2130US001B-E01 Cable BUS-A01 BUS-A06 0.08 0.04 0.09

2130WR001-P01 Cable BUS-2130MC501-B BUS-E16 2824.43 354.15 2846.54

2130WR002-P01 Cable BUS-2130MC501-B BUS-E17 6064.43 1634.55 6280.85

2130ZM253-P01 Cable BUS-2110MC501-E BUS-24A/1 16029.27 436.05 16035.20

2831ZM02404-P01 Cable BUS-2110MC501-F BUS-B20/1 21372.36 581.40 21380.27

2831ZM02404-P2 Cable BUS-2110MC501-F BUS-B20/3 302.26 299.01 425.17

2110US001-E02 Line 2130-VL-001 BUS-C05 8.83 20.39 22.21

CB-5A Tie Breaker BUS-2110MC501-A BS-5A/1

CB-B01 Tie Breaker BUS-B01 BUS-B02

CB-E01 Tie Breaker Bus-E01 BUS-2130MC501-A

CB-F01 Tie Breaker Bus-F01 BUS-2110MC501-A

SW1 Tie Switch BUS-2110MC501-A BUS-2110MC501-B

SW2 Tie Switch BUS-2110MC501-B BUS-2110MC501-C

SW3 Tie Switch BUS-2110MC501-C BUS-2110MC501-D

SW4 Tie Switch BUS-2110MC501-D BUS-2110MC501-E

SW5 Tie Switch BUS-2110MC501-E BUS-2110MC501-F

SW6 Tie Switch BUS-2130MC501-A BUS-2130MC501-B

21 5
Project: SPENCE GROWTH OPTION PROJECT

Page: 13

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV X/R R X

U1 2130-VL-001 624.926 23.000 5.78 2.72797 15.76766

Total Connected Power Grids (= 1 ): 624.926 MVA

21 6
Project: SPENCE GROWTH OPTION PROJECT

Page: 14

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Induction Machine Input Data

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
2130-CV002-A 1 2130-B03 1865.00 2137.99 4.000 1500 32.60 32.60 0.47 15.38 23.08
2130-CV002-B 1 2130-B04 1865.00 2137.99 4.000 1500 32.60 32.60 0.47 15.38 23.08
2110-CR001-A 1 BUS-D03 750.00 1163.94 4.000 500 24.25 24.25 0.70 16.95 25.42
2110-CV001HU-01A 1 BUS-D04 368.00 428.77 4.000 1500 17.30 17.30 1.07 18.46 46.15
2110-CV001HU-01B 1 BUS-D05 368.00 428.77 4.000 1500 17.30 17.30 1.07 18.46 46.15
2110-CR01-03A 1 BUS-5A/2 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-CR01-03B 1 BUS-5A/3 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-ZM-250 1 BUS-10A/1 44.70 61.29 0.460 1500 6.03 6.03 3.32 20.00 50.00
2110-CP-001 1 BUS-11A/1 257.00 375.27 0.460 1500 14.46 14.46 1.38 20.00 50.00
2110-DS-001 1 BUS-14A/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-MA001-RC 1 BUS-16A/1 42.00 57.84 0.460 1500 5.84 5.84 3.42 20.00 50.00
2110-MA001-A 1 BUS-17A/2 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-MA001-B 1 BUS-17A/3 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-MA001-01C 1 BUS-17A/4 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-MA001-01D 1 BUS-17A/5 2.20 3.25 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-RB001-A 1 BUS-18A/1 75.00 99.38 0.460 1500 7.81 7.81 2.56 20.00 50.00
2110-RB001-B 1 BUS-18A/1 0.80 1.28 0.460 1500 0.81 0.81 34.50 27.83 9999.00
2110-CV001-02 1 BUS-19A/1 37.30 51.81 0.460 1500 5.51 5.51 3.63 20.00 50.00
2130-CV002-07 1 BUS-23A/1 30.00 41.67 0.460 1500 4.94 4.94 5.63 27.83 9999.00
2130-CV002-02 1 BUS-25A/1 37.00 51.39 0.460 1500 5.49 5.49 5.07 27.83 9999.00
2110-BL001-A 1 BUS-28A/2 2.30 3.91 0.460 1500 1.37 1.37 20.35 27.83 9999.00
2110-CR001-B 1 BUS-B1/1 4.00 6.46 0.460 1500 1.80 1.80 15.43 27.83 9999.00
2110-CR01-02A 1 BUS-B2/1 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-CR01-02B 1 BUS-B3/1 5.60 8.77 0.460 1500 2.13 2.13 13.04 27.83 9999.00
2110-CR01-01A 1 BUS-B4/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-CR01-01B 1 BUS-B6/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-CR001-01C 1 BUS-B7/1 1.50 2.71 0.460 1500 1.10 1.10 25.20 27.83 9999.00
2110-CR01-05A 1 BUS-B8/1 2.20 3.76 0.460 1500 1.34 1.34 20.81 27.83 9999.00
2110-DC-001 1 BUS-B9/1 56.00 76.57 0.460 1500 6.75 6.75 2.96 20.00 50.00
2110-HU001-A 1 BUS-B11/1 15.00 21.64 0.460 1500 3.49 3.49 7.97 27.83 9999.00
2110-CV001HU-01C 1 BUS-B12/1 15.00 21.64 0.460 1500 3.49 3.49 7.97 27.83 9999.00
2110-CV001HU-01D 1 BUS-B13/1 15.00 21.64 0.460 1500 3.49 3.49 7.97 27.83 9999.00
2130-DC-002 1 BUS-B16/1 22.50 32.03 0.460 1500 4.28 4.28 6.51 27.83 9999.00
2110-BL001-B 1 BUS-B18/1 0.40 0.84 0.460 1500 0.57 0.57 48.80 27.83 9999.00
2831-ZM-024-04 1 BUS-B20/1 5.00 7.91 0.460 1500 2.02 2.02 13.80 27.83 9999.00
2130-BL001-A 1 Bus-E3 2.30 3.91 0.460 1500 1.37 1.37 20.35 27.83 9999.00
2130-CV002B-01A 1 Bus-E4 3.70 6.02 0.460 1500 1.73 1.73 16.04 27.83 9999.00
2130-BL001-B 1 Bus-E5 0.40 0.84 0.460 1500 0.57 0.57 48.80 27.83 9999.00
2130-ST055-01 1 BUS-E14 9.00 13.46 0.460 1500 2.71 2.71 10.29 27.83 9999.00

21 7
Project: SPENCE GROWTH OPTION PROJECT

Page: 15

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

% Impedance
Induction Machine Connected Bus Rating X/R Ratio Machine Base
ID Qty ID HP/kW kVA kV RPM X"/R X'/R R X" X'

Motors
2130-CV002A-01A 1 Bus-E18 3.70 6.02 0.460 1500 1.73 1.73 16.04 27.83 9999.00
2110-CN014-A 1 BUS-F9A/1 115.00 135.56 0.460 1500 9.67 9.67 2.07 20.00 50.00
2110-CN014-B 1 BUS-F9A/1 5.00 7.91 0.460 1500 2.02 2.02 13.80 27.83 9999.00

Total Connected Induction Motors ( = 42 ): 7554.4 kVA

21 8
Project: SPENCE GROWTH OPTION PROJECT

Page: 16

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Lumped Load Input Data

Lumped Load Motor Loads Static Loads


% Impedance
Lumped Load Connected Bus Rating % Load Loading X/R Ratio (Machine Base) Loading
ID ID kVA kV MTR STAT kW kvar X"/R X'/R R X" X' kW kvar

2110-CH-016 BUS-21A/1 18.0 0.480 80 20 12.2 7.6 2.38 2.38 8.403 20.00 50.00 3.06 1.90

2110-CH-251 BUS-12A/1 12.0 0.480 80 20 8.2 5.1 2.38 2.38 8.403 20.00 50.00 2.04 1.26

2110-CN014-HE1 BUS-F9A/1 0.5 0.480 80 20 0.4 0.0 2.38 2.38 8.403 20.00 50.00 0.10 0.00

2110-CN014-HE2 BUS-F9A/1 0.5 0.480 80 20 0.4 0.0 2.38 2.38 8.403 20.00 50.00 0.10 0.00

2110-CR00101-HE1 BUS-6A/1 5.0 0.480 80 20 4.0 0.0 2.38 2.38 8.403 20.00 50.00 1.00 0.00

2110-CR00101-HE2 BUS-6A/1 5.0 0.480 80 20 4.0 0.0 2.38 2.38 8.403 20.00 50.00 1.00 0.00

2110-CR00101-HE3 BUS-6A/1 5.0 0.480 80 20 4.0 0.0 2.38 2.38 8.403 20.00 50.00 1.00 0.00

2110-CV001-07 BUS-20A/1 40.0 0.480 80 20 27.2 16.9 2.38 2.38 8.403 20.00 50.00 6.80 4.21

2110-DP-501 BUS-2A/3 20.0 0.240 80 20 13.6 8.4 2.38 2.38 8.403 20.00 50.00 3.40 2.11

2110-DP-502 BUS-3A/3 28.0 0.380 80 20 19.0 11.8 2.38 2.38 8.403 20.00 50.00 4.76 2.95

2110-DP-505 BUS-4A/3 55.0 0.415 80 20 37.4 23.2 2.38 2.38 8.403 20.00 50.00 9.35 5.79

2110-LP-501 BUS-1A/3 70.0 0.380 80 20 47.6 29.5 2.38 2.38 8.403 20.00 50.00 11.90 7.37

2110-UP-501 BUS-29A/1 5.0 0.480 80 20 3.4 2.1 2.38 2.38 8.403 20.00 50.00 0.85 0.53

2130-CH-003 BUS-22A/1 12.0 0.480 80 20 8.2 5.1 2.38 2.38 8.403 20.00 50.00 2.04 1.26

2130-CH-004 BUS-E15 24.0 0.480 80 20 16.3 10.1 2.38 2.38 8.403 20.00 50.00 4.08 2.53

2130-CH-005 BUS-E2 12.0 0.480 80 20 8.2 5.1 2.38 2.38 8.403 20.00 50.00 2.04 1.26

2130-CV002-08 BUS-24A/5 25.0 0.480 80 20 17.0 10.5 2.38 2.38 8.403 20.00 50.00 4.25 2.63

2130-DP-501 BUS-E08 24.0 0.240 80 20 16.3 10.1 2.38 2.38 8.403 20.00 50.00 4.08 2.53

2130-DP-502 BUS-E11 36.0 0.380 80 20 24.5 15.2 2.38 2.38 8.403 20.00 50.00 6.12 3.79

2130-DP-505 BUS-F22 80.0 0.415 80 20 54.4 33.7 2.38 2.38 8.403 20.00 50.00 13.60 8.43

2130-LP-501 BUS-E05 65.0 0.380 80 20 44.2 27.4 2.38 2.38 8.403 20.00 50.00 11.05 6.85

2130-SC251-01 BUS-24A/2 1.8 0.480 80 20 1.2 0.7 2.38 2.38 8.403 20.00 50.00 0.30 0.18

2130-SC251-02 BUS-24A/3 1.8 0.480 80 20 1.2 0.7 2.38 2.38 8.403 20.00 50.00 0.30 0.18

2130-UP-501 BUS-E12 5.0 0.480 80 20 3.4 2.1 2.38 2.38 8.403 20.00 50.00 0.85 0.53

2130-ZM-253 BUS-24A/1 1.8 0.480 80 20 1.2 0.7 2.38 2.38 8.403 20.00 50.00 0.30 0.18

Total Connected Lumped Loads ( = 25 ): 552.3 kVA

21 9
Project: SPENCE GROWTH OPTION PROJECT

Page: 17

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

SHORT-CIRCUIT REPORT

3-phase fault at bus: 2130-B03

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

2130-B03 Total 0.00 1.886 -14.402 7.6 14.525 0.00 1.802 -13.059 7.2 13.183

BUS-B01 2130-B03 4.99 1.822 -12.318 6.8 12.452 4.73 1.759 -11.670 6.6 11.802

2130-CV002-A 2130-B03 104.00 0.064 -2.084 32.6 2.085 104.00 0.043 -1.389 32.6 1.390

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

220
Project: SPENCE GROWTH OPTION PROJECT

Page: 18

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: 2130-B04

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

2130-B04 Total 0.00 1.809 -14.561 8.0 14.673 0.00 1.733 -13.204 7.6 13.317

BUS-B01 2130-B04 3.60 1.745 -12.477 7.1 12.598 3.41 1.690 -11.815 7.0 11.935

2130-CV002-B 2130-B04 104.00 0.064 -2.084 32.6 2.085 104.00 0.043 -1.389 32.6 1.390

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

221
Project: SPENCE GROWTH OPTION PROJECT

Page: 19

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: 2130-VL-001

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

2130-VL-001 Total 0.00 2.780 -16.434 5.9 16.667 0.00 2.723 -16.092 5.9 16.320

BUS-A01 2130-VL-001 0.17 0.043 -0.581 13.6 0.583 0.12 0.025 -0.418 17.0 0.418

BUS-C05 2130-VL-001 3.54 0.063 -0.395 6.2 0.400 1.93 0.024 -0.217 8.9 0.218

U1 2130-VL-001 100.00 2.674 -15.457 5.8 15.687 100.00 2.674 -15.457 5.8 15.687

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

222
Project: SPENCE GROWTH OPTION PROJECT

Page: 20

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BS-5A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BS-5A/1 Total 0.00 8.519 -38.313 4.5 39.249

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

223
Project: SPENCE GROWTH OPTION PROJECT

Page: 21

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BS-5A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

*BUS-2110MC501-A BS-5A/1 0.00 8.485 -38.249 4.5 39.179

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-B BUS-2110MC501-A 0.00 1.655 -6.850 4.1 7.048

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.423 -6.090 4.3 6.255

*BUS-2110MC501-D BUS-2110MC501-C 0.00 0.692 -2.098 3.0 2.209

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.471 -1.282 2.7 1.366

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

224
Project: SPENCE GROWTH OPTION PROJECT

Page: 22

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-1A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-1A/1 Total 0.00 14.361 -14.251 1.0 20.231

BUS-2110MC501-A BUS-1A/1 63.53 14.246 -13.995 1.0 19.971

BUS-1A/2 BUS-1A/1 9.31 0.114 -0.255 2.2 0.280

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

225
Project: SPENCE GROWTH OPTION PROJECT

Page: 23

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-1A/2

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-1A/2 Total 0.00 2.062 -3.061 1.5 3.691

BUS-1A/3 BUS-1A/2 1.04 0.153 -0.358 2.3 0.389

BUS-1A/1 BUS-1A/2 87.12 1.909 -2.703 1.4 3.309

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

226
Project: SPENCE GROWTH OPTION PROJECT

Page: 24

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-1A/3

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-1A/3 Total 0.00 2.018 -2.797 1.4 3.449

BUS-1A/2 BUS-1A/3 8.19 1.866 -2.435 1.3 3.068

2110-LP-501 BUS-1A/3 100.00 0.152 -0.362 2.4 0.392

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

227
Project: SPENCE GROWTH OPTION PROJECT

Page: 25

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2A/1 Total 0.00 6.071 -1.534 0.3 6.262

BUS-2110MC501-A BUS-2A/1 94.10 6.037 -1.461 0.2 6.212

BUS-2A/2 BUS-2A/1 8.85 0.034 -0.072 2.1 0.080

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

228
Project: SPENCE GROWTH OPTION PROJECT

Page: 26

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2A/2

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 95.00 % of base (0.253 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2A/2 Total 0.00 1.088 -1.426 1.3 1.794

BUS-2A/3 BUS-2A/2 2.68 0.072 -0.160 2.2 0.175

BUS-2A/1 BUS-2A/2 90.00 1.017 -1.266 1.2 1.624

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

229
Project: SPENCE GROWTH OPTION PROJECT

Page: 27

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2A/3

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 95.00 % of base (0.253 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2A/3 Total 0.00 1.068 -1.091 1.0 1.526

BUS-2A/2 BUS-2A/3 20.88 0.999 -0.927 0.9 1.363

2110-DP-501 BUS-2A/3 100.00 0.069 -0.164 2.4 0.177

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

230
Project: SPENCE GROWTH OPTION PROJECT

Page: 28

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-3A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-3A/1 Total 0.00 6.083 -1.566 0.3 6.281

BUS-2110MC501-A BUS-3A/1 94.10 6.037 -1.462 0.2 6.211

BUS-3A/2 BUS-3A/1 8.39 0.046 -0.104 2.3 0.113

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

231
Project: SPENCE GROWTH OPTION PROJECT

Page: 29

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-3A/2

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-3A/2 Total 0.00 1.019 -1.248 1.2 1.611

BUS-3A/3 BUS-3A/2 0.63 0.061 -0.144 2.3 0.156

BUS-3A/1 BUS-3A/2 85.51 0.958 -1.104 1.2 1.462

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

232
Project: SPENCE GROWTH OPTION PROJECT

Page: 30

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-3A/3

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 95.00 % of base (0.400 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-3A/3 Total 0.00 1.002 -1.169 1.2 1.539

BUS-3A/2 BUS-3A/3 5.59 0.941 -1.024 1.1 1.391

2110-DP-502 BUS-3A/3 100.00 0.061 -0.145 2.4 0.157

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

233
Project: SPENCE GROWTH OPTION PROJECT

Page: 31

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-4A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-4A/1 Total 0.00 13.980 -11.475 0.8 18.086

BUS-2110MC501-A BUS-4A/1 70.18 13.889 -11.270 0.8 17.886

BUS-4A/2 BUS-4A/1 7.47 0.091 -0.205 2.2 0.224

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

234
Project: SPENCE GROWTH OPTION PROJECT

Page: 32

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-4A/2

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 95.00 % of base (0.437 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-4A/2 Total 0.00 1.877 -2.675 1.4 3.268

BUS-4A/3 BUS-4A/2 1.03 0.111 -0.258 2.3 0.280

BUS-4A/1 BUS-4A/2 86.09 1.766 -2.418 1.4 2.994

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

235
Project: SPENCE GROWTH OPTION PROJECT

Page: 33

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-4A/3

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 95.00 % of base (0.437 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-4A/3 Total 0.00 1.854 -2.376 1.3 3.014

BUS-4A/2 BUS-4A/3 10.09 1.745 -2.116 1.2 2.743

2110-DP-505 BUS-4A/3 100.00 0.109 -0.260 2.4 0.282

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

236
Project: SPENCE GROWTH OPTION PROJECT

Page: 34

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-5A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-5A/2 Total 0.00 0.570 -0.057 0.1 0.573

BS-5A/1 BUS-5A/2 99.65 0.554 -0.023 0.0 0.554

2110-CR01-03A BUS-5A/2 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

237
Project: SPENCE GROWTH OPTION PROJECT

Page: 35

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-5A/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-5A/3 Total 0.00 0.570 -0.057 0.1 0.573

BS-5A/1 BUS-5A/3 99.65 0.554 -0.023 0.0 0.554

2110-CR01-03B BUS-5A/3 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

238
Project: SPENCE GROWTH OPTION PROJECT

Page: 36

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-6A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-6A/1 Total 0.00 1.170 -0.192 0.2 1.185

BUS-2110MC501-B BUS-6A/1 99.08 1.144 -0.131 0.1 1.151

2110-CR00101-HE1 BUS-6A/1 100.00 0.009 -0.020 2.4 0.022

2110-CR00101-HE2 BUS-6A/1 100.00 0.009 -0.020 2.4 0.022

2110-CR00101-HE3 BUS-6A/1 100.00 0.009 -0.020 2.4 0.022

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

239
Project: SPENCE GROWTH OPTION PROJECT

Page: 37

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-8A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-8A/1 Total 0.00 1.808 -0.308 0.2 1.834

BUS-2110MC501-B BUS-8A/1 98.33 1.808 -0.308 0.2 1.834

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

240
Project: SPENCE GROWTH OPTION PROJECT

Page: 38

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-10A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-10A/1 Total 0.00 3.215 -1.365 0.4 3.493

BUS-2110MC501-C BUS-10A/1 96.08 3.150 -0.975 0.3 3.298

2110-ZM-250 BUS-10A/1 104.35 0.065 -0.391 6.0 0.396

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

241
Project: SPENCE GROWTH OPTION PROJECT

Page: 39

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-11A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-11A/1 Total 0.00 9.004 -14.499 1.6 17.067

BUS-2110MC501-C BUS-11A/1 64.94 8.835 -12.053 1.4 14.944

2110-CP-001 BUS-11A/1 104.35 0.169 -2.446 14.5 2.452

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

242
Project: SPENCE GROWTH OPTION PROJECT

Page: 40

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-12A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-12A/1 Total 0.00 0.658 -0.097 0.1 0.665

BUS-2110MC501-C BUS-12A/1 99.54 0.637 -0.048 0.1 0.639

2110-CH-251 BUS-12A/1 100.00 0.021 -0.049 2.4 0.053

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

243
Project: SPENCE GROWTH OPTION PROJECT

Page: 41

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-14A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-14A/1 Total 0.00 1.995 -0.407 0.2 2.036

BUS-2110MC501-C BUS-14A/1 98.37 1.962 -0.264 0.1 1.980

2110-DS-001 BUS-14A/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

244
Project: SPENCE GROWTH OPTION PROJECT

Page: 42

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-16A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-16A/1 Total 0.00 2.960 -1.244 0.4 3.211

BUS-2110MC501-C BUS-16A/1 96.43 2.897 -0.876 0.3 3.027

2110-MA001-RC BUS-16A/1 104.35 0.063 -0.368 5.8 0.373

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

245
Project: SPENCE GROWTH OPTION PROJECT

Page: 43

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/1 Total 0.00 1.406 -0.259 0.2 1.429

BUS-2110MC501-D BUS-17A/1 98.75 1.376 -0.220 0.2 1.394

BUS-17A/2 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

BUS-17A/3 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

BUS-17A/4 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

BUS-17A/5 BUS-17A/1 0.59 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

246
Project: SPENCE GROWTH OPTION PROJECT

Page: 44

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/2 Total 0.00 0.845 -0.105 0.1 0.852

BUS-17A/1 BUS-17A/2 40.93 0.838 -0.095 0.1 0.843

2110-MA001-A BUS-17A/2 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

247
Project: SPENCE GROWTH OPTION PROJECT

Page: 45

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/3 Total 0.00 0.845 -0.105 0.1 0.852

BUS-17A/1 BUS-17A/3 40.93 0.838 -0.095 0.1 0.843

2110-MA001-B BUS-17A/3 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

248
Project: SPENCE GROWTH OPTION PROJECT

Page: 46

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/4

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/4 Total 0.00 0.845 -0.105 0.1 0.852

BUS-17A/1 BUS-17A/4 40.93 0.838 -0.095 0.1 0.843

2110-MA001-01C BUS-17A/4 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

249
Project: SPENCE GROWTH OPTION PROJECT

Page: 47

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-17A/5

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-17A/5 Total 0.00 0.845 -0.105 0.1 0.852

BUS-17A/1 BUS-17A/5 40.93 0.838 -0.095 0.1 0.843

2110-MA001-01D BUS-17A/5 104.35 0.007 -0.010 1.3 0.012

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

250
Project: SPENCE GROWTH OPTION PROJECT

Page: 48

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-18A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-18A/1 Total 0.00 5.251 -4.069 0.8 6.643

BUS-2110MC501-D BUS-18A/1 89.13 5.166 -3.427 0.7 6.199

2110-RB001-A BUS-18A/1 104.35 0.082 -0.640 7.8 0.646

2110-RB001-B BUS-18A/1 104.35 0.003 -0.002 0.8 0.004

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

251
Project: SPENCE GROWTH OPTION PROJECT

Page: 49

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-19A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-19A/1 Total 0.00 3.161 -0.961 0.3 3.304

BUS-2110MC501-E BUS-19A/1 96.97 3.101 -0.633 0.2 3.165

2110-CV001-02 BUS-19A/1 104.35 0.060 -0.328 5.5 0.334

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

252
Project: SPENCE GROWTH OPTION PROJECT

Page: 50

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-20A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-20A/1 Total 0.00 1.655 -0.425 0.3 1.709

BUS-2110MC501-E BUS-20A/1 98.54 1.587 -0.262 0.2 1.608

2110-CV001-07 BUS-20A/1 100.00 0.069 -0.164 2.4 0.177

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

253
Project: SPENCE GROWTH OPTION PROJECT

Page: 51

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-21A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-21A/1 Total 0.00 0.824 -0.136 0.2 0.835

BUS-2110MC501-E BUS-21A/1 99.42 0.793 -0.063 0.1 0.795

2110-CH-016 BUS-21A/1 100.00 0.031 -0.074 2.4 0.080

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

254
Project: SPENCE GROWTH OPTION PROJECT

Page: 52

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-22A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-22A/1 Total 0.00 1.321 -0.254 0.2 1.345

BUS-2110MC501-E BUS-22A/1 98.82 1.300 -0.205 0.2 1.316

2130-CH-003 BUS-22A/1 100.00 0.021 -0.049 2.4 0.053

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

255
Project: SPENCE GROWTH OPTION PROJECT

Page: 53

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-23A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-23A/1 Total 0.00 1.714 -0.569 0.3 1.806

BUS-2110MC501-E BUS-23A/1 98.20 1.676 -0.380 0.2 1.718

2130-CV002-07 BUS-23A/1 104.35 0.038 -0.188 4.9 0.192

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

256
Project: SPENCE GROWTH OPTION PROJECT

Page: 54

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/1 Total 0.00 0.676 -0.037 0.1 0.677

BUS-2110MC501-E BUS-24A/1 99.57 0.673 -0.030 0.0 0.674

2130-ZM-253 BUS-24A/1 100.00 0.003 -0.007 2.4 0.008

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

257
Project: SPENCE GROWTH OPTION PROJECT

Page: 55

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/2 Total 0.00 0.327 -0.019 0.1 0.328

BUS-2110MC501-F BUS-24A/2 99.80 0.324 -0.011 0.0 0.324

2130-SC251-01 BUS-24A/2 100.00 0.003 -0.007 2.4 0.008

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

258
Project: SPENCE GROWTH OPTION PROJECT

Page: 56

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/3 Total 0.00 0.327 -0.019 0.1 0.328

BUS-2110MC501-F BUS-24A/3 99.80 0.324 -0.011 0.0 0.324

2130-SC251-02 BUS-24A/3 100.00 0.003 -0.007 2.4 0.008

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

259
Project: SPENCE GROWTH OPTION PROJECT

Page: 57

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-24A/5

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/5 Total 0.00 1.621 -0.456 0.3 1.684

BUS-2110MC501-F BUS-24A/5 98.32 1.578 -0.354 0.2 1.617

2130-CV002-08 BUS-24A/5 100.00 0.043 -0.102 2.4 0.111

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

260
Project: SPENCE GROWTH OPTION PROJECT

Page: 58

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-25A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-25A/1 Total 0.00 2.020 -0.783 0.4 2.166

BUS-2110MC501-E BUS-25A/1 97.64 1.977 -0.549 0.3 2.052

2130-CV002-02 BUS-25A/1 104.35 0.043 -0.234 5.5 0.238

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

261
Project: SPENCE GROWTH OPTION PROJECT

Page: 59

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-26A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-26A/1 Total 0.00 1.568 -0.258 0.2 1.589

BUS-2110MC501-F BUS-26A/1 98.56 1.568 -0.258 0.2 1.589

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

262
Project: SPENCE GROWTH OPTION PROJECT

Page: 60

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-27A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-27A/1 Total 0.00 1.596 -0.263 0.2 1.618

BUS-2110MC501-F BUS-27A/1 98.54 1.596 -0.263 0.2 1.618

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

263
Project: SPENCE GROWTH OPTION PROJECT

Page: 61

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-28A/2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-28A/2 Total 0.00 3.166 -0.347 0.1 3.185

BUS-2110MC501-F BUS-28A/2 97.72 3.158 -0.335 0.1 3.175

2110-BL001-A BUS-28A/2 104.35 0.009 -0.012 1.4 0.015

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

264
Project: SPENCE GROWTH OPTION PROJECT

Page: 62

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-29A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-29A/1 Total 0.00 2.006 -0.174 0.1 2.013

BUS-2110MC501-F BUS-29A/1 98.63 1.997 -0.154 0.1 2.003

2110-UP-501 BUS-29A/1 100.00 0.009 -0.020 2.4 0.022

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

265
Project: SPENCE GROWTH OPTION PROJECT

Page: 63

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-A

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-A Total 0.00 8.519 -38.313 4.5 39.249

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

266
Project: SPENCE GROWTH OPTION PROJECT

Page: 64

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-A

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-B BUS-2110MC501-A 0.00 1.655 -6.850 4.1 7.048

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.423 -6.090 4.3 6.255

*BUS-2110MC501-D BUS-2110MC501-C 0.00 0.692 -2.098 3.0 2.209

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.471 -1.282 2.7 1.366

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

267
Project: SPENCE GROWTH OPTION PROJECT

Page: 65

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-B

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-B Total 0.00 8.519 -38.313 4.5 39.249

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

268
Project: SPENCE GROWTH OPTION PROJECT

Page: 66

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-B

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.864 -31.462 4.6 32.202

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.423 -6.090 4.3 6.255

*BUS-2110MC501-D BUS-2110MC501-C 0.00 0.692 -2.098 3.0 2.209

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.471 -1.282 2.7 1.366

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

269
Project: SPENCE GROWTH OPTION PROJECT

Page: 67

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-C

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-C Total 0.00 8.519 -38.313 4.5 39.249

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

270
Project: SPENCE GROWTH OPTION PROJECT

Page: 68

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-C

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.864 -31.462 4.6 32.202

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.096 -32.222 4.5 32.994

*BUS-2110MC501-D BUS-2110MC501-C 0.00 0.692 -2.098 3.0 2.209

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.471 -1.282 2.7 1.366

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

271
Project: SPENCE GROWTH OPTION PROJECT

Page: 69

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-D

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-D Total 0.00 8.519 -38.313 4.5 39.249

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

272
Project: SPENCE GROWTH OPTION PROJECT

Page: 70

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-D

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.864 -31.462 4.6 32.202

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.096 -32.222 4.5 32.994

*BUS-2110MC501-C BUS-2110MC501-D 0.00 7.827 -36.215 4.6 37.051

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.471 -1.282 2.7 1.366

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

273
Project: SPENCE GROWTH OPTION PROJECT

Page: 71

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-E

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-E Total 0.00 8.519 -38.313 4.5 39.249

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

274
Project: SPENCE GROWTH OPTION PROJECT

Page: 72

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-E

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.864 -31.462 4.6 32.202

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.096 -32.222 4.5 32.994

*BUS-2110MC501-C BUS-2110MC501-D 0.00 7.827 -36.215 4.6 37.051

*BUS-2110MC501-D BUS-2110MC501-E 0.00 8.049 -37.031 4.6 37.895

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

275
Project: SPENCE GROWTH OPTION PROJECT

Page: 73

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2110MC501-F

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2110MC501-F Total 0.00 8.519 -38.313 4.5 39.249

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

276
Project: SPENCE GROWTH OPTION PROJECT

Page: 74

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: BUS-2110MC501-F

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*Bus-F01 BUS-2110MC501-A 0.00 6.451 -30.546 4.7 31.220

*BUS-2110MC501-A BUS-2110MC501-B 0.00 6.864 -31.462 4.6 32.202

*BUS-2110MC501-B BUS-2110MC501-C 0.00 7.096 -32.222 4.5 32.994

*BUS-2110MC501-C BUS-2110MC501-D 0.00 7.827 -36.215 4.6 37.051

*BUS-2110MC501-D BUS-2110MC501-E 0.00 8.049 -37.031 4.6 37.895

*BUS-2110MC501-E BUS-2110MC501-F 0.00 8.431 -38.141 4.5 39.062

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

277
Project: SPENCE GROWTH OPTION PROJECT

Page: 75

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2130MC501-A

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2130MC501-A Total 0.00 5.913 -9.398 1.6 11.104

BUS-E15 BUS-2130MC501-A 6.72 0.045 -0.092 2.0 0.102

BUS-E2 BUS-2130MC501-A 7.07 0.023 -0.046 2.0 0.051

BUS-E06 BUS-2130MC501-A 1.41 0.041 -0.083 2.0 0.093

BUS-E09 BUS-2130MC501-A 0.85 0.061 -0.126 2.0 0.140

BUS-F31 BUS-2130MC501-A 1.00 0.132 -0.284 2.2 0.313

BUS-E03 BUS-2130MC501-A 0.81 0.105 -0.231 2.2 0.254

BUS-E14 BUS-2130MC501-A 8.19 0.024 -0.052 2.2 0.057

Bus-E3 BUS-2130MC501-B 2.83 0.009 -0.012 1.3 0.015

Bus-E5 BUS-2130MC501-B 0.38 0.002 -0.001 0.6 0.002

Bus-E18 BUS-2130MC501-B 6.33 0.013 -0.020 1.5 0.024

Bus-E4 BUS-2130MC501-B 5.49 0.013 -0.020 1.6 0.024

BUS-E12 BUS-2130MC501-B 3.71 0.009 -0.020 2.2 0.022

BUS-E16 BUS-2130MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-E17 BUS-2130MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-A03 Bus-E01 8.84 5.436 -8.412 1.5 10.016

*Bus-E01 BUS-2130MC501-A 0.00 5.436 -8.412 1.5 10.016

*BUS-2130MC501-B BUS-2130MC501-A 0.00 0.045 -0.072 1.6 0.085

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

278
Project: SPENCE GROWTH OPTION PROJECT

Page: 76

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-2130MC501-B

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-2130MC501-B Total 0.00 5.913 -9.398 1.6 11.104

Bus-E3 BUS-2130MC501-B 2.83 0.009 -0.012 1.3 0.015

Bus-E5 BUS-2130MC501-B 0.38 0.002 -0.001 0.6 0.002

Bus-E18 BUS-2130MC501-B 6.33 0.013 -0.020 1.5 0.024

Bus-E4 BUS-2130MC501-B 5.49 0.013 -0.020 1.6 0.024

BUS-E12 BUS-2130MC501-B 3.71 0.009 -0.020 2.2 0.022

BUS-E16 BUS-2130MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-E17 BUS-2130MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-E15 BUS-2130MC501-A 6.72 0.045 -0.092 2.0 0.102

BUS-E2 BUS-2130MC501-A 7.07 0.023 -0.046 2.0 0.051

BUS-E06 BUS-2130MC501-A 1.41 0.041 -0.083 2.0 0.093

BUS-E09 BUS-2130MC501-A 0.85 0.061 -0.126 2.0 0.140

BUS-F31 BUS-2130MC501-A 1.00 0.132 -0.284 2.2 0.313

BUS-E03 BUS-2130MC501-A 0.81 0.105 -0.231 2.2 0.254

BUS-E14 BUS-2130MC501-A 8.19 0.024 -0.052 2.2 0.057

BUS-A03 Bus-E01 8.84 5.436 -8.412 1.5 10.016

*Bus-E01 BUS-2130MC501-A 0.00 5.436 -8.412 1.5 10.016

*BUS-2130MC501-A BUS-2130MC501-B 0.00 5.868 -9.326 1.6 11.018

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

279
Project: SPENCE GROWTH OPTION PROJECT

Page: 77

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A1

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A1 Total 0.00 2.228 -6.638 3.0 7.002 0.00 2.178 -6.425 3.0 6.784

BUS-C01 BUS-A1 0.38 2.191 -6.491 3.0 6.851 0.38 2.166 -6.368 2.9 6.727

BUS-C03 BUS-A1 17.97 0.037 -0.146 3.9 0.151 6.87 0.011 -0.057 5.1 0.058

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

280
Project: SPENCE GROWTH OPTION PROJECT

Page: 78

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A01

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A01 Total 0.00 3.290 -15.886 4.8 16.223 0.00 3.223 -15.557 4.8 15.887

2130-VL-001 BUS-A01 4.66 3.248 -15.304 4.7 15.645 4.60 3.199 -15.139 4.7 15.473

BUS-A06 BUS-A01 0.00 0.010 -0.019 2.0 0.022 0.00 0.004 -0.008 2.2 0.009

BUS-A05 BUS-A01 24.69 0.032 -0.563 17.5 0.564 17.98 0.020 -0.410 20.0 0.410

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

281
Project: SPENCE GROWTH OPTION PROJECT

Page: 79

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A03

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-A03 Total 0.00 6.514 -10.148 1.6 12.059

Bus-E01 BUS-A03 0.96 0.472 -0.976 2.1 1.085

BUS-A06 BUS-A03 96.15 6.041 -9.172 1.5 10.982

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

282
Project: SPENCE GROWTH OPTION PROJECT

Page: 80

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A05

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A05 Total 0.00 1.570 -15.058 9.6 15.139 0.00 1.510 -13.672 9.1 13.756

BUS-B02 BUS-A05 0.39 0.155 -4.131 26.7 4.134 0.26 0.097 -2.762 28.4 2.764

BUS-A01 BUS-A05 87.33 1.416 -10.927 7.7 11.018 87.19 1.413 -10.910 7.7 11.001

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

283
Project: SPENCE GROWTH OPTION PROJECT

Page: 81

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-A06

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-A06 Total 0.00 3.354 -15.813 4.7 16.165 0.00 3.284 -15.487 4.7 15.831

BUS-A01 BUS-A06 0.60 3.345 -15.794 4.7 16.144 0.59 3.281 -15.479 4.7 15.822

BUS-A03 BUS-A06 9.11 0.010 -0.019 2.0 0.022 3.69 0.004 -0.008 2.2 0.009

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

284
Project: SPENCE GROWTH OPTION PROJECT

Page: 82

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B01

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-B01 Total 0.00 1.600 -14.965 9.4 15.050 0.00 1.544 -13.572 8.8 13.659

2130-B03 BUS-B01 0.83 0.075 -2.071 27.7 2.072 0.56 0.047 -1.383 29.2 1.384

2130-B04 BUS-B01 0.59 0.072 -2.074 29.0 2.076 0.40 0.046 -1.385 30.1 1.386

BUS-A05 BUS-B02 1.03 1.453 -10.820 7.4 10.917 1.03 1.451 -10.803 7.4 10.900

*BUS-B02 BUS-B01 0.00 1.453 -10.820 7.4 10.917 0.00 1.451 -10.803 7.4 10.900

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

285
Project: SPENCE GROWTH OPTION PROJECT

Page: 83

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B1/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B1/1 Total 0.00 0.567 -0.046 0.1 0.569

BUS-2110MC501-A BUS-B1/1 99.65 0.554 -0.023 0.0 0.554

2110-CR001-B BUS-B1/1 104.35 0.013 -0.023 1.8 0.027

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

286
Project: SPENCE GROWTH OPTION PROJECT

Page: 84

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B02

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 100.00 % of base (4.160 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-B02 Total 0.00 1.600 -14.965 9.4 15.050 0.00 1.544 -13.572 8.8 13.659

BUS-A05 BUS-B02 1.03 1.453 -10.820 7.4 10.917 1.03 1.451 -10.803 7.4 10.900

2130-B03 BUS-B01 0.83 0.075 -2.071 27.7 2.072 0.56 0.047 -1.383 29.2 1.384

2130-B04 BUS-B01 0.59 0.072 -2.074 29.0 2.076 0.40 0.046 -1.385 30.1 1.386

*BUS-B01 BUS-B02 0.00 0.146 -4.145 28.3 4.148 0.00 0.094 -2.769 29.6 2.770

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

287
Project: SPENCE GROWTH OPTION PROJECT

Page: 85

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B2/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B2/1 Total 0.00 0.593 -0.058 0.1 0.596

BUS-2110MC501-A BUS-B2/1 99.63 0.578 -0.024 0.0 0.578

2110-CR01-02A BUS-B2/1 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

288
Project: SPENCE GROWTH OPTION PROJECT

Page: 86

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B3/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B3/1 Total 0.00 0.593 -0.058 0.1 0.596

BUS-2110MC501-A BUS-B3/1 99.63 0.578 -0.024 0.0 0.578

2110-CR01-02B BUS-B3/1 104.35 0.016 -0.034 2.1 0.037

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

289
Project: SPENCE GROWTH OPTION PROJECT

Page: 87

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B4/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B4/1 Total 0.00 1.841 -0.451 0.2 1.896

BUS-2110MC501-A BUS-B4/1 98.32 1.808 -0.308 0.2 1.834

2110-CR01-01A BUS-B4/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

290
Project: SPENCE GROWTH OPTION PROJECT

Page: 88

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B6/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B6/1 Total 0.00 1.841 -0.451 0.2 1.896

BUS-2110MC501-B BUS-B6/1 98.32 1.808 -0.308 0.2 1.834

2110-CR01-01B BUS-B6/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

291
Project: SPENCE GROWTH OPTION PROJECT

Page: 89

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B7/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B7/1 Total 0.00 0.288 -0.015 0.1 0.288

BUS-2110MC501-B BUS-B7/1 99.83 0.282 -0.008 0.0 0.282

2110-CR001-01C BUS-B7/1 104.35 0.006 -0.007 1.1 0.009

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

292
Project: SPENCE GROWTH OPTION PROJECT

Page: 90

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B8/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B8/1 Total 0.00 0.256 -0.018 0.1 0.257

BUS-2110MC501-B BUS-B8/1 99.85 0.248 -0.007 0.0 0.248

2110-CR01-05A BUS-B8/1 104.35 0.008 -0.011 1.3 0.014

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

293
Project: SPENCE GROWTH OPTION PROJECT

Page: 91

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B9/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B9/1 Total 0.00 4.091 -2.010 0.5 4.558

BUS-2110MC501-B BUS-B9/1 94.38 4.018 -1.520 0.4 4.296

2110-DC-001 BUS-B9/1 104.35 0.073 -0.491 6.7 0.496

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

294
Project: SPENCE GROWTH OPTION PROJECT

Page: 92

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B11/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B11/1 Total 0.00 1.187 -0.227 0.2 1.209

BUS-2110MC501-B BUS-B11/1 99.07 1.160 -0.133 0.1 1.168

2110-HU001-A BUS-B11/1 104.35 0.027 -0.094 3.5 0.098

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

295
Project: SPENCE GROWTH OPTION PROJECT

Page: 93

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B12/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B12/1 Total 0.00 1.083 -0.212 0.2 1.103

BUS-2110MC501-D BUS-B12/1 99.15 1.056 -0.118 0.1 1.062

2110-CV001HU-01C BUS-B12/1 104.35 0.027 -0.094 3.5 0.098

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

296
Project: SPENCE GROWTH OPTION PROJECT

Page: 94

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B13/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B13/1 Total 0.00 1.076 -0.211 0.2 1.097

BUS-2110MC501-D BUS-B13/1 99.16 1.049 -0.117 0.1 1.056

2110-CV001HU-01D BUS-B13/1 104.35 0.027 -0.094 3.5 0.098

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

297
Project: SPENCE GROWTH OPTION PROJECT

Page: 95

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B16/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B16/1 Total 0.00 2.161 -0.742 0.3 2.285

BUS-2110MC501-E BUS-B16/1 97.45 2.127 -0.599 0.3 2.210

2130-DC-002 BUS-B16/1 104.35 0.033 -0.143 4.3 0.147

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

298
Project: SPENCE GROWTH OPTION PROJECT

Page: 96

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B18/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B18/1 Total 0.00 2.278 -0.192 0.1 2.286

BUS-2110MC501-F BUS-B18/1 98.42 2.276 -0.191 0.1 2.284

2110-BL001-B BUS-B18/1 104.35 0.002 -0.001 0.6 0.002

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

299
Project: SPENCE GROWTH OPTION PROJECT

Page: 97

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B20/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B20/1 Total 0.00 0.521 -0.050 0.1 0.523

BUS-2110MC501-F BUS-B20/1 99.68 0.506 -0.020 0.0 0.506

2831-ZM-024-04 BUS-B20/1 104.35 0.015 -0.030 2.0 0.033

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

300
Project: SPENCE GROWTH OPTION PROJECT

Page: 98

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-B20/3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-B20/3 Total 0.00 8.643 -13.575 1.6 16.093

BUS-2110MC501-F BUS-B20/3 63.03 8.643 -13.575 1.6 16.093

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

301
Project: SPENCE GROWTH OPTION PROJECT

Page: 99

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C01

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-C01 Total 0.00 2.213 -6.659 3.0 7.017 0.00 2.163 -6.446 3.0 6.799

BUS-C05 BUS-C01 2.65 2.151 -6.250 2.9 6.610 2.64 2.140 -6.225 2.9 6.582

BUS-A1 BUS-C01 0.01 0.037 -0.146 3.9 0.151 0.00 0.011 -0.057 5.1 0.058

BUS-C04 BUS-C01 24.01 0.024 -0.263 10.8 0.264 14.98 0.012 -0.164 13.5 0.165

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

302
Project: SPENCE GROWTH OPTION PROJECT

Page: 100

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C03

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-C03 Total 0.00 8.252 -40.965 5.0 41.788

Bus-F01 BUS-C03 2.11 2.062 -7.597 3.7 7.872

BUS-A1 BUS-C03 84.24 6.191 -33.368 5.4 33.937

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

303
Project: SPENCE GROWTH OPTION PROJECT

Page: 101

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C04

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-C04 Total 0.00 1.050 -6.560 6.2 6.643 0.00 0.986 -5.800 5.9 5.883

BUS-D01 BUS-C04 0.35 0.120 -1.703 14.2 1.707 0.20 0.056 -0.957 17.0 0.958

BUS-C01 BUS-C04 81.23 0.930 -4.857 5.2 4.945 81.02 0.929 -4.843 5.2 4.932

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

304
Project: SPENCE GROWTH OPTION PROJECT

Page: 102

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-C05

Prefault voltage = 23.000 kV = 100.00 % of nominal bus kV (23.000 kV)


= 100.00 % of base (23.000 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-C05 Total 0.00 2.110 -6.804 3.2 7.124 0.00 2.061 -6.590 3.2 6.905

BUS-C01 BUS-C05 0.17 0.062 -0.409 6.6 0.414 0.09 0.024 -0.221 9.4 0.222

2130-VL-001 BUS-C05 59.43 2.048 -6.395 3.1 6.715 59.18 2.038 -6.369 3.1 6.687

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

305
Project: SPENCE GROWTH OPTION PROJECT

Page: 103

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D01

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D01 Total 0.00 1.062 -6.517 6.1 6.603 0.00 1.000 -5.754 5.8 5.840

BUS-D03 BUS-D01 2.13 0.061 -1.018 16.6 1.020 1.43 0.037 -0.681 18.6 0.682

BUS-D05 BUS-D01 2.33 0.028 -0.345 12.4 0.346 0.94 0.009 -0.139 14.9 0.139

BUS-D04 BUS-D01 2.33 0.028 -0.345 12.4 0.346 0.94 0.009 -0.139 14.9 0.139

BUS-C04 BUS-D01 1.02 0.945 -4.809 5.1 4.901 1.01 0.944 -4.796 5.1 4.888

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

306
Project: SPENCE GROWTH OPTION PROJECT

Page: 104

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D03

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D03 Total 0.00 1.426 -6.054 4.2 6.220 0.00 1.316 -5.350 4.1 5.509

BUS-D01 BUS-D03 10.90 1.384 -5.025 3.6 5.212 10.12 1.288 -4.664 3.6 4.838

2110-CR001-A BUS-D03 104.00 0.042 -1.029 24.2 1.030 104.00 0.028 -0.686 24.2 0.687

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

307
Project: SPENCE GROWTH OPTION PROJECT

Page: 105

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D04

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D04 Total 0.00 2.556 -4.910 1.9 5.536 0.00 2.280 -4.409 1.9 4.963

BUS-D01 BUS-D04 35.17 2.536 -4.563 1.8 5.220 32.58 2.272 -4.270 1.9 4.837

2110-CV001HU-01A BUS-D04 104.00 0.020 -0.347 17.3 0.348 104.00 0.008 -0.139 17.3 0.139

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

308
Project: SPENCE GROWTH OPTION PROJECT

Page: 106

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-D05

Prefault voltage = 4.160 kV = 100.00 % of nominal bus kV (4.160 kV)


= 95.00 % of base (4.379 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

BUS-D05 Total 0.00 2.556 -4.910 1.9 5.536 0.00 2.280 -4.409 1.9 4.963

BUS-D01 BUS-D05 35.17 2.536 -4.563 1.8 5.220 32.58 2.272 -4.270 1.9 4.837

2110-CV001HU-01B BUS-D05 104.00 0.020 -0.347 17.3 0.348 104.00 0.008 -0.139 17.3 0.139

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

309
Project: SPENCE GROWTH OPTION PROJECT

Page: 107

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E01

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E01 Total 0.00 5.913 -9.398 1.6 11.104

BUS-A03 Bus-E01 8.84 5.436 -8.412 1.5 10.016

BUS-E15 BUS-2130MC501-A 6.72 0.045 -0.092 2.0 0.102

BUS-E2 BUS-2130MC501-A 7.07 0.023 -0.046 2.0 0.051

BUS-E06 BUS-2130MC501-A 1.41 0.041 -0.083 2.0 0.093

BUS-E09 BUS-2130MC501-A 0.85 0.061 -0.126 2.0 0.140

BUS-F31 BUS-2130MC501-A 1.00 0.132 -0.284 2.2 0.313

BUS-E03 BUS-2130MC501-A 0.81 0.105 -0.231 2.2 0.254

BUS-E14 BUS-2130MC501-A 8.19 0.024 -0.052 2.2 0.057

Bus-E3 BUS-2130MC501-B 2.83 0.009 -0.012 1.3 0.015

Bus-E5 BUS-2130MC501-B 0.38 0.002 -0.001 0.6 0.002

Bus-E18 BUS-2130MC501-B 6.33 0.013 -0.020 1.5 0.024

Bus-E4 BUS-2130MC501-B 5.49 0.013 -0.020 1.6 0.024

BUS-E12 BUS-2130MC501-B 3.71 0.009 -0.020 2.2 0.022

BUS-E16 BUS-2130MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-E17 BUS-2130MC501-B 0.00 0.000 0.000 999.9 0.000

*BUS-2130MC501-A Bus-E01 0.00 0.477 -0.986 2.1 1.095

*BUS-2130MC501-B BUS-2130MC501-A 0.00 0.045 -0.072 1.6 0.085

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 0
Project: SPENCE GROWTH OPTION PROJECT

Page: 108

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E2

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E2 Total 0.00 0.706 -0.169 0.2 0.726

BUS-2130MC501-A BUS-E2 95.89 0.685 -0.120 0.2 0.695

2130-CH-005 BUS-E2 100.00 0.021 -0.049 2.4 0.053

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 1
Project: SPENCE GROWTH OPTION PROJECT

Page: 109

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E03

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E03 Total 0.00 5.766 -6.491 1.1 8.682

BUS-2130MC501-A BUS-E03 26.85 5.661 -6.258 1.1 8.438

BUS-E04 BUS-E03 11.33 0.104 -0.233 2.2 0.255

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 2
Project: SPENCE GROWTH OPTION PROJECT

Page: 110

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E3

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E3 Total 0.00 0.510 -0.042 0.1 0.511

BUS-2130MC501-B Bus-E3 97.44 0.501 -0.030 0.1 0.502

2130-BL001-A Bus-E3 104.35 0.009 -0.012 1.4 0.015

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 3
Project: SPENCE GROWTH OPTION PROJECT

Page: 111

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E04

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E04 Total 0.00 1.448 -2.169 1.5 2.608

BUS-E05 BUS-E04 0.39 0.142 -0.334 2.4 0.363

BUS-E03 BUS-E04 79.05 1.307 -1.834 1.4 2.252

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 4
Project: SPENCE GROWTH OPTION PROJECT

Page: 112

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E4

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E4 Total 0.00 0.436 -0.044 0.1 0.438

BUS-2130MC501-B Bus-E4 97.84 0.424 -0.023 0.1 0.424

2130-CV002B-01A Bus-E4 104.35 0.012 -0.021 1.7 0.025

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 5
Project: SPENCE GROWTH OPTION PROJECT

Page: 113

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E05

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E05 Total 0.00 1.440 -2.117 1.5 2.561

BUS-E04 BUS-E05 2.36 1.299 -1.782 1.4 2.205

2130-LP-501 BUS-E05 100.00 0.141 -0.336 2.4 0.364

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 6
Project: SPENCE GROWTH OPTION PROJECT

Page: 114

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E5

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E5 Total 0.00 0.503 -0.031 0.1 0.504

BUS-2130MC501-B Bus-E5 97.44 0.501 -0.030 0.1 0.502

2130-BL001-B Bus-E5 104.35 0.002 -0.001 0.6 0.002

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 7
Project: SPENCE GROWTH OPTION PROJECT

Page: 115

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E06

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E06 Total 0.00 4.211 -1.962 0.5 4.645

BUS-2130MC501-A BUS-E06 69.29 4.170 -1.878 0.5 4.573

BUS-E07 BUS-E06 10.37 0.041 -0.084 2.1 0.094

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 8
Project: SPENCE GROWTH OPTION PROJECT

Page: 116

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E07

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 97.50 % of base (0.246 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E07 Total 0.00 1.052 -1.389 1.3 1.743

BUS-E08 BUS-E07 3.99 0.087 -0.189 2.2 0.209

BUS-E06 BUS-E07 85.34 0.965 -1.200 1.2 1.540

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

31 9
Project: SPENCE GROWTH OPTION PROJECT

Page: 117

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E08

Prefault voltage = 0.240 kV = 100.00 % of nominal bus kV (0.240 kV)


= 97.50 % of base (0.246 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E08 Total 0.00 1.019 -1.028 1.0 1.447

BUS-E07 BUS-E08 23.99 0.937 -0.831 0.9 1.253

2130-DP-501 BUS-E08 100.00 0.082 -0.196 2.4 0.213

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

320
Project: SPENCE GROWTH OPTION PROJECT

Page: 118

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E09

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E09 Total 0.00 5.612 -4.640 0.8 7.282

BUS-2130MC501-A BUS-E09 43.50 5.551 -4.513 0.8 7.154

BUS-E10 BUS-E09 10.40 0.061 -0.127 2.1 0.141

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

321
Project: SPENCE GROWTH OPTION PROJECT

Page: 119

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E10

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E10 Total 0.00 0.941 -1.344 1.4 1.640

BUS-E11 BUS-E10 3.79 0.083 -0.180 2.2 0.198

BUS-E09 BUS-E10 84.60 0.858 -1.164 1.4 1.446

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

322
Project: SPENCE GROWTH OPTION PROJECT

Page: 120

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E11

Prefault voltage = 0.380 kV = 100.00 % of nominal bus kV (0.380 kV)


= 97.50 % of base (0.390 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E11 Total 0.00 0.950 -1.017 1.1 1.391

BUS-E10 BUS-E11 23.05 0.872 -0.831 1.0 1.204

2130-DP-502 BUS-E11 100.00 0.078 -0.186 2.4 0.202

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

323
Project: SPENCE GROWTH OPTION PROJECT

Page: 121

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E12

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E12 Total 0.00 0.579 -0.057 0.1 0.581

BUS-2130MC501-B BUS-E12 97.07 0.570 -0.037 0.1 0.571

2130-UP-501 BUS-E12 100.00 0.009 -0.020 2.4 0.022

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

324
Project: SPENCE GROWTH OPTION PROJECT

Page: 122

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E14

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E14 Total 0.00 0.680 -0.170 0.3 0.700

BUS-2130MC501-A BUS-E14 96.05 0.659 -0.114 0.2 0.669

2130-ST055-01 BUS-E14 104.35 0.021 -0.056 2.7 0.059

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

325
Project: SPENCE GROWTH OPTION PROJECT

Page: 123

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E15

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E15 Total 0.00 1.375 -0.475 0.3 1.455

BUS-2130MC501-A BUS-E15 91.02 1.334 -0.377 0.3 1.386

2130-CH-004 BUS-E15 100.00 0.041 -0.098 2.4 0.106

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

326
Project: SPENCE GROWTH OPTION PROJECT

Page: 124

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E16

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E16 Total 0.00 2.995 -1.088 0.4 3.186

BUS-2130MC501-B BUS-E16 79.32 2.995 -1.088 0.4 3.186

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

327
Project: SPENCE GROWTH OPTION PROJECT

Page: 125

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-E17

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-E17 Total 0.00 1.512 -0.573 0.4 1.617

BUS-2130MC501-B BUS-E17 88.82 1.512 -0.573 0.4 1.617

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

328
Project: SPENCE GROWTH OPTION PROJECT

Page: 126

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-E18

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-E18 Total 0.00 0.379 -0.039 0.1 0.381

BUS-2130MC501-B Bus-E18 98.14 0.367 -0.018 0.0 0.368

2130-CV002A-01A Bus-E18 104.35 0.012 -0.021 1.7 0.025

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

329
Project: SPENCE GROWTH OPTION PROJECT

Page: 127

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: Bus-F01

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus-F01 Total 0.00 8.519 -38.313 4.5 39.249

BUS-C03 Bus-F01 8.35 6.451 -30.546 4.7 31.220

BUS-B1/1 BUS-2110MC501-A 4.66 0.013 -0.022 1.6 0.026

BUS-B4/1 BUS-2110MC501-A 7.64 0.042 -0.136 3.2 0.143

BUS-B2/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-B3/1 BUS-2110MC501-A 6.25 0.017 -0.032 1.9 0.036

BUS-2A/1 BUS-2110MC501-A 1.20 0.034 -0.072 2.1 0.079

BUS-3A/1 BUS-2110MC501-A 1.70 0.047 -0.102 2.2 0.113

BUS-4A/1 BUS-2110MC501-A 0.88 0.092 -0.203 2.2 0.223

BUS-1A/1 BUS-2110MC501-A 0.88 0.115 -0.253 2.2 0.278

BUS-B6/1 BUS-2110MC501-B 7.64 0.042 -0.136 3.2 0.143

BUS-B7/1 BUS-2110MC501-B 3.28 0.006 -0.007 1.1 0.009

BUS-6A/1 BUS-2110MC501-B 5.57 0.028 -0.058 2.1 0.065

BUS-B8/1 BUS-2110MC501-B 5.50 0.009 -0.011 1.2 0.014

BUS-B9/1 BUS-2110MC501-B 10.40 0.114 -0.459 4.0 0.473

BUS-B11/1 BUS-2110MC501-B 8.04 0.033 -0.089 2.7 0.095

BUS-F7A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-8A/1 BUS-2110MC501-B 0.00 0.000 0.000 999.9 0.000

BUS-12A/1 BUS-2110MC501-C 7.98 0.023 -0.046 2.0 0.051

BUS-F9A/1 BUS-2110MC501-C 8.39 0.150 -0.848 5.6 0.861

BUS-11A/1 BUS-2110MC501-C 9.90 0.320 -2.256 7.0 2.278

BUS-14A/1 BUS-2110MC501-C 7.12 0.042 -0.137 3.3 0.143

BUS-16A/1 BUS-2110MC501-C 11.31 0.096 -0.342 3.6 0.355

BUS-10A/1 BUS-2110MC501-C 11.00 0.099 -0.364 3.7 0.377

BUS-B12/1 BUS-2110MC501-D 8.82 0.033 -0.088 2.6 0.094

BUS-B13/1 BUS-2110MC501-D 8.87 0.033 -0.088 2.6 0.094

BUS-17A/1 BUS-2110MC501-D 3.38 0.030 -0.037 1.3 0.048

BUS-18A/1 BUS-2110MC501-D 8.84 0.125 -0.602 4.8 0.615

BUS-21A/1 BUS-2110MC501-E 9.53 0.035 -0.067 1.9 0.076

BUS-19A/1 BUS-2110MC501-E 9.88 0.087 -0.310 3.6 0.322

BUS-20A/1 BUS-2110MC501-E 10.27 0.078 -0.148 1.9 0.168

BUS-22A/1 BUS-2110MC501-E 3.92 0.022 -0.047 2.2 0.052

330
Project: SPENCE GROWTH OPTION PROJECT

Page: 128

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

(Cont.)
3-phase fault at bus: Bus-F01

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-25A/1 BUS-2110MC501-E 10.79 0.063 -0.218 3.5 0.227

BUS-23A/1 BUS-2110MC501-E 10.50 0.054 -0.176 3.3 0.184

BUS-B16/1 BUS-2110MC501-E 6.28 0.040 -0.137 3.4 0.143

BUS-24A/1 BUS-2110MC501-E 1.14 0.003 -0.007 2.3 0.008

BUS-28A/2 BUS-2110MC501-F 0.46 0.009 -0.012 1.4 0.015

BUS-B18/1 BUS-2110MC501-F 0.08 0.002 -0.001 0.6 0.002

BUS-29A/1 BUS-2110MC501-F 1.09 0.009 -0.020 2.3 0.022

BUS-26A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-27A/1 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-24A/5 BUS-2110MC501-F 6.49 0.047 -0.096 2.1 0.107

BUS-24A/2 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-24A/3 BUS-2110MC501-F 2.36 0.003 -0.007 2.2 0.008

BUS-B20/1 BUS-2110MC501-F 6.36 0.016 -0.028 1.8 0.032

BUS-B20/3 BUS-2110MC501-F 0.00 0.000 0.000 999.9 0.000

BUS-5A/2 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

BUS-5A/3 BS-5A/1 6.51 0.017 -0.032 1.8 0.036

*BS-5A/1 BUS-2110MC501-A 0.00 0.035 -0.064 1.8 0.072

*BUS-2110MC501-A Bus-F01 0.00 2.069 -7.766 3.8 8.037

*BUS-2110MC501-B BUS-2110MC501-A 0.00 1.655 -6.850 4.1 7.048

*BUS-2110MC501-C BUS-2110MC501-B 0.00 1.423 -6.090 4.3 6.255

*BUS-2110MC501-D BUS-2110MC501-C 0.00 0.692 -2.098 3.0 2.209

*BUS-2110MC501-E BUS-2110MC501-D 0.00 0.471 -1.282 2.7 1.366

*BUS-2110MC501-F BUS-2110MC501-E 0.00 0.088 -0.171 1.9 0.193

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

331
Project: SPENCE GROWTH OPTION PROJECT

Page: 129

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F7A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F7A/1 Total 0.00 1.808 -0.308 0.2 1.834

BUS-2110MC501-B BUS-F7A/1 98.33 1.808 -0.308 0.2 1.834

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

332
Project: SPENCE GROWTH OPTION PROJECT

Page: 130

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F9A/1

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 95.00 % of base (0.505 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F9A/1 Total 0.00 5.822 -7.078 1.2 9.165

BUS-2110MC501-C BUS-F9A/1 81.83 5.714 -6.166 1.1 8.407

2110-CN014-A BUS-F9A/1 104.35 0.091 -0.878 9.7 0.883

2110-CN014-B BUS-F9A/1 104.35 0.015 -0.030 2.0 0.033

2110-CN014-HE1 BUS-F9A/1 100.00 0.001 -0.002 2.4 0.002

2110-CN014-HE2 BUS-F9A/1 100.00 0.001 -0.002 2.4 0.002

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

333
Project: SPENCE GROWTH OPTION PROJECT

Page: 131

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F22

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 97.50 % of base (0.426 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F22 Total 0.00 1.652 -2.233 1.4 2.778

BUS-F30 BUS-F22 8.76 1.493 -1.854 1.2 2.381

2130-DP-505 BUS-F22 100.00 0.159 -0.378 2.4 0.410

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

334
Project: SPENCE GROWTH OPTION PROJECT

Page: 132

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F30

Prefault voltage = 0.415 kV = 100.00 % of nominal bus kV (0.415 kV)


= 97.50 % of base (0.426 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F30 Total 0.00 1.667 -2.452 1.5 2.965

BUS-F22 BUS-F30 1.50 0.162 -0.373 2.3 0.406

BUS-F31 BUS-F30 73.80 1.505 -2.079 1.4 2.567

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

335
Project: SPENCE GROWTH OPTION PROJECT

Page: 133

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-phase fault at bus: BUS-F31

Prefault voltage = 0.480 kV = 100.00 % of nominal bus kV (0.480 kV)


= 97.50 % of base (0.492 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BUS-F31 Total 0.00 5.766 -6.520 1.1 8.704

BUS-2130MC501-A BUS-F31 26.73 5.635 -6.233 1.1 8.403

BUS-F30 BUS-F31 10.48 0.131 -0.287 2.2 0.315

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.

336
Project: SPENCE GROWTH OPTION PROJECT

Page: 134

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

2130-B03 4.160 2130-B03 Bus 14.525 11.6 1.471 21.371 36.217

2130-B04 4.160 2130-B04 Bus 14.673 12.0 1.478 21.690 36.724

2130-VL-001 23.000 2130-VL-001 Bus 16.667 6.2 1.314 21.896 37.771

BS-5A/1 0.480 BS-5A/1 Bus 39.249 4.7 1.237 48.549 84.082

BUS-1A/1 0.480 BUS-1A/1 Bus 20.231 1.0 1.002 20.269 29.850

BUS-1A/2 0.380 BUS-1A/2 Bus 3.691 1.5 1.015 3.747 5.866

BUS-1A/3 0.380 BUS-1A/3 Bus 3.449 1.4 1.012 3.489 5.405

BUS-2A/1 0.480 BUS-2A/1 Bus 6.262 0.2 1.000 6.262 8.855

BUS-2A/2 0.240 BUS-2A/2 Bus 1.794 1.3 1.009 1.809 2.775

BUS-2A/3 0.240 BUS-2A/3 Bus 1.526 1.1 1.003 1.530 2.269

BUS-3A/1 0.480 BUS-3A/1 Bus 6.281 0.3 1.000 6.281 8.883

BUS-3A/2 0.380 BUS-3A/2 Bus 1.611 1.2 1.007 1.621 2.463

BUS-3A/3 0.380 BUS-3A/3 Bus 1.539 1.2 1.005 1.547 2.334

BUS-4A/1 0.480 BUS-4A/1 Bus 18.086 0.8 1.001 18.095 26.150

BUS-4A/2 0.415 BUS-4A/2 Bus 3.268 1.4 1.013 3.310 5.145

BUS-4A/3 0.415 BUS-4A/3 Bus 3.014 1.3 1.008 3.039 4.647

BUS-5A/2 0.480 BUS-5A/2 Bus 0.573 0.0 1.000 0.573 0.810

BUS-5A/3 0.480 BUS-5A/3 Bus 0.573 0.0 1.000 0.573 0.810

BUS-6A/1 0.480 BUS-6A/1 Bus 1.185 0.1 1.000 1.185 1.676

BUS-8A/1 0.480 BUS-8A/1 Bus 1.834 0.2 1.000 1.834 2.593

BUS-10A/1 0.480 BUS-10A/1 Bus 3.493 0.5 1.000 3.493 4.950

BUS-11A/1 0.480 BUS-11A/1 Bus 17.067 2.9 1.109 18.923 32.309

BUS-12A/1 0.480 BUS-12A/1 Bus 0.665 0.1 1.000 0.665 0.940

BUS-14A/1 0.480 BUS-14A/1 Bus 2.036 0.2 1.000 2.036 2.880

BUS-16A/1 0.480 BUS-16A/1 Bus 3.211 0.5 1.000 3.211 4.549

BUS-17A/1 0.480 BUS-17A/1 Bus 1.429 0.2 1.000 1.429 2.021

BUS-17A/2 0.480 BUS-17A/2 Bus 0.852 0.1 1.000 0.852 1.204

BUS-17A/3 0.480 BUS-17A/3 Bus 0.852 0.1 1.000 0.852 1.204

BUS-17A/4 0.480 BUS-17A/4 Bus 0.852 0.1 1.000 0.852 1.204

BUS-17A/5 0.480 BUS-17A/5 Bus 0.852 0.1 1.000 0.852 1.204

BUS-18A/1 0.480 BUS-18A/1 Bus 6.643 1.1 1.003 6.660 9.874

BUS-19A/1 0.480 BUS-19A/1 Bus 3.304 0.3 1.000 3.304 4.672

337
Project: SPENCE GROWTH OPTION PROJECT

Page: 135

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

BUS-20A/1 0.480 BUS-20A/1 Bus 1.709 0.2 1.000 1.709 2.417

BUS-21A/1 0.480 BUS-21A/1 Bus 0.835 0.1 1.000 0.835 1.181

BUS-22A/1 0.480 BUS-22A/1 Bus 1.345 0.2 1.000 1.345 1.902

BUS-23A/1 0.480 BUS-23A/1 Bus 1.806 0.3 1.000 1.806 2.554

BUS-24A/1 0.480 BUS-24A/1 Bus 0.677 0.0 1.000 0.677 0.958

BUS-24A/2 0.480 BUS-24A/2 Bus 0.328 0.0 1.000 0.328 0.463

BUS-24A/3 0.480 BUS-24A/3 Bus 0.328 0.0 1.000 0.328 0.463

BUS-24A/5 0.480 BUS-24A/5 Bus 1.684 0.3 1.000 1.684 2.381

BUS-25A/1 0.480 BUS-25A/1 Bus 2.166 0.4 1.000 2.166 3.066

BUS-26A/1 0.480 BUS-26A/1 Bus 1.589 0.2 1.000 1.589 2.247

BUS-27A/1 0.480 BUS-27A/1 Bus 1.618 0.2 1.000 1.618 2.288

BUS-28A/2 0.480 BUS-28A/2 Bus 3.185 0.1 1.000 3.185 4.505

BUS-29A/1 0.480 BUS-29A/1 Bus 2.013 0.1 1.000 2.013 2.847

BUS-2110MC501-A 0.480 BUS-2110MC501-A Bus 39.249 4.7 1.237 48.549 84.082

BUS-2110MC501-B 0.480 BUS-2110MC501-B Bus 39.249 4.7 1.237 48.549 84.082

BUS-2110MC501-C 0.480 BUS-2110MC501-C Bus 39.249 4.7 1.237 48.549 84.082

BUS-2110MC501-D 0.480 BUS-2110MC501-D Bus 39.249 4.7 1.237 48.549 84.082

BUS-2110MC501-E 0.480 BUS-2110MC501-E Bus 39.249 4.7 1.237 48.549 84.082

BUS-2110MC501-F 0.480 BUS-2110MC501-F Bus 39.249 4.7 1.237 48.549 84.082

BUS-2130MC501-A 0.480 BUS-2130MC501-A Bus 11.104 1.6 1.019 11.319 17.899

BUS-2130MC501-B 0.480 BUS-2130MC501-B Bus 11.104 1.6 1.019 11.319 17.899

BUS-A1 23.000 BUS-A1 Bus 7.002 3.2 1.133 7.933 13.632

BUS-A01 23.000 BUS-A01 Switchgear 16.223 5.2 1.262 20.476 35.436

23.000 CB-A01 3 cy Sym CB 16.223 5.2 1.262 20.476 35.436 40.000 68.000

BUS-A03 0.480 BUS-A03 Bus 12.059 1.6 1.018 12.275 19.346

BUS-A05 4.160 BUS-A05 Bus 15.139 12.9 1.493 22.599 38.189

BUS-A06 23.000 BUS-A06 Bus 16.165 5.0 1.255 20.283 35.112

BUS-B01 4.160 BUS-B01 MCC 15.050 13.2 1.497 22.530 38.050

4.160 CB-B01 3 cy Sym CB 15.050 13.2 1.497 22.530 38.050 58.000 97.000

BUS-B1/1 0.480 BUS-B1/1 Bus 0.569 0.0 1.000 0.569 0.804

BUS-B02 4.160 BUS-B02 Bus 15.050 13.2 1.497 22.530 38.050

4.160 CB-B01 3 cy Sym CB 15.050 13.2 1.497 22.530 38.050 58.000 97.000

BUS-B2/1 0.480 BUS-B2/1 Bus 0.596 0.0 1.000 0.596 0.843

BUS-B3/1 0.480 BUS-B3/1 Bus 0.596 0.0 1.000 0.596 0.843

338
Project: SPENCE GROWTH OPTION PROJECT

Page: 136

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

BUS-B4/1 0.480 BUS-B4/1 Bus 1.896 0.2 1.000 1.896 2.681

BUS-B6/1 0.480 BUS-B6/1 Bus 1.896 0.2 1.000 1.896 2.681

BUS-B7/1 0.480 BUS-B7/1 Bus 0.288 0.0 1.000 0.288 0.408

BUS-B8/1 0.480 BUS-B8/1 Bus 0.257 0.0 1.000 0.257 0.363

BUS-B9/1 0.480 BUS-B9/1 Bus 4.558 0.6 1.000 4.558 6.490

BUS-B11/1 0.480 BUS-B11/1 Bus 1.209 0.1 1.000 1.209 1.709

BUS-B12/1 0.480 BUS-B12/1 Bus 1.103 0.1 1.000 1.103 1.561

BUS-B13/1 0.480 BUS-B13/1 Bus 1.097 0.1 1.000 1.097 1.551

BUS-B16/1 0.480 BUS-B16/1 Bus 2.285 0.4 1.000 2.285 3.231

BUS-B18/1 0.480 BUS-B18/1 Bus 2.286 0.1 1.000 2.286 3.233

BUS-B20/1 0.480 BUS-B20/1 Bus 0.523 0.0 1.000 0.523 0.739

BUS-B20/3 0.480 BUS-B20/3 Bus 16.093 1.6 1.019 16.393 25.880

BUS-C01 23.000 BUS-C01 Switchgear 7.017 3.3 1.136 7.970 13.703

23.000 CB-C01 3 cy Sym CB 7.017 3.3 1.136 7.970 13.703 25.600 43.000

BUS-C03 0.480 BUS-C03 Bus 41.788 5.3 1.267 52.952 91.619

BUS-C04 4.160 BUS-C04 Bus 6.643 7.6 1.369 9.092 15.602

BUS-C05 23.000 BUS-C05 Bus 7.124 3.5 1.151 8.198 14.131

BUS-D01 4.160 BUS-D01 MCC 6.603 7.6 1.370 9.044 15.518

4.160 CB-D01 3 cy Sym CB 6.603 7.6 1.370 9.044 15.518 58.000 97.000

BUS-D03 4.160 BUS-D03 Bus 6.220 7.1 1.351 8.403 14.446

BUS-D04 4.160 BUS-D04 Bus 5.536 2.7 1.097 6.071 10.321

BUS-D05 4.160 BUS-D05 Bus 5.536 2.7 1.097 6.071 10.321

Bus-E01 0.480 Bus-E01 MCC 11.104 1.6 1.019 11.319 17.899

BUS-E2 0.480 BUS-E2 Bus 0.726 0.2 1.000 0.726 1.026

BUS-E03 0.480 BUS-E03 Bus 8.682 1.1 1.004 8.716 13.047

Bus-E3 0.480 Bus-E3 Bus 0.511 0.1 1.000 0.511 0.723

BUS-E04 0.380 BUS-E04 Bus 2.608 1.5 1.016 2.650 4.157

Bus-E4 0.480 Bus-E4 Bus 0.438 0.1 1.000 0.438 0.620

BUS-E05 0.380 BUS-E05 Bus 2.561 1.5 1.015 2.599 4.067

Bus-E5 0.480 Bus-E5 Bus 0.504 0.1 1.000 0.504 0.712

BUS-E06 0.480 BUS-E06 Bus 4.645 0.5 1.000 4.646 6.577

BUS-E07 0.240 BUS-E07 Bus 1.743 1.3 1.009 1.759 2.701

BUS-E08 0.240 BUS-E08 Bus 1.447 1.1 1.003 1.451 2.150

BUS-E09 0.480 BUS-E09 Bus 7.282 0.8 1.001 7.285 10.533

339
Project: SPENCE GROWTH OPTION PROJECT

Page: 137

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

BUS-E10 0.380 BUS-E10 Bus 1.640 1.4 1.013 1.662 2.584

BUS-E11 0.380 BUS-E11 Bus 1.391 1.1 1.004 1.396 2.085

BUS-E12 0.480 BUS-E12 Bus 0.581 0.1 1.000 0.581 0.822

BUS-E14 0.480 BUS-E14 Bus 0.700 0.2 1.000 0.700 0.991

BUS-E15 0.480 BUS-E15 Bus 1.455 0.3 1.000 1.455 2.058

BUS-E16 0.480 BUS-E16 Bus 3.186 0.4 1.000 3.186 4.507

BUS-E17 0.480 BUS-E17 Bus 1.617 0.4 1.000 1.617 2.287

Bus-E18 0.480 Bus-E18 Bus 0.381 0.1 1.000 0.381 0.539

Bus-F01 0.480 Bus-F01 MCC 39.249 4.7 1.237 48.549 84.082

BUS-F7A/1 0.480 BUS-F7A/1 Bus 1.834 0.2 1.000 1.834 2.593

BUS-F9A/1 0.480 BUS-F9A/1 Bus 9.165 1.7 1.025 9.389 15.002

BUS-F22 0.415 BUS-F22 Bus 2.778 1.4 1.011 2.807 4.336

BUS-F30 0.415 BUS-F30 Bus 2.965 1.5 1.015 3.009 4.706

BUS-F31 0.480 BUS-F31 Bus 8.704 1.1 1.004 8.739 13.091

- Method: IEEE - X/R is calculated from separate R & X networks.


- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

- The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability.

340
Project: SPENCE GROWTH OPTION PROJECT

Page: 138

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
2130-B03 4.160 13.183 10.3

2130-B04 4.160 13.317 10.7

2130-VL-001 23.000 Fuse1 Fuse 16.667 6.2 1.000 16.667 25.000 3.95 22.000 22.000

BS-5A/1 0.480 CB-5A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

BUS-1A/1 0.480 20.231 1.0

BUS-1A/2 0.380 3.691 1.5

BUS-1A/3 0.380 3.449 1.4

BUS-2A/1 0.480 6.262 0.2

BUS-2A/2 0.240 1.794 1.3

BUS-2A/3 0.240 1.526 1.1

BUS-3A/1 0.480 6.281 0.3

BUS-3A/2 0.380 1.611 1.2

BUS-3A/3 0.380 1.539 1.2

BUS-4A/1 0.480 18.086 0.8

BUS-4A/2 0.415 3.268 1.4

BUS-4A/3 0.415 3.014 1.3

BUS-5A/2 0.480 0.573 0.0

BUS-5A/3 0.480 0.573 0.0

BUS-6A/1 0.480 1.185 0.1

BUS-8A/1 0.480 1.834 0.2

BUS-10A/1 0.480 3.493 0.5

BUS-11A/1 0.480 17.067 2.9

BUS-12A/1 0.480 0.665 0.1

BUS-14A/1 0.480 2.036 0.2

BUS-16A/1 0.480 3.211 0.5

BUS-17A/1 0.480 1.429 0.2

BUS-17A/2 0.480 0.852 0.1

BUS-17A/3 0.480 0.852 0.1

BUS-17A/4 0.480 0.852 0.1

BUS-17A/5 0.480 0.852 0.1

BUS-18A/1 0.480 6.643 1.1

BUS-19A/1 0.480 3.304 0.3

341
Project: SPENCE GROWTH OPTION PROJECT

Page: 139

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-20A/1 0.480 1.709 0.2

BUS-21A/1 0.480 0.835 0.1

BUS-22A/1 0.480 1.345 0.2

BUS-23A/1 0.480 1.806 0.3

BUS-24A/1 0.480 0.677 0.0

BUS-24A/2 0.480 0.328 0.0

BUS-24A/3 0.480 0.328 0.0

BUS-24A/5 0.480 1.684 0.3

BUS-25A/1 0.480 2.166 0.4

BUS-26A/1 0.480 1.589 0.2

BUS-27A/1 0.480 1.618 0.2

BUS-28A/2 0.480 3.185 0.1

BUS-29A/1 0.480 2.013 0.1

BUS-2110MC501-A 0.480 CB-1A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-2A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-3A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-4A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B1 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B2 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B3 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-5A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B4 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-F01 Molded Case 39.249 4.7 1.000 39.249 0.600 20.00 65.000 65.000

BUS-2110MC501-B 0.480 MCP-B6 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-6A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B7 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-7A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-8A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B8 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B9 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 100.000 100.000

MCP-B11 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

BUS-2110MC501-C 0.480 CB-9A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-10A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-11A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

342
Project: SPENCE GROWTH OPTION PROJECT

Page: 140

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-2110MC501-C CB-12A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-14A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-16A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

BUS-2110MC501-D 0.480 CB-17A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-18A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B12 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B13 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

BUS-2110MC501-E 0.480 CB-19A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-20A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-21A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-22A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-23A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B16 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-24A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-25A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

BUS-2110MC501-F 0.480 CB-26A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-27A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-28A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B18 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B20 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-29A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

MCP-B21 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-30A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-31A Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

CB-31A2 Molded Case 39.249 4.7 1.000 39.249 0.480 20.00 65.000 65.000

BUS-2130MC501-A 0.480 CB-E02 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-E03 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-E04 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-F5 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-E05 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-E2 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-E08 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

CB-E01 Molded Case 11.104 1.6 1.000 11.104 0.600 20.00 65.000 65.000

BUS-2130MC501-B 0.480 CB-E06 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

343
Project: SPENCE GROWTH OPTION PROJECT

Page: 141

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-2130MC501-B CB-E07 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

MCP-E03 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

MCP-E3 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

MCP-E2 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

MCP-E4 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

MCP-E01 Molded Case 11.104 1.6 1.000 11.104 0.480 20.00 65.000 65.000

BUS-A1 23.000 6.784 3.2

BUS-A01 23.000 CB-A01 3 cy Sym CB 2.0 15.887 5.1 1.000 15.887 27.000 25.000 25.000

BUS-A03 0.480 12.059 1.6

BUS-A05 4.160 13.756 11.9

BUS-A06 23.000 15.831 5.0

BUS-B01 4.160 CB-B01 3 cy Sym CB 2.0 13.659 11.9 1.000 13.659 4.760 29.000 33.183

BUS-B1/1 0.480 0.569 0.0

BUS-B02 4.160 CB-B01 3 cy Sym CB 2.0 13.659 11.9 1.000 13.659 4.760 29.000 33.183

BUS-B2/1 0.480 0.596 0.0

BUS-B3/1 0.480 0.596 0.0

BUS-B4/1 0.480 1.896 0.2

BUS-B6/1 0.480 1.896 0.2

BUS-B7/1 0.480 0.288 0.0

BUS-B8/1 0.480 0.257 0.0

BUS-B9/1 0.480 4.558 0.6

BUS-B11/1 0.480 1.209 0.1

BUS-B12/1 0.480 1.103 0.1

BUS-B13/1 0.480 1.097 0.1

BUS-B16/1 0.480 2.285 0.4

BUS-B18/1 0.480 2.286 0.1

BUS-B20/1 0.480 0.523 0.0

BUS-B20/3 0.480 16.093 1.6

BUS-C01 23.000 CB-C01 3 cy Sym CB 2.0 6.799 3.2 1.000 6.799 27.000 16.000 16.000

BUS-C03 0.480 41.788 5.3

BUS-C04 4.160 5.883 7.1

BUS-C05 23.000 Fuse2 Fuse 7.124 3.5 1.000 7.124 25.000 3.95 10.000 10.000

BUS-D01 4.160 CB-D01 3 cy Sym CB 2.0 5.840 7.1 1.000 5.840 4.760 29.000 33.183

BUS-D03 4.160 5.509 6.2

344
Project: SPENCE GROWTH OPTION PROJECT

Page: 142

Date: 11-05-2018
SHORT CIRCUIT STUDY
ETAP Ver. 16.1.1C

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability


CPT Symm. X/R Adj. Sym. Test Rated Adjusted
ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
BUS-D04 4.160 4.963 2.4

BUS-D05 4.160 4.963 2.4

Bus-E01 0.480 CB-E01 Molded Case 11.104 1.6 1.000 11.104 0.600 20.00 65.000 65.000

BUS-E2 0.480 0.726 0.2

BUS-E03 0.480 8.682 1.1

Bus-E3 0.480 0.511 0.1

BUS-E04 0.380 2.608 1.5

Bus-E4 0.480 0.438 0.1

BUS-E05 0.380 2.561 1.5

Bus-E5 0.480 0.504 0.1

BUS-E06 0.480 4.645 0.5

BUS-E07 0.240 1.743 1.3

BUS-E08 0.240 1.447 1.1

BUS-E09 0.480 7.282 0.8

BUS-E10 0.380 1.640 1.4

BUS-E11 0.380 1.391 1.1

BUS-E12 0.480 0.581 0.1

BUS-E14 0.480 0.700 0.2

BUS-E15 0.480 1.455 0.3

BUS-E16 0.480 3.186 0.4

BUS-E17 0.480 1.617 0.4

Bus-E18 0.480 0.381 0.1

Bus-F01 0.480 CB-F01 Molded Case 39.249 4.7 1.000 39.249 0.600 20.00 65.000 65.000

BUS-F7A/1 0.480 1.834 0.2

BUS-F9A/1 0.480 9.165 1.7

BUS-F22 0.415 2.778 1.4

BUS-F30 0.415 2.965 1.5

BUS-F31 0.480 8.704 1.1

- Method: IEEE - X/R is calculated from separate R & X networks.


- HV CB interrupting capability is adjusted based on bus nominal voltage.
- Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

* Indicates a device with interrupting duty exceeding the device capability


** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.

345
One-Line Diagram - OLV1 (Short-Circuit Analysis)
U1
624. 926 MVAsc

2130-VL-001 23 kV 15. 687 kA

. 583 kA

2130-US-001 2130-SG-001 2130-MC-001


BUS-A01 15. 645 kA
BUS-B01 4. 16 kV
23 kV . 022 kA . 564 kA 10. 917 kA 2. 072 kA 2. 076 kA

CB-B01
2130US001B-E01

BUS-A06 16. 144 kA


23 kV
. 022 kA
CB-A01 o o

MR MR
R

o o

BUS-B02 4. 148 kA
4. 16 kV
10. 917 kA
2130-XF-501
0. 5 MVA 2130-XF-001
5 MVA

BUS-A03 10. 982 kA BUS-A05 11. 018 kA


0. 48 kV 4. 16 kV
1. 085 kA 4. 134 kA

2130-B04
2130-B03 12. 452 kA 12. 598 kA

4. 16 kV 2. 085 kA 4. 16 kV 2. 085 kA
10. 016 kA

2130-MC-501 2130-CV002-B
2130-CV002-A
1865 kW
1865 kW
346
One-Line Diagram - OLV1 (Short-Circuit Analysis)

. 4 kA

BUS-C05
6. 715 kA
23 kV
. 414 kA

2110US001A-E01

2110-US-001
2110-SG-001 2110-MC-001
BUS-C01 6. 61 kA BUS-D01 4. 16 kV

23 kV . 151 kA . 264 kA 4. 901 kA 1. 02 kA . 346 kA . 346 kA


o

CB-D01

2110US001B-E01

BUS-A1 6. 851 kA CB-C01


23 kV
. 151 kA

o o
o
R MR MR
MR

o o o
o

2110-XF-501 2110-XF-001
2. 25 MVA
1. 75 MVA

BUS-C04
BUS-C03 33. 937 kA 4. 16 kV 4. 945 kA
0. 48 kV
7. 872 kA 1. 707 kA

BUS-D03 5. 212 kA BUS-D04 5. 22 kA BUS-D05 5. 22 kA


4. 16 kV 1. 03 kA 4. 16 kV . 348 kA 4. 16 kV . 348 kA
31. 22 kA

2110-MC-501 2110-CR001-A 2110-CV001HU-01A 2110-CV001HU-01B


750 kW 368 kW 368 kW
347
One-Line Diagram - OLV1=>2130-MC-501 (Short-Circuit Analysis)

2130MC501-P01~P06

Bus-E01 10. 016 kA


0. 48 kV
1. 095 kA

CB-E01

BUS-2130MC501-A
0. 48 kV 10. 016 kA

. 254 kA . 093 kA . 14 kA . 313 kA . 102 kA . 051 kA . 057 kA . 085 kA


CB-F5
CB-E02 CB-E03 CB-E04
CB-E08
CB-E2
CB-E05

SW6 SWICTH IS SHOWN ONLY AS


A MEANS OF BUSBAR
CONTINUATION IN CREATING
THIS SINGLE LINE. IT DOES
NOT EXIST IN 2130MC-501.

BUS-E03 8. 438 kA BUS-E06 4. 573 kA BUS-E09 7. 154 kA


BUS-F31 8. 403 kA
0. 48 kV 0. 48 kV 0. 48 kV
. 255 kA . 094 kA . 141 kA 0. 48 kV
. 315 kA

2130-LX-501 2130-DX-501 2130-DX-502


30 kVA 45 kVA 2130-DX-503
75 kVA 100 kVA

BUS-E04 2. 252 kA BUS-E07 1. 54 kA BUS-E10 1. 446 kA


BUS-F30 2. 567 kA
0. 38 kV 0. 24 kV 0. 38 kV
. 363 kA . 209 kA . 198 kA 0. 415 kV
. 406 kA

BUS-E08 BUS-E11 BUS-F22 2. 381 kA BUS-E2


BUS-E05 2. 205 kA 1. 253 kA 1. 204 kA . 695 kA BUS-E14
0. 415 kV BUS-E15 1. 386 kA . 669 kA
0. 38 kV . 41 kA 0. 48 kV
. 364 kA . 213 kA 0. 38 kV . 202 kA 0. 48 kV . 053 kA 0. 48 kV
0. 24 kV . 106 kA . 059 kA

2130-ST055-01
2130-DP-505 9 kW
2130-LP-501 2130-DP-501 2130-DP-502 2130-CH-005
65 kVA 24 kVA 80 kVA 2130-CH-004
36 kVA 12 kVA
24 kVA

348
One-Line Diagram - OLV1=>2130-MC-501 (Short-Circuit Analysis)

BUS-2130MC501 CONTINUATION
FROM SHEET 1.

BUS-2130MC501-B
0. 48 kV
11. 018 kA

. 024 kA . 024 kA . 015 kA . 002 kA . 022 kA

MCP-E2 MCP-E01
CB-E07 MCP-E3 MCP-E4
MCP-E03
CB-E06

BUS-E12
Bus-E3 . 502 kA
Bus-E5 . 502 kA 0. 48 kV
0. 48 kV . 571 kA
. 015 kA 0. 48 kV
Bus-E4 . 424 kA . 002 kA
BUS-E16 3. 186 kA Bus-E18 . 368 kA . 022 kA
BUS-E17 1. 617 kA 0. 48 kV
0. 48 kV 0. 48 kV . 025 kA
0. 48 kV . 025 kA

2130-BL001-A
2130-BL001-B 2130-UP-501
2. 3 kW
0. 4 kW 5 kVA
2130-WR-001 2130-CV002B-01A
2130-WR-002 2130-CV002A-01A
35 kVA 3. 7 kW
35 kVA 3. 7 kW

349
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

2110MC501-P01~P15

Bus-F01 31. 22 kA
0. 48 kV
8. 037 kA

CB-F01

BUS-2110MC501-A
0. 48 kV 31. 22 kA
. 278 kA . 079 kA . 113 kA . 223 kA . 026 kA . 036 kA . 036 kA . 072 kA . 143 kA 7. 048 kA
MCP-B1 MCP-B2
CB-1A CB-3A CB-4A MCP-B3 MCP-B4
CB-2A CB-5A

AFD1 SW1 SWICTH IS


BS-5A/1 SHOWN ONLY AS A
39. 179 kA MEANS OF BUSBAR
. 036 kA . 036 kA CONTINUATION IN
0. 48 kV CREATING THIS
SINGLE LINE. IT
DOES NOT EXIST
IN 2110MC-501.

BUS-1A/1 19. 971 kA BUS-3A/1 6. 211 kA BUS-4A/1 17. 886 kA


BUS-2A/1 6. 212 kA
0. 48 kV 0. 48 kV 0. 48 kV
. 28 kA 0. 48 kV . 113 kA . 224 kA
. 08 kA

2110-LX-501 2110-DX-502
2110-DX-501
100 kVA 45 kVA
30 kVA 2110-DX-503
100 kVA

BUS-4A/2
BUS-1A/2 BUS-3A/2 1. 462 kA 2. 994 kA
BUS-2A/2 1. 624 kA 0. 415 kV
0. 38 kV 3. 309 kA
0. 24 kV 0. 38 kV . 156 kA . 28 kA
. 175 kA
. 389 kA

BUS-B1/1 . 554 kA BUS-B2/1 BUS-5A/2


. 578 kA BUS-B3/1 . 578 kA . 554 kA
0. 48 kV BUS-5A/3 . 554 kA BUS-B4/1 1. 834 kA
. 027 kA
0. 48 kV . 037 kA 0. 48 kV . 037 kA 0. 48 kV . 037 kA
0. 48 kV . 037 kA 0. 48 kV . 147 kA

BUS-1A/3 3. 068 kA 2. 743 kA 2110-CR001-B


BUS-2A/3 BUS-3A/3 1. 391 kA BUS-4A/3 2110-CR01-02A
0. 38 kV 1. 363 kA 4 kW 2110-CR01-02B 2110-CR01-03A
0. 24 kV 0. 38 kV 0. 415 kV . 282 kA 5. 6 kW 5. 6 kW 5. 6 kW 2110-CR01-03B 2110-CR01-01A
. 392 kA . 157 kA 22. 5 kW
. 177 kA 5. 6 kW

2110-DP-501
2110-LP-501 20 kVA 2110-DP-502 2110-DP-505
70 kVA 28 kVA 55 kVA

350
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

BUS-2110MC501
BUS-2110MC501-B CONTINUATION FROM SHEET 1.
0. 48 kV 32. 202 kA
. 143 kA . 065 kA . 009 kA . 014 kA . 473 kA . 095 kA 6. 255 kA

MCP-B6
CB-6A CB-7A CB-8A
MCP-B7 MCP-B8 MCP-B11
MCP-B9

BUS-6A/1 1. 151 kA
1. 834 kA BUS-F7A/1 1. 834 kA 1. 168 kA
BUS-B6/1 0. 48 kV BUS-B7/1 . 282 kA BUS-8A/1 1. 834 kA BUS-B8/1 . 248 kA 4. 296 kA BUS-B11/1
. 022 kA . 022 kA . 022 kA BUS-B9/1
0. 48 kV . 147 kA 0. 48 kV 0. 48 kV 0. 48 kV . 098 kA
0. 48 kV . 009 kA 0. 48 kV . 014 kA . 496 kA
0. 48 kV

2110-CR00101-HE1 2110-CR00101-HE2 2110-CR00101-HE3 2110-HU001-A


2110-CR01-01B
22. 5 kW 5 kVA 5 kVA 5 kVA 2110-CR001-01C 2110-WR-001 2110-CR01-05A 2110-DC-001 15 kW
1. 5 kW 2110-WR-002 56 kW
35 kVA 2. 2 kW
35 kVA

BUS-2110MC501-C
0. 48 kV 32. 994 kA
. 861 kA . 377 kA 2. 278 kA . 051 kA . 143 kA . 355 kA 2. 209 kA

CB-12A CB-14A CB-16A


CB-10A CB-11A
CB-9A

BUS-F9A/1 8. 407 kA BUS-14A/1 1. 98 kA


BUS-10A/1 3. 298 kA BUS-12A/1 . 639 kA BUS-16A/1 3. 027 kA
0. 48 kV . 883 kA . 033 kA . 002 kA . 002 kA BUS-11A/1 14. 944 kA
0. 48 kV 0. 48 kV . 053 kA 0. 48 kV . 147 kA 0. 48 kV . 373 kA
. 396 kA 0. 48 kV 2. 452 kA

2110-DS-001 2110-MA001-RC
2110-ZM-250 2110-CP-001 2110-CH-251 42 kW
2110-CN014-A 2110-CN014-B 22. 5 kW
5 kW 2110-CN014-HE1 2110-CN014-HE2 44. 7 kW 257 kW 12 kVA
115 kW
0. 5 kVA 0. 5 kVA

351
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 2.
BUS-2110MC501-D
0. 48 kV 37. 051 kA
. 048 kA . 615 kA . 094 kA . 094 kA 1. 366 kA

MCP-B12 MCP-B13
CB-17A
CB-18A

BUS-17A/1 0. 48 kV 1. 394 kA
. 012 kA . 012 kA . 012 kA . 012 kA

BUS-B12/1 1. 062 kA BUS-B13/1 1. 056 kA


6. 199 kA
BUS-18A/1
0. 48 kV . 098 kA 0. 48 kV . 098 kA
0. 48 kV . 646 kA . 004 kA

2110-RB001-B 2110-CV001HU-01C 2110-CV001HU-01D


2110-RB001-A
BUS-17A/2 . 843 kA BUS-17A/3 . 843 kA 15 kW 15 kW
BUS-17A/4 . 843 kA 75 kW 0. 8 kW
0. 48 kV BUS-17A/5 . 843 kA
. 012 kA 0. 48 kV . 012 kA . 012 kA
0. 48 kV
0. 48 kV . 012 kA

2110-MA001-A 2110-MA001-B
2. 2 kW 2110-MA001-01C
2. 2 kW 2110-MA001-01D
2. 2 kW
2. 2 kW

BUS-2110MC501-E
0. 48 kV 37. 895 kA
. 322 kA . 168 kA . 076 kA . 052 kA . 184 kA . 143 kA . 008 kA . 227 kA . 193 kA

CB-19A CB-20A CB-23A


CB-21A CB-22A MCP-B16 CB-24A
CB-25A

BUS-19A/1 3. 165 kA BUS-20A/1 BUS-21A/1 . 795 kA BUS-22A/1 BUS-23A/1 BUS-B16/1 BUS-24A/1


1. 608 kA 1. 316 kA 1. 718 kA 2. 21 kA . 674 kA BUS-25A/1 2. 052 kA
0. 48 kV . 334 kA 0. 48 kV . 177 kA 0. 48 kV . 08 kA . 053 kA 0. 48 kV . 192 kA . 147 kA . 008 kA
0. 48 kV 0. 48 kV 0. 48 kV . 238 kA
0. 48 kV

2110-CV001-02 2110-CV001-07
37. 3 kW 2110-CH-016 2130-CV002-07 2130-CV002-02
40 kVA 2130-CH-003 2130-DC-002 2130-ZM-253
18 kVA 30 kW 37 kW
12 kVA 22. 5 kW 1. 75 kVA
352
One-Line Diagram - OLV1=>2110-MC-501 (Short-Circuit Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 3.
BUS-2110MC501-F
0. 48 kV 39. 062 kA
. 015 kA . 002 kA . 032 kA . 022 kA . 008 kA CB-31A . 008 kA . 107 kA
MCP-B20 CB-30A
CB-28A MCP-B18 CB-29A CB-31A2
CB-26A CB-27A MCP-B21

AFD-02
BUS-28A/1

0. 48 kV

BUS-26A/1 BUS-27A/1 BUS-B20/1 BUS-29A/1


1. 589 kA 1. 618 kA BUS-28A/2 3. 175 kA BUS-B18/1 . 506 kA 2. 003 kA BUS-24A/3
2. 284 kA BUS-24A/2 . 324 kA . 324 kA
BUS-B20/3 16. 093 kA BUS-24A/5 1. 617 kA
. 015 kA 0. 48 kV . 033 kA 0. 48 kV . 022 kA
0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV . 002 kA . 008 kA 0. 48 kV . 008 kA
0. 48 kV 0. 48 kV . 111 kA
0. 48 kV

2110-BL001-A 2110-BL001-B 2831-ZM-024-04 2110-UP-501 2130-SC251-02


2130-SC251-01
2110-WR-003 2110-WR-004 2. 3 kW 0. 4 kW 2831-ZM-024-03 5 kW 1. 75 kVA 2130-CV002-08
5 kVA 1. 75 kVA
35 kVA 35 kVA 149 kW 25 kVA

353
Project: SPENCE GROWTH OPTION PROJECT

Page: 1
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Electrical Transient Analyzer Program

Motor Starting Analysis

Static

Prestart Loading Category (1): Design

Prestart Generation Category (1) : Design

Load Diversity Factor: None

Swing V-Control Load Total

Number of Buses: 1 0 108 109

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 12 0 0 86 0 10 108

Synchronous Power Synchronous Induction


Generator Grid Motor Machines Total

Number of Machines: 0 1 0 2 3

Method of Solution: Adaptive Newton-Raphson

System Frequency: 50.00 Hz

Unit System: English


Project Filename: 3057-ETAP-1001_2 MOT ST

354
Project: SPENCE GROWTH OPTION PROJECT

Page: 2
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual

355
Project: SPENCE GROWTH OPTION PROJECT

Page: 3
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Bus Input Data

Load @ T=0¯

Bus Initial Voltage Constant kVA Constant Z Constant I Generic


ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

2130-B03 4.160 1 100.0 0.0 1.983 0.799

2130-B04 4.160 1 100.0 0.0 1.983 0.799

2130-VL-001 23.000 1 100.0 0.0

BS-5A/1 0.480 1 100.0 0.0

BUS-1A/1 0.480 1 100.0 0.0

BUS-1A/2 0.380 1 100.0 0.0

BUS-1A/3 0.380 1 100.0 0.0 0.048 0.029 0.012 0.007

BUS-2A/1 0.480 1 100.0 0.0

BUS-2A/2 0.240 1 100.0 0.0

BUS-2A/3 0.240 1 100.0 0.0 0.014 0.008 0.003 0.002

BUS-3A/1 0.480 1 100.0 0.0

BUS-3A/2 0.380 1 100.0 0.0

BUS-3A/3 0.380 1 100.0 0.0 0.019 0.012 0.005 0.003

BUS-4A/1 0.480 1 100.0 0.0

BUS-4A/2 0.415 1 100.0 0.0

BUS-4A/3 0.415 1 100.0 0.0 0.037 0.023 0.009 0.006

BUS-5A/2 0.480 1 100.0 0.0 0.008 0.004

BUS-5A/3 0.480 1 100.0 0.0 0.008 0.004

BUS-6A/1 0.480 1 100.0 0.0 0.012 0.000 0.003 0.000

BUS-8A/1 0.480 1 100.0 0.0

BUS-10A/1 0.480 1 100.0 0.0 0.056 0.026

BUS-11A/1 0.480 1 100.0 0.0 0.345 0.148

BUS-12A/1 0.480 1 100.0 0.0

BUS-14A/1 0.480 1 100.0 0.0 0.029 0.014

BUS-16A/1 0.480 1 100.0 0.0 0.052 0.024

BUS-17A/1 0.480 1 100.0 0.0

BUS-17A/2 0.480 1 100.0 0.0 0.003 0.002

BUS-17A/3 0.480 1 100.0 0.0 0.003 0.002

BUS-17A/4 0.480 1 100.0 0.0 0.003 0.002

BUS-17A/5 0.480 1 100.0 0.0 0.003 0.002

BUS-18A/1 0.480 1 100.0 0.0 0.092 0.041

BUS-19A/1 0.480 1 100.0 0.0 0.047 0.022

BUS-20A/1 0.480 1 100.0 0.0 0.027 0.017 0.007 0.004

BUS-21A/1 0.480 1 100.0 0.0

356
Project: SPENCE GROWTH OPTION PROJECT

Page: 4
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Load @ T=0¯

Bus Initial Voltage Constant kVA Constant Z Constant I Generic


ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BUS-22A/1 0.480 1 100.0 0.0

BUS-23A/1 0.480 1 100.0 0.0

BUS-24A/1 0.480 1 100.0 0.0 0.001 0.001

BUS-24A/2 0.480 1 100.0 0.0 0.001 0.001

BUS-24A/3 0.480 1 100.0 0.0 0.001 0.001

BUS-24A/5 0.480 1 100.0 0.0 0.017 0.011 0.004 0.003

BUS-25A/1 0.480 1 100.0 0.0 0.046 0.022

BUS-26A/1 0.480 1 100.0 0.0

BUS-27A/1 0.480 1 100.0 0.0

BUS-28A/2 0.480 1 100.0 0.0 0.003 0.002

BUS-29A/1 0.480 1 100.0 0.0 0.003 0.002

BUS-2110MC501-A 0.480 1 100.0 0.0

BUS-2110MC501-B 0.480 1 100.0 0.0

BUS-2110MC501-C 0.480 1 100.0 0.0

BUS-2110MC501-D 0.480 1 100.0 0.0

BUS-2110MC501-E 0.480 1 100.0 0.0

BUS-2110MC501-F 0.480 1 100.0 0.0

BUS-2130MC501-A 0.480 1 100.0 0.0

BUS-2130MC501-B 0.480 1 100.0 0.0

BUS-A1 23.000 1 100.0 0.0

BUS-A01 23.000 1 100.0 0.0

BUS-A03 0.480 1 100.0 0.0

BUS-A05 4.160 1 100.0 0.0

BUS-A06 23.000 1 100.0 0.0

BUS-B01 4.160 1 100.0 0.0

BUS-B1/1 0.480 1 100.0 0.0 0.005 0.003

BUS-B02 4.160 1 100.0 0.0

BUS-B2/1 0.480 1 100.0 0.0 0.008 0.004

BUS-B3/1 0.480 1 100.0 0.0 0.008 0.004

BUS-B4/1 0.480 1 100.0 0.0 0.029 0.014

BUS-B6/1 0.480 1 100.0 0.0 0.029 0.014

BUS-B7/1 0.480 1 100.0 0.0 0.002 0.002

BUS-B8/1 0.480 1 100.0 0.0 0.003 0.002

BUS-B9/1 0.480 1 100.0 0.0

BUS-B11/1 0.480 1 100.0 0.0 0.019 0.010

BUS-B12/1 0.480 1 100.0 0.0 0.019 0.010

357
Project: SPENCE GROWTH OPTION PROJECT

Page: 5
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Load @ T=0¯

Bus Initial Voltage Constant kVA Constant Z Constant I Generic


ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BUS-B13/1 0.480 1 100.0 0.0 0.019 0.010

BUS-B16/1 0.480 1 100.0 0.0 0.029 0.014

BUS-B18/1 0.480 1 100.0 0.0

BUS-B20/1 0.480 1 100.0 0.0

BUS-B20/3 0.480 1 100.0 0.0

BUS-C01 23.000 1 100.0 0.0

BUS-C03 0.480 1 100.0 0.0

BUS-C04 4.160 1 100.0 0.0

BUS-C05 23.000 1 100.0 0.0

BUS-D01 4.160 1 100.0 0.0

BUS-D03 4.160 1 100.0 0.0

BUS-D04 4.160 1 100.0 0.0 0.395 0.167

BUS-D05 4.160 1 100.0 0.0 0.395 0.167

Bus-E01 0.480 1 100.0 0.0

BUS-E2 0.480 1 100.0 0.0

BUS-E03 0.480 1 100.0 0.0

Bus-E3 0.480 1 100.0 0.0 0.003 0.002

BUS-E04 0.380 1 100.0 0.0

Bus-E4 0.480 1 100.0 0.0 0.005 0.003

BUS-E05 0.380 1 100.0 0.0 0.044 0.027 0.011 0.007

Bus-E5 0.480 1 100.0 0.0

BUS-E06 0.480 1 100.0 0.0

BUS-E07 0.240 1 100.0 0.0

BUS-E08 0.240 1 100.0 0.0 0.016 0.010 0.004 0.003

BUS-E09 0.480 1 100.0 0.0

BUS-E10 0.380 1 100.0 0.0

BUS-E11 0.380 1 100.0 0.0 0.024 0.015 0.006 0.004

BUS-E12 0.480 1 100.0 0.0 0.003 0.002

BUS-E14 0.480 1 100.0 0.0 0.012 0.007

BUS-E15 0.480 1 100.0 0.0

BUS-E16 0.480 1 100.0 0.0

BUS-E17 0.480 1 100.0 0.0

Bus-E18 0.480 1 100.0 0.0 0.005 0.003

Bus-F01 0.480 1 100.0 0.0

BUS-F7A/1 0.480 1 100.0 0.0

BUS-F9A/1 0.480 1 100.0 0.0 0.132 0.058

358
Project: SPENCE GROWTH OPTION PROJECT

Page: 6
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Load @ T=0¯

Bus Initial Voltage Constant kVA Constant Z Constant I Generic


ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BUS-F22 0.415 1 100.0 0.0 0.054 0.034 0.014 0.008

BUS-F30 0.415 1 100.0 0.0

BUS-F31 0.480 1 100.0 0.0

Total Number of Buses: 109 6.102 2.606 0.081 0.048 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

2130-VL-001 23.000 Swing 1 100.0 0.0

0.000 0.000

359
Project: SPENCE GROWTH OPTION PROJECT

Page: 7
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Line/Cable Input Data


ohms or siemens/ 1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110BL001A-P01 0.6MCUN3 10 82.0 0.0 1 75 1.03940 0.02828 0.0000000

2110BL001B-P01 0.6MCUN3 10 114.8 0.0 1 75 1.03940 0.02828 0.0000000

2110CH016-P01 0.6MCUN3 8 426.5 0.0 1 75 0.81100 0.04808 0.0000000

2110CH251-P01 0.6MCUN3 8 531.5 0.0 1 75 0.81100 0.04808 0.0000000

2110CN014-P01 0.6MCUN3 350 551.2 0.0 1 75 0.03780 0.03108 0.0000000

2110CP001-P1 0.6MCUN3 350 492.1 0.0 2 75 0.03780 0.03108 0.0000000

2110CR001A-E01 5.0MCUS3 3/0 557.7 0.0 1 75 0.08140 0.03858 0.0000000

2110CR001B-P01 0.6MCUN3 10 479.0 0.0 1 75 1.03940 0.02828 0.0000000

2110CR0101A-P01 0.6MCUN3 4 459.3 0.0 1 75 0.32100 0.04025 0.0000000

2110CR0101B-P01 0.6MCUN3 4 459.3 0.0 1 75 0.32100 0.04025 0.0000000

2110CR0101C-P01 0.6MCUN3 12 479.0 0.0 1 75 2.05000 0.04398 0.0000000

2110CR00101HE-P01 0.6MCUN3 6 465.9 0.0 1 75 0.51000 0.04375 0.0000000

2110CR0102A-P01 0.6MCUN3 10 459.3 0.0 1 75 1.03940 0.02828 0.0000000

2110CR0102B-P01 0.6MCUN3 10 459.3 0.0 1 75 1.03940 0.02828 0.0000000

2110CR0103A-P01 0.6MCUN3 10 479.0 0.0 1 75 1.03940 0.02828 0.0000000

2110CR0103B-P01 0.6MCUN3 10 479.0 0.0 1 75 1.03940 0.02828 0.0000000

2110CR0105A-P01 0.6MCUN3 12 544.6 0.0 1 75 2.05000 0.04398 0.0000000

2110CV001B-E01 5.0MCUS3 4 498.7 0.0 1 75 0.32100 0.04733 0.0000000

2110CV001HU01A-E01 5.0MCUS3 4 498.7 0.0 1 75 0.32100 0.04733 0.0000000

2110CV001HU01C-P01 0.6MCUN3 6 505.2 0.0 1 75 0.51000 0.04375 0.0000000

2110CV001HU01D-P01 0.6MCUN3 6 508.5 0.0 1 75 0.51000 0.04375 0.0000000

2110CV00102-P01 0.6MCUN3 4 262.5 0.0 1 75 0.32100 0.04025 0.0000000

2110CV00107-P01 0.6MCUN3 4 524.9 0.0 1 75 0.32100 0.04025 0.0000000

2110DC001A-P01 0.6MCUN3 1/0 459.3 0.0 1 75 0.12800 0.03450 0.0000000

2110DP501-P01 0.6MCUN3 4 65.6 0.0 1 75 0.32100 0.04025 0.0000000

2110DP502-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.10200 0.03392 0.0000000

2110DP505-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.10200 0.03392 0.0000000

2110DS001-P01 0.6MCUN3 6 269.0 0.0 1 75 0.51000 0.04375 0.0000000

2110DX501-P01 0.6MCUN3 6 82.0 0.0 1 75 0.51000 0.04375 0.0000000

2110DX502-P01 0.6MCUN3 6 82.0 0.0 1 75 0.51000 0.04375 0.0000000

2110DX503-P01 0.6MCUN3 1/0 82.0 0.0 1 75 0.12800 0.03450 0.0000000

2110HU001A-P01 0.6MCUN3 6 459.3 0.0 1 75 0.51000 0.04375 0.0000000

2110LP501-P01 0.6MCUN3 4/0 82.0 0.0 1 75 0.06400 0.03175 0.0000000

2110LX501-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.10200 0.03392 0.0000000

360
Project: SPENCE GROWTH OPTION PROJECT

Page: 8
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

ohms or siemens/ 1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2110MA001RC-P01 0.6MCUN3 1 538.1 0.0 1 75 0.16000 0.03633 0.0000000

2110MA001TFC-P01 0.6MCUN3 4 607.0 0.0 1 75 0.32100 0.04025 0.0000000

2110MA00101A-P01 0.6MCUN3 12 65.6 0.0 1 75 2.05000 0.04398 0.0000000

2110MA00101B-P01 0.6MCUN3 12 65.6 0.0 1 75 2.05000 0.04398 0.0000000

2110MA00101C-P01 0.6MCUN3 12 65.6 0.0 1 75 2.05000 0.04398 0.0000000

2110MA00101D-P01 0.6MCUN3 12 65.6 0.0 1 75 2.05000 0.04398 0.0000000

2110MC501-P01~P15 0.6MCUN1 750 82.0 0.0 5 75 0.02100 0.04000 0.0000000

2110RB001-P01 0.6MCUN3 4/0 557.7 0.0 1 75 0.06400 0.03175 0.0000000

2110SG001-E01~E03 5.0MCUS1 350 82.0 0.0 1 75 0.03860 0.04683 0.0000000

2110UP501-P01 0.6MCUN3 10 131.2 0.0 1 75 1.03940 0.02828 0.0000000

2110US001A-E01 25MCUS3 1 328.1 0.0 1 75 0.15451 0.05000 0.0000000

2110US001B-E01 25MCUS3 1 45.9 0.0 1 75 0.15451 0.05000 0.0000000

2110WR001-P01 0.6MCUN3 4 459.3 0.0 1 75 0.32100 0.04025 0.0000000

2110WR002-P01 0.6MCUN3 4 459.3 0.0 1 75 0.32100 0.04025 0.0000000

2110WR003-P01 0.6MCUN3 4 531.5 0.0 1 75 0.32100 0.04025 0.0000000

2110WR004-P01 0.6MCUN3 4 521.7 0.0 1 75 0.32100 0.04025 0.0000000

2110ZM250-P01 0.6MCUN3 1 492.1 0.0 1 75 0.16000 0.03633 0.0000000

2130BL001A-P01 0.6MCUN3 12 262.5 0.0 1 75 2.05000 0.04398 0.0000000

2130BL001B-P01 0.6MCUN3 12 262.5 0.0 1 75 2.05000 0.04398 0.0000000

2130CH003-P01 0.6MCUN3 4 643.0 0.0 1 75 0.32100 0.04025 0.0000000

2130CH004-P01 0.6MCUN3 2 885.8 0.0 1 75 0.20200 0.03733 0.0000000

2130CH005-P01 0.6MCUN3 4 1181.1 0.0 1 75 0.32100 0.04025 0.0000000

2130CV002A-E01 5.0MCUS3 500 216.5 0.0 1 75 0.03000 0.03283 0.0000000

2130CV002A01A-P01 0.6MCUN3 12 360.9 0.0 1 75 2.05000 0.04398 0.0000000

2130CV002B-E01 5.0MCUS3 500 154.2 0.0 1 75 0.03000 0.03283 0.0000000

2130CV002B01A-P01 0.6MCUN3 12 311.7 0.0 1 75 2.05000 0.04398 0.0000000

2130CV00202-P01 0.6MCUN3 1 803.8 0.0 1 75 0.16000 0.03633 0.0000000

2130CV00207-P01 0.6MCUN3 2 771.0 0.0 1 75 0.20200 0.03733 0.0000000

2130CV00208-P01 0.6MCUN3 2 820.2 0.0 1 75 0.20200 0.03733 0.0000000

2130DC002A-P01 0.6MCUN3 1 744.8 0.0 1 75 0.16000 0.03633 0.0000000

2130DP501-P01 0.6MCUN3 4 82.0 0.0 1 75 0.32100 0.04025 0.0000000

2130DP502-P01 0.6MCUN3 6 82.0 0.0 1 75 0.51000 0.04375 0.0000000

2130DP505-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.10200 0.03392 0.0000000

2130DX501-P01 0.6MCUN3 6 82.0 0.0 1 75 0.51000 0.04375 0.0000000

2130DX502-P01 0.6MCUN3 2 82.0 0.0 1 75 0.20200 0.03733 0.0000000

2130DX503-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.10200 0.03392 0.0000000

361
Project: SPENCE GROWTH OPTION PROJECT

Page: 9
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

ohms or siemens/ 1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

2130LP501-P01 0.6MCUN3 4/0 32.8 0.0 1 75 0.06400 0.03175 0.0000000

2130LX501-P01 0.6MCUN3 2/0 82.0 0.0 1 75 0.10200 0.03392 0.0000000

2130MC501-P01~P06 0.6MCUN1 750 108.3 0.0 2 75 0.02100 0.04000 0.0000000

2130SC25101-P01 0.6MCUN3 10 820.2 0.0 1 75 1.03940 0.02828 0.0000000

2130SC25102-P01 0.6MCUN3 10 820.2 0.0 1 75 1.03940 0.02828 0.0000000

2130SG001-E01~E06 5.0MCUS1 500 85.3 0.0 2 75 0.03000 0.04383 0.0000000

2130ST05501-P01 0.6MCUN3 4 1230.3 0.0 1 75 0.32100 0.04025 0.0000000

2130UP501-P01 0.6MCUN3 12 229.7 0.0 1 75 2.05000 0.04398 0.0000000

2130US001A-E01 25MCUS3 2/0 367.5 0.0 1 75 0.09729 0.04583 0.0000000

2130US001B-E01 25MCUS3 2/0 45.9 0.0 1 75 0.09729 0.04583 0.0000000

2130WR001-P01 0.6MCUN3 4 213.3 0.0 1 75 0.32100 0.04025 0.0000000

2130WR002-P01 0.6MCUN3 1/0 1148.3 0.0 1 75 0.12800 0.03450 0.0000000

2130ZM253-P01 0.6MCUN3 10 393.7 0.0 1 75 1.03940 0.02828 0.0000000

2831ZM02404-P01 0.6MCUN3 10 524.9 0.0 1 75 1.03940 0.02828 0.0000000

2831ZM02404-P2 0.6MCUN3 500 262.5 0.0 1 75 0.02940 0.02908 0.0000000

2110US001-E02 465 9186.4 0.0 1 75 0.05083 0.11740 0.0000009

Line / Cable resistances are listed at the specified temperatures.

362
Project: SPENCE GROWTH OPTION PROJECT

Page: 10
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

2-Winding Transformer Input Data

% Tap
Transformer Rating Z Variation Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

2110-DX-501 0.030 0.480 0.240 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-DX-502 0.045 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-DX-503 0.100 0.480 0.415 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-LX-501 0.100 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2110-XF-001 2.250 23.000 4.160 5.40 6.00 0 0 0 -5.000 0 5.4000 Dyn 0.000

2110-XF-501 1.750 23.000 0.480 5.50 6.00 0 0 0 -5.000 0 5.5000 Dyn 0.000

2130-DX-501 0.030 0.480 0.240 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-DX-502 0.045 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-DX-503 0.100 0.480 0.415 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-LX-501 0.075 0.480 0.380 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

2130-XF-001 5.000 23.000 4.160 5.50 8.50 0 0 0 0 0 5.5000 Dyn 0.000

2130-XF-501 0.500 23.000 0.480 5.40 1.50 0 0 0 -2.500 0 5.4000 Dyn 0.000

363
Project: SPENCE GROWTH OPTION PROJECT

Page: 11
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2110-DX-501 2W XFMR BUS-2A/1 BUS-2A/2 7396.00 11094.00 13333.33

2110-DX-502 2W XFMR BUS-3A/1 BUS-3A/2 4930.67 7396.00 8888.89

2110-DX-503 2W XFMR BUS-4A/1 BUS-4A/2 2218.80 3328.20 4000.00

2110-LX-501 2W XFMR BUS-1A/1 BUS-1A/2 2218.80 3328.20 4000.00

2110-XF-001 2W XFMR BUS-C01 BUS-C04 37.48 224.90 228.00

2110-XF-501 2W XFMR BUS-A1 BUS-C03 49.08 294.51 298.57

2130-DX-501 2W XFMR BUS-E06 BUS-E07 7396.00 11094.00 13333.33

2130-DX-502 2W XFMR BUS-E09 BUS-E10 4930.67 7396.00 8888.89

2130-DX-503 2W XFMR BUS-F31 BUS-F30 2218.80 3328.20 4000.00

2130-LX-501 2W XFMR BUS-E03 BUS-E04 2958.40 4437.60 5333.33

2130-XF-001 2W XFMR BUS-A01 BUS-A05 12.85 109.25 110.00

2130-XF-501 2W XFMR BUS-A06 BUS-A03 584.10 876.15 1053.00

2110BL001A-P01 Cable BUS-2110MC501-F BUS-28A/2 3700.20 100.66 3701.57

2110BL001B-P01 Cable BUS-2110MC501-F BUS-B18/1 5180.28 140.92 5182.20

2110CH016-P01 Cable BUS-2110MC501-E BUS-21A/1 15012.98 890.10 15039.34

2110CH251-P01 Cable BUS-2110MC501-C BUS-12A/1 18708.48 1109.21 18741.33

2110CN014-P01 Cable BUS-2110MC501-C BUS-F9A/1 904.28 743.60 1170.76

2110CP001-P1 Cable BUS-2110MC501-C BUS-11A/1 403.70 331.96 522.66

2110CR001A-E01 Cable BUS-D01 BUS-D03 26.23 12.44 29.03

2110CR001B-P01 Cable BUS-2110MC501-A BUS-B1/1 21609.17 587.84 21617.17

2110CR0101A-P01 Cable BUS-2110MC501-A BUS-B4/1 6399.35 802.41 6449.46

2110CR0101B-P01 Cable BUS-2110MC501-B BUS-B6/1 6399.35 802.41 6449.46

2110CR0101C-P01 Cable BUS-2110MC501-B BUS-B7/1 42619.59 914.42 42629.40

2110CR00101HE-P01 Cable BUS-2110MC501-B BUS-6A/1 10312.43 884.64 10350.31

2110CR0102A-P01 Cable BUS-2110MC501-A BUS-B2/1 20721.13 563.68 20728.79

2110CR0102B-P01 Cable BUS-2110MC501-A BUS-B3/1 20721.13 563.68 20728.79

2110CR0103A-P01 Cable BS-5A/1 BUS-5A/2 21609.17 587.84 21617.17

2110CR0103B-P01 Cable BS-5A/1 BUS-5A/3 21609.17 587.84 21617.17

2110CR0105A-P01 Cable BUS-2110MC501-B BUS-B8/1 48457.89 1039.68 48469.05

2110CV001B-E01 Cable BUS-D01 BUS-D05 92.50 13.64 93.50

2110CV001HU01A-E01 Cable BUS-D01 BUS-D04 92.50 13.64 93.50

2110CV001HU01C-P01 Cable BUS-2110MC501-D BUS-B12/1 11183.91 959.40 11224.98

2110CV001HU01D-P01 Cable BUS-2110MC501-D BUS-B13/1 11256.53 965.63 11297.87

2110CV00102-P01 Cable BUS-2110MC501-E BUS-19A/1 3656.77 458.52 3685.41

2110CV00107-P01 Cable BUS-2110MC501-E BUS-20A/1 7313.54 917.04 7370.81

2110DC001A-P01 Cable BUS-2110MC501-B BUS-B9/1 2551.77 687.78 2642.83

2110DP501-P01 Cable BUS-2A/2 BUS-2A/3 3656.77 458.52 3685.41

364
Project: SPENCE GROWTH OPTION PROJECT

Page: 12
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2110DP502-P01 Cable BUS-3A/2 BUS-3A/3 579.37 192.65 610.56

2110DP505-P01 Cable BUS-4A/2 BUS-4A/3 485.77 161.53 511.92

2110DS001-P01 Cable BUS-2110MC501-C BUS-14A/1 5955.07 510.85 5976.94

2110DX501-P01 Cable BUS-2110MC501-A BUS-2A/1 1815.57 155.75 1822.24

2110DX502-P01 Cable BUS-2110MC501-A BUS-3A/1 1815.57 155.75 1822.24

2110DX503-P01 Cable BUS-2110MC501-A BUS-4A/1 455.67 122.82 471.93

2110HU001A-P01 Cable BUS-2110MC501-B BUS-B11/1 10167.19 872.19 10204.53

2110LP501-P01 Cable BUS-1A/2 BUS-1A/3 363.53 180.34 405.80

2110LX501-P01 Cable BUS-2110MC501-A BUS-1A/1 363.11 120.74 382.66

2110MA001RC-P01 Cable BUS-2110MC501-C BUS-16A/1 3736.51 848.50 3831.64

2110MA001TFC-P01 Cable BUS-2110MC501-D BUS-17A/1 8456.28 1060.33 8522.50

2110MA00101A-P01 Cable BUS-17A/1 BUS-17A/2 5838.30 125.26 5839.64

2110MA00101B-P01 Cable BUS-17A/1 BUS-17A/3 5838.30 125.26 5839.64

2110MA00101C-P01 Cable BUS-17A/1 BUS-17A/4 5838.30 125.26 5839.64

2110MA00101D-P01 Cable BUS-17A/1 BUS-17A/5 5838.30 125.26 5839.64

2110MC501-P01~P15 Cable BUS-C03 Bus-F01 14.95 28.48 32.17

2110RB001-P01 Cable BUS-2110MC501-D BUS-18A/1 1549.29 768.59 1729.46

2110SG001-E01~E03 Cable BUS-D01 BUS-C04 1.83 2.22 2.88

2110UP501-P01 Cable BUS-2110MC501-F BUS-29A/1 5920.32 161.05 5922.51

2110US001A-E01 Cable BUS-C05 BUS-C01 0.96 0.31 1.01

2110US001B-E01 Cable BUS-C01 BUS-A1 0.13 0.04 0.14

2110WR001-P01 Cable BUS-2110MC501-B BUS-F7A/1 6399.35 802.41 6449.46

2110WR002-P01 Cable BUS-2110MC501-B BUS-8A/1 6399.35 802.41 6449.46

2110WR003-P01 Cable BUS-2110MC501-F BUS-26A/1 7404.96 928.50 7462.94

2110WR004-P01 Cable BUS-2110MC501-F BUS-27A/1 7267.83 911.31 7324.74

2110ZM250-P01 Cable BUS-2110MC501-C BUS-10A/1 3417.54 776.07 3504.55

2130BL001A-P01 Cable BUS-2130MC501-B Bus-E3 23353.20 501.05 23358.58

2130BL001B-P01 Cable BUS-2130MC501-B Bus-E5 23353.20 501.05 23358.58

2130CH003-P01 Cable BUS-2110MC501-E BUS-22A/1 8959.09 1123.37 9029.24

2130CH004-P01 Cable BUS-2130MC501-A BUS-E15 7766.36 1435.37 7897.89

2130CH005-P01 Cable BUS-2130MC501-A BUS-E2 16455.46 2063.34 16584.32

2130CV002A-E01 Cable BUS-B01 2130-B03 3.75 4.11 5.56

2130CV002A01A-P01 Cable BUS-2130MC501-B Bus-E18 32110.65 688.94 32118.04

2130CV002B-E01 Cable BUS-B01 2130-B04 2.67 2.93 3.96

2130CV002B01A-P01 Cable BUS-2130MC501-B Bus-E4 27731.93 595.00 27738.31

2130CV00202-P01 Cable BUS-2110MC501-E BUS-25A/1 5581.99 1267.58 5724.10

2130CV00207-P01 Cable BUS-2110MC501-E BUS-23A/1 6759.61 1249.30 6874.09

2130CV00208-P01 Cable BUS-2110MC501-F BUS-24A/5 7191.08 1329.04 7312.86

2130DC002A-P01 Cable BUS-2110MC501-E BUS-B16/1 5171.88 1174.45 5303.55

365
Project: SPENCE GROWTH OPTION PROJECT

Page: 13
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

2130DP501-P01 Cable BUS-E07 BUS-E08 4570.96 573.15 4606.76

2130DP502-P01 Cable BUS-E10 BUS-E11 2896.86 248.51 2907.50

2130DP505-P01 Cable BUS-F30 BUS-F22 485.77 161.53 511.92

2130DX501-P01 Cable BUS-2130MC501-A BUS-E06 1815.57 155.75 1822.24

2130DX502-P01 Cable BUS-2130MC501-A BUS-E09 719.11 132.90 731.29

2130DX503-P01 Cable BUS-2130MC501-A BUS-F31 363.11 120.74 382.66

2130LP501-P01 Cable BUS-E04 BUS-E05 145.41 72.14 162.32

2130LX501-P01 Cable BUS-2130MC501-A BUS-E03 363.11 120.74 382.66

2130MC501-P01~P06 Cable BUS-A03 Bus-E01 49.34 93.98 106.15

2130SC25101-P01 Cable BUS-2110MC501-F BUS-24A/2 37002.01 1006.57 37015.70

2130SC25102-P01 Cable BUS-2110MC501-F BUS-24A/3 37002.01 1006.57 37015.70

2130SG001-E01~E06 Cable BUS-B02 BUS-A05 0.74 1.08 1.31

2130ST05501-P01 Cable BUS-2130MC501-A BUS-E14 17141.11 2149.31 17275.33

2130UP501-P01 Cable BUS-2130MC501-B BUS-E12 20434.05 438.42 20438.75

2130US001A-E01 Cable 2130-VL-001 BUS-A01 0.68 0.32 0.75

2130US001B-E01 Cable BUS-A01 BUS-A06 0.08 0.04 0.09

2130WR001-P01 Cable BUS-2130MC501-B BUS-E16 2971.13 372.55 2994.39

2130WR002-P01 Cable BUS-2130MC501-B BUS-E17 6379.41 1719.45 6607.07

2130ZM253-P01 Cable BUS-2110MC501-E BUS-24A/1 17760.96 483.16 17767.54

2831ZM02404-P01 Cable BUS-2110MC501-F BUS-B20/1 23681.29 644.21 23690.05

2831ZM02404-P2 Cable BUS-2110MC501-F BUS-B20/3 334.92 331.31 471.10

2110US001-E02 Line 2130-VL-001 BUS-C05 8.83 20.39 22.21 0.0044582

CB-5A Tie Breakr BUS-2110MC501-A BS-5A/1

CB-B01 Tie Breakr BUS-B01 BUS-B02

CB-E01 Tie Breakr Bus-E01 BUS-2130MC501-A

CB-F01 Tie Breakr Bus-F01 BUS-2110MC501-A

SW1 Tie Switch BUS-2110MC501-A BUS-2110MC501-B

SW2 Tie Switch BUS-2110MC501-B BUS-2110MC501-C

SW3 Tie Switch BUS-2110MC501-C BUS-2110MC501-D

SW4 Tie Switch BUS-2110MC501-D BUS-2110MC501-E

SW5 Tie Switch BUS-2110MC501-E BUS-2110MC501-F

SW6 Tie Switch BUS-2130MC501-A BUS-2130MC501-B

366
Project: SPENCE GROWTH OPTION PROJECT

Page: 14
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Machine Input Data

% Impedance
Machine Connected Bus Rating (Machine Base)

ID Type ID MVA kV R X" X' *


U1 Utility 2130-VL-001 624.926 23.000 17.05 98.54 98.54

Total Connected Machines ( = 0 ): MVA

* Indicates the reactance used for machine representation.

367
Project: SPENCE GROWTH OPTION PROJECT

Page: 15
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Switching Motors

Motor Nameplate Locked-Rotor Accel. Time (Sec.)


ID Type Qty Connected Bus ID HP/kW kV RPM FLA % PF % Eff % LRC % PF No Load Full Load

2110-CR001-A Ind. 1 BUS-D03 750.0 4.000 500 168.0 67.0 96.2 590.00 15.59 0.00 5.00

2110-DC-001 Ind. 1 BUS-B9/1 56.0 0.460 1500 96.1 91.4 80.1 600.00 33.05 0.00 2.00

368
Project: SPENCE GROWTH OPTION PROJECT

Page: 16
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Sequence of Events
Load Change
Time Event Switching Load % Loading Time Motor Load Static Load

Name Time ID Type Action Category Start Final Begin End MW Mvar MW Mvar

EVENT 1 1.000 2110-CR001-A Ind. Motor Start Normal 100.0 100.0 0.00 0.00

EVENT 2 5.000 2110-DC-001 Ind. Motor Start Normal 100.0 100.0 0.00 0.00

369
Project: SPENCE GROWTH OPTION PROJECT

Page: 17
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

2130-B03 4.160 97.398 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 304.6 92.8

2130-B04 4.160 97.430 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 304.6 92.8

* 2130-VL-001 23.000 100.000 0.0 0 0 0 0 BUS-A01 4.209 1.952 116.5 90.7

BUS-C05 2.061 1.029 57.8 89.5

U1 -6.269 -2.981 174.3 90.3

BS-5A/1 0.480 101.924 -2.2 0 0 0 0 BUS-5A/2 0.008 0.005 10.5 86.3

BUS-5A/3 0.008 0.005 10.5 86.3

BUS-2110MC501-A -0.015 -0.009 21.0 86.3

BUS-1A/1 0.480 101.662 -2.2 0 0 0 0 BUS-2110MC501-A -0.061 -0.038 84.8 84.4

BUS-1A/2 0.061 0.038 84.8 84.4

BUS-1A/2 0.380 99.089 -2.9 0 0 0 0 BUS-1A/3 0.059 0.037 107.1 85.0

BUS-1A/1 -0.059 -0.037 107.1 85.0

BUS-1A/3 0.380 98.805 -2.8 0 0 0.059 0.037 BUS-1A/2 -0.059 -0.037 107.1 85.0

BUS-2A/1 0.480 101.597 -2.1 0 0 0 0 BUS-2110MC501-A -0.017 -0.011 24.3 84.6

BUS-2A/2 0.017 0.011 24.3 84.6

BUS-2A/2 0.240 99.145 -2.8 0 0 0 0 BUS-2A/3 0.017 0.010 48.6 85.2

BUS-2A/1 -0.017 -0.010 48.6 85.2

BUS-2A/3 0.240 98.468 -2.6 0 0 0.017 0.010 BUS-2A/2 -0.017 -0.010 48.6 85.0

BUS-3A/1 0.480 101.468 -2.1 0 0 0 0 BUS-2110MC501-A -0.024 -0.015 33.9 84.5

BUS-3A/2 0.024 0.015 33.9 84.5

BUS-3A/2 0.380 99.185 -2.7 0 0 0 0 BUS-3A/3 0.024 0.015 42.8 85.0

BUS-3A/1 -0.024 -0.015 42.8 85.0

BUS-3A/3 0.380 99.018 -2.7 0 0 0.024 0.015 BUS-3A/2 -0.024 -0.015 42.8 85.0

BUS-4A/1 0.480 101.675 -2.2 0 0 0 0 BUS-2110MC501-A -0.047 -0.030 66.4 84.6

BUS-4A/2 0.047 0.030 66.4 84.6

BUS-4A/2 0.415 99.662 -2.7 0 0 0 0 BUS-4A/3 0.047 0.029 76.8 85.0

BUS-4A/1 -0.047 -0.029 76.8 85.0

BUS-4A/3 0.415 99.387 -2.7 0 0 0.047 0.029 BUS-4A/2 -0.047 -0.029 76.8 85.0

BUS-5A/2 0.480 100.270 -1.7 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.5 85.9

BUS-5A/3 0.480 100.270 -1.7 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.5 85.9

BUS-6A/1 0.480 100.380 -2.3 0 0 0.015 0.000 BUS-2110MC501-B -0.015 0.000 18.0 100.0

BUS-8A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-10A/1 0.480 99.817 -2.0 0 0 0.056 0.026 BUS-2110MC501-C -0.056 -0.026 73.9 90.8

BUS-11A/1 0.480 100.040 -2.5 0 0 0.345 0.148 BUS-2110MC501-C -0.345 -0.148 451.2 91.9

BUS-12A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-C 0.000 0.000 0.0 0.0

BUS-14A/1 0.480 100.149 -1.8 0 0 0.029 0.014 BUS-2110MC501-C -0.029 -0.014 38.5 89.2

370
Project: SPENCE GROWTH OPTION PROJECT

Page: 18
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-16A/1 0.480 99.751 -2.0 0 0 0.052 0.024 BUS-2110MC501-C -0.052 -0.024 69.7 90.7

BUS-17A/1 0.480 100.934 -2.0 0 0 0 0 BUS-2110MC501-D -0.011 -0.007 15.5 83.7

BUS-17A/2 0.003 0.002 3.9 83.7

BUS-17A/3 0.003 0.002 3.9 83.7

BUS-17A/4 0.003 0.002 3.9 83.7

BUS-17A/5 0.003 0.002 3.9 83.7

BUS-17A/2 0.480 100.774 -1.9 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/3 0.480 100.774 -1.9 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/4 0.480 100.774 -1.9 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/5 0.480 100.774 -1.9 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-18A/1 0.480 100.188 -2.3 0 0 0.092 0.041 BUS-2110MC501-D -0.092 -0.041 120.8 91.3

BUS-19A/1 0.480 100.110 -1.9 0 0 0.047 0.022 BUS-2110MC501-E -0.047 -0.022 62.2 90.4

BUS-20A/1 0.480 99.224 -1.5 0 0 0.034 0.021 BUS-2110MC501-E -0.034 -0.021 48.3 85.0

BUS-21A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-22A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-23A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-24A/1 0.480 101.658 -2.1 0 0 0.001 0.001 BUS-2110MC501-E -0.001 -0.001 2.1 85.0

BUS-24A/2 0.480 101.368 -2.1 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/3 0.480 101.368 -2.1 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/5 0.480 100.221 -1.9 0 0 0.021 0.013 BUS-2110MC501-F -0.021 -0.013 30.0 85.0

BUS-25A/1 0.480 99.022 -1.9 0 0 0.046 0.022 BUS-2110MC501-E -0.046 -0.022 62.4 90.4

BUS-26A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-27A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-28A/2 0.480 101.803 -2.2 0 0 0.003 0.002 BUS-2110MC501-F -0.003 -0.002 4.6 83.7

BUS-29A/1 0.480 101.670 -2.2 0 0 0.004 0.003 BUS-2110MC501-F -0.004 -0.003 6.0 85.0

BUS-2110MC501-A 0.480 101.924 -2.2 0 0 0 0 BUS-B1/1 0.006 0.003 7.7 85.4

BUS-B4/1 0.029 0.015 38.5 89.5

BUS-B2/1 0.008 0.005 10.5 86.3

BUS-B3/1 0.008 0.005 10.5 86.3

BUS-2A/1 0.017 0.011 24.3 84.7

BUS-3A/1 0.024 0.015 33.9 84.6

BUS-4A/1 0.048 0.030 66.4 84.6

BUS-1A/1 0.061 0.039 84.8 84.4

BS-5A/1 0.015 0.009 21.0 86.3

Bus-F01 -1.248 -0.608 1637.7 89.9

BUS-2110MC501-B 1.032 0.477 1341.7 90.8

371
Project: SPENCE GROWTH OPTION PROJECT

Page: 19
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-2110MC501-B 0.480 101.924 -2.2 0 0 0 0 BUS-B6/1 0.029 0.015 38.5 89.5

BUS-B7/1 0.002 0.002 3.2 83.1

BUS-6A/1 0.015 0.000 18.0 100.0

BUS-B8/1 0.003 0.002 4.5 84.1

BUS-B9/1 0.000 0.000 0.0 0.0

BUS-B11/1 0.020 0.010 26.1 88.6

BUS-F7A/1 0.000 0.000 0.0 0.0

BUS-8A/1 0.000 0.000 0.0 0.0

BUS-2110MC501-A -1.032 -0.477 1341.7 90.8

BUS-2110MC501-C 0.962 0.449 1253.2 90.6

BUS-2110MC501-C 0.480 101.924 -2.2 0 0 0 0 BUS-12A/1 0.000 0.000 0.0 0.0

BUS-F9A/1 0.134 0.060 173.1 91.2

BUS-11A/1 0.351 0.152 451.2 91.7

BUS-14A/1 0.029 0.015 38.5 89.5

BUS-16A/1 0.054 0.025 69.7 90.9

BUS-10A/1 0.057 0.026 73.9 91.0

BUS-2110MC501-B -0.962 -0.449 1253.2 90.6

BUS-2110MC501-D 0.338 0.171 447.3 89.2

BUS-2110MC501-D 0.480 101.924 -2.2 0 0 0 0 BUS-B12/1 0.020 0.010 26.1 88.6

BUS-B13/1 0.020 0.010 26.1 88.7

BUS-17A/1 0.011 0.007 15.5 83.9

BUS-18A/1 0.093 0.042 120.8 91.3

BUS-2110MC501-C -0.338 -0.171 447.3 89.2

BUS-2110MC501-E 0.194 0.102 258.9 88.6

BUS-2110MC501-E 0.480 101.924 -2.2 0 0 0 0 BUS-21A/1 0.000 0.000 0.0 0.0

BUS-19A/1 0.048 0.022 62.2 90.6

BUS-20A/1 0.035 0.021 48.3 85.6

BUS-22A/1 0.000 0.000 0.0 0.0

BUS-25A/1 0.048 0.022 62.4 90.6

BUS-23A/1 0.000 0.000 0.0 0.0

BUS-B16/1 0.029 0.015 38.4 89.4

BUS-24A/1 0.002 0.001 2.1 85.1

BUS-2110MC501-D -0.194 -0.102 258.9 88.6

BUS-2110MC501-F 0.033 0.020 45.8 85.0

BUS-2110MC501-F 0.480 101.924 -2.2 0 0 0 0 BUS-28A/2 0.003 0.002 4.6 83.8

BUS-B18/1 0.001 0.001 1.0 79.6

372
Project: SPENCE GROWTH OPTION PROJECT

Page: 20
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-29A/1 0.004 0.003 6.0 85.1

BUS-26A/1 0.000 0.000 0.0 0.0

BUS-27A/1 0.000 0.000 0.0 0.0

BUS-24A/5 0.022 0.013 30.0 85.3

BUS-24A/2 0.002 0.001 2.1 85.2

BUS-24A/3 0.002 0.001 2.1 85.2

BUS-B20/1 0.000 0.000 0.0 0.0

BUS-B20/3 0.000 0.000 0.0 0.0

BUS-2110MC501-E -0.033 -0.020 45.8 85.0

BUS-2130MC501-A 0.480 99.871 -0.7 0 0 0 0 BUS-E15 0.000 0.000 0.0 0.0

BUS-E2 0.000 0.000 0.0 0.0

BUS-E06 0.021 0.013 29.7 84.6

BUS-E09 0.031 0.020 44.5 84.6

BUS-F31 0.069 0.044 98.6 84.4

BUS-E03 0.056 0.036 80.0 84.3

BUS-E14 0.012 0.007 16.6 87.4

Bus-E01 -0.208 -0.131 295.9 84.6

BUS-2130MC501-B 0.019 0.012 26.5 84.9

BUS-2130MC501-B 0.480 99.871 -0.7 0 0 0 0 Bus-E3 0.003 0.002 4.7 84.0

Bus-E5 0.001 0.001 1.0 79.6

Bus-E18 0.005 0.003 7.4 85.4

Bus-E4 0.005 0.003 7.4 85.3

BUS-E12 0.004 0.003 6.1 85.3

BUS-E16 0.000 0.000 0.0 0.0

BUS-E17 0.000 0.000 0.0 0.0

BUS-2130MC501-A -0.019 -0.012 26.5 84.9

BUS-A1 23.000 99.584 -0.2 0 0 0 0 BUS-C01 -1.260 -0.671 36.0 88.3

BUS-C03 1.260 0.671 36.0 88.3 -5.000

BUS-A01 23.000 99.965 0.0 0 0 0 0 2130-VL-001 -4.207 -1.951 116.5 90.7

BUS-A06 0.212 0.137 6.3 84.0

BUS-A05 3.995 1.814 110.2 91.1

BUS-A03 0.480 100.097 -0.6 0 0 0 0 Bus-E01 0.208 0.131 295.9 84.6

BUS-A06 -0.208 -0.131 295.9 84.6

BUS-A05 4.160 97.556 -2.4 0 0 0 0 BUS-B02 3.970 1.604 609.2 92.7

BUS-A01 -3.970 -1.604 609.2 92.7

BUS-A06 23.000 99.965 0.0 0 0 0 0 BUS-A01 -0.212 -0.137 6.3 84.0

373
Project: SPENCE GROWTH OPTION PROJECT

Page: 21
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-A03 0.212 0.137 6.3 84.0 -2.500

BUS-B01 4.160 97.509 -2.4 0 0 0 0 2130-B03 1.985 0.801 304.6 92.7

2130-B04 1.984 0.801 304.6 92.7

BUS-B02 -3.969 -1.602 609.2 92.7

BUS-B1/1 0.480 100.723 -1.8 0 0 0.005 0.003 BUS-2110MC501-A -0.005 -0.003 7.7 85.1

BUS-B02 4.160 97.509 -2.4 0 0 0 0 BUS-A05 -3.969 -1.602 609.2 92.7

BUS-B01 3.969 1.602 609.2 92.7

BUS-B2/1 0.480 100.339 -1.7 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.5 85.9

BUS-B3/1 0.480 100.339 -1.7 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.5 85.9

BUS-B4/1 0.480 99.976 -1.8 0 0 0.029 0.014 BUS-2110MC501-A -0.029 -0.014 38.5 89.2

BUS-B6/1 0.480 99.976 -1.8 0 0 0.029 0.014 BUS-2110MC501-B -0.029 -0.014 38.5 89.2

BUS-B7/1 0.480 100.960 -1.9 0 0 0.002 0.002 BUS-2110MC501-B -0.002 -0.002 3.2 82.7

BUS-B8/1 0.480 100.382 -1.7 0 0 0.003 0.002 BUS-2110MC501-B -0.003 -0.002 4.5 83.6

BUS-B9/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-B11/1 0.480 99.888 -1.7 0 0 0.019 0.010 BUS-2110MC501-B -0.019 -0.010 26.1 88.2

BUS-B12/1 0.480 99.679 -1.7 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.1 88.2

BUS-B13/1 0.480 99.664 -1.7 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.1 88.2

BUS-B16/1 0.480 100.280 -2.0 0 0 0.029 0.014 BUS-2110MC501-E -0.029 -0.014 38.4 89.2

BUS-B18/1 0.480 101.889 -2.2 0 0 0 0 BUS-2110MC501-F -0.001 -0.001 1.0 79.6

BUS-B20/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-B20/3 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-C01 23.000 99.586 -0.2 0 0 0 0 BUS-C05 -2.056 -1.022 57.9 89.5

BUS-A1 1.260 0.671 36.0 88.3

BUS-C04 0.796 0.351 21.9 91.5 -5.000

BUS-C03 0.480 102.277 -2.1 0 0 0 0 Bus-F01 1.250 0.613 1637.7 89.8

BUS-A1 -1.250 -0.613 1637.7 89.8

BUS-C04 4.160 103.747 -1.1 0 0 0 0 BUS-D01 0.793 0.335 115.2 92.1

BUS-C01 -0.793 -0.335 115.2 92.1

BUS-C05 23.000 99.609 -0.2 0 0 0 0 BUS-C01 2.056 1.022 57.9 89.5

2130-VL-001 -2.056 -1.022 57.9 89.5

BUS-D01 4.160 103.726 -1.1 0 0 0 0 BUS-D03 0.000 0.000 0.0 0.0

BUS-D05 0.396 0.167 57.6 92.1

BUS-D04 0.396 0.167 57.6 92.1

BUS-C04 -0.793 -0.335 115.2 92.1

BUS-D03 4.160 103.726 -1.1 0 0 0 0 BUS-D01 0.000 0.000 0.0 0.0

BUS-D04 4.160 103.351 -1.1 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 57.6 92.1

374
Project: SPENCE GROWTH OPTION PROJECT

Page: 22
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-D05 4.160 103.351 -1.1 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 57.6 92.1

Bus-E01 0.480 99.871 -0.7 0 0 0 0 BUS-A03 -0.208 -0.131 295.9 84.6

BUS-2130MC501-A 0.208 0.131 295.9 84.6

BUS-E2 0.480 99.871 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E03 0.480 99.624 -0.6 0 0 0 0 BUS-2130MC501-A -0.056 -0.036 80.0 84.2

BUS-E04 0.056 0.036 80.0 84.2

Bus-E3 0.480 99.088 -0.4 0 0 0.003 0.002 BUS-2130MC501-B -0.003 -0.002 4.7 83.7

BUS-E04 0.380 96.385 -1.5 0 0 0 0 BUS-E05 0.055 0.034 101.1 85.0

BUS-E03 -0.055 -0.034 101.1 85.0

Bus-E4 0.480 98.408 -0.2 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

BUS-E05 0.380 96.277 -1.5 0 0 0.054 0.034 BUS-E04 -0.054 -0.034 101.1 85.0

Bus-E5 0.480 99.711 -0.6 0 0 0 0 BUS-2130MC501-B -0.001 -0.001 1.0 79.6

BUS-E06 0.480 99.471 -0.6 0 0 0 0 BUS-2130MC501-A -0.021 -0.013 29.7 84.5

BUS-E07 0.021 0.013 29.7 84.5

BUS-E07 0.240 96.472 -1.4 0 0 0 0 BUS-E08 0.020 0.012 59.4 85.3

BUS-E06 -0.020 -0.012 59.4 85.3

BUS-E08 0.240 95.436 -1.1 0 0 0.020 0.012 BUS-E07 -0.020 -0.012 59.4 85.0

BUS-E09 0.480 99.619 -0.6 0 0 0 0 BUS-2130MC501-A -0.031 -0.020 44.5 84.5

BUS-E10 0.031 0.020 44.5 84.5

BUS-E10 0.380 96.625 -1.4 0 0 0 0 BUS-E11 0.030 0.019 56.2 85.3

BUS-E09 -0.030 -0.019 56.2 85.3

BUS-E11 0.380 95.664 -1.1 0 0 0.030 0.019 BUS-E10 -0.030 -0.019 56.2 85.0

BUS-E12 0.480 98.984 -0.4 0 0 0.004 0.003 BUS-2130MC501-B -0.004 -0.003 6.1 85.0

BUS-E14 0.480 97.665 -0.2 0 0 0.012 0.007 BUS-2130MC501-A -0.012 -0.007 16.6 87.0

BUS-E15 0.480 99.871 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E16 0.480 99.871 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

BUS-E17 0.480 99.871 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

Bus-E18 0.480 98.172 -0.1 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

Bus-F01 0.480 101.924 -2.2 0 0 0 0 BUS-C03 -1.248 -0.608 1637.7 89.9

BUS-2110MC501-A 1.248 0.608 1637.7 89.9

BUS-F7A/1 0.480 101.924 -2.2 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-F9A/1 0.480 100.300 -2.5 0 0 0.132 0.058 BUS-2110MC501-C -0.132 -0.058 173.1 91.4

BUS-F22 0.415 96.169 -1.4 0 0 0.067 0.042 BUS-F30 -0.067 -0.042 114.0 85.0

BUS-F30 0.415 96.577 -1.4 0 0 0 0 BUS-F22 0.067 0.042 114.0 85.1

BUS-F31 -0.067 -0.042 114.0 85.1

BUS-F31 0.480 99.566 -0.6 0 0 0 0 BUS-2130MC501-A -0.069 -0.044 98.6 84.3

375
Project: SPENCE GROWTH OPTION PROJECT

Page: 23
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-F30 0.069 0.044 98.6 84.3

* U1 23.000 100.645 0.5 6.282 3.057 0 0 2130-VL-001 6.282 3.057 174.3 89.9

* Indicates a voltage regulated bus (voltage-controlled or swing type machine connected to it).

376
Project: SPENCE GROWTH OPTION PROJECT

Page: 24
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

2130-B03 4.160 96.283 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 308.2 92.8

2130-B04 4.160 96.315 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 308.1 92.8

* 2130-VL-001 23.000 98.917 0.0 0 0 0 0 BUS-A01 4.209 1.957 117.8 90.7

BUS-C05 3.247 7.567 209.0 39.4

U1 -7.456 -9.524 306.9 61.6

BS-5A/1 0.480 99.133 -2.1 0 0 0 0 BUS-5A/2 0.008 0.005 10.8 86.3

BUS-5A/3 0.008 0.005 10.8 86.3

BUS-2110MC501-A -0.015 -0.009 21.7 86.3

BUS-1A/1 0.480 98.867 -2.1 0 0 0 0 BUS-2110MC501-A -0.060 -0.038 86.4 84.4

BUS-1A/2 0.060 0.038 86.4 84.4

BUS-1A/2 0.380 96.247 -2.8 0 0 0 0 BUS-1A/3 0.059 0.036 109.1 85.0

BUS-1A/1 -0.059 -0.036 109.1 85.0

BUS-1A/3 0.380 95.957 -2.8 0 0 0.059 0.036 BUS-1A/2 -0.059 -0.036 109.1 85.0

BUS-2A/1 0.480 98.800 -2.0 0 0 0 0 BUS-2110MC501-A -0.017 -0.011 24.7 84.6

BUS-2A/2 0.017 0.011 24.7 84.6

BUS-2A/2 0.240 96.303 -2.7 0 0 0 0 BUS-2A/3 0.017 0.010 49.5 85.2

BUS-2A/1 -0.017 -0.010 49.5 85.2

BUS-2A/3 0.240 95.614 -2.5 0 0 0.017 0.010 BUS-2A/2 -0.017 -0.010 49.5 85.0

BUS-3A/1 0.480 98.669 -2.0 0 0 0 0 BUS-2110MC501-A -0.024 -0.015 34.5 84.5

BUS-3A/2 0.024 0.015 34.5 84.5

BUS-3A/2 0.380 96.345 -2.6 0 0 0 0 BUS-3A/3 0.023 0.015 43.6 85.0

BUS-3A/1 -0.023 -0.015 43.6 85.0

BUS-3A/3 0.380 96.174 -2.6 0 0 0.023 0.015 BUS-3A/2 -0.023 -0.015 43.6 85.0

BUS-4A/1 0.480 98.880 -2.1 0 0 0 0 BUS-2110MC501-A -0.047 -0.030 67.6 84.5

BUS-4A/2 0.047 0.030 67.6 84.5

BUS-4A/2 0.415 96.831 -2.6 0 0 0 0 BUS-4A/3 0.046 0.029 78.2 85.0

BUS-4A/1 -0.046 -0.029 78.2 85.0

BUS-4A/3 0.415 96.551 -2.6 0 0 0.046 0.029 BUS-4A/2 -0.046 -0.029 78.2 85.0

BUS-5A/2 0.480 97.431 -1.6 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.8 85.9

BUS-5A/3 0.480 97.431 -1.6 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.8 85.9

BUS-6A/1 0.480 97.563 -2.2 0 0 0.015 0.000 BUS-2110MC501-B -0.015 0.000 18.3 100.0

BUS-8A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-10A/1 0.480 96.965 -1.9 0 0 0.056 0.026 BUS-2110MC501-C -0.056 -0.026 76.0 90.8

BUS-11A/1 0.480 97.194 -2.5 0 0 0.345 0.148 BUS-2110MC501-C -0.345 -0.148 464.4 91.9

BUS-12A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-C 0.000 0.000 0.0 0.0

BUS-14A/1 0.480 97.306 -1.7 0 0 0.029 0.014 BUS-2110MC501-C -0.029 -0.014 39.6 89.2

377
Project: SPENCE GROWTH OPTION PROJECT

Page: 25
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-16A/1 0.480 96.896 -1.9 0 0 0.052 0.024 BUS-2110MC501-C -0.052 -0.024 71.8 90.7

BUS-17A/1 0.480 98.114 -1.8 0 0 0 0 BUS-2110MC501-D -0.011 -0.007 16.0 83.7

BUS-17A/2 0.003 0.002 4.0 83.7

BUS-17A/3 0.003 0.002 4.0 83.7

BUS-17A/4 0.003 0.002 4.0 83.7

BUS-17A/5 0.003 0.002 4.0 83.7

BUS-17A/2 0.480 97.950 -1.8 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.0 83.6

BUS-17A/3 0.480 97.950 -1.8 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.0 83.6

BUS-17A/4 0.480 97.950 -1.8 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.0 83.6

BUS-17A/5 0.480 97.950 -1.8 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.0 83.6

BUS-18A/1 0.480 97.347 -2.2 0 0 0.092 0.041 BUS-2110MC501-D -0.092 -0.041 124.3 91.3

BUS-19A/1 0.480 97.266 -1.8 0 0 0.047 0.022 BUS-2110MC501-E -0.047 -0.022 64.1 90.4

BUS-20A/1 0.480 96.384 -1.4 0 0 0.034 0.021 BUS-2110MC501-E -0.034 -0.021 49.2 85.0

BUS-21A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-22A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-23A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-24A/1 0.480 98.862 -2.0 0 0 0.001 0.001 BUS-2110MC501-E -0.001 -0.001 2.1 85.0

BUS-24A/2 0.480 98.568 -1.9 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/3 0.480 98.568 -1.9 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/5 0.480 97.400 -1.7 0 0 0.021 0.013 BUS-2110MC501-F -0.021 -0.013 30.6 85.0

BUS-25A/1 0.480 96.144 -1.7 0 0 0.046 0.022 BUS-2110MC501-E -0.046 -0.022 64.3 90.4

BUS-26A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-27A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-28A/2 0.480 99.009 -2.1 0 0 0.003 0.002 BUS-2110MC501-F -0.003 -0.002 4.7 83.7

BUS-29A/1 0.480 98.875 -2.0 0 0 0.004 0.003 BUS-2110MC501-F -0.004 -0.003 6.1 85.0

BUS-2110MC501-A 0.480 99.133 -2.1 0 0 0 0 BUS-B1/1 0.006 0.003 7.9 85.4

BUS-B4/1 0.029 0.015 39.7 89.5

BUS-B2/1 0.008 0.005 10.8 86.3

BUS-B3/1 0.008 0.005 10.8 86.3

BUS-2A/1 0.017 0.011 24.7 84.7

BUS-3A/1 0.024 0.015 34.5 84.6

BUS-4A/1 0.047 0.030 67.6 84.6

BUS-1A/1 0.060 0.038 86.4 84.4

BS-5A/1 0.015 0.009 21.7 86.3

Bus-F01 -1.246 -0.607 1682.1 89.9

BUS-2110MC501-B 1.032 0.477 1379.8 90.8

378
Project: SPENCE GROWTH OPTION PROJECT

Page: 26
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-2110MC501-B 0.480 99.133 -2.1 0 0 0 0 BUS-B6/1 0.029 0.015 39.7 89.5

BUS-B7/1 0.002 0.002 3.3 83.1

BUS-6A/1 0.015 0.000 18.3 100.0

BUS-B8/1 0.003 0.002 4.6 84.2

BUS-B9/1 0.000 0.000 0.0 0.0

BUS-B11/1 0.020 0.010 26.8 88.6

BUS-F7A/1 0.000 0.000 0.0 0.0

BUS-8A/1 0.000 0.000 0.0 0.0

BUS-2110MC501-A -1.032 -0.477 1379.8 90.8

BUS-2110MC501-C 0.963 0.449 1288.8 90.6

BUS-2110MC501-C 0.480 99.133 -2.1 0 0 0 0 BUS-12A/1 0.000 0.000 0.0 0.0

BUS-F9A/1 0.134 0.060 178.1 91.2

BUS-11A/1 0.351 0.153 464.4 91.7

BUS-14A/1 0.029 0.015 39.6 89.5

BUS-16A/1 0.054 0.025 71.8 90.9

BUS-10A/1 0.057 0.026 76.0 91.0

BUS-2110MC501-B -0.963 -0.449 1288.8 90.6

BUS-2110MC501-D 0.338 0.171 459.3 89.2

BUS-2110MC501-D 0.480 99.133 -2.1 0 0 0 0 BUS-B12/1 0.020 0.010 26.9 88.7

BUS-B13/1 0.020 0.010 26.9 88.7

BUS-17A/1 0.011 0.007 16.0 84.0

BUS-18A/1 0.094 0.042 124.3 91.3

BUS-2110MC501-C -0.338 -0.171 459.3 89.2

BUS-2110MC501-E 0.194 0.101 265.5 88.6

BUS-2110MC501-E 0.480 99.133 -2.1 0 0 0 0 BUS-21A/1 0.000 0.000 0.0 0.0

BUS-19A/1 0.048 0.022 64.1 90.7

BUS-20A/1 0.035 0.021 49.2 85.7

BUS-22A/1 0.000 0.000 0.0 0.0

BUS-25A/1 0.048 0.022 64.3 90.7

BUS-23A/1 0.000 0.000 0.0 0.0

BUS-B16/1 0.029 0.015 39.5 89.4

BUS-24A/1 0.001 0.001 2.1 85.1

BUS-2110MC501-D -0.194 -0.101 265.5 88.6

BUS-2110MC501-F 0.033 0.020 46.6 85.0

BUS-2110MC501-F 0.480 99.133 -2.1 0 0 0 0 BUS-28A/2 0.003 0.002 4.7 83.8

BUS-B18/1 0.001 0.001 1.0 79.6

379
Project: SPENCE GROWTH OPTION PROJECT

Page: 27
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-29A/1 0.004 0.003 6.1 85.1

BUS-26A/1 0.000 0.000 0.0 0.0

BUS-27A/1 0.000 0.000 0.0 0.0

BUS-24A/5 0.021 0.013 30.6 85.4

BUS-24A/2 0.001 0.001 2.1 85.2

BUS-24A/3 0.001 0.001 2.1 85.2

BUS-B20/1 0.000 0.000 0.0 0.0

BUS-B20/3 0.000 0.000 0.0 0.0

BUS-2110MC501-E -0.033 -0.020 46.6 85.0

BUS-2130MC501-A 0.480 98.737 -0.7 0 0 0 0 BUS-E15 0.000 0.000 0.0 0.0

BUS-E2 0.000 0.000 0.0 0.0

BUS-E06 0.021 0.013 29.9 84.6

BUS-E09 0.031 0.020 44.8 84.6

BUS-F31 0.069 0.044 99.3 84.4

BUS-E03 0.056 0.036 80.6 84.2

BUS-E14 0.012 0.007 16.8 87.4

Bus-E01 -0.207 -0.130 298.3 84.6

BUS-2130MC501-B 0.019 0.012 26.8 84.9

BUS-2130MC501-B 0.480 98.737 -0.7 0 0 0 0 Bus-E3 0.003 0.002 4.8 84.0

Bus-E5 0.001 0.001 1.0 79.6

Bus-E18 0.005 0.003 7.5 85.4

Bus-E4 0.005 0.003 7.4 85.3

BUS-E12 0.004 0.003 6.1 85.3

BUS-E16 0.000 0.000 0.0 0.0

BUS-E17 0.000 0.000 0.0 0.0

BUS-2130MC501-A -0.019 -0.012 26.8 84.9

BUS-A1 23.000 97.010 0.0 0 0 0 0 BUS-C01 -1.259 -0.673 37.0 88.2

BUS-C03 1.259 0.673 37.0 88.2 -5.000

BUS-A01 23.000 98.882 0.0 0 0 0 0 2130-VL-001 -4.207 -1.956 117.8 90.7

BUS-A06 0.211 0.137 6.4 84.0

BUS-A05 3.996 1.819 111.5 91.0

BUS-A03 0.480 98.965 -0.6 0 0 0 0 Bus-E01 0.207 0.131 298.3 84.5

BUS-A06 -0.207 -0.131 298.3 84.5

BUS-A05 4.160 96.443 -2.5 0 0 0 0 BUS-B02 3.971 1.604 616.3 92.7

BUS-A01 -3.971 -1.604 616.3 92.7

BUS-A06 23.000 98.882 0.0 0 0 0 0 BUS-A01 -0.211 -0.137 6.4 84.0

380
Project: SPENCE GROWTH OPTION PROJECT

Page: 28
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-A03 0.211 0.137 6.4 84.0 -2.500

BUS-B01 4.160 96.395 -2.5 0 0 0 0 2130-B03 1.985 0.801 308.2 92.7

2130-B04 1.984 0.801 308.1 92.7

BUS-B02 -3.969 -1.602 616.3 92.7

BUS-B1/1 0.480 97.898 -1.7 0 0 0.005 0.003 BUS-2110MC501-A -0.005 -0.003 7.9 85.1

BUS-B02 4.160 96.395 -2.5 0 0 0 0 BUS-A05 -3.969 -1.602 616.3 92.7

BUS-B01 3.969 1.602 616.3 92.7

BUS-B2/1 0.480 97.502 -1.6 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.8 85.9

BUS-B3/1 0.480 97.502 -1.6 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.8 85.9

BUS-B4/1 0.480 97.128 -1.7 0 0 0.029 0.014 BUS-2110MC501-A -0.029 -0.014 39.7 89.2

BUS-B6/1 0.480 97.128 -1.7 0 0 0.029 0.014 BUS-2110MC501-B -0.029 -0.014 39.7 89.2

BUS-B7/1 0.480 98.142 -1.8 0 0 0.002 0.002 BUS-2110MC501-B -0.002 -0.002 3.3 82.7

BUS-B8/1 0.480 97.546 -1.6 0 0 0.003 0.002 BUS-2110MC501-B -0.003 -0.002 4.6 83.6

BUS-B9/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-B11/1 0.480 97.037 -1.6 0 0 0.019 0.010 BUS-2110MC501-B -0.019 -0.010 26.8 88.2

BUS-B12/1 0.480 96.822 -1.6 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.9 88.2

BUS-B13/1 0.480 96.807 -1.6 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.9 88.2

BUS-B16/1 0.480 97.441 -1.9 0 0 0.029 0.014 BUS-2110MC501-E -0.029 -0.014 39.5 89.2

BUS-B18/1 0.480 99.097 -2.1 0 0 0 0 BUS-2110MC501-F -0.001 -0.001 1.0 79.6

BUS-B20/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-B20/3 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-C01 23.000 97.012 0.0 0 0 0 0 BUS-C05 -3.179 -7.428 209.1 39.4

BUS-A1 1.259 0.673 37.0 88.2

BUS-C04 1.920 6.754 181.7 27.3 -5.000

BUS-C03 0.480 99.496 -2.0 0 0 0 0 Bus-F01 1.249 0.613 1682.1 89.8

BUS-A1 -1.249 -0.613 1682.1 89.8

BUS-C04 4.160 85.738 -1.2 0 0 0 0 BUS-D01 1.733 5.635 954.3 29.4

BUS-C01 -1.733 -5.635 954.3 29.4

BUS-C05 23.000 97.067 0.0 0 0 0 0 BUS-C01 3.186 7.430 209.1 39.4

2130-VL-001 -3.186 -7.430 209.1 39.4

BUS-D01 4.160 85.555 -1.1 0 0 0 0 BUS-D03 0.930 5.289 871.2 17.3

BUS-D05 0.397 0.168 69.9 92.1

BUS-D04 0.397 0.168 69.9 92.1

BUS-C04 -1.725 -5.625 954.3 29.3

BUS-D03 4.160 84.514 -0.1 0 0 0.827 5.240 BUS-D01 -0.827 -5.240 871.2 15.6

BUS-D04 4.160 85.099 -1.1 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 69.9 92.1

381
Project: SPENCE GROWTH OPTION PROJECT

Page: 29
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-D05 4.160 85.099 -1.1 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 69.9 92.1

Bus-E01 0.480 98.737 -0.7 0 0 0 0 BUS-A03 -0.207 -0.130 298.3 84.6

BUS-2130MC501-A 0.207 0.130 298.3 84.6

BUS-E2 0.480 98.737 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E03 0.480 98.489 -0.7 0 0 0 0 BUS-2130MC501-A -0.056 -0.036 80.6 84.2

BUS-E04 0.056 0.036 80.6 84.2

Bus-E3 0.480 97.946 -0.4 0 0 0.003 0.002 BUS-2130MC501-B -0.003 -0.002 4.8 83.7

BUS-E04 0.380 95.225 -1.5 0 0 0 0 BUS-E05 0.054 0.034 101.8 85.0

BUS-E03 -0.054 -0.034 101.8 85.0

Bus-E4 0.480 97.257 -0.2 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

BUS-E05 0.380 95.117 -1.5 0 0 0.054 0.034 BUS-E04 -0.054 -0.034 101.8 85.0

Bus-E5 0.480 98.576 -0.6 0 0 0 0 BUS-2130MC501-B -0.001 -0.001 1.0 79.6

BUS-E06 0.480 98.334 -0.6 0 0 0 0 BUS-2130MC501-A -0.021 -0.013 29.9 84.5

BUS-E07 0.021 0.013 29.9 84.5

BUS-E07 0.240 95.312 -1.4 0 0 0 0 BUS-E08 0.020 0.012 59.9 85.3

BUS-E06 -0.020 -0.012 59.9 85.3

BUS-E08 0.240 94.268 -1.1 0 0 0.020 0.012 BUS-E07 -0.020 -0.012 59.9 85.0

BUS-E09 0.480 98.484 -0.6 0 0 0 0 BUS-2130MC501-A -0.031 -0.020 44.8 84.5

BUS-E10 0.031 0.020 44.8 84.5

BUS-E10 0.380 95.467 -1.5 0 0 0 0 BUS-E11 0.030 0.019 56.6 85.3

BUS-E09 -0.030 -0.019 56.6 85.3

BUS-E11 0.380 94.499 -1.2 0 0 0.030 0.019 BUS-E10 -0.030 -0.019 56.6 85.0

BUS-E12 0.480 97.844 -0.4 0 0 0.004 0.003 BUS-2130MC501-B -0.004 -0.003 6.1 85.0

BUS-E14 0.480 96.505 -0.2 0 0 0.012 0.007 BUS-2130MC501-A -0.012 -0.007 16.8 87.0

BUS-E15 0.480 98.737 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E16 0.480 98.737 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

BUS-E17 0.480 98.737 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

Bus-E18 0.480 97.019 -0.1 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.5 84.9

Bus-F01 0.480 99.133 -2.1 0 0 0 0 BUS-C03 -1.246 -0.607 1682.1 89.9

BUS-2110MC501-A 1.246 0.607 1682.1 89.9

BUS-F7A/1 0.480 99.133 -2.1 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-F9A/1 0.480 97.462 -2.4 0 0 0.132 0.058 BUS-2110MC501-C -0.132 -0.058 178.1 91.4

BUS-F22 0.415 95.007 -1.4 0 0 0.067 0.041 BUS-F30 -0.067 -0.041 114.9 85.0

BUS-F30 0.415 95.418 -1.5 0 0 0 0 BUS-F22 0.067 0.041 114.9 85.1

BUS-F31 -0.067 -0.041 114.9 85.1

BUS-F31 0.480 98.431 -0.7 0 0 0 0 BUS-2130MC501-A -0.069 -0.044 99.3 84.3

382
Project: SPENCE GROWTH OPTION PROJECT

Page: 30
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 1.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-F30 0.069 0.044 99.3 84.3

* U1 23.000 100.645 0.5 7.497 9.759 0 0 2130-VL-001 7.497 9.759 306.9 60.9

* Indicates a voltage regulated bus (voltage-controlled or swing type machine connected to it).

383
Project: SPENCE GROWTH OPTION PROJECT

Page: 31
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

2130-B03 4.160 96.205 -2.6 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 308.4 92.8

2130-B04 4.160 96.237 -2.6 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 308.3 92.8

* 2130-VL-001 23.000 98.841 0.0 0 0 0 0 BUS-A01 4.209 1.957 117.9 90.7

BUS-C05 3.445 8.000 221.2 39.6

U1 -7.654 -9.957 318.9 60.9

BS-5A/1 0.480 97.356 -2.4 0 0 0 0 BUS-5A/2 0.008 0.005 11.0 86.4

BUS-5A/3 0.008 0.005 11.0 86.4

BUS-2110MC501-A -0.015 -0.009 22.1 86.4

BUS-1A/1 0.480 97.087 -2.4 0 0 0 0 BUS-2110MC501-A -0.060 -0.038 87.4 84.4

BUS-1A/2 0.060 0.038 87.4 84.4

BUS-1A/2 0.380 94.435 -3.1 0 0 0 0 BUS-1A/3 0.058 0.036 110.4 85.0

BUS-1A/1 -0.058 -0.036 110.4 85.0

BUS-1A/3 0.380 94.142 -3.0 0 0 0.058 0.036 BUS-1A/2 -0.058 -0.036 110.4 85.0

BUS-2A/1 0.480 97.020 -2.3 0 0 0 0 BUS-2110MC501-A -0.017 -0.011 25.0 84.5

BUS-2A/2 0.017 0.011 25.0 84.5

BUS-2A/2 0.240 94.492 -3.0 0 0 0 0 BUS-2A/3 0.017 0.010 50.1 85.2

BUS-2A/1 -0.017 -0.010 50.1 85.2

BUS-2A/3 0.240 93.794 -2.8 0 0 0.017 0.010 BUS-2A/2 -0.017 -0.010 50.1 85.0

BUS-3A/1 0.480 96.887 -2.2 0 0 0 0 BUS-2110MC501-A -0.024 -0.015 34.9 84.4

BUS-3A/2 0.024 0.015 34.9 84.4

BUS-3A/2 0.380 94.534 -2.9 0 0 0 0 BUS-3A/3 0.023 0.014 44.1 85.0

BUS-3A/1 -0.023 -0.014 44.1 85.0

BUS-3A/3 0.380 94.362 -2.9 0 0 0.023 0.014 BUS-3A/2 -0.023 -0.014 44.1 85.0

BUS-4A/1 0.480 97.100 -2.3 0 0 0 0 BUS-2110MC501-A -0.047 -0.030 68.4 84.5

BUS-4A/2 0.047 0.030 68.4 84.5

BUS-4A/2 0.415 95.027 -2.9 0 0 0 0 BUS-4A/3 0.046 0.028 79.1 85.0

BUS-4A/1 -0.046 -0.028 79.1 85.0

BUS-4A/3 0.415 94.744 -2.9 0 0 0.046 0.028 BUS-4A/2 -0.046 -0.028 79.1 85.0

BUS-5A/2 0.480 95.622 -1.8 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 11.0 85.9

BUS-5A/3 0.480 95.622 -1.8 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 11.0 85.9

BUS-6A/1 0.480 95.768 -2.5 0 0 0.015 0.000 BUS-2110MC501-B -0.015 0.000 18.5 100.0

BUS-8A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-10A/1 0.480 95.147 -2.1 0 0 0.056 0.026 BUS-2110MC501-C -0.056 -0.026 77.5 90.8

BUS-11A/1 0.480 95.381 -2.7 0 0 0.345 0.148 BUS-2110MC501-C -0.345 -0.148 473.2 91.9

BUS-12A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-C 0.000 0.000 0.0 0.0

BUS-14A/1 0.480 95.494 -2.0 0 0 0.029 0.014 BUS-2110MC501-C -0.029 -0.014 40.3 89.2

384
Project: SPENCE GROWTH OPTION PROJECT

Page: 32
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-16A/1 0.480 95.077 -2.1 0 0 0.052 0.024 BUS-2110MC501-C -0.052 -0.024 73.2 90.7

BUS-17A/1 0.480 96.319 -2.1 0 0 0 0 BUS-2110MC501-D -0.011 -0.007 16.3 83.7

BUS-17A/2 0.003 0.002 4.1 83.7

BUS-17A/3 0.003 0.002 4.1 83.7

BUS-17A/4 0.003 0.002 4.1 83.7

BUS-17A/5 0.003 0.002 4.1 83.7

BUS-17A/2 0.480 96.151 -2.0 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.1 83.6

BUS-17A/3 0.480 96.151 -2.0 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.1 83.6

BUS-17A/4 0.480 96.151 -2.0 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.1 83.6

BUS-17A/5 0.480 96.151 -2.0 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 4.1 83.6

BUS-18A/1 0.480 95.536 -2.4 0 0 0.092 0.041 BUS-2110MC501-D -0.092 -0.041 126.7 91.3

BUS-19A/1 0.480 95.454 -2.0 0 0 0.047 0.022 BUS-2110MC501-E -0.047 -0.022 65.3 90.4

BUS-20A/1 0.480 94.574 -1.6 0 0 0.033 0.021 BUS-2110MC501-E -0.033 -0.021 49.8 85.0

BUS-21A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-22A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-23A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-24A/1 0.480 97.083 -2.3 0 0 0.001 0.001 BUS-2110MC501-E -0.001 -0.001 2.1 85.0

BUS-24A/2 0.480 96.785 -2.2 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/3 0.480 96.785 -2.2 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/5 0.480 95.603 -2.0 0 0 0.021 0.013 BUS-2110MC501-F -0.021 -0.013 30.9 85.0

BUS-25A/1 0.480 94.310 -2.0 0 0 0.046 0.022 BUS-2110MC501-E -0.046 -0.022 65.5 90.4

BUS-26A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-27A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-28A/2 0.480 97.230 -2.3 0 0 0.003 0.002 BUS-2110MC501-F -0.003 -0.002 4.8 83.7

BUS-29A/1 0.480 97.096 -2.3 0 0 0.004 0.003 BUS-2110MC501-F -0.004 -0.003 6.1 85.0

BUS-2110MC501-A 0.480 97.356 -2.4 0 0 0 0 BUS-B1/1 0.006 0.003 8.1 85.5

BUS-B4/1 0.029 0.015 40.4 89.5

BUS-B2/1 0.008 0.005 11.0 86.3

BUS-B3/1 0.008 0.005 11.0 86.3

BUS-2A/1 0.017 0.011 25.0 84.6

BUS-3A/1 0.024 0.015 34.9 84.6

BUS-4A/1 0.047 0.030 68.4 84.6

BUS-1A/1 0.060 0.038 87.4 84.4

BS-5A/1 0.015 0.009 22.1 86.4

Bus-F01 -1.432 -1.004 2160.7 81.9

BUS-2110MC501-B 1.219 0.875 1853.3 81.2

385
Project: SPENCE GROWTH OPTION PROJECT

Page: 33
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-2110MC501-B 0.480 97.356 -2.4 0 0 0 0 BUS-B6/1 0.029 0.015 40.4 89.5

BUS-B7/1 0.002 0.002 3.4 83.1

BUS-6A/1 0.015 0.000 18.5 100.0

BUS-B8/1 0.003 0.002 4.7 84.2

BUS-B9/1 0.186 0.398 542.3 42.4

BUS-B11/1 0.020 0.010 27.3 88.6

BUS-F7A/1 0.000 0.000 0.0 0.0

BUS-8A/1 0.000 0.000 0.0 0.0

BUS-2110MC501-A -1.219 -0.875 1853.3 81.2

BUS-2110MC501-C 0.963 0.449 1312.7 90.6

BUS-2110MC501-C 0.480 97.356 -2.4 0 0 0 0 BUS-12A/1 0.000 0.000 0.0 0.0

BUS-F9A/1 0.134 0.060 181.5 91.2

BUS-11A/1 0.351 0.153 473.2 91.7

BUS-14A/1 0.029 0.015 40.3 89.5

BUS-16A/1 0.054 0.025 73.2 90.9

BUS-10A/1 0.057 0.026 77.5 91.0

BUS-2110MC501-B -0.963 -0.449 1312.7 90.6

BUS-2110MC501-D 0.338 0.171 467.4 89.3

BUS-2110MC501-D 0.480 97.356 -2.4 0 0 0 0 BUS-B12/1 0.020 0.010 27.4 88.7

BUS-B13/1 0.020 0.010 27.4 88.7

BUS-17A/1 0.011 0.007 16.3 84.0

BUS-18A/1 0.094 0.042 126.7 91.3

BUS-2110MC501-C -0.338 -0.171 467.4 89.3

BUS-2110MC501-E 0.194 0.101 269.9 88.6

BUS-2110MC501-E 0.480 97.356 -2.4 0 0 0 0 BUS-21A/1 0.000 0.000 0.0 0.0

BUS-19A/1 0.048 0.022 65.3 90.7

BUS-20A/1 0.035 0.021 49.8 85.7

BUS-22A/1 0.000 0.000 0.0 0.0

BUS-25A/1 0.048 0.022 65.5 90.7

BUS-23A/1 0.000 0.000 0.0 0.0

BUS-B16/1 0.029 0.015 40.3 89.4

BUS-24A/1 0.001 0.001 2.1 85.1

BUS-2110MC501-D -0.194 -0.101 269.9 88.6

BUS-2110MC501-F 0.032 0.020 47.2 85.0

BUS-2110MC501-F 0.480 97.356 -2.4 0 0 0 0 BUS-28A/2 0.003 0.002 4.8 83.8

BUS-B18/1 0.001 0.001 1.0 79.6

386
Project: SPENCE GROWTH OPTION PROJECT

Page: 34
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-29A/1 0.004 0.003 6.1 85.1

BUS-26A/1 0.000 0.000 0.0 0.0

BUS-27A/1 0.000 0.000 0.0 0.0

BUS-24A/5 0.021 0.013 30.9 85.4

BUS-24A/2 0.001 0.001 2.1 85.2

BUS-24A/3 0.001 0.001 2.1 85.2

BUS-B20/1 0.000 0.000 0.0 0.0

BUS-B20/3 0.000 0.000 0.0 0.0

BUS-2110MC501-E -0.032 -0.020 47.2 85.0

BUS-2130MC501-A 0.480 98.658 -0.7 0 0 0 0 BUS-E15 0.000 0.000 0.0 0.0

BUS-E2 0.000 0.000 0.0 0.0

BUS-E06 0.021 0.013 30.0 84.6

BUS-E09 0.031 0.020 44.9 84.6

BUS-F31 0.069 0.044 99.4 84.4

BUS-E03 0.056 0.036 80.7 84.2

BUS-E14 0.012 0.007 16.8 87.4

Bus-E01 -0.207 -0.130 298.5 84.6

BUS-2130MC501-B 0.019 0.012 26.8 84.9

BUS-2130MC501-B 0.480 98.658 -0.7 0 0 0 0 Bus-E3 0.003 0.002 4.8 84.0

Bus-E5 0.001 0.001 1.0 79.6

Bus-E18 0.005 0.003 7.5 85.4

Bus-E4 0.005 0.003 7.5 85.3

BUS-E12 0.004 0.003 6.1 85.3

BUS-E16 0.000 0.000 0.0 0.0

BUS-E17 0.000 0.000 0.0 0.0

BUS-2130MC501-A -0.019 -0.012 26.8 84.9

BUS-A1 23.000 96.822 0.0 0 0 0 0 BUS-C01 -1.453 -1.113 47.5 79.4

BUS-C03 1.453 1.113 47.5 79.4 -5.000

BUS-A01 23.000 98.806 0.0 0 0 0 0 2130-VL-001 -4.207 -1.956 117.9 90.7

BUS-A06 0.211 0.137 6.4 84.0

BUS-A05 3.996 1.820 111.6 91.0

BUS-A03 0.480 98.886 -0.6 0 0 0 0 Bus-E01 0.207 0.131 298.5 84.5

BUS-A06 -0.207 -0.131 298.5 84.5

BUS-A05 4.160 96.365 -2.5 0 0 0 0 BUS-B02 3.971 1.604 616.8 92.7

BUS-A01 -3.971 -1.604 616.8 92.7

BUS-A06 23.000 98.806 0.0 0 0 0 0 BUS-A01 -0.211 -0.137 6.4 84.0

387
Project: SPENCE GROWTH OPTION PROJECT

Page: 35
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-A03 0.211 0.137 6.4 84.0 -2.500

BUS-B01 4.160 96.316 -2.5 0 0 0 0 2130-B03 1.985 0.801 308.4 92.7

2130-B04 1.984 0.801 308.3 92.7

BUS-B02 -3.969 -1.602 616.8 92.7

BUS-B1/1 0.480 96.098 -2.0 0 0 0.005 0.003 BUS-2110MC501-A -0.005 -0.003 8.1 85.1

BUS-B02 4.160 96.316 -2.5 0 0 0 0 BUS-A05 -3.969 -1.602 616.8 92.7

BUS-B01 3.969 1.602 616.8 92.7

BUS-B2/1 0.480 95.694 -1.8 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 11.0 85.9

BUS-B3/1 0.480 95.694 -1.8 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 11.0 85.9

BUS-B4/1 0.480 95.314 -2.0 0 0 0.029 0.014 BUS-2110MC501-A -0.029 -0.014 40.4 89.2

BUS-B6/1 0.480 95.314 -2.0 0 0 0.029 0.014 BUS-2110MC501-B -0.029 -0.014 40.4 89.2

BUS-B7/1 0.480 96.346 -2.0 0 0 0.002 0.002 BUS-2110MC501-B -0.002 -0.002 3.4 82.7

BUS-B8/1 0.480 95.739 -1.8 0 0 0.003 0.002 BUS-2110MC501-B -0.003 -0.002 4.7 83.6

BUS-B9/1 0.480 90.129 3.4 0 0 0.134 0.384 BUS-2110MC501-B -0.134 -0.384 542.3 33.0

BUS-B11/1 0.480 95.221 -1.9 0 0 0.019 0.010 BUS-2110MC501-B -0.019 -0.010 27.3 88.2

BUS-B12/1 0.480 95.001 -1.8 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 27.4 88.2

BUS-B13/1 0.480 94.985 -1.8 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 27.4 88.2

BUS-B16/1 0.480 95.632 -2.1 0 0 0.029 0.014 BUS-2110MC501-E -0.029 -0.014 40.3 89.2

BUS-B18/1 0.480 97.320 -2.4 0 0 0 0 BUS-2110MC501-F -0.001 -0.001 1.0 79.6

BUS-B20/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-B20/3 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-C01 23.000 96.825 0.0 0 0 0 0 BUS-C05 -3.369 -7.843 221.3 39.5

BUS-A1 1.453 1.113 47.5 79.4

BUS-C04 1.916 6.730 181.4 27.4 -5.000

BUS-C03 0.480 97.870 -2.2 0 0 0 0 Bus-F01 1.437 1.013 2160.7 81.7

BUS-A1 -1.437 -1.013 2160.7 81.7

BUS-C04 4.160 85.567 -1.2 0 0 0 0 BUS-D01 1.730 5.614 952.8 29.4

BUS-C01 -1.730 -5.614 952.8 29.4

BUS-C05 23.000 96.883 0.0 0 0 0 0 BUS-C01 3.377 7.846 221.3 39.5

2130-VL-001 -3.377 -7.846 221.3 39.5

BUS-D01 4.160 85.385 -1.2 0 0 0 0 BUS-D03 0.927 5.268 869.5 17.3

BUS-D05 0.397 0.168 70.1 92.1

BUS-D04 0.397 0.168 70.1 92.1

BUS-C04 -1.721 -5.604 952.8 29.4

BUS-D03 4.160 84.346 -0.2 0 0 0.824 5.220 BUS-D01 -0.824 -5.220 869.5 15.6

BUS-D04 4.160 84.928 -1.1 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 70.1 92.1

388
Project: SPENCE GROWTH OPTION PROJECT

Page: 36
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-D05 4.160 84.928 -1.1 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 70.1 92.1

Bus-E01 0.480 98.658 -0.7 0 0 0 0 BUS-A03 -0.207 -0.130 298.5 84.6

BUS-2130MC501-A 0.207 0.130 298.5 84.6

BUS-E2 0.480 98.658 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E03 0.480 98.409 -0.7 0 0 0 0 BUS-2130MC501-A -0.056 -0.036 80.7 84.2

BUS-E04 0.056 0.036 80.7 84.2

Bus-E3 0.480 97.865 -0.4 0 0 0.003 0.002 BUS-2130MC501-B -0.003 -0.002 4.8 83.7

BUS-E04 0.380 95.143 -1.5 0 0 0 0 BUS-E05 0.054 0.034 101.9 85.0

BUS-E03 -0.054 -0.034 101.9 85.0

Bus-E4 0.480 97.176 -0.2 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.5 84.9

BUS-E05 0.380 95.035 -1.5 0 0 0.054 0.034 BUS-E04 -0.054 -0.034 101.9 85.0

Bus-E5 0.480 98.496 -0.6 0 0 0 0 BUS-2130MC501-B -0.001 -0.001 1.0 79.6

BUS-E06 0.480 98.255 -0.6 0 0 0 0 BUS-2130MC501-A -0.021 -0.013 30.0 84.5

BUS-E07 0.021 0.013 30.0 84.5

BUS-E07 0.240 95.230 -1.4 0 0 0 0 BUS-E08 0.020 0.012 59.9 85.3

BUS-E06 -0.020 -0.012 59.9 85.3

BUS-E08 0.240 94.186 -1.1 0 0 0.020 0.012 BUS-E07 -0.020 -0.012 59.9 85.0

BUS-E09 0.480 98.404 -0.7 0 0 0 0 BUS-2130MC501-A -0.031 -0.020 44.9 84.5

BUS-E10 0.031 0.020 44.9 84.5

BUS-E10 0.380 95.385 -1.5 0 0 0 0 BUS-E11 0.030 0.019 56.7 85.3

BUS-E09 -0.030 -0.019 56.7 85.3

BUS-E11 0.380 94.417 -1.2 0 0 0.030 0.019 BUS-E10 -0.030 -0.019 56.7 85.0

BUS-E12 0.480 97.764 -0.4 0 0 0.004 0.003 BUS-2130MC501-B -0.004 -0.003 6.1 85.0

BUS-E14 0.480 96.424 -0.2 0 0 0.012 0.007 BUS-2130MC501-A -0.012 -0.007 16.8 87.0

BUS-E15 0.480 98.658 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E16 0.480 98.658 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

BUS-E17 0.480 98.658 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

Bus-E18 0.480 96.938 -0.1 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.5 84.9

Bus-F01 0.480 97.356 -2.4 0 0 0 0 BUS-C03 -1.432 -1.004 2160.7 81.9

BUS-2110MC501-A 1.432 1.004 2160.7 81.9

BUS-F7A/1 0.480 97.356 -2.4 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-F9A/1 0.480 95.654 -2.7 0 0 0.132 0.058 BUS-2110MC501-C -0.132 -0.058 181.5 91.4

BUS-F22 0.415 94.925 -1.4 0 0 0.067 0.041 BUS-F30 -0.067 -0.041 114.9 85.0

BUS-F30 0.415 95.337 -1.5 0 0 0 0 BUS-F22 0.067 0.041 114.9 85.1

BUS-F31 -0.067 -0.041 114.9 85.1

BUS-F31 0.480 98.351 -0.7 0 0 0 0 BUS-2130MC501-A -0.069 -0.044 99.4 84.3

389
Project: SPENCE GROWTH OPTION PROJECT

Page: 37
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 5.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-F30 0.069 0.044 99.4 84.3

* U1 23.000 100.645 0.5 7.698 10.211 0 0 2130-VL-001 7.698 10.211 318.9 60.2

* Indicates a voltage regulated bus (voltage-controlled or swing type machine connected to it).

390
Project: SPENCE GROWTH OPTION PROJECT

Page: 38
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

2130-B03 4.160 97.209 -2.6 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 305.2 92.8

2130-B04 4.160 97.241 -2.5 0 0 1.983 0.799 BUS-B01 -1.983 -0.799 305.1 92.8

* 2130-VL-001 23.000 99.816 -0.1 0 0 0 0 BUS-A01 4.209 1.953 116.7 90.7

BUS-C05 2.938 2.025 89.7 82.3

U1 -7.146 -3.978 205.7 87.4

BS-5A/1 0.480 101.242 -2.5 0 0 0 0 BUS-5A/2 0.008 0.005 10.6 86.3

BUS-5A/3 0.008 0.005 10.6 86.3

BUS-2110MC501-A -0.015 -0.009 21.2 86.3

BUS-1A/1 0.480 100.979 -2.5 0 0 0 0 BUS-2110MC501-A -0.060 -0.038 85.2 84.4

BUS-1A/2 0.060 0.038 85.2 84.4

BUS-1A/2 0.380 98.395 -3.1 0 0 0 0 BUS-1A/3 0.059 0.037 107.6 85.0

BUS-1A/1 -0.059 -0.037 107.6 85.0

BUS-1A/3 0.380 98.109 -3.1 0 0 0.059 0.037 BUS-1A/2 -0.059 -0.037 107.6 85.0

BUS-2A/1 0.480 100.913 -2.4 0 0 0 0 BUS-2110MC501-A -0.017 -0.011 24.4 84.6

BUS-2A/2 0.017 0.011 24.4 84.6

BUS-2A/2 0.240 98.451 -3.0 0 0 0 0 BUS-2A/3 0.017 0.010 48.8 85.2

BUS-2A/1 -0.017 -0.010 48.8 85.2

BUS-2A/3 0.240 97.771 -2.9 0 0 0.017 0.010 BUS-2A/2 -0.017 -0.010 48.8 85.0

BUS-3A/1 0.480 100.784 -2.4 0 0 0 0 BUS-2110MC501-A -0.024 -0.015 34.0 84.5

BUS-3A/2 0.024 0.015 34.0 84.5

BUS-3A/2 0.380 98.491 -3.0 0 0 0 0 BUS-3A/3 0.024 0.015 43.0 85.0

BUS-3A/1 -0.024 -0.015 43.0 85.0

BUS-3A/3 0.380 98.323 -2.9 0 0 0.024 0.015 BUS-3A/2 -0.024 -0.015 43.0 85.0

BUS-4A/1 0.480 100.992 -2.4 0 0 0 0 BUS-2110MC501-A -0.047 -0.030 66.7 84.6

BUS-4A/2 0.047 0.030 66.7 84.6

BUS-4A/2 0.415 98.970 -3.0 0 0 0 0 BUS-4A/3 0.047 0.029 77.1 85.0

BUS-4A/1 -0.047 -0.029 77.1 85.0

BUS-4A/3 0.415 98.694 -2.9 0 0 0.047 0.029 BUS-4A/2 -0.047 -0.029 77.1 85.0

BUS-5A/2 0.480 99.576 -2.0 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.6 85.9

BUS-5A/3 0.480 99.576 -2.0 0 0 0.008 0.004 BS-5A/1 -0.008 -0.004 10.6 85.9

BUS-6A/1 0.480 99.692 -2.6 0 0 0.015 0.000 BUS-2110MC501-B -0.015 0.000 18.1 100.0

BUS-8A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-10A/1 0.480 99.120 -2.2 0 0 0.056 0.026 BUS-2110MC501-C -0.056 -0.026 74.4 90.8

BUS-11A/1 0.480 99.345 -2.8 0 0 0.345 0.148 BUS-2110MC501-C -0.345 -0.148 454.4 91.9

BUS-12A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-C 0.000 0.000 0.0 0.0

BUS-14A/1 0.480 99.454 -2.1 0 0 0.029 0.014 BUS-2110MC501-C -0.029 -0.014 38.7 89.2

391
Project: SPENCE GROWTH OPTION PROJECT

Page: 39
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-16A/1 0.480 99.053 -2.2 0 0 0.052 0.024 BUS-2110MC501-C -0.052 -0.024 70.2 90.7

BUS-17A/1 0.480 100.245 -2.2 0 0 0 0 BUS-2110MC501-D -0.011 -0.007 15.6 83.7

BUS-17A/2 0.003 0.002 3.9 83.7

BUS-17A/3 0.003 0.002 3.9 83.7

BUS-17A/4 0.003 0.002 3.9 83.7

BUS-17A/5 0.003 0.002 3.9 83.7

BUS-17A/2 0.480 100.084 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/3 0.480 100.084 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/4 0.480 100.084 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-17A/5 0.480 100.084 -2.2 0 0 0.003 0.002 BUS-17A/1 -0.003 -0.002 3.9 83.6

BUS-18A/1 0.480 99.494 -2.5 0 0 0.092 0.041 BUS-2110MC501-D -0.092 -0.041 121.7 91.3

BUS-19A/1 0.480 99.415 -2.2 0 0 0.047 0.022 BUS-2110MC501-E -0.047 -0.022 62.7 90.4

BUS-20A/1 0.480 98.530 -1.8 0 0 0.034 0.021 BUS-2110MC501-E -0.034 -0.021 48.5 85.0

BUS-21A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-22A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-23A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-E 0.000 0.000 0.0 0.0

BUS-24A/1 0.480 100.974 -2.4 0 0 0.001 0.001 BUS-2110MC501-E -0.001 -0.001 2.1 85.0

BUS-24A/2 0.480 100.684 -2.3 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/3 0.480 100.684 -2.3 0 0 0.001 0.001 BUS-2110MC501-F -0.001 -0.001 2.1 85.0

BUS-24A/5 0.480 99.531 -2.1 0 0 0.021 0.013 BUS-2110MC501-F -0.021 -0.013 30.2 85.0

BUS-25A/1 0.480 98.319 -2.1 0 0 0.046 0.022 BUS-2110MC501-E -0.046 -0.022 62.9 90.4

BUS-26A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-27A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-28A/2 0.480 101.120 -2.4 0 0 0.003 0.002 BUS-2110MC501-F -0.003 -0.002 4.6 83.7

BUS-29A/1 0.480 100.987 -2.4 0 0 0.004 0.003 BUS-2110MC501-F -0.004 -0.003 6.0 85.0

BUS-2110MC501-A 0.480 101.242 -2.5 0 0 0 0 BUS-B1/1 0.006 0.003 7.8 85.4

BUS-B4/1 0.029 0.015 38.8 89.5

BUS-B2/1 0.008 0.005 10.6 86.3

BUS-B3/1 0.008 0.005 10.6 86.3

BUS-2A/1 0.017 0.011 24.4 84.7

BUS-3A/1 0.024 0.015 34.0 84.6

BUS-4A/1 0.047 0.030 66.7 84.6

BUS-1A/1 0.061 0.038 85.2 84.4

BS-5A/1 0.015 0.009 21.2 86.3

Bus-F01 -1.319 -0.639 1741.1 90.0

BUS-2110MC501-B 1.103 0.509 1443.6 90.8

392
Project: SPENCE GROWTH OPTION PROJECT

Page: 40
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-2110MC501-B 0.480 101.242 -2.5 0 0 0 0 BUS-B6/1 0.029 0.015 38.8 89.5

BUS-B7/1 0.002 0.002 3.3 83.1

BUS-6A/1 0.015 0.000 18.1 100.0

BUS-B8/1 0.003 0.002 4.5 84.2

BUS-B9/1 0.071 0.032 92.8 91.5

BUS-B11/1 0.020 0.010 26.2 88.6

BUS-F7A/1 0.000 0.000 0.0 0.0

BUS-8A/1 0.000 0.000 0.0 0.0

BUS-2110MC501-A -1.103 -0.509 1443.6 90.8

BUS-2110MC501-C 0.963 0.449 1261.7 90.6

BUS-2110MC501-C 0.480 101.242 -2.5 0 0 0 0 BUS-12A/1 0.000 0.000 0.0 0.0

BUS-F9A/1 0.134 0.060 174.3 91.2

BUS-11A/1 0.351 0.152 454.4 91.7

BUS-14A/1 0.029 0.015 38.7 89.5

BUS-16A/1 0.054 0.025 70.2 90.9

BUS-10A/1 0.057 0.026 74.4 91.0

BUS-2110MC501-B -0.963 -0.449 1261.7 90.6

BUS-2110MC501-D 0.338 0.171 450.1 89.2

BUS-2110MC501-D 0.480 101.242 -2.5 0 0 0 0 BUS-B12/1 0.020 0.010 26.3 88.7

BUS-B13/1 0.020 0.010 26.3 88.7

BUS-17A/1 0.011 0.007 15.6 83.9

BUS-18A/1 0.093 0.042 121.7 91.3

BUS-2110MC501-C -0.338 -0.171 450.1 89.2

BUS-2110MC501-E 0.194 0.102 260.5 88.6

BUS-2110MC501-E 0.480 101.242 -2.5 0 0 0 0 BUS-21A/1 0.000 0.000 0.0 0.0

BUS-19A/1 0.048 0.022 62.7 90.6

BUS-20A/1 0.035 0.021 48.5 85.6

BUS-22A/1 0.000 0.000 0.0 0.0

BUS-25A/1 0.048 0.022 62.9 90.6

BUS-23A/1 0.000 0.000 0.0 0.0

BUS-B16/1 0.029 0.015 38.7 89.4

BUS-24A/1 0.001 0.001 2.1 85.1

BUS-2110MC501-D -0.194 -0.102 260.5 88.6

BUS-2110MC501-F 0.033 0.020 46.0 85.0

BUS-2110MC501-F 0.480 101.242 -2.5 0 0 0 0 BUS-28A/2 0.003 0.002 4.6 83.8

BUS-B18/1 0.001 0.001 1.0 79.6

393
Project: SPENCE GROWTH OPTION PROJECT

Page: 41
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-29A/1 0.004 0.003 6.0 85.1

BUS-26A/1 0.000 0.000 0.0 0.0

BUS-27A/1 0.000 0.000 0.0 0.0

BUS-24A/5 0.022 0.013 30.2 85.3

BUS-24A/2 0.002 0.001 2.1 85.2

BUS-24A/3 0.002 0.001 2.1 85.2

BUS-B20/1 0.000 0.000 0.0 0.0

BUS-B20/3 0.000 0.000 0.0 0.0

BUS-2110MC501-E -0.033 -0.020 46.0 85.0

BUS-2130MC501-A 0.480 99.678 -0.7 0 0 0 0 BUS-E15 0.000 0.000 0.0 0.0

BUS-E2 0.000 0.000 0.0 0.0

BUS-E06 0.021 0.013 29.7 84.6

BUS-E09 0.031 0.020 44.6 84.6

BUS-F31 0.069 0.044 98.7 84.4

BUS-E03 0.056 0.036 80.1 84.2

BUS-E14 0.012 0.007 16.6 87.4

Bus-E01 -0.208 -0.131 296.3 84.6

BUS-2130MC501-B 0.019 0.012 26.6 84.9

BUS-2130MC501-B 0.480 99.678 -0.7 0 0 0 0 Bus-E3 0.003 0.002 4.7 84.0

Bus-E5 0.001 0.001 1.0 79.6

Bus-E18 0.005 0.003 7.4 85.4

Bus-E4 0.005 0.003 7.4 85.3

BUS-E12 0.004 0.003 6.1 85.3

BUS-E16 0.000 0.000 0.0 0.0

BUS-E17 0.000 0.000 0.0 0.0

BUS-2130MC501-A -0.019 -0.012 26.6 84.9

BUS-A1 23.000 99.107 -0.3 0 0 0 0 BUS-C01 -1.333 -0.710 38.2 88.3

BUS-C03 1.333 0.710 38.2 88.3 -5.000

BUS-A01 23.000 99.781 -0.1 0 0 0 0 2130-VL-001 -4.207 -1.952 116.7 90.7

BUS-A06 0.212 0.137 6.3 84.0

BUS-A05 3.995 1.815 110.4 91.0

BUS-A03 0.480 99.905 -0.7 0 0 0 0 Bus-E01 0.208 0.131 296.3 84.6

BUS-A06 -0.208 -0.131 296.3 84.6

BUS-A05 4.160 97.367 -2.5 0 0 0 0 BUS-B02 3.971 1.604 610.4 92.7

BUS-A01 -3.971 -1.604 610.4 92.7

BUS-A06 23.000 99.781 -0.1 0 0 0 0 BUS-A01 -0.212 -0.137 6.3 84.0

394
Project: SPENCE GROWTH OPTION PROJECT

Page: 42
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-A03 0.212 0.137 6.3 84.0 -2.500

BUS-B01 4.160 97.320 -2.5 0 0 0 0 2130-B03 1.985 0.801 305.2 92.7

2130-B04 1.984 0.801 305.1 92.7

BUS-B02 -3.969 -1.602 610.4 92.7

BUS-B1/1 0.480 100.033 -2.1 0 0 0.005 0.003 BUS-2110MC501-A -0.005 -0.003 7.8 85.1

BUS-B02 4.160 97.320 -2.5 0 0 0 0 BUS-A05 -3.969 -1.602 610.4 92.7

BUS-B01 3.969 1.602 610.4 92.7

BUS-B2/1 0.480 99.646 -2.0 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.6 85.9

BUS-B3/1 0.480 99.646 -2.0 0 0 0.008 0.004 BUS-2110MC501-A -0.008 -0.004 10.6 85.9

BUS-B4/1 0.480 99.281 -2.1 0 0 0.029 0.014 BUS-2110MC501-A -0.029 -0.014 38.8 89.2

BUS-B6/1 0.480 99.281 -2.1 0 0 0.029 0.014 BUS-2110MC501-B -0.029 -0.014 38.8 89.2

BUS-B7/1 0.480 100.271 -2.1 0 0 0.002 0.002 BUS-2110MC501-B -0.002 -0.002 3.3 82.7

BUS-B8/1 0.480 99.689 -1.9 0 0 0.003 0.002 BUS-2110MC501-B -0.003 -0.002 4.5 83.6

BUS-B9/1 0.480 99.226 -2.3 0 0 0.070 0.031 BUS-2110MC501-B -0.070 -0.031 92.8 91.4

BUS-B11/1 0.480 99.192 -2.0 0 0 0.019 0.010 BUS-2110MC501-B -0.019 -0.010 26.2 88.2

BUS-B12/1 0.480 98.981 -1.9 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.3 88.2

BUS-B13/1 0.480 98.966 -1.9 0 0 0.019 0.010 BUS-2110MC501-D -0.019 -0.010 26.3 88.2

BUS-B16/1 0.480 99.586 -2.3 0 0 0.029 0.014 BUS-2110MC501-E -0.029 -0.014 38.7 89.2

BUS-B18/1 0.480 101.207 -2.5 0 0 0 0 BUS-2110MC501-F -0.001 -0.001 1.0 79.6

BUS-B20/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-B20/3 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-F 0.000 0.000 0.0 0.0

BUS-C01 23.000 99.109 -0.3 0 0 0 0 BUS-C05 -2.925 -2.003 89.8 82.5

BUS-A1 1.333 0.710 38.2 88.3

BUS-C04 1.592 1.293 52.0 77.6 -5.000

BUS-C03 0.480 101.617 -2.3 0 0 0 0 Bus-F01 1.322 0.645 1741.1 89.9

BUS-A1 -1.322 -0.645 1741.1 89.9

BUS-C04 4.160 100.837 -2.1 0 0 0 0 BUS-D01 1.577 1.202 272.9 79.5

BUS-C01 -1.577 -1.202 272.9 79.5

BUS-C05 23.000 99.143 -0.3 0 0 0 0 BUS-C01 2.926 2.004 89.8 82.5

2130-VL-001 -2.926 -2.004 89.8 82.5

BUS-D01 4.160 100.782 -2.1 0 0 0 0 BUS-D03 0.783 0.866 160.8 67.1

BUS-D05 0.396 0.167 59.3 92.1

BUS-D04 0.396 0.167 59.3 92.1

BUS-C04 -1.576 -1.201 272.9 79.6

BUS-D03 4.160 100.471 -2.0 0 0 0.780 0.864 BUS-D01 -0.780 -0.864 160.8 67.0

BUS-D04 4.160 100.395 -2.0 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 59.3 92.1

395
Project: SPENCE GROWTH OPTION PROJECT

Page: 43
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-D05 4.160 100.395 -2.0 0 0 0.395 0.167 BUS-D01 -0.395 -0.167 59.3 92.1

Bus-E01 0.480 99.678 -0.7 0 0 0 0 BUS-A03 -0.208 -0.131 296.3 84.6

BUS-2130MC501-A 0.208 0.131 296.3 84.6

BUS-E2 0.480 99.678 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E03 0.480 99.431 -0.7 0 0 0 0 BUS-2130MC501-A -0.056 -0.036 80.1 84.2

BUS-E04 0.056 0.036 80.1 84.2

Bus-E3 0.480 98.894 -0.5 0 0 0.003 0.002 BUS-2130MC501-B -0.003 -0.002 4.7 83.7

BUS-E04 0.380 96.188 -1.6 0 0 0 0 BUS-E05 0.054 0.034 101.2 85.0

BUS-E03 -0.054 -0.034 101.2 85.0

Bus-E4 0.480 98.213 -0.2 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

BUS-E05 0.380 96.081 -1.6 0 0 0.054 0.034 BUS-E04 -0.054 -0.034 101.2 85.0

Bus-E5 0.480 99.518 -0.7 0 0 0 0 BUS-2130MC501-B -0.001 -0.001 1.0 79.6

BUS-E06 0.480 99.278 -0.6 0 0 0 0 BUS-2130MC501-A -0.021 -0.013 29.7 84.5

BUS-E07 0.021 0.013 29.7 84.5

BUS-E07 0.240 96.275 -1.4 0 0 0 0 BUS-E08 0.020 0.012 59.5 85.3

BUS-E06 -0.020 -0.012 59.5 85.3

BUS-E08 0.240 95.238 -1.1 0 0 0.020 0.012 BUS-E07 -0.020 -0.012 59.5 85.0

BUS-E09 0.480 99.427 -0.7 0 0 0 0 BUS-2130MC501-A -0.031 -0.020 44.6 84.5

BUS-E10 0.031 0.020 44.6 84.5

BUS-E10 0.380 96.428 -1.5 0 0 0 0 BUS-E11 0.030 0.019 56.3 85.3

BUS-E09 -0.030 -0.019 56.3 85.3

BUS-E11 0.380 95.467 -1.2 0 0 0.030 0.019 BUS-E10 -0.030 -0.019 56.3 85.0

BUS-E12 0.480 98.790 -0.4 0 0 0.004 0.003 BUS-2130MC501-B -0.004 -0.003 6.1 85.0

BUS-E14 0.480 97.468 -0.2 0 0 0.012 0.007 BUS-2130MC501-A -0.012 -0.007 16.6 87.0

BUS-E15 0.480 99.678 -0.7 0 0 0 0 BUS-2130MC501-A 0.000 0.000 0.0 0.0

BUS-E16 0.480 99.678 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

BUS-E17 0.480 99.678 -0.7 0 0 0 0 BUS-2130MC501-B 0.000 0.000 0.0 0.0

Bus-E18 0.480 97.977 -0.2 0 0 0.005 0.003 BUS-2130MC501-B -0.005 -0.003 7.4 84.9

Bus-F01 0.480 101.242 -2.5 0 0 0 0 BUS-C03 -1.319 -0.639 1741.1 90.0

BUS-2110MC501-A 1.319 0.639 1741.1 90.0

BUS-F7A/1 0.480 101.242 -2.5 0 0 0 0 BUS-2110MC501-B 0.000 0.000 0.0 0.0

BUS-F9A/1 0.480 99.606 -2.7 0 0 0.132 0.058 BUS-2110MC501-C -0.132 -0.058 174.3 91.4

BUS-F22 0.415 95.971 -1.4 0 0 0.067 0.041 BUS-F30 -0.067 -0.041 114.1 85.0

BUS-F30 0.415 96.380 -1.5 0 0 0 0 BUS-F22 0.067 0.042 114.1 85.1

BUS-F31 -0.067 -0.042 114.1 85.1

BUS-F31 0.480 99.374 -0.7 0 0 0 0 BUS-2130MC501-A -0.069 -0.044 98.7 84.3

396
Project: SPENCE GROWTH OPTION PROJECT

Page: 44
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

LOAD FLOW REPORT @ T = 10.000+

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BUS-F30 0.069 0.044 98.7 84.3

* U1 23.000 100.645 0.5 7.164 4.084 0 0 2130-VL-001 7.164 4.084 205.7 86.9

* Indicates a voltage regulated bus (voltage-controlled or swing type machine connected to it).

397
Project: SPENCE GROWTH OPTION PROJECT

Page: 45
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

% Alert Settings

Critical Marginal
Starting Motors/MOV

MOV Terminal Voltage 80.00 90.00 (Vmtr, rate)

Motor Terminal Voltage 80.00 90.00 (Vmtr, rate)

Failed to Start, Slip Kept 5.00

Generator/Engine/Exciter Rating Min. Span (Sec.)


Generator Rating 100.00 95.00 0.00

Engine Continuous Rating 100.00 95.00 0.00

Engine Peak Rating 100.00 95.00 0.00

Exciter Peak Rating 100.00 95.00 0.00

Bus Voltage Group Min. Dip Width (Sec.)


Starting Motor Bus VBus 85.00 90.00 0.00

Grid/Generator Bus VBus 92.00 95.00 0.00

HV Bus, kV 10.00 VBus 85.00 95.00 0.00


MV Bus, 10.00 kV 1.00 VBus 85.00 95.00 0.00

LV Bus, kV 1.00 VBus 85.00 95.00 0.00

398
Project: SPENCE GROWTH OPTION PROJECT

Page: 46
Date: 11-05-2018

MOTOR STARTING ETAP Ver. 16.1.1C


STUDY

Critical Alert Report


DeviceID Type Alert Condition Rating/Limit Unit Operating % Operating T Begin Duration

BUS-D03 Motor Bus Bus Voltage Under Voltage 4.160 kV 3.516 84.5 1.000 4.980

BUS-D03 MV Bus Bus Voltage Under Voltage 4.160 kV 3.516 84.5 1.000 4.980

BUS-D04 MV Bus Bus Voltage Under Voltage 4.160 kV 3.533 84.9 5.000 0.980

BUS-D05 MV Bus Bus Voltage Under Voltage 4.160 kV 3.533 84.9 5.000 0.980

Marginal Alert Report


DeviceID Type Alert Condition Rating/Limit Unit Operating % Operating T Begin Duration

2110-CR001-A Motor Motor Voltage Under Voltage 4.000 kV 3.516 87.9 1.000 4.980

BUS-1A/2 LV Bus Bus Voltage Under Voltage 0.380 kV 0.359 94.4 5.000 0.980

BUS-1A/3 LV Bus Bus Voltage Under Voltage 0.380 kV 0.358 94.1 5.000 0.980

BUS-2A/2 LV Bus Bus Voltage Under Voltage 0.240 kV 0.227 94.5 5.000 0.980

BUS-2A/3 LV Bus Bus Voltage Under Voltage 0.240 kV 0.225 93.8 5.000 0.980

BUS-3A/2 LV Bus Bus Voltage Under Voltage 0.380 kV 0.359 94.5 5.000 0.980

BUS-3A/3 LV Bus Bus Voltage Under Voltage 0.380 kV 0.359 94.4 5.000 0.980

BUS-4A/3 LV Bus Bus Voltage Under Voltage 0.415 kV 0.393 94.7 5.000 0.980

BUS-20A/1 LV Bus Bus Voltage Under Voltage 0.480 kV 0.454 94.6 5.000 0.980

BUS-25A/1 LV Bus Bus Voltage Under Voltage 0.480 kV 0.453 94.3 5.000 0.980

BUS-B9/1 LV Bus Bus Voltage Under Voltage 0.480 kV 0.433 90.1 5.000 1.980

BUS-B13/1 LV Bus Bus Voltage Under Voltage 0.480 kV 0.456 95.0 5.000 0.980

BUS-C04 MV Bus Bus Voltage Under Voltage 4.160 kV 3.567 85.7 1.000 4.980

BUS-D01 MV Bus Bus Voltage Under Voltage 4.160 kV 3.559 85.6 1.000 4.980

BUS-D04 MV Bus Bus Voltage Under Voltage 4.160 kV 3.540 85.1 1.000 4.000

BUS-D05 MV Bus Bus Voltage Under Voltage 4.160 kV 3.540 85.1 1.000 4.000

BUS-E08 LV Bus Bus Voltage Under Voltage 0.240 kV 0.226 94.3 1.000 4.980

BUS-E11 LV Bus Bus Voltage Under Voltage 0.380 kV 0.359 94.5 1.000 4.980

BUS-F22 LV Bus Bus Voltage Under Voltage 0.415 kV 0.394 94.9 5.000 0.980

399
ETAP
Proj ect: SPENCE GROWTH OPTION PROJECT 16. 1. 1 C Date: 1 1-05-2 01 8
Location: CHILE SN: SYNERGYLTD
Contract: Revision: Base
Engineer: Study Case: MOTOR STARTI Config. : Normal

Proj ect File: \\SYNERGY1\Work Order\3000-3999\3057 TNT Spence SGO\Synergy Drawings\1 -Working Directory\ETAP\3057 -ETAP-1001_2 \3057 -ETAP-1001_2 MOT ST
Output Report: Untitled

MOTOR STARTING ANALYSIS

2110-CR001-A 2110-CR001-A

150 600
Vt (% of Motor Rated kV) - Motor Terminal Voltage (Motor Base)

100 400
I (% of FLA) - Motor Line Current

50 200

0 -0
0 2 4 6 8 10
Time (Sec.)

400
ETAP
Proj ect: SPENCE GROWTH OPTION PROJECT 16. 1. 1 C Date: 1 1-05-2 01 8
Location: CHILE SN: SYNERGYLTD
Contract: Revision: Base
Engineer: Study Case: MOTOR STARTI Config. : Normal

Proj ect File: \\SYNERGY1\Work Order\3000-3999\3057 TNT Spence SGO\Synergy Drawings\1 -Working Directory\ETAP\3057 -ETAP-1001_2 \3057 -ETAP-1001_2 MOT ST
Output Report: Untitled

MOTOR STARTING ANALYSIS

2110-DC-001 2110-DC-001

150 600
Vt (% of Motor Rated kV) - Motor Terminal Voltage (Motor Base)

100 400
I (% of FLA) - Motor Line Current

50 200

0 -0
0 2 4 6 8 10
Time (Sec.)

401
ETAP
Proj ect: SPENCE GROWTH OPTION PROJECT 16. 1. 1 C Date: 1 1-05-2 01 8
Location: CHILE SN: SYNERGYLTD
Contract: Revision: Base
Engineer: Study Case: MOTOR STARTI Config. : Normal

Proj ect File: \\SYNERGY1\Work Order\3000-3999\3057 TNT Spence SGO\Synergy Drawings\1 -Working Directory\ETAP\3057 -ETAP-1001_2 \3057 -ETAP-1001_2 MOT ST
Output Report: Untitled

MOTOR STARTING ANALYSIS

Bus Voltage

BUS-D03 BUS-D04 BUS-D05

110

105

100
Vt (% of Bus Nominal kV)

95

90

85

80
0 1 2 3 4 5 6 7 8 9 10
Time (Sec.)

402
One-Line Diagram - OLV1 (Motor Acceleration Analysis)
U1
624. 926 MVAsc

2130-VL-001 23 kV 318. 9 A

2130-US-001 2130-SG-001 2130-MC-001


BUS-A01 BUS-B01 4. 16 kV
23 kV

2130US001B-E01

o
BUS-A06
23 kV

o o

MR MR
R

o o

BUS-B02
4. 16 kV

2130-XF-501
0. 5 MVA 2130-XF-001
5 MVA

BUS-A03 BUS-A05
0. 48 kV 4. 16 kV

2130-B04
2130-B03

4. 16 kV 4. 16 kV

2130-MC-501 2130-CV002-B
2130-CV002-A 1865 kW
1865 kW

403
One-Line Diagram - OLV1 (Motor Acceleration Analysis)

BUS-C05
23 kV

2110US001A-E01

2110-US-001 2110-SG-001 2110-MC-001


BUS-D01 4. 16 kV
BUS-C01
23 kV

2110US001B-E01

BUS-A1
23 kV

o o
o
R MR MR
MR

o o o
o

2110-XF-501 2110-XF-001
2. 25 MVA
1. 75 MVA

BUS-C04
BUS-C03 4. 16 kV
0. 48 kV

BUS-D03 BUS-D04 BUS-D05


4. 16 kV 869. 5 A 4. 16 kV 4. 16 kV

2110-MC-501 2110-CR001-A 2110-CV001HU-01A 2110-CV001HU-01B


750 kW 368 kW 368 kW

404
One-Line Diagram - OLV1=>2130-MC-501 (Motor Acceleration Analysis)

2130MC501-P01~P06

Bus-E01
0. 48 kV

BUS-2130MC501-A
0. 48 kV

SW6 SWICTH IS SHOWN ONLY AS


A MEANS OF BUSBAR
CONTINUATION IN CREATING
THIS SINGLE LINE. IT DOES
NOT EXIST IN 2130MC-501.

BUS-E03 BUS-E06 BUS-E09


BUS-F31
0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV

2130-LX-501 2130-DX-501 2130-DX-502


30 kVA 45 kVA 2130-DX-503
75 kVA 100 kVA

BUS-E04 BUS-E07 BUS-E10


BUS-F30
0. 38 kV 0. 24 kV 0. 38 kV
0. 415 kV

BUS-E08 BUS-E11 BUS-F22 BUS-E2


BUS-E05 BUS-E14
0. 415 kV BUS-E15
0. 38 kV 0. 48 kV
0. 38 kV 0. 48 kV 0. 48 kV
0. 24 kV

2130-ST055-01
2130-DP-505 9 kW
2130-LP-501 2130-DP-501 2130-DP-502 2130-CH-005
65 kVA 24 kVA 80 kVA 2130-CH-004
36 kVA 12 kVA
24 kVA

405
One-Line Diagram - OLV1=>2130-MC-501 (Motor Acceleration Analysis)

BUS-2130MC501 CONTINUATION
FROM SHEET 1.

BUS-2130MC501-B
0. 48 kV

BUS-E12
Bus-E3
Bus-E5 0. 48 kV
0. 48 kV
0. 48 kV
Bus-E4
BUS-E16 Bus-E18
BUS-E17 0. 48 kV
0. 48 kV 0. 48 kV
0. 48 kV

2130-BL001-A
2130-BL001-B 2130-UP-501
2. 3 kW
0. 4 kW 5 kVA
2130-WR-001 2130-CV002B-01A
2130-WR-002 2130-CV002A-01A
35 kVA 3. 7 kW
35 kVA 3. 7 kW

406
One-Line Diagram - OLV1=>2110-MC-501 (Motor Acceleration Analysis)

2110MC501-P01~P15

Bus-F01
0. 48 kV

BUS-2110MC501-A
0. 48 kV

AFD1 SW1 SWICTH IS


BS-5A/1 SHOWN ONLY AS A
MEANS OF BUSBAR
CONTINUATION IN
0. 48 kV CREATING THIS
SINGLE LINE. IT
DOES NOT EXIST
IN 2110MC-501.

BUS-1A/1 BUS-3A/1 BUS-4A/1


BUS-2A/1
0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV

2110-LX-501 2110-DX-502
2110-DX-501
100 kVA 45 kVA
30 kVA 2110-DX-503
100 kVA

BUS-4A/2
BUS-1A/2 BUS-3A/2
BUS-2A/2 0. 415 kV
0. 38 kV
0. 24 kV 0. 38 kV

BUS-B1/1
BUS-B2/1 BUS-5A/2
BUS-B3/1 BUS-5A/3 BUS-B4/1
0. 48 kV
0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV 0. 48 kV

BUS-1A/3 2110-CR001-B
BUS-2A/3 BUS-3A/3 BUS-4A/3 2110-CR01-02A
0. 38 kV 4 kW 2110-CR01-02B 2110-CR01-03A
0. 24 kV 0. 38 kV 0. 415 kV 5. 6 kW 5. 6 kW 5. 6 kW 2110-CR01-03B 2110-CR01-01A
5. 6 kW 22. 5 kW

2110-DP-501
2110-LP-501 20 kVA 2110-DP-502 2110-DP-505
70 kVA 28 kVA 55 kVA

407
One-Line Diagram - OLV1=>2110-MC-501 (Motor Acceleration Analysis)

BUS-2110MC501
BUS-2110MC501-B CONTINUATION FROM SHEET 1.
0. 48 kV

BUS-6A/1
BUS-B6/1 BUS-F7A/1 BUS-8A/1 BUS-B8/1
0. 48 kV BUS-B7/1 BUS-B9/1 BUS-B11/1
0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV 0. 48 kV 542. 3 A
0. 48 kV

2110-CR00101-HE1 2110-CR00101-HE2 2110-CR00101-HE3 2110-HU001-A


2110-CR01-01B
22. 5 kW 5 kVA 5 kVA 5 kVA 2110-CR001-01C 2110-WR-001 2110-CR01-05A 2110-DC-001 15 kW
1. 5 kW 2110-WR-002 56 kW
35 kVA 2. 2 kW
35 kVA

BUS-2110MC501-C
0. 48 kV

BUS-F9A/1 BUS-14A/1 BUS-16A/1


BUS-10A/1 BUS-12A/1
0. 48 kV BUS-11A/1
0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV

2110-DS-001 2110-MA001-RC
2110-ZM-250 2110-CP-001 2110-CH-251 42 kW
2110-CN014-A 2110-CN014-B 22. 5 kW
5 kW 2110-CN014-HE1 2110-CN014-HE2 44. 7 kW 257 kW 12 kVA
115 kW
0. 5 kVA 0. 5 kVA

408
One-Line Diagram - OLV1=>2110-MC-501 (Motor Acceleration Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 2.
BUS-2110MC501-D
0. 48 kV

BUS-17A/1 0. 48 kV

BUS-B12/1 BUS-B13/1
BUS-18A/1
0. 48 kV 0. 48 kV
0. 48 kV

2110-RB001-B 2110-CV001HU-01C 2110-CV001HU-01D


2110-RB001-A
BUS-17A/2 BUS-17A/3 15 kW 15 kW
BUS-17A/4 75 kW 0. 8 kW
0. 48 kV 0. 48 kV BUS-17A/5
0. 48 kV
0. 48 kV

2110-MA001-A 2110-MA001-B
2. 2 kW 2110-MA001-01C
2. 2 kW 2110-MA001-01D
2. 2 kW
2. 2 kW

BUS-2110MC501-E
0. 48 kV

BUS-19A/1 BUS-20A/1 BUS-21A/1 BUS-22A/1 BUS-23A/1 BUS-B16/1 BUS-24A/1


BUS-25A/1
0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV

2110-CV001-02 2110-CV001-07
37. 3 kW 2110-CH-016 2130-CV002-07 2130-CV002-02
40 kVA 2130-CH-003 2130-DC-002 2130-ZM-253
18 kVA 30 kW 37 kW
12 kVA 22. 5 kW 1. 75 kVA
409
One-Line Diagram - OLV1=>2110-MC-501 (Motor Acceleration Analysis)

BUS-2110MC501
CONTINUATION FROM SHEET 3.
BUS-2110MC501-F
0. 48 kV

AFD-02
BUS-28A/1

0. 48 kV

BUS-26A/1 BUS-27A/1 BUS-B20/1 BUS-29A/1


BUS-28A/2 BUS-B18/1 BUS-24A/3
BUS-24A/2
BUS-B20/3 BUS-24A/5
0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV 0. 48 kV 0. 48 kV 0. 48 kV
0. 48 kV 0. 48 kV

2110-BL001-A 2110-BL001-B 2831-ZM-024-04 2110-UP-501 2130-SC251-02


2130-SC251-01
2110-WR-003 2110-WR-004 2. 3 kW 0. 4 kW 2831-ZM-024-03 5 kW 1. 75 kVA 2130-CV002-08
5 kVA 1. 75 kVA
35 kVA 35 kVA 149 kW 25 kVA

41 0
26. COORDINATION STUDY

PURPOSE OF COORDINATION STUDY:

The purpose of a coordination study is to determine the proper setting for protection devices in the power
system. The proper setting will protect the power system equipment as well as remove only the smallest
portion of the electrical system as necessary from service in order to isolate a fault.

COORDINATION STUDY RESULT.

A power analysis software, ETAP Version 16.2 was utilized to perform the Device Coordination Study;
and the setting of the protection devices are plotted on time‐current curve graphs (TCCs).

Reference to the Time Current Curve Graph below, the transformers and the feeders are well protected
from the upstream fuses and protection relays. The fuses and relays in the power system coordinate
properly and provide primary as well as back up protection, and at the same time avoid the unnecessary
outage of healthy part of system.

41 1
Amps X 1 0 BUS-C01 (Nom. kV=23, Plot Ref. kV=23)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K
21 1 0-XF-001
FLA - Other 65
500 31 2.269 Amps 500

300 300
FU-002 T60-2 - P
Cutler-Hammer GE Multilin
BA-200 (Filter) T60
Standard 25 kV CT Ratio 1 50:5
1 00
1 50E IAC - Extremely Inverse 1 00
Pickup = 0.4 (0.01 - 30 xCT Sec)
Time Dial = 2.5
3x = 1 .51 s, 5x = 0.61 4 s, 8x = 0.31 s
50 50
Inst = 1 0 (0.01 - 30 xCT Sec)
Time Delay = 0.01 s
30 30

10 10

5 5
Seconds

Seconds
3 3

21 1 0-XF-001
1 21 1 0-XF-001 1
2.25 MVA (Secondary) 5.4 %Z
Inrush Delta-Wye Resistor Grd
Multiplier = 8 xFLA (2498.1 5 Amps) Curve Shift = 1
.5 .5
Duration = 6 Cycles

.3 150 A .3
FU-002

T60-2 - 3P
T60-2
R
.1 FU-002 - 3P .1
7.842kA @ 23kV
(Sym)

.05 2110-XF-001 .05


2 . 2 5 MVA

.03 .03

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 0 BUS-C01 (Nom. kV=23, Plot Ref. kV=23)


ETAP Star 1 6.1 .1 C

21 1 0-XF-001 COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 2
Amps X 1 00 BUS-C03 (Nom. kV=0.48, Plot Ref. kV=0.505)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K

21 1 0-XF-501
FLA - Other 65
500 500
21 04.923 Amps

300 300
FU-002
Cutler-Hammer
BA-200 (Filter)
Standard 25 kV
1 00
1 50E FU-C01 1 00
Mersen
IEC DIN
Standard 24 kV
50 50
150 A 63
FU-002
30 30

10 10

21 1 0-XF-501
5 FU-C01 1 .75 MVA (Secondary) 5.5 %Z 5

Seconds
Seconds

63 A Delta-Wye Solid Grd


3 3

2110-XF-501
1 1. 7 5 MVA 1

.5 .5

.3 .3

21 1 0-XF-501
.1 .1
Inrush
Multiplier = 8 xFLA (1 6839.38 Amps)
Duration = 6 Cycles
.05 .05
FU-C01 - 3P
7.768kA
FU-002 @ 23kV
- 3P
.03 (Sym) .03
7.842kA @ 23kV
(Sym)

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 00 BUS-C03 (Nom. kV=0.48, Plot Ref. kV=0.505) ETAP Star 1 6.1 .1 C

21 1 0-XF-501 COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 3
Amps X 1 0 BUS-D01 (Nom. kV=4.1 6, Plot Ref. kV=4.379)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K

FU-002
500 Cutler-Hammer 500
BA-200 (Filter)
300 Standard 25 kV 300
GE369-3 - OL-J 1 50E
GE Multilin
369
Jam
CT Ratio 200:5
1 00 T60-2 - P 1 00
Pickup = 2.3 (1 .01 - 6 xFLA)
Time Delay = 5 s GE Multilin
T60
50 CT Ratio 1 50:5 50
IAC - Extremely Inverse
30 Pickup = 0.4 (0.01 - 30 xCT Sec) 30
Time Dial = 2.5
3x = 1 .51 s, 5x = 0.61 4 s, 8x = 0.31 s
Inst = 1 0 (0.01 - 30 xCT Sec)
Time Delay = 0.01 s
10 10

5 5
Seconds

Seconds
GE369-3 - OL
3 GE Multilin
FU-D01 3
369 Gould Shawmut (Ferraz)
CT Ratio 200:5 A055D1
Standard Overload Curve Other 5.5 kV
Pickup = 1 .1 (1 .01 - 1 .25 xFLA) 2x9R
1 Curve Multiplier = 1 1

FU-002
150 A
.5 .5

.3 T60-2 T60-2 - 3P .3
7.707kA @ 23kV
R (Sym)

FU-002 - 3P
7.842kA @ 23kV
FU-D01 (Sym)
.1 .1
360 A GE369-3 - 3P
6.671 kA @ 4.379kV
GE369-3 (Sym)
.05 .05
MR
FU-D01 - 3P
.03 6.671 kA @ 4.379kV .03
(Sym)

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 0 BUS-D01 (Nom. kV=4.1 6, Plot Ref. kV=4.379) ETAP Star 1 6.1 .1 C

21 1 0-CR001 -A COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 4
Amps X 1 0 BUS-C05 (Nom. kV=23, Plot Ref. kV=23)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K

500 500

300 300
FU-002
Cutler-Hammer
BA-200 (Filter)
Standard 25 kV
1 00 1 50E 1 00

FU-C01
50 Mersen 50
IEC DIN
Standard 24 kV
30 1 50 A 30
63
FU-002
CB-F01
Square-D MICROLOGIC 6.0
10 FU-C01 Sensor = 2000 10

63 A LT Pickup = 1 (2000 Amps)


LT Band = 0.5
5 ST Pickup = 1 .5 (3000 Amps) 5
Seconds

Seconds
ST Band = 0 (I^x)t = OUT
CB-F01 Inst. Pickup = 2 (4000 Amps)
3 3
2000 A

1 1

.5 .5

.3 .3

.1 .1

FU-C01 - 3P
.05 .05
7.768kA @ 23kV
(Sym)

.03 FU-002 - 3P .03


7.842kA @ 23kV
(Sym)

CB-F01 - 3P
39.564kA @ 0.505kV
(Sym)
.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 0 BUS-C05 (Nom. kV=23, Plot Ref. kV=23) ETAP Star 1 6.1 .1 C

21 1 0-MC-501 COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 5
Amps X 1 0 BUS-A01 (Nom. kV=23, Plot Ref. kV=23)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K
21 30-XF-001
FLA - Other 65
500 693.931 Amps 500

300 300
FU-001
Cutler-Hammer
BA-200 (Filter)
Standard 25 kV
1 00
200E 1 00

50 50

30 30
T60-1 - P
GE Multilin
T60
CT Ratio 1 50:5
10
IAC - Extremely Inverse 10
Pickup = 0.85 (0.01 - 30 xCT Sec)
Time Dial = 2.5
3x = 1 .51 s, 5x = 0.61 4 s, 8x = 0.31 s
5 5
Inst = 1 0 (0.01 - 30 xCT Sec)

Seconds
Seconds

Time Delay = 0.1 s


3 3

200 A
FU-001

1 21 30-XF-001 1
T60-1 5 MVA (Secondary) 5.5 %Z
R Delta-Wye Resistor Grd
.5 Curve Shift = 1 .5
21 30-XF-001
.3
Inrush .3
Multiplier = 8 xFLA (5551 .445 Amps)
Duration = 6 Cycles

T60-1 - 3P
2130-XF-001 21 .003kA @ 23kV
.1 5 MVA (Sym)
.1

.05 .05
FU-001 - 3P
21 .796kA @ 23kV
(Sym)
.03 .03

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 0 BUS-A01 (Nom. kV=23, Plot Ref. kV=23) ETAP Star 1 6.1 .1 C

21 30-XF-001 COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 6
Amps X 1 00 BUS-A03 (Nom. kV=0.48, Plot Ref. kV=0.492)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K
21 30-XF-501
FLA - Other 65
500 500
601 .407 Amps

300 300
FU-001
Cutler-Hammer
BA-200 (Filter)
Standard 25 kV FU-A01
1 00
200E Mersen 1 00
IEC DIN
Standard 24 kV
20
50 50

30 30

10 10
21 30-XF-501
0.5 MVA (Secondary) 5.4 %Z
5 Delta-Wye Solid Grd 5
Seconds

Seconds
3 3

21 30-XF-501
Inrush
1 Multiplier = 8 xFLA (481 1 .252 Amps) 1

Duration = 6 Cycles
200 A
.5 FU-001 .5

.3 .3

FU-A01
20 A

.1 2130-XF-501 .1
0. 5 MVA FU-A01 - 3P
21 .534kA @ 23kV
(Sym)
.05 .05

FU-001 - 3P
.03 21 .796kA @ 23kV .03
(Sym)

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 00 BUS-A03 (Nom. kV=0.48, Plot Ref. kV=0.492) ETAP Star 1 6.1 .1 C

21 30-XF-501 COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 7
Amps X 1 00 BUS-B01 (Nom. kV=4.1 6, Plot Ref. kV=4.1 6)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K

GE369-1 - OL
500 GE Multilin 500
369
300
CT Ratio 400:5 300
Standard Overload Curve
Pickup = 1 .01 (1 .01 - 1 .25 xFLA)
Curve Multiplier = 1

1 00 1 00
FU-001
Cutler-Hammer
50 BA-200 (Filter) 50
Standard 25 kV
200E
30 30

T60-1 - P
GE Multilin
200 A T60
FU-001 CT Ratio 1 50:5
10 10
IAC - Extremely Inverse
GE369-1 - OL-J Pickup = 0.85 (0.01 - 30 xCT Sec)
T60-1 Time Dial = 2.5
5 GE Multilin 5
Seconds

Seconds
R
3x = 1 .51 s, 5x = 0.61 4 s, 8x = 0.31 s
369
Inst = 1 0 (0.01 - 30 xCT Sec)
3 Jam 3
Time Delay = 0.1 s
CT Ratio 400:5
FU-B01
Pickup = 558
2 (1 .01
A - 6 xFLA)
Time Delay = 2 s

1 GE369-1 1

MR

.5 .5

.3 .3
FU-B01
Gould Shawmut (Ferraz)
A055D1
Other 5.5 kV
.1
2x1 9R .1

GE369-1 - 3P
1 5.384kA @ 4.1 6kV
(Sym) FU-001 - 3P
.05 .05
21 .796kA @ 23kV
(Sym)
FU-B01 - 3P
.03 T60-1 - 3P .03
1 5.384kA @ 4.1 6kV
(Sym) 21 .003kA @ 23kV
(Sym)

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 00 BUS-B01 (Nom. kV=4.1 6, Plot Ref. kV=4.1 6) ETAP Star 1 6.1 .1 C

21 30-CV002-A/B COORD:

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 8
Amps X 1 0 21 30-VL-001 (Nom. kV=23, Plot Ref. kV=23)
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K
1K 1K

500 500

300 300
FU-001
Cutler-Hammer
BA-200 (Filter)
Standard 25 kV
FU-A01
1 00
200E 1 00
20 A

50 2 00 A 50

FU-001
30 30

CB-E01
FU-A01
Mersen
10 10
IEC DIN
Standard 24 kV
20
5 5
Seconds

3 3
CB-E01
Square-D MICROLOGIC 6.0
Sensor = 1 600
LT Pickup = 0.75 (1 200 Amps)
1 LT Band = 0.5 1
ST Pickup = 1 .5 (1 800 Amps)
ST Band = 0 (I^x)t = OUT
.5 Inst. Pickup = 2 (3200 Amps) .5

.3 .3

.1 .1

FU-A01 - 3P
.05 21 .534kA @ 23kV .05
(Sym)
CB-E01 - 3P FU-001 - 3P
.03 21 .796kA @ 23kV .03
(Sym)

.01 .01
.5 1 3 5 10 30 50 1 00 300 500 1K 3K 5K 1 0K

Amps X 1 0 21 30-VL-001 (Nom. kV=23, Plot Ref. kV=23) ETAP Star 1 6.1 .1 C

21 30-MC-501 COORDINATION

Project: SPENCE GROWTH OPTION PROJECT Date: 1 2-01 -201 8


Location: CHILE

41 9