Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

SIGNED AND SEALED PRC NO.

PRC NO. REVISIONS / GENERAL NOTES PROJECT TITLE & LOCATION APPROVED BY: SHEET CONTENTS CADD BY: SHEET NO.
· Shall provide with shop drawing(s) for Architect's approval.
PTR NO. · Any discrepancy with dimension(s) and specification(s) in plan(s), * CONST. NOTES
contractors / sub-contractors shall inform and verify with the

ISSUED AT:
Architect before proceeding any work / action.
· It shall be noted that contractors / sub-contractors shall strictly
PROPOSED S-1
comply with the National Building Code and Structural Building
RESIDENTIAL BUILDING LANIE M. VALLESPIN
CIVIL ENGINEER
ISSUED ON: Code of the Philippines for construction standards in all areas
where Deeds / Construction Guidelines and Restrictions are
OWNER
4
required to be followed, Contractors and Sub-contractors are
P-10 SUG-OBON TABON BISLIG CITY
TIN NO. mandated to comply and to coordinate with its requirements.

You might also like