Deployment Report - PMC (T11-T16) - 01-04-2024
Deployment Report - PMC (T11-T16) - 01-04-2024
DETAILED DESIGN & PROJECT MANAGEMENT CONSULTANCY for CONSTRUCTION OF TUNNELS T11 TO T16 FROM CHAINAGE KM 31+800 TO KM 48+962,
STATION YARDS AND WORKS RELATED TO MINOR BRIDGES AND FORMATION ON APPROACHES OF SUCH TUNNELS IN CONNECTION WITH NEW SINGLE
LINE BROAD GAUGE RAIL LINK BETWEEN BHANUPALI-BILASPUR-BERI IN THE STATE OF HIMACHAL PRADESH, INDIA.
DEPLOYMENT REPORT OF PMC PERSONNEL OF BRIDGE PACKAGE-2, PACKAGE-4 (T11-T13) and PACKAGE-5 (T14-T16)
Date : 01 April 2024
Bridge Package 2
Sr.No. Name Designation Location Activity Remarks
1 Dayaram Thakur Resident Alignment & 3D Monitoring Engineer All Site - Checking Site work -
2 Anirudh CE - Sub-Structure Expert Pk- 02 office Checking of BBS for Br.no 6 and 17 -
Supervisor Civil Engineer (Sub Structure - Checking boring , for A1 pile no -07 , Pier no.-03-pile no.-16, Pier-04
5 Maharaj Singh Bridge no.-06 & 07 (Day) -
Bridge) pile no.-19 boring, cage lowering and concreting at Bridge no.07.
Supervisor Civil Engineer (Sub Structure - Checking boring , for A1 pile no -07 , Pier no.-03-pile no.-16, Pier-04
6 Piyush singh Bridge no.-06 & 07 (Night) -
Bridge) pile no.-19 boring, cage lowering and concreting at Bridge no.07.
Supervisor Civil Engineer (Sub Structure - Checking boring , for A1 pile no -07 , Pier no.-03-pile no.-16, Pier-04
7 Mohan Lal Bridge no.-06 & 07 (Day) -
Bridge) pile no.-19 boring, cage lowering and concreting at Bridge no.07.
8 Debasis Pal Supervisor Surveyor cum 3D Monitoring. Bridge 6 and 7 - Checking survey work -
9 Ainullah Ansari Supervisor Surveyor cum 3D Monitoring. Bridge 17 and 20 - Checking survey work -
11 Gh. Nabi Naik Supervisor Material Laboratory Bridge 17 and 20 - Checking quality work -
Package 4
Sr.No. Name Designation Location Activity Remarks
1 Nishith Resident Engineer (Tunnel/Civil) Tunnnel and Portals - Tunnnel and Portal works -
2 Dinesh Kumar Resident Geologist Tunnel and Jagatkhana Station - Geological works -
All Approach Roads & Jagatkhana Station -Construction of gabion walls, hume pipes at approach roads and
3 Kush Dhiman CE-I-Civil Engineer Expert -
Yard Works. Jagatkhana Station Yard works.
4 Ramnish Chandel Quality Control Expert All sites and Lab - Daily Testing /Concrete Work -
17 Ashutosh Rohta Supervisor - Geologist Tunnel and Jagatkhana Station - Geological works -
Supervisor Civil Engineer (Sub Structure - Checking Shuttering arrangments of pier -02 and concreting of abut.
18 Abhineet Guleria Bridge no.-12 (Night) -
Bridge) cap for A2 at Bridge no.12
Supervisor Civil Engineer (Sub Structure - Checking Shuttering arrangments of pier -02 and concreting of abut.
19 Bhupesh Pal Singh Bridge no.-12 (Day) -
Bridge) cap for A2 at Bridge no.12
20 Rakhahari Hazra Supervisor-Surveyor cum 3D Monitoring T11, T12-P1 and Bridge 12 Checking All Site Survey Work and billing work. -
21 Anil Kumar Supervisor-Surveyor cum 3D Monitoring T13, T12-P2 and Station yard Checking All Site Survey Work and billing work. -
23 Gaurav Verma Supervisor Quantity Surveyor Office - Dpr, Daily report and Billing works -
Package 5
1 Gopal Chand Resident Engineer (Tunnel/Civil) Tunnnel and Portals - Tunnnel and Portal works -
2 Amit Singh Billowria Resident Geologist Package 05 All Sites (Day Shift). - Tunnel excavation and ring closure -
3 Kewal Krishan Resident alignment & 3D monitoring engineer PK -04 & Pk-05 Checking All Site Survey Work and billing work. -
4 Dharani Kant Mishra Resident Engineer (RE)/Sub-Structure/Civil Package- 02 All Sub-Structure Work -
8 Rajeev Kumar Quality Control Expert Laboratory & All site work All Quality Work -
10 Sanjay Rana Expert - Safety, Health & Environment Package 4 and 5 - SHE works -
21 Ajay Verma Supervisor - Geologist All Sites (Night Shift). - Tunnel excavation and ring closure -
22 Rajat Verma Supervisor - Geologist All Sites (Day Shift). - Tunnel excavation and ring closure -
- Checking Excavation & P.C.C for Pier no.-02, Pier -03 Slipform
Supervisor Civil Engineer (Sub Structure
23 Amandeep Sharma Bridge no.- 16 (Day) shuttering & Concreting, Pier -01 Pier cap shuttering work at Bridge -
Bridge)
No.-16
- Checking boring, for pile no.- 7, Pier-02 & pier -03 pile no -03,Pile
Supervisor Civil Engineer (Sub Structure cap abt-2 & pier 1, steel binding work at Bridge no.-15 and Excavation
24 Bhupender Singh Bridge no.-15 & 16 (Night) -
Bridge) & P.C.C for Pier no.-02, Pier -03 Slipform shuttering, Pier -01 Pier cap
shuttering work at Bridge No.-16
3/3
Supervisor Civil Engineer (Sub Structure - Checking boring, for pile no.- 7, Pier-02 & pier -03 pile no -03,Pile
25 Rohit Singh Bridge no.- 15 (Day) -
Bridge) cap abt-2 & pier 1, steel binding & shuttering work at Bridge no.-15
26 Sandeep Barwal Supervisor Civil Engineer (Steel Bridge) Ambala(Haryana). With Fabrication Agency (HMM) for Bridge 12 Superstructure work. -
Supervisor Civil Engineer (Sub Structure With Fabrication Agency (JALPADEVI) in Bridge (15 & 16)
27 Amandeep Indore(M P.). -
Bridge) Superstructure work.
28 Avishek Chakraborty Supervisor-Surveyor cum 3D Monitoring T14 and Bridge 15 Checking All Site Survey Work and billing work. -
29 Debasis Gayen Supervisor-Surveyor cum 3D Monitoring T15,T16 and Bridge 16 Checking All Site Survey Work and billing work. -
30 Saurabh Mehra Supervisor Material Laboratory Laboratory & All site work Daily Testing & shotcrete concrete work -