Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

Riyadh Metro Project - Package 1

Work Inspection Request (WIR)

We request your attendance to inspect the following works:


Civil Mechanical Electrical Architectural TS Others:
Discipline:
Level of Inspection: Hold Witness WIR No.: M-BCW-1F4TS0-CMPP-WIR-000018_001

Area/Unit: 1F4/5A1 Deep Underground Transfer Station Submited Date: 31-03-2024

Location: B04 G.L Between (B05-B07) & (BA-BB) CWP (IWP): M-BMF-1F4TS0-CMPP-CWP-000006_001
Inspection Date and Time: 01-04-2024 at 09:30 AM ITP Ref.: M-BMF-1F4TS0-CMPP-ITP-000001_002
M-BNR-1F4TS0-CMPP-SDR-430400_001
Item to be Inspected: Installation For CHW Piping DWG. Ref.:
M-BAR-1F4TS0-CM00-EDR-430400_000
Checklist Survey Data Others:
Attachment:
Inspection status: Ready Cancelled

Description of Inspection:

Installation of Chilled Water Piping, see attached Highlighted Drawing.


Dia.20mm=18 m
Dia.15mm=21 m,
Total Quantity = 39 M

BACS Quality Control Comments:

Material is Approved (M-BNR-1A1TS0-CMPP-MAR-000002 Code A)


Shop drawings Status: "Under S/C Submission and BACS review" For Rev.03 Drawings
IFC Drawing, Status- "Code B"
IRF Reference: M-BMF-1F4TS0-GCMO-IRF-001021_003
CWP Status "Code B"

BACS Quality Control: Islam Zaghloul 581817884 31-Mar-24


Print Name Contact No. Signature Date

RMTC Comments:

Status: Work May Proceed Work May Proceed as Noted Work May not Proceed

RMTC Representative
Print Name Signature Date
Document No. M-BAC-000000-GQ00-FOR-000002_Rev. 010 M-BCW-000000-GQQC-PRO-000001

Page 1 of 2

© 2013 Saudi Arabian Bechtel Company and Almabani General Contractors and Consolidated Contractors Company WLL
Use, disclosure or reproduction of this information only by permission of the Project Director. All rights reserved.
Page 2 of 2

© 2013 Saudi Arabian Bechtel Company and Almabani General Contractors and Consolidated Contractors Company WLL
Use, disclosure or reproduction of this information only by permission of the Project Director. All rights reserved.
INSPECTION REQUEST FORM

Riyadh Metro Project – Package 1


Type of Inspection:
IRF Reference No.: M-BMF-1F4TS0-GCMO-IRF-001021 Rev. No: 003
Material
WIR / MIR Reference No.: Rev. No: Installation
Testing
Discipline: Mechanical Electrical Plumbing Fire Fighting TVS

CONTRACT No: M-BCW-1F4000-CMEP-SUB-000001 SUBCONTRACTOR NAME: Zamil Air Conditioning & Refrigeration Services Co.

SUBMISSION DATE: 30-Mar-2024 INSPECTION DATE: 31-Mar-2024 INSPECTION TIME: 10:00 am


REFERENCE DOCUMENT No.: M-BMF-1F4TS0-CMPP-CWP-000006, M-BNR-1A1TS0-CMPP-MAR-000002_004

DRAWING No.: M-BNR-1F4TS0-CMPP-SDR-430402_001: M-BAR-1F4TS0-CM00-EDR-430402_000

LEVEL OF INSPECTION:
ITP NO.: M-BMF-1F4TS0-CMPP-ITP-000001 ACTIVITY No.: 3.2
Witness Hold
ITEM TO BE INSPECTED:
Installation of Chilled Water Piping, see attached Highlighted Drawing.
Dia.20mm=18 m
Dia.15mm=21 m,

Total Quantity = 39 M

LOCATION: B04 G.L Between (B05-B07) & (BA-BB)

BACS / ZAMIL PROJECTS QUALITY CONTROL COMMENTS:

STATUS: Work May Proceed Work May Proceed as Noted Work May not Proceed

NAME: Mohsin Mapari CONTACT NO. 571523739


Zamil Projects Quality Control
DATE: 30-Mar-2024
SIGNATURE:

NAME: Islam Zaghloul CONTACT NO. 581817884


BACS Quality Control
SIGNATURE: DATE:

M-BCW-000000-GC00-PRO-000071 Rev 004 Page 13 of 14


© 2013 Saudi Arabian Bechtel Company and Almabani General Contractors and Consolidated Contractors Company WLL

Use, disclosure or reproduction of this information only by permission of the Project Director. All rights reserved
M-BMF-1F4TS0-GCMO-IRF-001021(WIR-CMPP-018) - Compliance sheet

1. Shop drawing is code 2 Drawings M-BNR-1F4TS0-CMPP-SDR-430402


is approved with Code B
2. Eccentric reducer is not provided Refer to NCR -M-RMT-1F4TS0-CMPP-NCR-111 is
closed

3. Work is incomplete. Inspection to be revised once Installation is been completed and find attach
the work is completed photos with present situation with insulation
installed
Riyadh Metro Project - Package 1
Work Inspection Request (WIR)

We request your attendance to inspect the following works:


Civil Mechanical Electrical Architectural TS Others:
Discipline:
Level of Inspection: Hold Witness WIR No.: M-BCW-1F4TS0-CMPP-WIR-000018_000

Area/Unit: 1F4/5A1 Deep Underground Transfer Station Submited Date:19 Mar.2020

Location B04 G.L Between (B05-B07) & (BA-BB), CWP (IWP): M-BMF-1F4TS0-CMPP-CWP-000001_003

Inspection Date and Time: 21 Mar 2020 at 09:30 AM ITP Ref.: M-BMF-1F4TS0-CMPP-ITP-000001_ 002
M-BMF-1F4TS0-CMPP-SDR-430402_002
Item to be Inspected: Chilled Water Pipe Installation DWG. Ref.:
M-BAR-1F4TS0-CM00-EDR-430402_000
Checklist Survey Data Others:
Attachment:
Inspection status: Ready Cancelled

Description of Inspection:
Installation of Chilled water pipe at B04 G.L Between (B05-B07) & (BA-BB), as per attached Highlighted Drawings.
(QTY:Pipe 20mm = 18 mtr,&15 mm = 21 MetersTotal = 391Meters.
Ref Drawings:

BACS Quality Control Comments:

2) Material is Approved ( Pipe: M-BLI-000DP0-CM00-MAR-000086 ,Code B,refer to M-RMT-000DP0-CM00-TRV-005465_00B


Paint- AL-Jazeera ; M-BLI-000000-CMEP-MAR-000011 ,Code B,refer to M-RMT-000000-CMEP-TRV-006829_00A
Shop drawings Status "Code 2"
IFC Drawing, Status- "Code C"
IRF Reference: M-BMF-1F4TS0-GCMO-IRF-001021_001
CWP Status "Code B"

BACS Quality Control: A.Asim 19-Mar-20


Print Name Contact No. Signature Date

RMTC Comments:

Status: Work May Proceed Work May Proceed as Noted Work May not Proceed

RMTC Representative
Print Name Signature Date
Document No. M-BAC-000000-GQ00-FOR-000002_Rev. 010 M-BCW-000000-GQQC-PRO-000001

Page 1 of 2

© 2013 Saudi Arabian Bechtel Company and Almabani General Contractors and Consolidated Contractors Company WLL
Use, disclosure or reproduction of this information only by permission of the Project Director. All rights reserved.
RIYADH METRO PROJECT - PACKAGE 1 Title/Description : ITP No. : M-BMF-1F4TS0-CMPP-ITP-000001
ITP FOR INSTALLATION OF HVAC CHILLED WATER PIPING WORKS Rev. No. : 1
Issue Date :
Page : 1 of 1

Unit/Area: 1F4 STATION Discipline: MEP Equipment/Tag No.: N/A

CWP No.: M-BMF-1F4TS0-CMPP-CWP-000006 CWP Title: CWP FOR INSTALLATION OF HVAC CHILLED WATER PIPING WORKS Location: STATION 1F4

Method of Verification
Inspection/Test Requirements Acceptance criteria Reference Documentation
(see Legend) Demonstrated Evidence Report /
Activity No. Activity Description
Test/Inspection SUBCON. Checklist
Stage/Frequency (Greater or equal to the value) Code/Spec/Etc. BACS RMTC
Performed QC
1.0 Document submittals
Project specification (M-BCW-
Project
Before Approved Specificationss, IFC 000000-CPPP-ESP-015080, M-
specification,Method
1.1 Document review commencement of drawings, ITP & MS,(M-BFR-1F4TS0- BCW-000000-CM00-ESP- R R R ZP-M-007
statement,ITP,Material
work OOOO-MST-000000) 015060, 015083) and Approved
approvals,Shop drawings
MAR
2.0 Supplied materials inspection
Inspection of supplied key Visual Approved MAR and Project Specs Project specification (M-BCW-
First delivery of
2.1 materials based on the inspection/Physical MTC, Mill Certificates & Compliance 000000-CPPP-ESP-015080 H W W ZP-W-001, IRF, MIR
material
specification inspection Certificate SEC 2.1,2.2,2.3,2.4)
Visual Approved MAR and Project Specs
Material Storage and Succeeding
2.2 inspection/Physical MTC, Mill Certificates & Compliance Manufacturer Recommendations H W W ZP-W-001, IRF, MIR
handling delivery of material
inspection Certificate
Project specification (M-BCW-
Visual
Material Storage and Every delivery of 000000-CPPP-ESP-015080
2.3 inspection/Physical Manufacturer recommendation I S S ZP-W-001
handling material SEC 2.1,2.2,2.3,2.4, 2.5, 2.6,
inspection
2.8,)
3.0 Execution & Installation

Every location as Piping Layout Drawing,


Hanger & Support As per IFC drawing, Specification and
3.1 Visual Inspection specified in Specification (M-BCW-000000- I S S ZP-M-007
Installation Method Statement
drawings CPPP-ESP-015080 SEC. 3.6)

As per IFC drawing, Specification and


IFC Drawing/ Project
Visual Inspection Every location as Method Statement (M-BFR-1F4TS0-
Fabrication & Pipe specification (M-BCW-000000-
3.2 ( Welding & specified in OOOO-MST-000000), WPS (Welding H W W ZP-M-007, ZP-M-008 IRF, WIR
Installation CPPP-ESP-015080 SEC. 3.1-B,
Installation) drawings Procedure Specification and weld
C, E; 3.7, 3.8)
summary report

Every location as Project specification (M-BCW-


As per IFC drawing, Specification and
3.3 Installation of Valves Visual Inspection specified in 000000-CPPP-ESP-015080 I S S ZP-M-007
Method Statement
drawings SEC 2.5, 3.4, 3.5)

Project specification (M-BCW-


As per IFC drawing, Specification and 000000-CPPP-ESP-015080
3.4 Pre Test Inspection Visual Inspection Every location H W W ZP-M-010, ZP-M-011, IRF, WIR
Method Statement SEC 3.1, 3.2, 3.3, 3.4, 3.5, 3.6,
3.7, 3.8)
RIYADH METRO PROJECT - PACKAGE 1 Title/Description : ITP No. : M-BMF-1F4TS0-CMPP-ITP-000001
ITP FOR INSTALLATION OF HVAC CHILLED WATER PIPING WORKS Rev. No. : 1
Issue Date :
Page : 1 of 1

Unit/Area: 1F4 STATION Discipline: MEP Equipment/Tag No.: N/A

CWP No.: M-BMF-1F4TS0-CMPP-CWP-000006 CWP Title: CWP FOR INSTALLATION OF HVAC CHILLED WATER PIPING WORKS Location: STATION 1F4

Method of Verification
Inspection/Test Requirements Acceptance criteria Reference Documentation
(see Legend) Demonstrated Evidence Report /
Activity No. Activity Description
Test/Inspection SUBCON. Checklist
Stage/Frequency (Greater or equal to the value) Code/Spec/Etc. BACS RMTC
Performed QC
As per IFC drawing, Specification and
Project specification (M-BCW-
Method Statement (M-BFR-1F4TS0-
3.5 Hydro test Visual Inspection Every location 000000-CPPP-ESP-015080 H W W ZP-M-012, IRF, WIR
OOOO-MST-000000, Minimum
SEC 3.12)
holding time of 15mins para 4.3 )

3.6 Reinstatement Inspection Visual Inspection Every location As per IFC drawing As per IFC drawing I S S ZP-M-015

Every location as Project specification (M-BCW-


Painting & Coating As per IFC drawing, Specification and
3.7 Visual Inspection specified in 000000-CPPP-ESP-015080 I S S ZP-M-045
Inspection (Touch Up only) Method Statement
drawings SEC 3.9)

IFC Drawing,Specifications(M-
BCW-000000-CM00-ESP-
As per IFC drawing, Specification and
3.8 Pipe Insulation Visual Inspection Every location 015083, M-BCW-000000-CPPP- H W W ZP-M-014, IRF, WIR
Method Statement
ESP-015080 SEC 2.15 - A, B;
3.1-A-3; 3.2-A-1, B-1 )
Project specification (M-BCW-
Flushing & Cleaning As per IFC drawing, Specification and
3.9 Visual Inspection Every location 000000-CPPP-ESP-015080 H W W ZP-M-013A, IRF, WIR
Inspection Method Statement
SEC 3.13)
4.0 Testing & commisioning

Project specification (M-BCW-


Final Inspection and 000000-CPPP-ESP-015080, M-
4.4 Visual Inspection Every location As per IFC drawing I W W ZP-M-028, IRF, WIR
Acceptance BCW-000000-CM00-ESP-
015060, 015083)

Legend : W - Witness Inspection Point; H – Mandatory Hold Point For Inspection; R – Document Review; T – Test; I – Inspection; S – Surveillance

FIELD SUPERVISION / SUBCONTRACTOR ACCEPTANCE OF ITP: FIELD ENGINEERING ACCEPTANCE OF ITP: QUALITY ACCEPTANCE OF ITP:
ARAIL / ZAMIL (date / name / signature) (date / name / signature)
M-BCW-000000-GC00-FOR-000406 Rev. 003
RIYADH METRO PROJECT – PACKAGE 01
Inspection Checklist
Electronic documents once printed, are uncontrolled and may become outdated. Refer to Aconex for current version.

TITLE: CHILLED WATER PIPE INSTALLATION CHECKLIST

DISCIPLINE:  MECHANICAL  ELECTRICAL  PLUMBING  FIRE PROTECTION  OTHERS:


LEVEL OF INSPECTION: HOLD WITNESS REVIEW OTHERS: CHECKLIST NO.: ZP-M-007

IRF NO: M-BMF-1F4TS0-GCMO-IRF-001021 INSPECTION TIME: 10:00 AM DATE: 31-mar-2024


AREA/UNIT: B04 G.L Between (B05-B07) & (BA-BB)
CWP NO.: M-BMF-1F4TS0-CMPP-CWP-000006

DESCRIPTION: Installation of Chilled Water Piping ITP REF.: M-BMF-1F4TS0-CMPP-ITP-000001

INSPECTION:  FIRST  SECOND  THIRD DRAWING NO.: As attached

ATTACHMENT:  YES  NO DELIVERY NOTE/PO:

ITEM RE-INSP.
Activity YES (√) NO (x) N/A
No. DATE

1 Verify the Project Documents, Project Specification, MOS, ITP, MAR, Drawings. 
2 Verify the approval of materials. 
3 Verify the Pipe route and level as per approved drawings 
4 Verify the Installation of Pipe hanger and supports. 
5 Verify the Pipe Work is installed in accordance with approved Drawings and
Specifications 

6 Line Sizes, Thicknesses and Materials correct 


7 Verify Installation of valves 
8 All inline items installed 
9 All drains / Vents fitted 
10 Mating surfaces checked for damage 
11 Correct gasket installed 
12 Screwed / Threaded joints acceptable 
13 Overall visual inspection satisfactory 
14 Joint compound / threads tape etc. applied correctly 
15 Verify the welded joints (if any) 
16 Verify NDE reports (If applicable) 

REMARKS:

REFERENCE DOCUMENTS:

Zamil-QC BACS-C BACS-QC


NAME Mohsin Mapari Zaid Abdallah Islam Zaghloul
SIGNATURE

DATE 30-Mar-2024

M-BFR-000000-OO00-OOO-000000 Rev 000 Page 1 of 1

© 2013 Saudi Arabian Bechtel Company and Almabani General Contractors and Consolidated Contractors Company WLL
Use, disclosure or reproduction of this information only by permission of the Project Director. All rights reserved.
March 14,2019

To whorn it may concern,

Please be informed that we do not produse the Eccentric Reducer.


Very sorry for the inconvenience.

\rt,-iY
Faithfully yours,
Export Department

' ,'

SAVE WATER o SAVE EARTH

. gls plpE FITTING IHDUSTRY GO., LTD.


107 Moo 4, Petchkasem Road, Omnoi, Kratumban, Samutsakorn 74130, THAILAND
Phone : +652.810.5588 Fax : +562.420.0758 I S1S.5599
iafc@bisfittin&cam r,r'nrw. bisfittins. c$m
hirawalraven.com

CHILLED WATER PIPE SUPPORT


USING CANTILEVER

700

1
2 12,13,14
16 11
3,4,5 15

17
6 10
7,8,9
325

17

7,8,9
10
1

325
3D
SECTION

Bill of Materials
Item Model Description Qty Unit
1 609831120 WTB1 Throughbolt Anchor 12x120 2 pc(s)
2 DMC155110 U Strap Clamp 110 mm 2 pc(s)
3 DMC3380830 Hexagonal Bolt M8x30mm 4 pc(s)
4 DMC33208 Flat Washer M8 4 pc(s)
5 DMC888008 Strut Slide Nut M8 2 pc(s)
6 DMC66581804 BIS Strut Wall Plate Heavy 1 pc(s)
7 DMC3381230 Hexagonal Bolt M12x30mm 4 pc(s)
8 DMC33212 Flat Washer M12 4 pc(s)
9 DMC888012 Strut Slide Nut M12 2 pc(s)
10 DMC66581242 BIS Strut Connector 135° 2 pc(s)
11 DMC155071 U Strap Clamp 71 mm 2 pc(s)
12 DMC3380830 Hexagonal Bolt M8x30mm 4 pc(s)
13 DMC33208 Flat Washer M8 4 pc(s)
14 DMC888008 Strut Slide Nut M8 2 pc(s)
15 DMRSI122525 Rubber Support Insert 1/2''x25x25mm 2 pc(s)
16 DMRSI22525 Rubber Support Insert 2''x25x25mm 2 pc(s)
17 DMC5534141 Slotted Channel 41x41x2.5 1.15 m

enquiry@hirawalraven.com
hirawalraven.com

CHILLED WATER PIPE SUPPORT


USING TRAPEZE

2,3
4

700
600

11,12,13
5,6,7 14
8
16
15

9 10

SECTION

3D

Bill of Materials
Item Model Description Qty Unit
1 6103112 WDI1L Drop In Anchor M12 2 pc(s)
2 DMC33212 Flat Washers M12 4 pc(s)
3 DMC33112 Hexagonal Nut M12 6 pc(s)
4 DMC33012 Threaded Rod M12 0.8 m
5 DMC3380830 Hexagonal Bolt M8x30mm 4 pc(s)
6 DMC33208 Flat Washer M8 4 pc(s)
7 DMC888008 Strut Slide Nut M8 4 pc(s)
8 DMC155110 U Strap Clamp 110 mm 2 pc(s)
9 DMC6658812 BIS Strut U-Washer M12 2 pc(s)
10 DMC5534141 Slotted Channel 41x41x2.5 0.75 m
11 DMC3380830 Hexagonal Bolt M8x30mm 4 pc(s)
12 DMC33208 Flat Washer M8 4 pc(s)
13 DMC888008 Strut Slide Nut M8 4 pc(s)
14 DMC155071 U Strap Clamp 71 mm 2 pc(s)
15 DMRSI22525 Rubber Support Insert 2x25x25mm 2 pc(s)
16 DMRSI122525 Rubber Support Insert 1/2''x25x25mm 2 pc(s)
enquiry@hirawalraven.com
Pipe 20mm =18m
Pipe 15mm = 21m
DO NOT SCALE FROM THIS DRAWING
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A
N A
C02 KEY PLAN
C03
MAKKAH
Pipe 20mm =18m A03
BA CT1 CC BB A02 C01 DD BC A04 BD
Pipe 15mm = 21m 1
4
V47
VOID
14515 8340
V45
VOID
14100 12790 2 6
B04-052 B04-151
CORR 25 RI MECH 37
5
B ø20 CHW F/R
MATCHLINE - REFER TO DWG No. M-BNR-1F4TS0-CMPP-SDR-430401 175
155
3 B

955
BOP: 4915

160

160
0.20 LPS

MATCHLINE - REFER TO DWG No. M-BNR-1F4TS0-CMPP-SDR-430404


160
150
150
B04-053
UPE L1.03 B04-156
UPE L1.04

150
A01 GENERAL NOTES:
B04-154
CORR 80
B04-153
TP PLEN L1.01 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER DISCIPLINES,DRAWINGS, SCHEDULES AND
SPECIFICATIONS, SCHEMATIC LEGENDS AND STANDARD DETAILS.

ø20 CHW F/R


Electronic drawings once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision.

2. UNLESS OTHERWISE STATED ALL DIMENSIONS ARE IN MILLIMETRES.

BOP: 5205
B04-058

0.21 LPS
3. ALL LEVELS ARE FROM FINISHED FLOOR LEVEL (FFL FROM SEA LEVEL 570.71 m FOR B04).
ELV L1.01

C B07 4. PLEASE REFER STANDARD DETAILS DRAWING.


C
5. WHERE MECHANICAL SERVICES PASS THROUGH FIRE COMPARTMENTATION CEILINGVOIDS, FLOOR VOIDS
0
155 1250 AND STRUCTURAL WALLS SHALL BE SLEEVE/SEAL THE OPENING WITH AN ACOUSTIC AND FIRE SEALANT.
6. ALL VALVES & CONTROL EQUIPMENT SHALL BE FULLY ACCESSIBLE TO ENABLE SERVICE, MAINTENANCE &
REPLACEMENT.
FCU-129 A 7. AIR VENTS TO BE PROVIDED AS PER SCHEMATIC AND SAFE WORKING OF CHW SYSTEM.
BOU: 5595 VP ø20 CHW F/R
8. PLEASE REFER CONTROLS & INSTRUMENTATION DRAWINGS

80
85
ø20 CHW F/R
5555

5555
B04-061 BOP: 5430
BOP: 4915

ELV L1.02 0.21 LPS


M-BAR-1F4DS0-CJ00-EDR-510151~M-BAR-1F4DS0-CJ00-EDR-510181.
0.20 LPS
THIS DRAWING AND THE DESIGN IT COVERS ARE THE PROPERTY OF CWJV. THEY ARE MERELY LOANED AND ON THE BORROWERS EXPRESS AGREEMENT THAT THEY WILL NOT BE REPRODUCED, COPIED, LOANED,EXHIBITED NOR USED EXCEPT IN THE

BOP: 5515
9. FLEXIBLE JOINTS SHOULD BE PROVIDED AT EVERY STRUCTURAL EXPANSION JOINTS AND / OR EQUIPMENT
CONNECTION TO SERVICES.
1250
0 10.THE CONSISTENCY BETWEEN CALCULATION REPORTS, SCHEMATICS, SCHEDULES AND LAYOUTS SHALL BE
BOP: 5425 MAINTAINED.
D 11. THE LOCATION OF FCU, DXUS, VALVES, COMMISSIONING SIT ABOVE FALSE CEILING HAVE BEEN COORDINATED D
210

C11 FCU-131 A WITH THE LATEST FALSE CEILING LAYOUT & THE LOCATION OF ACCESS PANE.
12. COORDINATION WITH OTHER TRADES FOR DUCT, MEP EQUIPMENT SPACE PROOFING HAS BEEN CONSIDERED.

1020
BOU: 5250
VP ø15 CHW F/R
BOP: 5340 13. CLEARANCE AREA FOR ACCESSIBILITY & FUTURE MAINTENANCE HAS BEEN CONSIDERED.
0.10 LPS
14. ALL ELECTRICAL PANELS SHOULD HAVE A CLEAR 6 FT EMPTY SPACE ABOVE THE PANEL AS PER NFPA 70.
6045
CP1 15. ALL ZAMIL IS RESPONSIBLE FOR CHILLED WATER DISTRIBUTION BALANCE AND EQUILIBRIUM .
3445

B04-068 16. ACCESSORY EQUIPMENT AND PERIPHERALS TO BE INSTALLED AS PER MANUFACTURER RECOMMENDATIONS .
COCP 02
17. AUTOMATIC AIR VENT SHOULD BE PROVIDED ON EACH HEADER.

2425
18. FCU & AHU, CHILLED FLOW RATE IS MATCHING WITH IFC DESIGN VERIFICATION & FINAL EQUIPMENT
SELECTION.
B06 19. MAKE SURE TO INSTALL THE EQUIPMENT TO ACHIEVE THE PROPER AIR CIRCULATION IN SERVED SPACE.
150 20. AUTOMATIC AIR VENT SHOULD BE PROVIDED ON EACH HEADER.
E E

MATCHLINE - REFER TO DWG No. M-BNR-1F4TS0-CMPP-SDR-430405


13960
REFERENCE DRAWINGS & DOCUMENTS
REV. APP.
DRAWING \ DOCUMENT NUMBER DISCRIPTION
ø15 CHW F/R
BOP: 4920

M-BAR-1F4TS0-CA00-BIM-100002 DEEP UNDERGROUND STATION LINE 1 - TRANSFER


00F.
0.10 LPS

REV-00F (DATE: 30 APR 2019) STATION 1F4 - ARCHITECTURE REVIT MODEL APP.
M-BAR-1F4TS0-CAEW-BIM-000002 DEEP UNDERGROUND STATION LINE 1 - TRANSFER
REV-00D (DATE: 13 APR 2017) STATION 1F4-FACADE REVIT MODEL 00D. APP.
14405
M-BAR-1F4TS0-CB00-BIM-000003 DEEP UNDERGROUND STATION LINE 1 - TRANSFER
00K APP.
9000

9000
B04-078 REV-00K (DATE: 02 MAY 2019) STATION 1F4 - STRUCTURE REVIT MODEL
ELV L1.03
M-BNR-1F4TS0-CMPP-SDR-430402_001 CHILLED WATER AND DX COOLING B04 CONCOURSE SHEET 2 001 APP.

M-BNR-1F4TS0-CMPP-SDR-410000 TO 410012 DEEP UNDERGROUND STATION LINE 1 - TRANSFER STATION 1F4


MECHANICAL CHILLED WATER SCHEMATIC SHEET 1 TO 12 ( FOR 003 APP.
BOP: 5070
F 70
NORMAL CIRCUIT) F
VP AA M-BNR-1F4TS0-CMPP-SDR-410300 & 410301
DEEP UNDERGROUND STATION LINE 1 - TRANSFER STATION 1F4
MECHANICAL CHILLED WATER SCHEMATIC SHEET 1 & 2 003 APP.
150

180
A

( FOR CRITICAL CIRCUIT)


C29 FCU-132
85

BOU: 6360 BOP: 6255 M-BNR-1F4TS0-CM00-SDR-490001~490015 PROJECT WIDE-MECHANICAL STANDARD DETAILS 00A APP.
B04-117
BOP: 6175 RI ELEC 13 M-BLI-000DP0-CM00-MAR-000291_002 DI-ELECTRIC UNIONS & FLANGES 002 APP.
B04-085 B04-083 B04-084 B04-082
RIEH L5.06 RIEH L5.07 RI COM L5.05 RI ELEC 12 M-BNK-000DS0-CMAC-MAR-000026_002 CHILLED WATER GROOVED FITTINGS 002 APP.
B05 M-BNK-000DS0-CMPP-MAR-000030_002 CARBON STEEL PIPES / CHILLED WATER PIPEWORK 002 APP.
M-BNK-000DS0-CMPP-MAR-000032_002 GALVANIZED CARBON STEEL & FITTINGS 002 APP.
M-BNR-000DS0-CMPP-MAR-000003_002 THREADED FITTINGS FOR CHILLED WATER SYSTEM 002 APP.

4400
B04-090 M-BOI-1B2DS0-CM00-MAR-000014_002 PIPE INSULATION FIBERGLASS 002 APP.
ESTR 60 B04-094
B04-099
G RI ST 03
AB M-BOI-1B2DS0-CM00-MAR-000028_002 CHW VALVE SELECTION 002 APP. G
TIMESTAMP11/16/2022 3:22:30 PM

B04-088 UPE L1.01


RI MECH 12 B04-091 M-BNR-1F4TS0-CMPP-MST-000001 MST FOR INSTALLATION OF CHILLED WATER PIPING. 002 APP.
TP PLEN L1.02
M-BNR-1F4TS0-CMPP-MST-000002 MST FOR INSTALLATION OF REFRIGERANT PIPING. 001 UR.

MATCHLINE - REFER TO DWG No. M-BNR-1F4TS0-CMPP-SDR-430403 M-BNR-1F4TS0-CMPP-MST-000003 MST FOR HYDRO TESTING OF CHILLED WATER PIPING 002 APP.
M-BNR-1F4TS0-CMPP-MST-000004 MST FOR LEAK TESTING OF REFRIGERANT PIPING 001 UR.
B04-092
UPE L1.02 V42
VOID V44 M-BNR-1F4TS0-CMPP-MST-000005 MST FOR FLUSHING AND CLEANING OF CHILLED WATER PIPING 001 UR.
VOID
M-BNR-1F4TS0-CMPP-MST-000006 MST FOR PAINTING OF CHILLED WATER PIPING 002 APP.
M-BNR-1F4TS0-CMPP-MST-000007 MST FOR INSTALLATION OF CHILLED WATER PUMPS 001 APP.

ABBREVIATIONS
H AHU AIR HANDLING UNIT FC FLEXIBLE CONNECTION H
AV AIR VENT (MANUAL) FCU FAN COIL UNIT
B.O.CT BOTTOM OF CABLE TRAY IV ISOLATING VALVE
BV BALL VALVE NC NORMALLY CLOSED
B.O.P BOTTOM OF PIPE OP ORIFICE PLATE
B04 CONCOURSE SHEET 2
LIMITED WAY AND PRIVATE USE PERMITTED BY AND WRITTEN CONSENT GIVEN BY CWJV TO THE BORROWER.

CH CHILLER PICV PRESSURE INDEPENDENT CONTROL VALVE


1 1 : 100
CHW F CHILLED WATER FLOW PMP PUMP
DOUBLE PIPE SUSPENDED FROM CEILING (CHILLED WATER) SCHEDULE CHW R CHILLED WATER RETURN REF REFRIGERANT
DESCRIPTION MATERIAL / FITTINGS
CV COMMISIONING VALVE STR STRAINER
Pipe Size Horizontal Channel Anchor Drop-Rod
(ZIIC)\Documents\M-BAR-1F4TS0-CMEP-BIM-000005_00C-MECH_Mohammed.Omar93CUX.rvt

PIPE SIZED 50MM AND BELOW: SCHEDULE 40 BLACK STEEL PIPE;THREADED FITTINGS AND JOINTS CS COMMISIONING STATION TO ABOVE
PIPE SIZES 65MM TO 300MM SHALL BE AS FOLLOWS: (mm) Span (m) Size Used Diameter (mm) TA
J SCHEDULE 40 BLACK STEEL PIPE; WELDED OR GROOVED FITTINGS; STEEL FLANGERS ,AND WELDED OR DC DRAIN COCK TB TO BELOW J
CHILLED WATER
GROOVED JOINTS 15 2 41X21X1.5mm WDI1L M10X40 M10 DRV DRAIN VALVE UN UNION
PIPE SIZES 350MM TO 400MM SHALL AS FOLLOW:
PIPES
ERW BLACK STEEL PIPE WITH A MINIMUM WALL THICKNESS OF 11.13MM FOR 350MM DIA. AND 12.7MM FOR TAG ROOM TAG SIZE (HxWxL) 20 2 41X21X1.5mm WDI1L M10X40 M10 DXU DIRECT EXPANSION UNIT 2MV TWO WAY MOTORISED VALVE
400MM DIA.;WROUGHT-STEEL FITTINGS AND WROUGHT-CAST OR FORGED-STEEL FLANGERS AND FLANGE CMAC-1F4TS0-B04-088 RI MECH 12-FCU-000132 B04-088 RI MECH 12 (244x610x1029) FA FROM ABOVE VP VALVE PACKAGE
FITTINGS AND WELDED AND FLANGED JOINTS. 25 2 41X21X1.5mm WDI1L M10X40 M10
PIPE SIZES 450MM TO 600MM SHALL AS FOLLOW: CMAC-1F4TS0-B04-068 COCP 02-FCU-000131 B04-068 COCP 02 (244x610x1029) FB FROM BELOW MAINTENANCE CLEARANCE FOR UNITS AS
ERW BLACK STEEL PIPE WITH A MINIMUM WALL THICKNESS OF 14.27MM;WROUGHT-CAST OR FORGED- CMAC-1F4TS0-B04-068 COCP 02-FCU-000129 B04-068 COCP 02 (305x652x1359) TYPICAL 2 PORT COIL CONNECTION DETAIL FOR FCU's 40 2.5 41X21X1.5mm WDI1L M10X40 M10 RECOMMENDED BY MANUFACTURER
STEEL FLANGERS AND FLANGE FITTINGS AND WELDED AND FLANGED JOINTS. NTS
50 3 41X21X1.5mm WDI1L M10X40 M10 DOP DOSING POT
65 3.4 41X41X1.5mm WDI1L M10X40 M10
CHWR IV DC CHILLED WATER PIPE INSULATION SCHEDULE CHILLED WATER COLOR LEGEND
UN FC 80 3.5 41X41X1.5mm WDI1L M10X40 M10
INSULATION THICKNESS DENSITY FINISH FEILD APPLIED VAPOUR RETARDER CHW F - CHILLED WATER FLOW PIPE WITH INSULATION
LOCATION M12
MATERIAL (mm) (kg/m3) JACKET REQUIRED 100 3.5 41X41X2.0mm WDI1L M12X50
K CHW R - CHILLED WATER RETURN PIPE WITH INSULATION K
BIM MODELC:\Users\za1077\OneDrive - Zamil Industrial Investment Co.

INSIDE BUILDING; CONCEALED, INSIDE SHAFTS MINERAL FOIL AND YES 125 3.5 41X41X2.0mm WDI1L M12X50 M12
UN FC 25 64 N/A
OR ABOVE LINEAR STRIPS SUSPENDED CEILING FIBER PAPER CRIT. CHW F - CRITICAL CHILLED WATER FLOW PIPE WITH INSULATION
150 3.5 41X51X2.0mm WDI1L M16X65 M16
INSIDE BUILDING EXPOSED TO VIEW MINERAL FOIL AND ALUMINUM
25 64 YES CRIT. CHW R - CRITICAL CHILLED WATER RETURN PIPE WITH INSULATION
OR INSIDE MECHANICAL ROOM FIBER PAPER JACKET 0.8 mm 200 3.5 41X51X2.0mm WDI1L M16X65 M16
CHWF IV DC
AV UN REFRIGERANT PIPE WORK TRAY
OUTSIDE BUILDING MINERAL 50 64 FOIL AND ALUMINUM
DETAIL A: TYPICAL 2 PORT COIL CONNECTION DETAIL FOR FCU's AND ACE's YES 300 1.6 41X51X2.0mm WDI1L M16X65 M16
FIBER PAPER JACKET 0.8 mm
HVAC EQUIPMENTS

RMTC STAMP REVISIONS BACS CONSORTIUM BACS STAMP DATE SCALE PAPER SIZE SHOP DRAWING TITLE
No Date Description Drawn Checked Approved
001 15 NOV 2022 ISSUED FOR APPROVAL MO SYB MJK
15 NOV 2022 1:100 A1 DEEP UNDERGROUND STATION
L L
SHOP DRAWING STATUS
LINE 1 - TRANSFER STATION 1F4
SHOP DRAWING
MECHANICAL
SUB-CONTRACTOR/VENDOR
CHW & CRITICAL CHW
RIYADH METRO PROJECT
B04 CONCOURSE SHEET 2
DRAWN BY CHECKED BY APPROVED BY SHOP DRAWING NUMBER REVISION
www.bacsrmp.com
NAME: MO NAME: SYB NAME: MJK

M This shop drawing has been Approved and Certified


M-BNR-1F4TS0-CMPP-SDR-430402 001 M
as acceptable on behalf of the BACS Consortium. DATE: 15 NOV 2022 DATE: 15 NOV 2022 DATE: 15 NOV 2022
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 001 v01
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DO NOT SCALE FROM THIS DRAWING


KEY PLAN
A N A

MAKKAH
1
4
2 6
A02
5
B A01 DD A03 A04 BD 3 B
CC

GENERAL NOTES:
1. ALL DIMENSIONS SHOWN IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
ø50 CRIT. CHW R TA 2. DRAWING TO BE READ IN CONJUNCTION WITH ALL ASMEP DRAWINGS AND
ø50 CRIT. CHW F FA
DESIGN BASIS REPORT AS ISSUED.
ø20 CHW R
Electronic drawings once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision.

C ø20 CHW F
3. ALL SECTIONS AND CALLOUTS DENOTED WITH 'CMEP' ARE LOCATED WITHIN THE C
COMBINED SERVICES 'CMEP' DRAWINGS.
MATCHLINE - REFER TO DWG No. M-BAR-1F4TS0-CM00-EDR-430401
4. DRAWING TO BE READ IN CONJUNCTION WITH LINE WIDE STANDARD DETAILS
PACKAGE ''M-BAR-000DS0-CM00-EDR-XXXXXX'' . ALL REFERENCES DENOTED WITH
'SD' ARE LOCATED WITHIN THIS PACKAGE.
B04-052
CORR 25

MATCHLINE - REFER TO DWG No. M-BAR-1F4TS0-CM00-EDR-430404


B04-053
UPE L1.03

B04-153
TP PLEN L1.01
B04-154

ESC 100007
CORR 80
D B04-058
D
ELV L1.01
B07

FCU-129
ø20 CHW F
ø20 CHW R
ø20 CHW R
B04-061 ø20 CHW F
E ELV L1.02
E

FCU-131
C11
ø15 CHW R
ø15 CHW F
1
______
809901
CMEP B04-068
COCP 02

F B06 F

ø15 CHW R

MATCHLINE - REFER TO DWG No. M-BAR-1F4TS0-CM00-EDR-430405


ø15 CHW F

B04-078
ELV L1.03

G G
TIMESTAMP 22/03/2018 13:05:49

FCU-132
AA
B04-085 B04-083 B04-084 B04-082
RIEH L5.06 RIEH L5.07 RI COM L5.05 RI ELEC 12
B04-117

ESC 100010
RI ELEC 13

B05
H H
B04-094
AB
RI ST 03
B04-090
B04-091 ESTR 60
TP PLEN L1.02

MATCHLINE - REFER TO DWG No. M-BAR-1F4TS0-CM00-EDR-430403


UPE L1.02
B04-092

ø25 CHW R FB
ø25 CHW F TB

J J

B04-095
ESTR 51

VFCU-45

BA CT1 C01 BB C02 BC


K K
BIM MODEL M-BAR-1F4TS0-CMEP-BIM-000004-Combined-Services.rvt

REVISIONS PROJECT BACS CONSORTIUM BACS APPROVAL SCALE PAPER DRAWING TITLE
SIZE
No
000 23/03/18
Date Description
ISSUED FOR CONSTRUCTION
Drawn
MG
Checked
PB
Approved
JB 1 : 100 A1 DEEP UNDERGROUND STATION
L L
DRAWING STATUS
LINE 1 - TRANSFER STATION 1F4
ISSUED FOR CONSTRUCTION MECHANICAL
CONSULTANT / SUB-CONTRACTOR
CLIENT
RIYADH METRO PROJECT This drawing has been Approved and COOLING
Certified as acceptable on behalf of the
www.bacsrmp.com BACS Consortium. B04 CONCOURSE SHEET 2
LEAD DESIGN ENTITY (LDE) APPROVED BY LDE DRAWN BY CHECKED BY APPROVED BY DRAWING NUMBER REVISION
NAME NAME NAME NAME

M M. GRAY P. BERRYMAN J. BATCHELOR M-BAR-1F4TS0-CM00-EDR-430402 000 M


© 2015 High Commission for the Development of ArRiyadh DATE DATE 23/03/2018 DATE 23/03/2018 DATE 23/03/2018
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 000v01

(WF-082813) - DCC Iconic Station - 28/03/2018