ROADS & BUILDINGS


DEPARTMENT

AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year


2023-24 in Medak district.

DETAILED ESTIMATE

AMOUNT OF ESTIMATE :: Rs. 1.45 Lakhs

(R&B) Division :: SANGAREDDY


(R&B) Circle :: SANGAREDDY
DETAILED CUM ABSTRACT ESTIMATE

Name of Work ::- AM to R&B roads in Shankarampet (A) Section for the year 2023-24 in Medak district.

Name of the road ::- AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year 2023-24 in Medak
district.

No. of Lanes Length in Km Rate/Km Amount in Rs.


Reach

Km 0/0 to km 1/0 2 1.00 30000.00 30000.00


Total Amount = Rs. 30000.00

MEASUREMENTS
Sno Description Quantity Rate Per Amount
No LENT BRDT DPT
1 2 3 4 5 6 7 8 9 10
Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with
required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for
filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips
and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the
1 edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing
and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all
operations etc., complete.

or say 60.00 sqm 225.00 1cum 13500.00

Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam
specification including cost, (excluding seigniorage) of all materials and including premixing the material with
water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with
Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the
3 desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for
finished item of work. (Payment will be made based on levels for finished item of work)

or say 2.00 cum 1608.00 1cum 3216


Clearing of light Jungle including all labour charges etc., complete for finished item of work.
4
or say 500 sqm 4.00 1sqm 2000.00
Making up loss of material/irregularities on the shoulder to the design level by adding fresh approved soil and
compacting with appropriate equipment as per MORT&H Specification No. 3003 with side earth
5

100 sqm 36.60 1 3660.00


PART-A Total :- 22376.00

Asst. Executive Engineer (R&B) Dy. Executive Engineer (R&B) Executive Engineer (R&B)
R&B Section Shankarampet(A) R&B Sub-Division Medak R&B Division Medak
ABSTRACT ESTIMATE

Additional repairs and renovations to residential quarters of senior and


junior civil Judges at Medak

Sl.
Name of the road Amount
No.
Part- A

1 Total Amount 782471.00

2 NAC @ 0.1% 783.00

3 Seignorage LS 35000.00

TOTAL 818254.00
Part- B

4 GST at 18% 147286.00

5 QC Charges @ 1% 8183.00

6 Labour Cess @ 1% 8183.00

7 Price Adjustment LS 45000.00

8 Land Scaping LS 50000.00

9 Electrical Items LS 50000.00

10 Price Sanitary arrengements LS 50000.00

8 LS for unforseen items and rounding off. 23094.00

TOTAL 1200000.00
0.00
ABSTRACT ESTIMATE

AM to roads of R&B section Kowdipally Package - I for the year 2022-23

Sl.
Name of the road Amount
No.

1 Jogipet - Ghanapur road from km 4/2 -4/8, 6/0- 8/0 & 15/0
- 23/4 274221.00

2
Kowdipally - Dumpalkunta road from km 0/0 to 10/6 70900.00

TOTAL 345121.00

3 LS for Seigniorae Charges ,DMF-30% &SMET-2% 25000.00

4 Add for NAC @ 0.1% 346.00


370467.00

5 GST @ 12% 44457.00

6 CESS @ 1% 3705.00

7 LS for fixing of guard stones etc. 80000.00

8 LS for unforseen items and rounding off. 1371.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Kowdipally Package - II for the year 2022-23

Sl.
Name of the road Amount
No.

1 Dharmasagar - Mangalparthy road from km 0/0 to 5/0 &


10/2 to 13/250 198918.00

2 Pothamsetty pally -Yeldurthy - Toopran road from km 0/0


99114.00
to 18/5

TOTAL 298032.00

3 LS for Seigniorae Charges ,DMF-30% &SMET-2% 12000.00

4 Add for NAC @ 0.1% 299.00


310331.00

5 GST @ 12% 37240.00

6 CESS @ 1% 3104.00

7 LS for fixing of HM, KM &Guard stones etc. 16000.00

8 LS for unforseen items and rounding off. 325.00

TOTAL 367000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Toopran Package - I for the year 2022-23

Sl.
Name of the road Amount
No.

1 Pothamsettypally -Yeldurthy-Toopran road from km 18/5


271680.00
to 38/0

2
Gouraram -Dandupally road from km 15/0 to 20/8 113720.00

TOTAL 385400.00

LS for Seigniorae Charges ,DMF-30% , SMET-2% & PF


3 27500.00

4 Add for NAC @ 0.1% 386.00


413286.00

5 GST @ 12% 49595.00

6 CESS @ 1% 4133.00

5 LS for fixing of missing HM,KM stones 30000.00

10 LS for unforseen items and rounding off. 2986.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Toopran Package - II for the year 2022-23

Sl.
Name of the road Amount
No.

1 Old NH-7 in (Dandupally village limits ) from km 448/360


26794.00
to 449/260

2 Shankarampet -Masaipet road from km 9/0 to 15/650


160785.00

3
Old NH-7 in (Toopran town limits ) from km 429/200 to
64665.00
435/800

TOTAL 252244.00

4 LS for Seigniorae Charges ,DMF-30% &SMET-2% 23000.00

5 Add for NAC @ 0.1% 253.00


275497.00

6 GST @ 12% 33060.00

7 CESS @ 1% 2755.00

8 LS for fixing of missing HM,KM stones 70000.00

9 LS for unforseen items and rounding off. 2688.00

TOTAL 384000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Narsapur for the year 2022-23

Sl.
Name of the road Amount
No.

1 Narsapur-Kuknoor road from km 0/0 to 21/2


280840.00

2 Pillutla PWD road to Shivampet PWD road from km 0/0 to


6/4 & 7/6 to 8/120 79534.00

TOTAL 360374.00

3 LS for Seigniorae Charges ,DMF-30% &SMET-2% 26500.00

8 Add for NAC @ 0.1% 361.00


387235.00

9 GST @ 12% 46469.00

9 CESS @ 1% 3873.00

5 LS for fixing of missing HM,KM stones & Guard stones 60000.00

10 LS for unforseen items and rounding off. 2423.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Medak for the year 2021-22

Sl.
Name of the road Amount
No.

1
Khajapur-Komtur road from km 0/0 to 14/160 173576.00

2
Medak - Sardana road from km 0/0 to 14/600 108586.00

3
Wadiyaram - Medak road from km 18/8 to 21/8 30196.00

TOTAL 312358.00

7 LS for Seigniorae Charges ,DMF-30% &SMET-2% 11000.00

8 Add for NAC @ 0.1% 313.00


TOTAL 323671.00

8 GST @ 12% 38841.00

9 CESS @ 1% 3237.00

10 LS for fixing of missing HM,KM stones 30000.00

11 LS for unforseen items and rounding off. 4251.00

TOTAL 400000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Ramayampet package 1 for the year 2022-23

Sl.
Name of the road Amount
No.

1 Wadiyaram - Medak road from km 0/0 to 5/8 150603.00

2 A M to Shankarampet(R ) to Khazipur of Mirdoddi Mandal 200773.00


via
Mirjapalli,Narsingi,Narsampally,Sutarpally,Tippangulla,Kal
vakunta road from km 14/2 - 25/4

TOTAL 351376.00

6 LS for Seigniorae Charges ,DMF-30% &SMET-2% 27000.00

7 Add for NAC @ 0.1% 352.00


378728.00

8 GST @ 12% 45448.00

9 CESS @ 1% 3788.00

10 LS for fixing of missing HM,KM stones 12000.00

11 LS for unforseen items and rounding off. 36.00

TOTAL 440000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Ramayampet package II for the year 2022-23

Sl.
Name of the road Amount
No.

1 Akkannapet-Uppulingapur road from km 20/4 to 23/0 63714.00

2 Shankarampet - Masaipet road from km 0/0 to 9/0 158044.00

3 Makkarajpet PWD road to NH-7 via Pothampally road 175086.00


from km 0/0 to 15/0

TOTAL 396844.00

4 LS for Seigniorae Charges ,DMF-30% &SMET-2% 35000.00

5 Add for NAC @ 0.1% 397.00


432241.00

6 GST @ 12% 51869.00

7 CESS @ 1% 4323.00

8 LS for fixing of missing HM,KM stones 10000.00

9 LS for unforseen items and rounding off. 1567.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Papannapet package - II for the year 2021-22

Sl.
Name of the road Amount
No.

1 Medak - Budmatpally road from km 0/0 to 35/5


418028.00

TOTAL 418028.00

7 LS for Seigniorae Charges ,DMF-30% &SMET-2% 8800.00

8 Add for NAC @ 0.1% 419.00


TOTAL 427247.00

8 GST @ 12% 51270.00

9 CESS @ 1% 4273.00

10 LS for fixing of missing HM,KM stones 15000.00

11 LS for unforseen items and rounding off. 2210.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Papannapet package - I for the year 2021-22

Sl.
Name of the road Amount
No.

1 Tekmal - Dhanoora road from km 0/0 to 5/4


33755.00

2 Narsingi - Kodapak road from km 0/0 to 9/3


166762.00

3 Papannapet - lingaipally road fromkm 0/0 to 7/7


53710.00

4 Elupugonda X road to Utloor X road from km 0/0 to 7/0


83771.00

5 Kothapally - Chintakunta road from km 0/0 to 15/0


86330.00

TOTAL 424328.00

7 LS for Seigniorae Charges ,DMF-30% &SMET-2% 14500.00

8 Add for NAC @ 0.1% 425.00


TOTAL 439253.00

8 GST @ 12% 52711.00

9 CESS @ 1% 4393.00

10 LS for fixing of missing HM,KM stones 0.00

11 LS for unforseen items and rounding off. 3643.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Shankarampet (A) packge - I for the year 2022-23

Sl.
Name of the road Amount
No.

1 Elupugonda X road to Utloor X road (via) Chikode from


km 7/0 to 14/920 143923.00

2 Alladurga feeder road from km 0/0 to 1/2


45531.00

3 Narsingi PWD road to Kolapally PWD road from km 0/0 to


10/430 98411.00

4 Dosapally - Gajawada road from km 0/0 to 7/0


76335.00

5 SNA PWD road to K.Venkatapur village from km 0/0 to


3/0 41164.00

TOTAL 405364.00

6 LS for Seigniorae Charges ,DMF-30% &SMET-2% 35500.00

7 Add for NAC @ 0.1% 406.00


441270.00

8 GST @ 12% 52953.00

9 CESS @ 1% 4413.00

10 LS for fixing of missing HM,KM stones & Guard stones 0.00

11 LS for unforseen items and rounding off. 1364.00

TOTAL 500000.00
ABSTRACT ESTIMATE

AM to roads of R&B section Shankarampet (A) packge - II for the year 2022-23

Sl.
Name of the road Amount
No.

3 Shankarampet - Narayankhed road (via) Bujrampally road


from km 0/0 to 7/0 119848.00

5 Chevella - Pocharam road from km 0/0 to 11/0


121687.00

7 Regode - Dugyal road from km 0/0 to 5/0


65027.00

8 Alladurga - Metlakunta road from km 0/0 to 2/0


24865.00

9 Narsingi - Shankarampet road from km 11/0 to 18/0


62798.00

TOTAL 394225.00

7 LS for Seigniorae Charges ,DMF-30% &SMET-2% 44000.00

8 Add for NAC @ 0.1% 395.00


438620.00

9 GST @ 12% 52635.00

9 CESS @ 1% 4387.00

5 LS for fixing of missing HM,KM stones & Guard stones 4000.00

10 LS for unforseen items and rounding off. 358.00

TOTAL 500000.00
the year 2022-23
the year 2022-23
he year 2022-23
he year 2022-23
ar 2022-23
r 2021-22
r the year 2022-23
r the year 2022-23
r the year 2021-22
the year 2021-22
or the year 2022-23
for the year 2022-23
AM to roads of R&B section Kowdipally Package - I for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

1 Jogipet - Ghanapur road from km 4/2 DL BT 11.00 30000.00


-4/8, 6/0- 8/0 & 15/0 - 23/4

2 Kowdipally - Dumpalkunta road from SL BT 10.60 24000.00


km 0/0 to 10/6

TOTAL
AM to roads of R&B section Kowdipally Package - II for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

SL BT 5.00 24000.00
SL BT 2.00 24000.00
1 Dharmasagar - Mangalparthy road DL BT 1.050 30000.00
from km 0/0 to 5/0 & 10/2 to 13/250

2 Pothamsetty pally -Yeldurthy - SL BT 7.00 24000.00


Toopran road from km 0/0 to 18/5

0.00
AM to roads of R&B section Toopran Package - I for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

1 Pothamsettypally -Yeldurthy-Toopran DL BT 19.50 30000.00


road from km 18/5 to 38/0

2 Gouraram -Dandupally road from km DL BT 5.80 30000.00


15/0 to 20/8
AM to roads of R&B section Toopran Package - II for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

1 Old NH-7 in (Dandupally village limits DL BT 0.90 30000.00


) from km 448/360 to 449/260

2 Shankarampet -Masaipet road from SL BT 6.65 24000.00


km 9/0 to 15/650

3 Old NH-7 in (Toopran town limits ) DL BT 6.60 30000.00


from km 429/200 to 435/800

0.00
AM to roads of R&B section Narsapur for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

DL BT 21.00 30000.00
1 Narsapur-Kuknoor road from km 0/0 SL BT 0.20 24000.00
to 21/2

2 Pillutla PWD road to Shivampet PWD SL BT 6.92 24000.00


road from km 0/0 to 6/4 & 7/6 to
8/120

TOTAL
AM to roads of R&B section Medak for the year 2021-22

Sl. Name of the road Lane Surface length Rate


No.

1 Khajapur-Komtur road from km 0/0 to SL BT 14.16 24000.00


14/160

2 Medak - Sardana road from km 0/0 to DL BT 14.60 30000.00


14/600

3 Wadiyaram - Medak road from km DL BT 3.00 30000.00


18/8 to 21/8

TOTAL
AM to roads of R&B section Ramayampet package 1 for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

1 Wadiyaram - Medak road from km DL BT 5.80 30000.00


0/0 to 5/8

2 A M to Shankarampet(R ) to Khazipur SL BT 11.20 24000.00


of Mirdoddi Mandal via
Mirjapalli,Narsingi,Narsampally,Sutar
pally,Tippangulla,Kalvakunta road
from km 14/2 - 25/4

TOTAL

0
AM to roads of R&B section Ramayampet package II for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

1 Akkannapet-Uppulingapur road from SL BT 2.60 24000.00


km 20/4 to 23/0

2 Shankarampet - Masaipet road from SL BT 9.00 24000.00


km 0/0 to 9/0

3 Makkarajpet PWD road to NH-7 via SL BT 15.00 24000.00


Pothampally road from km 0/0 to 15/0

TOTAL
AM to roads of R&B section Papannapet package - II for the year 2021-22

Sl. Name of the road Lane Surface length Rate


No.

1 Medak - Budmatpally road from km DL BT 35.50 30000.00


0/0 to 35/5

TOTAL
AM to roads of R&B section Papannapet package - I for the year 2021-22

Sl. Name of the road Lane Surface length Rate


No.

1 Tekmal - Dhanoora road from km 0/0 DL BT 5.40 30000.00


to 5/4

2 Narsingi - Kodapak road from km 0/0 SL BT 9.30 24000.00


to 9/3

3 Papannapet - lingaipally road fromkm SL BT 7.70 24000.00


0/0 to 7/7

4 Elupugonda X road to Utloor X road SL BT 7.00 24000.00


from km 0/0 to 7/0

5 Kothapally - Chintakunta road from DL BT 15.00 30000.00


km 0/0 to 15/0

TOTAL
AM to roads of R&B section Shankarampet (A) packge - I for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

1 Elupugonda X road to Utloor X road SL BT 7.92 24000.00


(via) Chikode from km 7/0 to 14/920

2 Alladurga feeder road from km 0/0 to DL BT 1.20 30000.00


1/2

3 Narsingi PWD road to Kolapally PWD SL BT 10.43 24000.00


road from km 0/0 to 10/430

4 Dosapally - Gajawada road from km SL BT 7.00 24000.00


0/0 to 7/0

5 SNA PWD road to K.Venkatapur SL BT 3.00 24000.00


village from km 0/0 to 3/0

TOTAL
AM to roads of R&B section Shankarampet (A) packge - II for the year 2022-23

Sl. Name of the road Lane Surface length Rate


No.

3 Shankarampet - Narayankhed road SL BT 7.00 24000.00


(via) Bujrampally road from km 0/0 to
7/0

5 Chevella - Pocharam road from km SL BT 11.00 24000.00


0/0 to 11/0

7 Regode - Dugyal road from km 0/0 to SL BT 5.00 24000.00


5/0

8 Alladurga - Metlakunta road from km DL BT 2.00 30000.00


0/0 to 2/0

9 Narsingi - Shankarampet road from DL BT 7.00 30000.00


km 11/0 to 18/0

TOTAL
Amount

330000.00

254400.00

584400.00
Amount

120000.00
48000.00
31500.00

168000.00

367500.00
Amount

585000.00

174000.00

759000.00
Amount

27000.00

159600.00

198000.00

384600.00
Amount

630000.00
4800.00

166080.00

800880.00
Amount

339840.00

438000.00

90000.00

867840.00
Amount

174000.00

268800.00

442800.00
for the year 2022-23

Amount

62400.00

216000.00

360000.00

638400.00
for the year 2021-22

Amount

1065000.00
for the year 2021-22

Amount

162000.00

223200.00

184800.00

168000.00

450000.00

1188000.00
I for the year 2022-23

Amount

190080.00

36000.00

250320.00

168000.00

72000.00

716400.00
II for the year 2022-23

Amount

168000.00

264000.00

120000.00

60000.00

210000.00

822000.00
0
55
DATAS FOR MAINTENANCE ITEMS - BT PATCH WORK ITEMS
AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year 2023-24 in Medak district.

2 Providing B.T. Patchwork for pot holes of depth ranging from 50 to 70mm, using 40mm HBT metal with
required quantity of 10-12mm size HBT key chips and VG-10 grade Bitumen at 42 Kgs./1Cum. of work for
filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBT chips and
VG-10 grade Bitumen at 72 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the
edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing
and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all
operations etc. complete.

Unit - 1Sqm. Quantity Rate Amount Rate Amount


Materials
Pot hole filling :
40mm HBG Metal 1.00 x 1.00 x 0.0495 Cum. 1081.51 53.53
0.045 x 1.10
10-12mm size HBG Key chips 1.00 x 1.00 x 0.045 0.00585 Cum. 1129.51 6.61
x 13/100

VG-10 Grade Bitumen 1.0 x 1.0 x 0.045 x 1.890 Kgs. 54957.25 103.87
42Kg/1Cum
(including Tack coat)
Sealing the Pot hole :
10-12mm size HBG chips 1.00 x 1.00 x 0.01995 Cum. 1129.51 22.53
0.015 x 1.33
Stone dust/Sand 1.0x1.0x 0.003 0.0030 Cum. 881.26 2.64
VG-10 Grade Bitumen 1.0 x 1.0 x 0.015 1.080 Kgs. 54957.25 59.35
x72Kg/1Cum

Add extra for wastage of materials and


recarting/inter-carting of materials @ 10% on the
cost of granite metal/chips

Labour Charges :
Pothole filling with 40mm HBG metal 2.86 X 545.00 0.045 Cum 1558.70 70.14

Sealing using 10-12mm 0.015 Cum 1558.70 23.38


Mobility, Conveyance ,carting/ recarting 15% on above 0.15 X 93.52 14.03
of men, material,machinery

T&P
Hire charges of bitumen boiler, cost of 0.045+0.015 0.060 40.00 2.40
fuel etc,

Add Seignorage charges Metal 0.0783 0.00 0.00


358.49
Say per 1 Sqm TOTAL 358.00
3 Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBT metal with
required quantity of 10-12mm size HBT key chips and VG-10 grade Bitumen at 72 Kgs./1Cum. of work for
filling the pot holes and sealing the filled up pot hole, including removal of the loose material in the pot holes,
trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting
and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur
charges for all operations etc. complete.

Unit - 1Sqm. Quantity Rate Amount Rate Amount


Materials
Pot hole filling :
20-25mm HBG Metal 1.0 x 1.0 x 0.0345 Cum. 1280.51 44.18
0.030 x 1.15
10-12mm size HBG Key chips 1.0x1.0x 0.030x 0.0039 Cum. 1129.51 4.41
13/100
56
Stone dust/Sand 1.00 x 1.00 x 0.0030 Cum. 881.26 2.64
0.003
VG-10 Grade Bitumen 1.0x1.0x0.030 x 2.160 Kgs. 54957.25 118.71
72Kg/1Cum
(including Tack coat)
Add extra for wastage of
materials and recarting/inter-
carting of materials @ 10% on
the cost of granite metal/chips

Labour Charges :
Sealing using 10-12mm 2.86 X 545.00 0.030 Cum 1558.70 46.76
Mobility, Conveyance,carting/ recarting 15% on above 0.15 X 46.76 7.01
of men, material,machinary

T&P
Hire charges of bitumen boiler, cost of 0.030 40.00 1.20
fuel etc,
Add Seignorage charges Metal 0.0414 0.00 0.00
224.91
Say per 1 Sqm TOTAL 225.00

5 Providing, Laying, Spreading and compacting graded HBT crushed stone aggregate to Wet Mix macadem
specification including cost of all materials and including premixing the material with water at OMC in
Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on
well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by
the Engineer-in-Charge and as per MoRT&H specification.406 (4th revision) for finished item of work.

Unit - 225 Cum. Quantity Rate Amount Rate Amount


Materials
45 mm to 22.40 mm metal (Av of 40-45,27-25,& 89.10 Cum 1210.85 107886.36
19-22 )
22.4 to 2.36 mm metal (Av. Of 19-22mm, 12-14mm, 9.5- 118.80 Cum 1099.11 130574.56
11.2mm, 5-7mm, 2.36 - 5mm )

2.36mm to 75 micron @ 30% (2.36mm & below) 89.10 Cum 881.26 78520.48

Machinery
Wet mix plant of 60 tonne hr. capacity 6.60 hr 0.00 0.00
Electric generating set 125 KVA 6.00 hr 1626.00 9756.00
front end loader 1 cum capacity 6.00 hr 2028.00 12168.00
Vibratory roller 3.90 hr 3535.00 13786.50
Water tanker 3.00 hr 769.00 2307.00
Labour Charges :
Mate 0.48 nos 580.00 278.40 9664.00
Mazdoor skilled 2.00 nos 589.00 1178.00 9074.00
Mazdoor 10.00 nos 545.00 5450.00 3840.00
Add Seignorage charges Metal 297.000 0.00 0.00
Cost per 225 cum 361905.30
Rate per I cum 1608.00
1608.47
DATAS FOR MAINTENANCE ITEMS - MAINTENANCE OF EARTHEN SHOULDERS
AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year 2023-24 in Medak district.

10 Stripping the excess soil from the shoulder surface to achieve the approved level for
sectioning the berms/ shoulders as per MORT&H Specification No. 3003

Unit : 1Sqm. Quantity Rate Amount


Taking out put of 100 Sqm. And assuming average depth
of stripping as 75mm, quantity of earth cutting involved =
7.50 Cum.
Labour :
Mate 0.10 M'day 580.00 58.00
Mazdoor 2.50 M'day 545.00 1362.50
Add sundries for caution boards, tools for ramming etc. L.S. 0.4
TOTAL 1420.90
Rate for 1Sqm. 14.21
Note : The earth stripped from earthen shoulders to be 14.20
dumped on the side slopes locally for disposal. 1 Sqm.
11 Making up loss of material/irregularities on the shoulder to the design level by adding
fresh approved soil and compacting with appropriate equipment as per MORT&H
Specification No. 3003 with Carted earth

Unit : 1Sqm. Quantity Rate Amount


Taking out put of 100 Sqm. And assuming average
thickness of filling to be 100mm,quantity of fresh
material/earth involved=15 Cum.
Labour :
Mate 0.18 M'day 580.00 104.40
Mazdoor 4.50 M'day 545.00 2452.50
Machinery :
Excavator 1.0 Cum. Bucket capacity @ 60Cum./1 Hr. 0.25 hours 3571.00 892.75
Tipper (L is average lead in Km. for borrow earth) = 24 x L = 24.00 t.Km. 8.00 192.00
(1 Km lead is considered, hence L=1)
Add 10% of cost of transportation to cover cost of loading and unloading 10% of 19.20
41.76
Add sundries for caution boards, tools for ramming etc. L.S. 3.56
TOTAL 3664.41
Rate for 1Sqm. 36.64
or say 36.60
1 Sqm.
12 Making up loss of material/irregularities on the shoulder to the design level by adding
fresh approved soil and compacting with appropriate equipment as per MORT&H
Specification No. 3003 with side earth

As per minutes of meeting in the chambers of E-in-C dt 10-05-2006


Rate as communicated per 1 Sqm 1 Sqm 3.00 3.00
TOTAL 3.00

3.00
3.00
1 Sqm.
13 Jungle clearance Juliflora Light /Scrub
Rate as per SSR 4.00 3.30
4.00 3.30
1 Sqm. 1 Sqm.
14 White washing 2 coat with best shell lime
cost of Shell lime 0.07 Cum 989.00 69.23
Mason 1.60 No 580.00 928.00
M.M. & W.M. 3.20 No 545.00 1744.00
Add LS for Jute, Gum,Blue neel etc., 4.26
2745.49
Rate/100Sqm 2745.49
Rate/1Sqm 27.50

26 Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side
slopes in accordance with requirements of lines , grades and cross sections etc., complete including
seignioarge charges for finished item of work for trench cutting as per MoRT&H specification 301(4 th
Revision) and as directed by the Engineer-in-Charge

Unit : Cum
Taking out put = 180 Cum Page 50 of MoRT&H SDB
(A) Labour
0.08 day Mate 580.00 day 46.40
2.00 day Mazdoor unskilled 545.00 day 1090.00
1136.40
(B) Machinery
180 Cum Rate as per G.O. Ms 13.00 cum 2340.00
No 10, Dt 26/7/2005

(C) Total of (A) + (B) 3476.40


Cost per 180 cum (A) + (B) 3476.40
Rate per Cum 19.31
Rate per 1 cum 19.30
1 Cum

33 Painting to two coats with synthetic enamel paint 1st quality including cost and conveyance of all
material and labour charges etc complete as directed by Engineer-In-Charge for KM Stones
Rate as per alrady approved rate in Division 104
Each

34 Painting to two coats with synthetic enamel paint 1st quality including cost and conveyance of all
material and labour charges etc complete as directed by Engineer-In-Charge for HM Stones
Rate as per alrady approved rate in Division 32
Each

35 Painting to two coats with synthetic enamel paint 1st quality including cost and conveyance of all
material and labour charges etc complete as directed by Engineer-In-Charge for Culvert numbering

Rate as per alrady approved rate in Division 32


Each
LEADS

Name of work : AM to R&B roads in Shankarampet (A) Section for the year 2023-23 in Medak
district.
Name of the road:- AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year 2023-24 in Medak
district.

Weighted Average lead for Bitumen

Vishakha refinery to 0/0 of SNA road = 603.90 Km


OnSNA road 0 to km 56.8 = 56.80 Km
Spreads in Km 0 to Km 1
Site average lead (1-0)/2 0.50 Km
Weighted average lead 661.20 Km
Say 661.00 Km

Weighted Average lead for Crusher(Qry at KM 43/4 Km 2.00 CT on SNA road )

Cart Track 1.10 x 2 = 2.20 Km


Lead on SNA road Km 43.40 to Km 51.80 = 8.40 Km
Site Spreads in Km 0 to Km 1
Site average lead (1-0)/2 0.50 Km
11.10 Km
Say 12.00 Km

(C) .WEIGHTED AVERAGE LEAD FOR SAND(Quarry at Km 125/2 + 0.20 on KKY road road)

Cart Track 1.10 x 0.20 = 0.22 Km


Lead on KKY Road road Km 125.20 to Km 138.60 = 13.40 Km
On HMB road Km 120.80 to Km 77.60 = 43.20 Km
On Medak Budmatpally road Km 0.00 to Km 35.50 = 35.50 Km
On SNA road Km 50.80 to Km 56.80 = 6.00 Km
Site Spreads in Km 0 to Km 1
Site average lead (1-0)/2 0.50 Km
98.82 Km
Say 99.00 Km

Asst. Executive Engineer, Dy. Executive Engineer, Executive Engineer,


R&B Section Shankarampet A R&B Sub-Division Medak (R&B) Division, Medak
ROAD METAL REPORT SSR 2023-24
AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year 2023-24 in Medak district.

Lead
Location Initial rate
Sl. charges Blasting Crushing Deduct I
Nature of metal of Lead less Total
No less charges charges km lead
quarry stacking
stacking

HBG Metal
65 mm IRC metal Av. Lead 12.00 209.48 493.00 90.00 - (36.967) 755.51 /Cum
40 - 45 mm IRC crushed 12.00 209.48 909.00 - - (36.967) 1081.51 /Cum
25 - 27 mm IRC crushed 12.00 209.48 1098.00 - - (36.967) 1270.51 /Cum
19 - 22 mm IRC crushed 12.00 209.48 1108.00 - - (36.967) 1280.51 /Cum
12 - 14 mm IRC crushed 12.00 209.48 1057.00 - - (36.967) 1229.51 /Cum
9.5-11.20 mm IRC crushed 12.00 209.48 957.00 - - (36.967) 1129.51 /Cum
5 - 7 mm IRC crushed 12.00 209.48 806.00 - - (36.967) 978.51 /Cum
2.36 - 5mm 12.00 209.48 705.00 - - (36.967) 877.51 /Cum
HBG Stone chips 2.36mm 12.00 209.48 567.00 141.75 (36.967) 881.26 /Cum
and below -
CRS stone 12.00 209.48 286.00 90.00 - (36.967) 548.51 /Cum
Rough stone 12.00 209.48 275.00 90.00 - (36.967) 537.51 /Cum

65mm SS-5 HBG 12.00 209.48 490.00 90.00 - (36.967) 752.51 /Cum

40mm SS-5 HBG 12.00 209.48 909.00 - - (36.967) 1081.51 /Cum

40mm SS-5 HBG m/c metal 12.00 209.48 909.00 - - (36.967) 1081.51 /Cum

20mm SS-5 HBG m/c metal 12.00 209.48 1108.00 - - (36.967) 1280.51 /Cum

12mm SS-5 HBG m/c metal 12.00 209.48 1057.00 - - (36.967) 1229.51 /Cum

10mm SS-5 HBG m/c metal 12.00 209.48 957.00 - - (36.967) 1129.51 /Cum

6mm SS-5 HBG m/c metal 12.00 209.48 806.00 - - (36.967) 978.51 /Cum

Sand for concrete 99.0 1365.75 662.00 - - (38.375) 1989.38 /Cum

Sand for mortar 99.0 1365.75 872.00 - - (38.375) 2199.38 /Cum

Gravel 5.00 102.28 109.00 - - (38.375) 172.90 /Cum

Bitumen VG-10 Packed vizag 661 1487.25 53470.00 - - - 54957.25 /MT


as on 1-12-2023 GST @12%
Cement 5400.00 per MT 5400.00 / Cum
Bricks (TBSC-A.I-01) 9000.00 /1000 No
HYSD Bars Fe-500 55000.00 55000.00 / MT
Mild Steel ( 6 mm) 57000.00 57000.00 / MT
For Graded Metal
60% of 20mm metal 768.31
15% of 12mm metal 184.43
15% of 10mm metal 169.43
10% of 6mm metal 97.85
1220.01
Name of Work :- AM to Alladurg Feeder road from km 0/0 to km 1/0 for the year 2023-24 in Medak district.

Earth/ Gravel Metal/ Stone Sand


S.No Unit Quantity cum cum cum
Factor Quantity Factor Quantity Factor Quantity
1 2 3 4 5 6 7 8 9 10

2 Patch Work above 50-70 mm depth 1 sqm 0.078 0.00

3 Patch work 25 - 35 mm depth 1 sqm 60.00 0.040 3.99


3 Wet Mix Macadam 1 cum 2.00 0.000 0.00 1.320 2.64
4 Making up loss of material 1 sqm 100.00 0.100 10.00 0.000 0.00
Total Quantity 10.00 6.63 0.00
Rate 30.00 97.50 40.50
Amount Rs 300.00 646.00 0.00
Transportation charges 0.00
Total Amount Rs 946.00
DMF & SMET 32% 302.72
1248.72

Assistant Executive Engineer Dy. Executive Engineer Executive Engineer


(R&B) Section, Shankarampet(A) (R&B) Sub-division, Medak (R&B) Division, Medak
LEAD CHARGES Cost of Materials, Labour
Earth/ Metal
Gravel/Sand
loading 63.372 119.350 1.13615 Material Rates
unloading 19.28 19.28 65 mm IRC & MoRTH HBG metal
stacking 0.000 0.000 50 to 55 mm IRC & MoRTH HBG metal
0.25 0.000 0.000 40 to 45 mm IRC & MoRTH HBG M/C metal
0.5 0.000 0.000 Granite for SS revetment 300 mm
1 38.375 36.967 Granite for SS revetment 225 mm
2 53.690 51.754 SS Revetment work 225mm
3 71.557 71.557 SS Revetment work 300mm
4 86.872 86.872 SS Revetment work 450mm
5 102.275 102.275 Laterite for Revetment 225mm
6 117.590 117.590 Laterite for Revetment 300mm
7 132.905 132.905 Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
8 148.220 148.220 Av. Of rate 25mm & 40mm
9 163.535 163.535 150 mm soling stone HBG metal
10 178.850 178.850 40 to 45 mm IRC & MoRTH HBG M/C metal
11 194.165 194.165 25 to 27 mm IRC & MoRTH HBG M/C metal
12 209.479 209.479 19 to 22 mm IRC & MoRTH HBG M/C metal
13 224.794 224.794 12 to 14 mm IRC & MoRTH HBG M/C metal
14 240.109 240.109 9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
15 255.424 255.424 5 to 7 mm IRC & MoRTH HBG M/C metal
16 270.739 270.739 2.36 to 5 mm IRC & MoRTH HBG M/C metal
17 286.054 286.054 HBG Stone chips 2.36mm and below
18 301.369 301.369 Gravel
19 316.684 316.684 40 mm SS-5 m/c HBG metal
20 331.998 331.998 25 mm SS-5 m/c HBG metal
21 347.313 347.313 20 mm SS-5 m/c HBG metal
22 362.628 362.628 12 mm SS-5 m/c HBG metal
23 377.943 377.943 10 mm SS-5 m/c HBG metal
24 393.258 393.258 6 mm SS-5 m/c HBG metal
25 408.573 408.573 Sand for concrete
26 423.888 423.888 Sand for Filling
27 439.203 439.203 HYSD Steel
28 454.517 454.517 Mild Steel
29 469.832 469.832 Cement
30 485.147 485.147 Mild Steel 6mm
31 497.910 497.910 Blasting charges
32 510.672 510.672 Blasting charges
33 523.434 523.434 Blasting charges for rough stone
34 536.197 536.197 Seigniorage charges
35 548.959 548.959 Metal
36 561.722 561.722 Gravel/earth
37 574.484 574.484 Sand
38 587.246 587.246 Labour Rates
39 600.009 600.009 Mate (Mason second class)
40 612.771 612.771 Mazdoor skilled (Mason 1 st class)
41 625.534 625.534 Mazdoor
42 638.296 638.296 Machinery Rates
43 651.058 651.058 Dozer (D 80)
44 663.821 663.821 Motor grader
45 676.583 676.583 Hydralic excavator
46 689.346 689.346 Front end loader 1 cum capacity
47 702.108 702.108 Tipper 5.5 cum per Hour
48 714.870 714.870 Vibratory roller 8T
49 727.633 727.633 smooth wheeled roller 8 Ton
50 740.395 740.395 Water tanker 6 KL
51 753.158 753.158 Tractor
52 765.920 765.920 Tractor with Rotavator
53 778.682 778.682 Tractor with ripper attachment @ 60 cum per hour
54 791.445 791.445 Air compressor
55 804.207 804.207 Wet mix plant of 60 TPH
56 816.970 816.970 Mechanical broom Hydraulic
57 829.732 829.732 Bitumen pressure distributor
58 842.494 842.494 Emulsion pressure distributor
59 855.257 855.257 Hot mix/Batch Mix Plant 100 TPH
60 868.019 868.019 Mechanical Paver finisher
61 880.782 880.782 Hydraulic chip spreader
62 893.544 893.544 Tandem road roller.
63 906.306 906.306 Pneumatic road Roller
64 919.069 919.069 GSB Plant 50 Cum
65 931.831 931.831 Generator 250 KVA
66 944.594 944.594 Generator set 125 KVA
67 957.356 957.356 Generator set 100 KVA
68 970.118 970.118 Generator set 30 KVA
69 982.881 982.881 Concrete mixer 0.28 cum
70 995.643 995.643 Tipper 5.5 cum per tonne Km
71 1008.406 1008.406 Tipper 5.5 cum per Km
72 1021.168 1021.168 Plate compactor/Power rammer
73 1033.930 1033.930 Sand for Mortar
74 1046.693 1046.693 RR masonary -G
75 1059.455 1059.455 CRS-23.a
76 1072.218 1072.218 Guard Stones ( 1200 x 200 x 200 mm )
77 1084.980 1084.980 Guide Stones ( 800 x 150 x150 mm )
78 1097.742 1097.742 65mm size (SS 5)
79 1110.505 1110.505 65 mm size ( IRC and MORTH )
80 1123.267 1123.267 Shell lime slaked and screened
81 1136.030 1136.030 Clearing heavy Jungle
82 1148.792 1148.792 Clearing light Jungle
83 1161.554 1161.554 Clearing Scrub Jungle
Clearing Juliflora (Prosafis) jungle including up-
84 1174.317 1174.317 rooting and removing of Juliflora stumps
White washing and colour banding for guard and
85 1187.079 1187.079 guide stones including cost of materials
86 1199.842 1199.842
87 1212.604 1212.604
88 1225.366 1225.366 Tipper 10Tonne capacity for carriage of stone
89 1238.129 1238.129 chips from stock pile on road side to chip
90 1250.891 1250.891 spreader
91 1263.654 1263.654
92 1276.416 1276.416 Synthetic Enamel Paint
93 1289.178 1289.178 Painter -Class I
94 1301.941 1301.941 Painter -Class II
95 1314.703 1314.703 Black Smith
96 1327.466 1327.466 Batch mix plant 100 TPH
97 1340.228 1340.228 PVC pipes of 110mm dia
98 1352.990 1352.990 Binding wire
99 1365.753 1365.753 AC pipes
100 1378.515 1378.515 NP3 pipes
101 1391.278 1391.278 Painting
102 1404.040 1404.040 CRS granite
103 1416.802 1416.802 Rough stone for RR granite
104 1429.565 1429.565 Bond stone
105 1442.327 1442.327 Mastic 25.4 mm (filler board -25 mm)
106 1455.090 1455.090 Mastic 12.7mm (filler board -18 mm)
107 1467.852 1467.852 Hydero static sensor Paver finisher
108 1480.614 1480.614 Sand for concrete
109 1493.377 1493.377 Sand for mortor
110 1506.139 1506.139
111 1518.902 1518.902
112 1531.664 1531.664
113 1544.426 1544.426
114 1557.189 1557.189
115 1569.951 1569.951
116 1582.714 1582.714
117 1595.476 1595.476
118 1608.238 1608.238
119 1621.001 1621.001
120 1633.763 1633.763
121 1646.526 1646.526
122 1659.288 1659.288
123 1672.050 1672.050
124 1684.813 1684.813
125 1697.575 1697.575
126 1710.338 1710.338
127 1723.100 1723.100
128 1735.862 1735.862
129 1748.625 1748.625
130 1761.387 1761.387
131 1774.150 1774.150
132 1786.912 1786.912
133 1799.674 1799.674
134 1812.437 1812.437
135 1825.199 1825.199
136 1837.962 1837.962
137 1850.724 1850.724
138 1863.486 1863.486
139 1876.249 1876.249
140 1889.011 1889.011
141 1901.774 1901.774
142 1914.536 1914.536
143 1927.298 1927.298
144 1940.061 1940.061
145 1952.823 1952.823
146 1965.586 1965.586 200
147 1978.348 1978.348 53
148 1991.110 1991.110 94
149 2003.873 2003.873 132
150 2016.635 2016.635 84
151 2029.398 2029.398 175.5
152 2042.160 2042.160
153 2054.922 2054.922
154 2067.685 2067.685
155 2080.447 2080.447
156 2093.210 2093.210
157 2105.972 2105.972
158 2118.734 2118.734
159 2131.497 2131.497
160 2144.259 2144.259
161 2157.022 2157.022
162 2169.784 2169.784
163 2182.546 2182.546
164 2195.309 2195.309
165 2208.071 2208.071
166 2220.834 2220.834
167 2233.596 2233.596
168 2246.358 2246.358
169 2259.121 2259.121
170 2271.883 2271.883
171 2284.646 2284.646
172 2297.408 2297.408
173 2310.170 2310.170
174 2322.933 2322.933
175 2335.695 2335.695
176 2348.458 2348.458
177 2361.220 2361.220
178 2373.982 2373.982
179 2386.745 2386.745
180 2399.507 2399.507
181 2412.270 2412.270
182 2425.032 2425.032
183 2437.794 2437.794
184 2450.557 2450.557
185 2463.319 2463.319
186 2476.082 2476.082
187 2488.844 2488.844
188 2501.606 2501.606
189 2514.369 2514.369
190 2527.131 2527.131
191 2539.893 2539.893
192 2552.656 2552.656
193 2565.418 2565.418
194 2578.181 2578.181
195 2590.943 2590.943
196 2603.705 2603.705
197 2616.468 2616.468
198 2629.230 2629.230
199 2641.993 2641.993
200 2654.755 2654.755
bour

New
493.00
544.00
909.00
164.00
1612.00
168.00
173.00
143.00
124.00
145.00
198.00

85.00

100.00
909.00
1098.00
1108.00
1057.00
957.00
806.00
705.00
567.00
109.00
909.00
1098.00
1108.00
1057.00
957.00
806.00
662.00
662.00

100.00

97.50
30.00
40.50

610.00
580.00 589.00 183 406 589
545.00

3168.30
3962.00
3571.00
2028.00
1278.00
3535.00
1758.00
769.00
512.00
520.00
625.00
714.00
2028.00
440.00
1846.00
1059.00
38683.00
2771.00
3163.00
2028.00
1581.00
1408.00
2279.00
1626.00
1387.00
1336.00
686.00
8.00
80.00
59.00
872.00
275
286
107
74
493
493
989
0
0
0

240.00
700.00
580.00
605.00
38683.00
189.00 189.667
85.00
sheet
sheet
228.00
286.00
275.00
0.00
0.00
0.00
3770.00
662.00
872.00
DATA FOR 5 th KM ,KM & HM STONES

12.8 1500, 1700 & Plain/Reinforced Cement Concrete in Open Foundation complete as per
2100
Drawing and Technical Specifications.
A PCC Grade M15
Unit = cum
Taking output = 15 cum
a) Material
Cement tonne 4.130 5400.00 22302.00
Coarse sand cum 6.750 1989.38 13428.30
40 mm Aggregate cum 8.100 1081.51 8760.25
20 mm Aggregate cum 4.050 1280.51 5186.08
10 mm Aggregate cum 1.350 1129.51 1524.84
b) Labour
Mate day 0.860 580.00 498.80
Mason day 1.50 610.00 915.00
Mazdoor day 20.00 545.00 10900.00
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum) hour 6.00 686.00 4116.00
Generator 63 KVA (100 KV) hour 6.00 1387.00 8322.00
75953.27
d) Formwork @ 4 per cent on cost of concrete i.e. cost of material, 3038.13
labour and machinery
say 78991.40 Per 15 cum

5266.09 Per cum

13.6 1600 & 2200 Supplying, fitting and placing HYSD bar reinforcement in sub-structure
complete as per drawing and Technical Specifications
Output: MT
Taking output = 1 MT
a) Material
HYSD bars including 5 per cent overlaps and wastage tonne 1.050 55000.00 57750.00
Binding wire kg 6.00 85.00 510.00
b) Labour for cutting, bending, shifting to site, tying and placing in position
Mate day 0.340 580.00 197.20
Blacksmith day 2.00 605.00 1210.00
Mazdoor day 6.50 545.00 3542.50
63209.70 Per MT
63.21 Per Kg

3.13 304 Excavation for Structures


Earth work in excavation of foundation of structures as per drawing and
technical specification, including setting out, construction of shoring and
bracing, removal of stumps and other deleterious matter, dressing of sides
and bottom, backfilling the excavation earth to the extent required and
utilising the remaining earth locally for road work.

(i) Ordinary soil


Unit = cum
Taking output = 10 cum
A Manual Means (Depth upto 3 m)
a) Labour
Mate day 0.320 580.00 185.60
Mazdoor day 8.00 545.00 4360.00
4545.60 Per 10 cum
say 454.56 Per cum

8.8 803 Painting Two Coats on New Concrete Surfaces


Painting two coats after filling the surface with synthetic enamel paint in all
shades on new plastered concrete surfaces

Unit = sqm
Taking output = 40 sqm
a) Labour
Mate day 0.120 580.00 69.60
Painter day 2.00 616.00 1232.00
Mazdoor day 1.00 545.00 545.00
b) Material
Litre 6.00 240.00 1440.00
Paint conforming to requirement of clause 803.3.

3286.60 Per 40 Sqm


82.16 Per Sqm
8.3 801 Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint
black or any other approved colour to give an even shade

8.3 (ii) English and Roman


Hyphens and the like not to be measured and paid for
Detail for 100 letters of 16 cm height. i.e.1600 cm
Unit = per cm height per letter
a) Labour
Mate day 0.070 580.00 40.60
Painter Ist class day 1.250 700.00 875.00
Mazdoor day 0.50 545.00 272.50
b) Material
Paint Litre 0.50 240.00 120.00
1308.10 Per 1600 sq
Cost for 1600 cm = a+b+c+d 0.82 Per cm
sq cm

8.14 804 Kilometre Stone


Reinforced cement concrete M15grade kilometre stone of standard design
as per IRC:8-1980, fixing in position including painting and printing etc

(i) 5th kilometre stone (precast)


Unit = Nos.
Taking output = 6 Nos.
a) M-15 grade of concrete cum 2.350 5266.09 12375.32 Item 12.8 (A)
b) Steel reinforcement @ 5 kg per sqm kg 22.080 63.21 1395.67 Item 13.6
c) Excavation in soil for foundation cum 1.680 454.56 763.66 Item/1000
No. 3.13
d) Painting two coats on concrete surface sqm 9.850 82.16 809.33 Item 8.8
per cm
e) Lettering on km post (average 30 letters of 10 cm height each) per 1800.00 0.82 1471.61 Item 8.3
letter
Transportation and fixing
f) Labour
Mate day 0.260 580.00 150.80
Mason day 0.60 610.00 366.00
Mazdoor including loading/unloading day 6.00 545.00 3270.00
g) Machinery
Tractor-trolley hour 6.00 512.00 3072.00
Cost for 6 Nos. 5th km stone 23674.39
Rate for each 5th km stone 3945.73 EACH
3946.00
8.14 (ii) Ordinary kilometer stone
Unit = Nos.
Taking output = 14 Nos.
a) M-15 grade of concrete cum 3.770 5266.09 19853.17 Item 12.8 (A)
b) Steel reinforcement @ 5 kg per sqm kg 26.320 63.21 1663.68 Item 13.6
c) Excavation in soil for foundation cum 2.770 454.56 1259.13 Item/1000
No. 3.13
d) Painting two coats on concrete surface sqm 11.410 82.16 937.50 Item 8.8
per cm
0.82 1373.50 Item 8.3
e) Lettering on km post ( average 12 letters of 10 cm height each) per 1680.00
letter
Transportation and fixing
f) Labour
Mate day 0.320 580.00 185.60 L-12
Mason day 1.00 610.00 610.00 L-11
Mazdoor day 7.00 545.00 3815.00 L-13
g) Machinery
Tractor-trolley hour 6.00 512.00 3072.00 P&M-053
Cost for 14 Nos. ordinary km stone 32769.59
Rate for each ordinary km stone 2340.68
2341.00
8.14 (iii) Hectometer stone (precast)
Unit = Nos.
Taking output = 33 Nos.
a) M-15 grade of concrete cum 1.580 5266.09 8320.43 Item 12.8 (A)
b) Steel reinforcement @ 5 kg per sqm kg 66.00 63.21 4171.84 Item 13.6
/1000
c) Excavation in soil for foundation cum 1.390 454.56 631.84 Item No. 3.13

d) Painting two coats on concrete surface sqm 6.270 82.16 515.17 Item 8.8
per cm 0.82 269.80 Item 8.3
e) Lettering on km post (average 1 letter of 10 cm height each) per 330.00
letter
Transportation and fixing
f) Labour
Mate day 0.340 580.00 197.20 L-12
Mason day 1.500 610.00 915.00 L-11
Mazdoor day 7.00 545.00 3815.00 L-13
g) Machinery
Tractor-trolley hour 6.00 512.00 3072.00 P&M-053
Cost for 33 Nos. Hectometer stone 21908.28
Rate for each Hectometer stone 663.89
664.00
2.3 201 Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass,
bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps
of trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, up to a lead of 1000 metres
including removal and disposal of top organic soil not exceeding 150 mm in
thickness.

Unit = Hectare
Taking output = 1 Hectare
(i) By Manual Means:-
A In area of light jungle
a) Labour
Mate day 6.00 580.00 3480.00
Mazdoor day 150.00 545.00 81750.00
b) Machinery
Tractor-trolley hour 1.00 512.00 512.00
Rate per Hectare 85742.00
8.57
SAY 8.20
2.3 (ii) By Mechanical Means
A In area of light jungle
a) Labour
Mate day 0.160 550.00 88.00
Mazdoor day 4.00 520.00 2080.00
b) Machinery
Dozer 80 HP with attachment for removal of trees & stumps hour 10.00 3099.00 30990.00
Tractor-trolley hour 1.00 512.00 512.00
Rate per Hectare 33670.00
3.367
SAY 3.30