DR Documents - Rev 7 Updated
DR Documents - Rev 7 Updated
DR Documents - Rev 7 Updated
(Completion at Pilot Stage except points related to RAR, negative list of pilot, RAR)
VENDOR NAME : DATE:
PART NUMBER : DOC. TYPE
PART DESC: REV No: 08 / 16.06.2023
2 List of major revisions, changes in part during development (with details and reason for changes)
5 DRBFM / PRBFM
11 Q -Defect mapping check sheet (past trouble database) & cognizence of all points for the subject
part
12 Distinct changes from existing parts - list and details
16 QA /QM Matrix
17 CTQ Parameters
18 Process capability- Cp / CpK reports for CTQ parameters like solder paste height, solder tip
temprature, reflow temperature or any other equivalent CTQ parameters.
19 Stage Inspection Check sheets
(To be made on separate sheet for each stage operation)
20 Test bench, Gauge, fixtures & instruments list with identification nos.,Calibration status(done
date,due date etc)
21 Poka - Yoke list & its horizontal deployment
31 Component Identification Mark ( V.code , Part number, part traceability ,Date etc )
32 Action completed for negative issues/ improvement points during Proto/PP/P/Cuft etc…
39 RAR Audit - Improvement points & their corrective action sheet & SOP ckearance ( (39a to 39c)
Plant head(Supplier)
BAL R &D CD :
DR 4 19 DR 4 report ( exceptions to be
approved)
CUFT production
5. Production Preparation
Part Name-
Part No.-
Prepared By
ECN/ Drawing Revisions
Model-
Date-
24
6 Model name Warranty
52 QSR
7 Model name
26
9 Model name Development
30
10 Model name Potential
Supplier LOGO
PART NAME :
APPLICATION :
SR.
PART VALUE.
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Remarks : .
BAL CFT APPROVAL
SR.No D.epartment
1 R&D
2 CD
3 Purchase
4 4 Purchase QA
Proto Sample:
STATUS: Tooled Up/ Pilot Lot :
Production:
CUSTOMER: BAJAJ AUTO LTD.
PART NO.:
MOD. NO: 00
SUPPLIER
Package
MAKE
Date BAL APPROVAL STAMP
BILL OF M
SUPPLIER DRG. NO.:
SUPPLIER DRG. MOD.:
SUPPLIER DRG. DATE.:
SUPPLIER
PART NO.
BAL APPROVAL STAMP
BILL OF MATERIA
DRG. APPROVAL DATE
PART LIST REF. NO.:
PART LIST REV. NO.:
PART LIST REV. DATE:
DISTRUBUTOR NAME PPM UNIT
VENDOR CFT APPROVAL
Designation/
Department Name of Person
Model:
Component Name/ No. : Mod. :
Process Stage :
DATE: / / .
Output Conditions
Supplier / Plant : Supplier Code Other approval Date (if reqd.) Other Approval Date. Customer :
Part / Process M/c,Device Charectrestics Customer Methods Control Resp Reaction Correcti
Process Name Jig,Tools Specific Product Evaluation / Error Sample Method Plan ve
No. /Operation for Mfg. Product Process Reqmt. /Process Measurement Proofing Size Freq. Action.
Desc. Specification. Technique
Warranty Applica
Model Defect / Root cause Countermeasure taken bility
Inhouse (Y/N)
Note: Consider all failures indicated in PRBFM for External Customer Complaints and QSR for Internal Customer Complaint
Development Engineer ( Vendor )
FECT MAPPING OF EARLIER COMPONENTS
DATE: / / .
Base Specifications /
model & Description of Specifications / Parameters Parameters- Existing
part no. Product
Prepared by
omponent wrt most similar existing component)
Changed Specifications /
Parameters - new model Remarks
component
Approved by
13. MANUFACTURABILITY STUDY
Model :
Component Name/ No. : Mod. : DATE : / / .
Sr Problem areas in Production Processes Proposed Counter measures BAL CD/R&D Response
No (Hard to make, Problems with
Equipment,Standardisation,Process
capability)
Product parameter
(CTQ)
Machine
Method
abnormality specification method
Tool
Matl
Man
Part Name.:
Part No.:
Class of Characteristics
Critical (I) Safety (S)
Sr Q Requirements Characteristics
Regulatory(R)
Major(M)
Performance / Functional
Fitment
Appearance
Development Engineer ( Vendor )
17. CTQ (Critical To Quality Requirements - Critical dimension/parameter matrix)
Rev.
Checking Method
Specifications
Development Engineer ( BAL )
matrix)
Vendor :
Sheet : 1 of 1
Frequency
Remarks
Cp, Cpk, Xbar R Chart, HISTOGRAM for CTQ parameters like solder paste hei
reflow temperature or any other equivalent CTQ parameters to be attached
e solder paste height, solder tip temperature,
to be attached
Stage Inspection Check sheets (first /middle /last piece inspection reports)
(To be made on separate sheet for each stage operation)
ection reports)
Vendor format can be used.
Should cover-
1.Test Benches
2.Gauges
3.Instruments
4.Fixtures
Applicability
S.No. Process POKAYOKE Details
(Y/N)
Prepared by
21. POKA-YOKE & KAIZEN List
POKAYOKE
Type- Verification
POKAYOKE verification Method PM plan
Preventive/ Frequency
Detective
Note : Include details of raw material ( Steel, Alluminium, Plastic, Rubber ) and Paint, thinner, plating chemicals.
Include details of Special process Vendors if outsorced ( HT, Painting, Plating )
Model: DATE: / / .
Specification/ target
Actual part Weight
Weight
S.No. (in Kg upto min. 3
(in Kg upto min. 3
decimals)
decimals)
10
HBM (Human body model) and CDM (Charged device model) has to be
2
identified and based upon the same ESD spec for floor has to be decided.
Parts are stored, transferred, and packaged in ESD bins, racks, magazine
7
trolley, trays bags, etc...
Mechanical and electrical noise are not allowed in clean room, Check points
6
are to be monitored periodically - 3 months min.
Components must be used within stated shelf life dates with no signs of
2
oxidation on component / board solderable surface.
Industrial refrigerator, dehumidifier, AC, Backing oven & windows are needs
7
of the clean room and stores.
Supplier has comprehensive soldering Operators are trained and certified for each job requirement and identified for
2 training program type of job assignment through badge or other methods.
Operator Training
Supplier must conform to
3 IPC A 610G and IPC 7711/7721 Supplier has to demonstrate multi skilling strategy for critical stations.
IPC A610G, Zero defect soldering should be known to Printer, ICT, AOI,
4
Soldering & rework operators.
Assembly Materials
Meet requirements for material selection, Final finish, Surface plating and
8 PCB
Coating thickness as per IPC 6012 and PCB warpage as per TM-650.
PCBs marked with bar code labels or serial numbers or 2D data matrix or
12
Supplier has appropriate traceability tracked by lot numbers.
Traceability system for PCBs, components and final
product Electronic identification (flash memory, bit writing) for tracking pass/fail
13
criteria as applicable.
Supplier has appropriate handling Boards in storage racks are nested / separated with no contact to populated
Handling 16
methods for PCB assemblies areas.
PCB Loader
1 Teknek or equivalent auto cleaning for 100% bare PCBs, Set up?
PCBs cleaning station with ionized air (blow off and vacuum system) or other
5 PCB Loadling 2 PCBs are clean prior to screen print
cleaning methods like antistatic brush or antistatic tape.
Solder paste containers are labeled to track date and time for storage, usage
4
and expiration.
Supplier uses automated solder paste Automated process required - manual process not recommended
5
application Automated fudicial check is recommended.
Supplier has appropriate methods for Visual inspection of stencil apertures for solder paste residue after cleaning
9
stencil cleanliness (Illuminating table with air gun is recommended for inspection)
Solder paste must have uniform appearance (roller) with no signs of separation
13
(while squeezy up ) and must be at room temperature for each print.
Supplier has appropriate controls for Measure or visually inspect solder paste height, registration, % pad coverage,
15
required solder paste coverage bridging and voids (Min coverage should be 75% of the pad)
22 All the apertures are to be covered with shrink rap from both the sides.
Tension on all four ends of the stencil should be checked at end of the shift /
23
Supplier is maintaining stencil with change over.
proper care
Cleaning of the stencil before stacking should be done at every end of the shift
24
/ change over
Verification of the stencil should be done for all the apertures before stacking
25 at end of the shift / change over (Illuminating table with inclined surface is
required)
29 Solder paste preparation (Extraction) Manual stirring is preferred to ensure proper solderability
35 Dust entry after paste printing No open section between printer and pick and place machine conveyor
36 Air pressure down pokayoke In case air pressure reduces machine should stop
37 Nozzel calibration NXT machine like facility of self suction and calibration
Supplier has controls for changing and If not, 200% inspection during reel loading/tray change-over (Splicing)
2
placing component reels documented on log sheet with two signatures required.
Next generation Pick and place machines are preferred in which splicing can
3
be eliminated.
Critical placement components (smallest SMD and fine pitch ICs) meet initial
4
Ppk> 1.67 and on-going production Cpk > 1.33
Supplier has a capable component
placement process
5 Equipment placement capability verified prior to run@rate.
100% High speed camera for proper component alignment and identification if
6
possible.
100% High speed camera for proper component alignment and identification if
9
possible.
Does the mounting machine have the
ability to inspect for QFPs lead
coplanarity before mounting ? Supplier to use 2-D inspection (3X magnifying light), 3-D inspection
10 (Automatic Optical Inspection), trend tracking capability or industry accepted
method to verify correct components placement.
100% High speed camera for proper component alignment and identification if
11
If BGAs used , does the mounting possible.
8 Pick & Place machine have the ability to inspect the
balls before mounting, and what do you
Page 84
Reflow
9 Reflow Equipment has alarm system for out of control conditions, UPS ?
6
(Power cut, conveyer width variation, etc..).
AOI
Automatic Optical Re- teaching/Part alarm should come if continue 3 parts failed for more than
10 5
Inspection either 5 or 5 % of the parts failing in AOI.
Manual Insertion
Confirmation of parts inserted and with correct polarity using the following
method (100% visual inspection, template, error proofing ).
1
Appropriate controls are in place for Auditee has to demonstrate best clinching practices, tools.
missing, wrong, raised components Prebending of the parts are preferred. As per IPC A-610G.
11 Manual insertion
Supplier must confirm minimum 1000
Lux at stage. Fixture and tools are used to hold down large components (e.g. bulk
2
connectors) prior to wave solder as applicable.
Wave Soldering
Oxygen level must be below threshold limit of 50 PPM in solder area. Use
6
Oxygen analyzer to measure.
Appropriate controls are in place for
Inert Solder Pot Oxygen level
7 Maintain solder pot contamination level as per IPC-JST-001.
Wave has a stable wetting force on the PCB. Tools include glass plate or
8
optimizer.
Appropriate controls are in place for
Wave Stability and Distribution
9 Wave force evenly distributed along the width of the PCB.
12 Wave Solder
ESD & Soldering Audit Checksheet
Audit Date(s): Vendor Name: Vendor location:
Auditor (s):
Rev no / Date: 00 / 12.02.2019 Vendor Code: Contact Person:
Auditee (s):
Sr. Exp. GYR
Characteristic Expectation Requirements Observation details Action Plan Responsibility Target Date Actual Date
no No. Status
Methods are in place to control wave
solder process.
Thermal profile to be completed after repair or product change-over with
13
parameter changes
Thermal profile must confirm to IPC
7530.
Current temperature profile to be posted on the line or on-file and available for
14
customer review
Appropriate controls are in place for Specific gravity of the foam flux per manufacturer's recommendation is
18
Foam Spray ( If Applicable) maintained to achieve uniform tiny bubbles for top side wetting
Selective Soldering
2 How do you control the solder height ? Solder height has to controlled
Master samples/ defect samples are used at start of shift and every change
5
over to verify proper ICT functions.
FTT is monitored for each tester in QOS (quality observation sheet) with
9
corrective actions.
Rejected PCB's are analyzed, root cause identified and corrective actions
11
developed.
4 Dust Supplier should demonstrate, no dust coming out because of the router.
Controls are in place for 100% functional 100% functional software verification per TNL and/or supplier specification.
2
coverage Follow software assurance disciplines
EOL should be error proofed (part locked in place, locked bins, automatic
3
rejection of the part, barcode scanning, etc.)
End of line
16
testing
Master samples are tagged and stored properly and are used at beginning of
6 Supplier has process to verify EOL tester shift and every change over to verify proper EOL functions
accuracy and proper function
7 Tester pins and hard connections are part of preventive maintenance program
10 Rejected parts are locked in fixture until parts are released by supervisor.
Repair / Reworks
Repaired parts with different component types (SMD, leaded, various sizes)
1 are included in Design Verification (DV) and Production Validation ( PV )
testing.
2 Repaired part to go back to station where it was rejected, PFD should include
3 Cannot repair the same part for same and/or different failures -/<2 times, SOP
6 Do not rework the parts until all the issues are identified.
Supplier has repair/rework policy,
procedures and guidelines
Photograph of common soldering failures should be displayed at visual and
7
rework stations.
Repairs must conform to
IPC-7711/7721
8 Metal wool cleaning of tip is recommended over sponge and roller.
17 Repair/Rework
9 Gun temperature to be justified. (Compliance as per component data sheet ).
Supplier has a process for quick Follow First-in-First-Out (FIFO) system for repaired parts inventory
15
turnaround time for repaired parts. No more than 2 days backlogs.
Conformal Coating
Manual Soldering
1 Tip temp 220 to 400 degree Celsius, tip temp measuring equipment.
Robotic Soldering
5 Fixtures are to be fixed and FCB should have locating dowel pin.
Dip soldering
21 Dip soldering
Supplier should send solder samples to solder paste manufacturer to ensure
6
chemistry, certificate should be available
SAMPLE FORMAT
31. Corrective Action Plan.
{ After Proto, Pre-Pilot, Pilot, Productoin, Cuft etc..}
Model :
Component Name/ No. : Mod. :
FUNCTION
FITMENT
AESTHETICS
Target Date
32. Material Handling Plan & Packaging Standards
Model :
Vendor Name :
DATE: / / .
Sr.No. Discription
5 Asthestic Standard
6 List of gauges
9 P.D.I.Report
nd M/s.
Attached
Y/N
To be attached
To be attached
To be attached
To be attached
between
Supplier - M/s.
Component name: Component
Implementation date: Rev.No.:
1. This Inspection agreement is prepared and to be followed to ensure defect free supply of parts to BAL in order to
Customer complaints and field failures due to detectable component / part characteristics.
2. This Inspection agreement aims at having common understanding between Bajaj Auto and the Vendor on Inspec
methods and acceptance criteria.
3. The Supplier team confirms that the quality requirements & inspection requirements mentioned in the documents
ambiguity on any point.
4. The Supplier team agrees to maintain the calibration records of all the tooling like inspection equipments (gauge
process), Jigs, Fixtures etc.
5. The Supplier team agrees to implement inspection agreement on similar lines with all concerned Sub vendors f
adequate inspection facilities.
6. The Supplier team agrees to submit PDI report alongwith every Lot of supplies of all parts & follow the correspon
this agreement.
7. The Supplier team agrees that this document will be reviewed and updated as and when felt necessary (i.e. Draw
action resulting out of investigations/ analysis , changes in capacity, any changes in sub vendors, any changes insp
in the scope of the agreement etc.)
8. The Supplier team agrees & confirm adherence to the systems in Development documents (Ref: DR/PPAP file).
9. The Supplier team agrees & confirm Prior Approvals from BAL QA authorities in case of 4M changes ( QA will int
QA )
· Deviating from / by-passing the agreed process, method etc.
· Changing any 2nd level source for special processes ( like surface treatment source / HT etc.)
· Change of Raw material or Raw Material Source
· Change in Source of Bought out parts,
For M/s. BAJAJ Auto Ltd- For M/s.
1 R & D CD 1
2 R & D QM 2
3 Plant QA 3
Space for Supplier logo
Component no.:
No.:
etc.)
Plant Head
QA Head
INSPECTION AGREEMENT
Vendor
Vendor Name Part Name Part No
Location
PART PHOTO
Class of
Characteristics
Critical (I) Safety
Sr. No. Requirement Inspection parameters Criteria OR Specification
(S)
Regulatory(R)
Major(M)
FUNCTIONAL
FITTMENT
AESTHETIC
AESTHETIC
Performance
Test Specification Inpsection Methodology
Requirement
Plating / painting /
As per drawing/ BAL ABS Std Salt spray equipment
powder coating
Sign 1
Sign 2
Sign 3
REEMENT
Part Mod/
Revision Model Date Requirement-
number
FUNCTION
FITMENT
AESTHETIC
As & when
house /3rd party TC Once in month
required
As & when
alt spray equipment Once in six months
required
N OFF
BAL - CD BAL - CDQM DATE
Model Part No.
3 Scratches on housing
4 Scratches on lens
7 Short mould
8 Burn mark
9 Crack
10 Flashes
12 Shrinkage of housing
13 Water strain / Oil mark
15 Yellowness metallizing
16 Rainbow on reflector
19 Texture of Lens
21
22
23
24
25
26
27
LEGENDS :
A ZONE
Plant QA
Pur QA
CD
Part Name
Specification
Zone A
Aest
Part Name
Specification
Zone B
Aesthetic standard
Part Mod. No.
Performance /
Fitment / Aesthetic
Zone C P F
B ZONE
M/s
QA HEAD
PROD.HEAD
ME HEAD
ard
Mod. No.
mance /
/ Aesthetics
General Guideline :
Part Visual Inspection criteria -Distance 60
cm ,Duration 5~15 sec, Light -800 TO
1200LX ,View- Vehicle mounting
A Zone
Front View
Material
Illustration
a -Distance 60
-800 TO
ting
Front View
Side View
Zone
iew
Company Name
Illustration
Top View
Front View
Side View
Top View
C Zone A Zone
Side View
C Zone
C ZONE
EYE SEQUENCE /VISUAL INSPECTION
PART NAME :-
Fitment CD 14
1
12
2
3 13
4
5
Under Bkt
7 Assembly
Direction of Inspection
(Blue Arrow )
11
10 Bottom
Case
Bottom Case
Identification mark
Must availabel as per
15 (Batch code, Date , Traceability
requirement
V. code etc)
Prepared by
NSPECTION CHECK POINTS
MODEL :-
Function Important
Fitment Important
Aesthetic Important
Under Bkt
Assembly 6
8
SAMPLE F
Bellow
clamp
Bottom Case
9
Bellow
Inspection
Inspection Method Inspection tool Freq.
Conf. mark
Visual 100% N
Visual 100% Y
Visual 100% N
GAUGE 100% Y
GAUGE 100% Y
GAUGE 100% N
Visual 100% N
Approved by
AMPLE FORMAT
34. PDI CHECK SHEET
DATE: / / .
PART NAME DATE Qty
PART NO VENDOR
Sr no Parameter Spec Checking Method 1 2 3 4 5 Remarks
(A) Function
(B) Fitment
(C) Aesthetics
Remarks
Checked By
Note: Vendors format can be used. Ensure that all above parameters are included
Vendor QA Head
Final Tooling Readiness
Model :
16 Are the Inspection /process poka-yoke's are available as per the list and working properly ?
17 Is the component /assly being manufactured by using final tooling / fixtures ?
18 Are the gauges available to check stage wise important /critical parameters ( if any as per CTQ).
19 Is single piece flow followed?
Requirement of SMT Processes
Are Electronics components packaging & storage condition meeting as per manufacturer recommendation.
20
26 Is Solder paste inspection through 3D SPI machine & followed as per IPC guidelines.
27 Is there any wrong loading detection facility available in Pick & place machine during setup & splicing
process.
28 Is there any mechanism for PCB support pins/block throughout the line from Solder paste to Reflow oven.
Is there any profile measurement of reflow oven online/through profiler with actual running board or frequency
29 of measurement in case of offline.
32 PCB de-panneling process through router & bit changing shall be defined & interlocked.
Is there any SOP for parts handling from AOI to post SMT processes & there should not be any damages to
33 the PCB components.
Is there any lead forming process & parts shall be ensured for any stress on PCB leads during forming & lead
34
cutting process.
Leaded component soldering process shall be through robo/wave /selective soldering & PCB component
35 shall be masked to avoid any soldering spatter on PCB component.
36 There should not be any stress on PCB component during ICT testing ICT fixture shall be validated.
For screwing process: Troque should be controllled, Screw counter should be available & PCBA components
37 should be masked.
Common
Stage wise rework procedure shall be defined with action/disposal details with rework traceability shall be
40
followed.
ESD Compliance shall be followed throughout the processes.
41
45 Are components cleaned by Tag O Rag after buffing and before surface treatment
Are the special test facilities available(Leak test, Hardness tests, Adhesion test for painting /plating,as
46 applicable given on respective drawing)
Are the Q-points/Q-Alerts are identified & displayed on resp machine /test rig etc.
47 (i.e. key points for insp method / job loading-unloading methods /leak test method etc.)
Is dfective component arrested at manufcaturing stage only & not passes to further stages ?
55
Is the Inspection report is made for minimum 30 components to ensure dimensional consistency (for all “I”
56 Dimensions & important parameters identified in CTQ) ?
Are cp/cpk parameters like solder paste height, solder tip temperature, reflow temperature or any other
57 equivalent CTQ parameters identified and followed
Is preventive maintenance schedule (cleaning, repairing, replacing) made and followed for component
60 handling trolleys and bins? (Appropriate labels indicating status of preventive maintenance shall be fixed on
trolleys and bins.)
Component handling trolleys- Are components are not touching to each other and located, oriented firmly to
61 avoid contact with each other?
Are at each work station/stage separate bins for input component and output component available? (Red bin
62 shall be available for non conforming components.)& bin cleaning frequency shall be defined.
For BAL
1)
2)
3)
Vendor Self Assesment Audit Check Sheet
meters Y/N
on Control :
tl T.C's available for every lot/batch ? (TC's of mill /raw matl manufacturer etc.)
g cross checked from out side lab with decided frequency?
tion is there for ok /not ok matl ?
ll loose brought out parts /sub-asslys are being carried out & reports available ?
ol :
DR Document is available at actual manufacturing plant /place ?
atest BAL drg / approved drg is available?
tificates of special processes are available
ting,powder coating & heat treatment etc.)
pprovals are available for any deviations /Nc's wrt to drawing (if any) ?
approved & copy available with vendor /sub-vendor's end ?
0 Basic systems followed for newly developed parts.?
wise audit check sheet ready – For transferring to regular process audit.
de for traceability of parts ?
ion /process poka-yoke's are available as per the list and working properly ?
ent /assly being manufactured by using final tooling / fixtures ?
s available to check stage wise important /critical parameters ( if any as per CTQ).
flow followed?
Processes
components packaging & storage condition meeting as per manufacturer recommendation.
followed ?
CB cleaning either through antistatic paper/air are being followed.
nstruction of PCB handling/loading in the magzine with clear direction of PCB.
aning frequency of stencil & criterias for frequency of cleaning.
ocedure defined for solder paste storage/throwing & meeting as per Solder paste
ling process through router & bit changing shall be defined & interlocked.
OP for parts handling from AOI to post SMT processes & there should not be any damages to
onents.
ad forming process & parts shall be ensured for any stress on PCB leads during forming & lead
.
nent soldering process shall be through robo/wave /selective soldering & PCB component
d to avoid any soldering spatter on PCB component.
ot be any stress on PCB component during ICT testing ICT fixture shall be validated.
rocess: Troque should be controllled, Screw counter should be available & PCBA components
ked.
ponents storage:
℃
70% RH
ronment condition for PCB Assembly:
O Class 8 or better should be followed.
℃
- 60% RH
ork procedure shall be defined with action/disposal details with rework traceability shall be
test facilities available(Leak test, Hardness tests, Adhesion test for painting /plating,as
n on respective drawing)
s/Q-Alerts are identified & displayed on resp machine /test rig etc.
for insp method / job loading-unloading methods /leak test method etc.)
ors /supervisor's are aware @ important CTQ parameters ?
rol
d area / identification is provided to store finish goods to avoid mix-up issues etc.?
table is made available ?.
ight at insp area, final Inspection gauges, Relation gauges & other test facilities are available)
n report is made for minimum 30 components to ensure dimensional consistency (for all “I”
mportant parameters identified in CTQ) ?
ameters like solder paste height, solder tip temperature, reflow temperature or any other
Q parameters identified and followed
g & packing
transportation modes of finish goods is ok ?
s touching to each other or to any metallic surface during handling specifically in “A” class
tical for appearance, during all manufacturing process and during material handling including
aintenance schedule (cleaning, repairing, replacing) made and followed for component
s and bins? (Appropriate labels indicating status of preventive maintenance shall be fixed on
s.)
ndling trolleys- Are components are not touching to each other and located, oriented firmly to
with each other?
rk station/stage separate bins for input component and output component available? (Red bin
ble for non conforming components.)& bin cleaning frequency shall be defined.
ventive actions
are taken on all field /QSR issues reported so far are horizontally deployed (if any on similar
mented / Maintained ?
For M/s.
1)
2)
3)
Vendor :
Audit Date :
Remarks
16.06.23
17.02.13
12.08.10
Date
RAR (Run @ Rate) Audit Check Sheet REV. NO. 3
Model :
16 Are the Inspection /process poka-yoke's are available as per the list and working properly ?
17 Is the component /assly being manufactured by using final tooling / fixtures ?
18 Are the gauges available to check stage wise important /critical parameters ( if any as per CTQ).
19 Is single piece flow followed?
Requirement of SMT Processes
Are Electronics components packaging & storage condition meeting as per manufacturer recommendation.
20
26 Is Solder paste inspection through 3D SPI machine & followed as per IPC guidelines.
27 Is there any wrong loading detection facility available in Pick & place machine during setup & splicing
process.
28 Is there any mechanism for PCB support pins/block throughout the line from Solder paste to Reflow oven.
Is there any profile measurement of reflow oven online/through profiler with actual running board or frequency
29 of measurement in case of offline.
32 PCB de-panneling process through router & bit changing shall be defined & interlocked.
Is there any SOP for parts handling from AOI to post SMT processes & there should not be any damages to
33 the PCB components.
Is there any lead forming process & parts shall be ensured for any stress on PCB leads during forming & lead
34
cutting process.
Leaded component soldering process shall be through robo/wave /selective soldering & PCB component
35 shall be masked to avoid any soldering spatter on PCB component.
36 There should not be any stress on PCB component during ICT testing ICT fixture shall be validated.
For screwing process: Troque should be controllled, Screw counter should be available & PCBA components
37 should be masked.
Common
Stage wise rework procedure shall be defined with action/disposal details with rework traceability shall be
40
followed.
ESD Compliance shall be followed throughout the processes.
41
45 Are components cleaned by Tag O Rag after buffing and before surface treatment
Are the special test facilities available(Leak test, Hardness tests, Adhesion test for painting /plating,as
46 applicable given on respective drawing)
Are the Q-points/Q-Alerts are identified & displayed on resp machine /test rig etc.
47 (i.e. key points for insp method / job loading-unloading methods /leak test method etc.)
Is dfective component arrested at manufcaturing stage only & not passes to further stages ?
55
Is the Inspection report is made for minimum 30 components to ensure dimensional consistency (for all “I”
56 Dimensions & important parameters identified in CTQ) ?
Are cp/cpk parameters like solder paste height, solder tip temperature, reflow temperature or any other
57 equivalent CTQ parameters identified and followed
Is preventive maintenance schedule (cleaning, repairing, replacing) made and followed for component
60 handling trolleys and bins? (Appropriate labels indicating status of preventive maintenance shall be fixed on
trolleys and bins.)
Component handling trolleys- Are components are not touching to each other and located, oriented firmly to
61 avoid contact with each other?
Are at each work station/stage separate bins for input component and output component available? (Red bin
62 shall be available for non conforming components.)& bin cleaning frequency shall be defined.
For BAL
1)
2)
3)
RAR (Run @ Rate) Audit Check Sheet REV. NO. 3
meters Y/N
on Control :
tl T.C's available for every lot/batch ? (TC's of mill /raw matl manufacturer etc.)
g cross checked from out side lab with decided frequency?
tion is there for ok /not ok matl ?
ll loose brought out parts /sub-asslys are being carried out & reports available ?
ol :
DR Document is available at actual manufacturing plant /place ?
atest BAL drg / approved drg is available?
tificates of special processes are available
ting,powder coating & heat treatment etc.)
pprovals are available for any deviations /Nc's wrt to drawing (if any) ?
approved & copy available with vendor /sub-vendor's end ?
0 Basic systems followed for newly developed parts.?
wise audit check sheet ready – For transferring to regular process audit.
de for traceability of parts ?
ion /process poka-yoke's are available as per the list and working properly ?
ent /assly being manufactured by using final tooling / fixtures ?
s available to check stage wise important /critical parameters ( if any as per CTQ).
flow followed?
Processes
components packaging & storage condition meeting as per manufacturer recommendation.
followed ?
CB cleaning either through antistatic paper/air are being followed.
nstruction of PCB handling/loading in the magzine with clear direction of PCB.
aning frequency of stencil & criterias for frequency of cleaning.
ocedure defined for solder paste storage/throwing & meeting as per Solder paste
ling process through router & bit changing shall be defined & interlocked.
OP for parts handling from AOI to post SMT processes & there should not be any damages to
onents.
ad forming process & parts shall be ensured for any stress on PCB leads during forming & lead
.
nent soldering process shall be through robo/wave /selective soldering & PCB component
d to avoid any soldering spatter on PCB component.
ot be any stress on PCB component during ICT testing ICT fixture shall be validated.
rocess: Troque should be controllled, Screw counter should be available & PCBA components
ked.
ponents storage:
℃
70% RH
ronment condition for PCB Assembly:
O Class 8 or better should be followed.
℃
- 60% RH
ork procedure shall be defined with action/disposal details with rework traceability shall be
test facilities available(Leak test, Hardness tests, Adhesion test for painting /plating,as
n on respective drawing)
s/Q-Alerts are identified & displayed on resp machine /test rig etc.
for insp method / job loading-unloading methods /leak test method etc.)
ors /supervisor's are aware @ important CTQ parameters ?
rol
d area / identification is provided to store finish goods to avoid mix-up issues etc.?
table is made available ?.
ight at insp area, final Inspection gauges, Relation gauges & other test facilities are available)
n report is made for minimum 30 components to ensure dimensional consistency (for all “I”
mportant parameters identified in CTQ) ?
ameters like solder paste height, solder tip temperature, reflow temperature or any other
Q parameters identified and followed
g & packing
transportation modes of finish goods is ok ?
s touching to each other or to any metallic surface during handling specifically in “A” class
tical for appearance, during all manufacturing process and during material handling including
aintenance schedule (cleaning, repairing, replacing) made and followed for component
s and bins? (Appropriate labels indicating status of preventive maintenance shall be fixed on
s.)
ndling trolleys- Are components are not touching to each other and located, oriented firmly to
with each other?
rk station/stage separate bins for input component and output component available? (Red bin
ble for non conforming components.)& bin cleaning frequency shall be defined.
ventive actions
are taken on all field /QSR issues reported so far are horizontally deployed (if any on similar
mented / Maintained ?
For M/s.
1)
2)
3)
. NO. 3
Vendor :
Audit Date :
Remarks
16.06.23
17.02.13
12.08.10
Date
Minutes of Meeting with - M/s.
RAR Audit-
Part Name- Part Number- Rev No.- Date-
S.No. Observation/Improvement points Action Plan Responsibilty Target Date Status
BAL- M/s.
1 1
2 2
3 3
PART LEVEL -SOP CLEARANCE
Corporate QA
Model : Date of Au
Vendor Part name
Auditor : BAL Auditee :
Date of Audit :
Part name / no.