Process and Operation Supply Arsh
Process and Operation Supply Arsh
Question 02) Bulkhead flat car is the most suitable railway equipment to transport the coal
(True/False)
Question 03) Due to use Unit train, there will be no empty backhaul (True/False)
Question 05) Truckload shipment (TL) costs higher than less-than Truckload (LTL) shipment
(True/False)
Question 07) A road vehicle with its front end resting on the fifth wheel of the vehicle hauling it
a. Tractor
b. Trailer
c. Semi-Trailer
d. Towing vehicle
Question 09) Movement of cargo from origin to destination by several modes of transport where
each of these modes have a different transport carrier responsible, However under a single
contract or bill of lading.
a. Intermodal
b. Multimodal
IPPC is short for International Plant Protection Convention. They developed a standard for
wood packaging in international business, called ISPM-15.
It is a heat treatment which destroys insects and larvae, reduces the moisture content, and
facilitates pallet handling.
Question 13) Which type of Marine is suitable for transporting the grains?
A dry bulk commodity is a raw material that is shipped in large unpackaged parcels
such as grain, metal, and energy materials, are transported long distances in bulk by
sea in large cargo vessels by companies that specialize in dry bulk delivery.
Question 14) What is Blind transfer in communication to the customer?
Question 15) What is the suitable railway equipment for transporting the logs?
The following are the railway equipments used for transporting logo.
Forest products - log car
Wood pulp boxcar
Forest products - wood pulp boxcar
Woodchip gondola
Forest products - woodchip gondola
Question 16) What is the speciality of LoLo Ships?
Lift-on/lift-off or LoLo ships are cargo ships with on-board cranes to load and
unload cargo. Its speciality is that it can load and unload their own cargo unassisted.Lift-on/lift-
off vessels can operate out of docks with no dockside cargo handling equipment
It takes 2.5 minutes to unload each pallet and it takes one hour to unload 500 cases.
You have two receivers who each work 9 hours. Each receiver has 30 minutes lunch and two fifteen
minutes breaks include in the nine hours.
If you do not have enough, how many more receivers you would need?
What it will be your solution to ma