Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Transport Service Request Form

保密级别 Confidentiality:

□ 绝密 TOP SECRET □ 机密 CONFIDENTIAL

■ 内部公开 INTERNAL USE □ 外部公开 PUBLIC

责 任 人 Owner: MR

编制部门 Prepared by: Mr-Azimeraw

发布日期 Release Date: 2024.03.26

保密要求 Confidentiality Requirements


绝 密:未经传音控股书面授权,不得复制、存储、引用或传播文件的任何片断。
机 密:复制、存储、引用或传播文件的任何片断,需经部门主管授权。
内部公开:仅限公司内部使用,如需分享到公司外部,需经部门主管授权。
外部公开:无保密要求。

TOP SECRET: Any fragment herein shall not be copied, saved, quoted or spread
without TRANSSION HOLDINGS' written authorization.
CONFIDENTIAL: Any fragment herein shall not be copied, saved, quoted or spread
without department manager's authorization.
INTERNAL USE: For internal use only. It shall not be shared to outside without
department manager's authorization.
PUBLIC: Open.
Date (2024/01/09) Transportation Service Request Summ
Applied/Arranged Required/STD Qty
S/N Dept
Qty for the planed action

1 PD 172 172

2 QM 89 89

3 ENG 52 52

4 PMC 13 13

5 WH 54 54

6 MR 38 38

Total 418 418


#. The request summary/list can be submit to logistic team everyday before 11:00AM
#. The arrangement request can't include dept mangers list
#. Before they provide to logistic team they must confirm the previous day attendance status (le
Notice #. The arrangement request qty and the task shall be confirmed & approved by dept managers b
Logistic team.
nsportation Service Request Summary
Task/Reason of attendance

1. 2 line ASSY production plan


2. 2 line charge production plan
3. Daily 3rd project activty
4. ICT workshop painting
5.Aging test
6. Indirect 5

1. for phone assembly(32)


2. for charger assembly(28)
3.for IQC material inspection(6 )
4.for OQC shipment(1 )
5.for mgt(23)
1. plan for RT(10)
2. Train New PE's and write new model quality
control point (8) 3. power and
system control(8)
4. EWH machine control and line have plan(9)
5.SE control server,plan (9)
6. IE BOM
confirmation and document email(8)
To Shipment preparation and delivery and plan rearrangement

1,Plan material preparation ,delivery & exchange material delivery


(38)
4,Received Finished ,QC2 return & singel phones from PD line with
inventory checking (4)
5,System recording processe (BOM ,voucher's) & peripaer (4)
inventory check list (9)MGT
6,All stock invontry checking

1.Cleaning activity in ICT and new project (23)


2.Lunch follow up (1)
3 training follow up(2)
4.To give first aid for sudden accident (1)
5.Check and follow Safety and 5S activity (2)
6.Departmental Managment activity (8)

Totally we arranged for 418 staff qty.


ubmit to logistic team everyday before 11:00AM
ude dept mangers list
m they must confirm the previous day attendance status (leave status).
he task shall be confirmed & approved by dept managers before submit to
Applied Employees Name List
S/N Dep't Name ID
1
2
3
4
5
6
7
8
9
10
me List
Phone no Location

You might also like