OVERVIEW
The objective of the repair performed in July 2021 by 3X ENGINEERING (3X) specialists
was to reinforce 3 catenary supports (HEA beam) damaged by severe corrosion. The
damaged structures are located near a railway line.
SCOPE OF WORK
The repair design was performed using finite element analysis.
Before performing the reinforcement, the 1st step was to proceed to a disbursement of the
concrete base before reinforcing the beams. This procedure was completed by a service
provider.
Fig. 2 - View of the beam after disbursement
Then the repair was made by 3X specialists following 4 main steps:
1.SURFACE PREPARATION
The surface preparation was completed using sandblasting to get a good surface
roughness (at least 60-micron surface profile).
2.RESIN AND METAL INSERTS APPLICATION
3X resin was applied at the base of the structure to seal the junction between the concrete
and the beam. Then metal inserts and steel plates (previously designed and manufactured
to fit with the specific geometry of the structure) were installed and fixed using 3X filler and
Fig. 3 - Metal inserts applied
ratching belts.
3.COMPOSITE WRAPPING REINFORCEMENT
Last step but not least was to wrap the composite reinforcement around the 3 beams.
Six layers of Kevlar® tape impregnated with 3X epoxy resin, for a total repair length of
respectively 125cm, 140cm and 160cm for the higher one, were necessary to reinforce the
structures.
4.IMPACTS AND UV PROTECTION
Each repair was recovered with a specific coating to protect the repair from UV and
Fig. 4 - Composite wrapping completed impacts.
RESULTS
This project was quite challenging because of the very small space to manage the surface
preparation and REINFORCEKiT® BEAM application. Additionnaly, the structures reinforced
were over 50m-height ! The job was successfully completed at night to avoid stopping traffic.
The structures are now reinforced for 20-year minimum.
To date the 160cm structure reinforcement is the highest ever performed by 3X with
our REINFORCEKiT® BEAM.
Fig. 5 - Final result with protective coating
info@3xeng.com www.3xeng.com
• TYPE OF DEFECT : CATENARY SUPPORTS SUFFERING FROM 80% OF CORROSION
• LOCATION : FRANCE
• 3X PRODUCT : REINFORCEKiT® BEAM
• CLIENT : SNCF (FRENCH NATIONAL RAILWAY COMPANY)
OVERVIEW
SCOPE OF WORK
For more information about our operations and range of products, please contact us at :
3X Engineering - 9 Avenue Albert II - 98000 Monaco
Phone : +377 92 05 79 81 - Fax : +377 92 05 72 71 - E-mail : info@3xeng.com - www.3xengineering.com