Professional Documents
Culture Documents
Marked Plot Plan For FCC Structure
Marked Plot Plan For FCC Structure
PREVAILING
WIND
(SW)
PREVAILING
WIND
COOLING TOWER
COOLING TOWER
NORTH
THIS DWG.
(SW)
KEY PLAN
N.1428.850
E.2190.000
N.1776.000
N.1735.000
SPE-21011
SPE-21019 TRANSFORMERS
10 1
GA-21209A
GA-21209B
GA-21201B
N.1687.000
N.1585.000
FA-21001 FA-21205 ELECTRICAL SUBSTATION-6
4
FCC-PAR-012 FCC SATELLITE
DA-21202
CHANGE HOUSE
GA-21204A CONTROL ROOM
SHT1
MAINTENANCE ACCESS
12
SPE-21013 FCC-STR-012
PR2
SPE-21201
FA-21002B LOADING/UNLOADING AREA FCC-STR-011 GB-21201
MAINTENANCE CYLINDER SHED
FCC-PR-002
ACCESS DROP AREA
GA-21205B
DA-21201
M
GA-21104B
30
FA-21002A GB-21201-EA02
R=
TRANSFORMER FCC-STR-007 EA-21203 M CYLINDER SHED
15
SHT6
SHED R=
BATTERY LIMIT N.1850.000
DWG. LIMIT N.1880.000
PR1
SPE-21012-GA1A BP-21201B
17
FCC-STR-003 GA-21104A FCC-PAR-011 GA-21205A
7
SPE-21012-GA1B CL ACCESS ROAD (WIDTH 6M)
FCC-SHT-001 FA-21201
SPE-21017
3 SHT4
DC-21001
9
FCC-PR-003
PR3
EA-21401A(LOWER)
EA-21401B(UPPER)
GA-21103B FCC-PAU-002 FCC-STR-017 E.2115.000
DF-21101 FCC-STR-009 EC-21203
EA-21405
FA-21606(W/PIT)
DF-21402
FA-21405
DA-21501(UPPER)
FA-21609(W/PIT)
FA-21404
GA-21203B N.1438.000
FA-21401
FA-21402
FA-21501(LOWER)
CL INTEGRATION ROAD (WIDTH 10M)
FCC-PR-001
SPE-21604
SPE-21014 GA-21608B
EA-21403
GA-21103A GA-21603B
SA-21601
EA-21404
FA-21204
FA-21004 DS-21101
EA-21502
EA-21402
DS-21102 GA-21203A GA-21608A GA-21603A CL ACCESS ROAD (WIDTH 6M)
SPE-21602 FA-21502
SPE-21012 E.2105.000
11 14
BA-21001
N.1437.000
SHT5
GA-21106A
GA-21106B
GA-21102A
GA-21107A
GA-21107B
GA-21102B
GA-21105B
GA-21402A
GA-21402B
GA-21401A
GA-21401B
FA-21616
FA-21614
FA-21615
SPE-21607
FA-21610 FA-21503 DF-21401
FA-21006 FCC-SHT-004
AMMONIA SPE-21012-BV5B GA-21105A FCC-SHT-005
EA-21602A(LOWER)
16
EA-21602B(UPPER)
FA-21602
PR4
UNIT
EC-21601
E.2091.000
FCC-PAR-001 FCC-PAR-002 FCC-PAR-003 FCC-PAR-004 FCC-PAR-005 FCC-PAR-006 FCC-PAR-007 FCC-PAR-008 FCC-PAR-009 FCC-PR-004
EC-21101
CL ACCESS ROAD (WIDTH 6M)
E.2085.000 EC-21102 EC-21202 EC-21204 EC-21401 BATTERY LIMIT
E.2080.000 VALVE PLATFORM
GA-21001A
GA-21001B
E.2079.000
18
GA-21601A
GA-21601B
GA-21604A
GA-21604B
GA-21605A
GA-21605B
FA-21008
N.1825.000
FCC-STR-018
GA-21110A
GA-21110B
E.2079.000
GA-21404A
GA-21404B
GA-21403A
GA-21403B
E.2076.000
SPE-21605
GA-21208A
GA-21208B
GA-21202A
GA-21202B
GA-21207A
GA-21207B
SPE-21606
FCC-STR-008
5
EA-21603B(UPPER)
N.1557.600
FCC-STR-005 EA-21408B FA-21403
EA-21603A(LOWER)
EA-21105A(LOWER)
GA-21108A
GA-21108B
EA-21105B(UPPER)
EA-21001B(UPPER)
13
FA-21604
EA-21213A
EA-21213B
EA-21001A(LOWER)
2
FCC-SHT-003
EA-21212
DF-21403
FA-21203
EA-21102A
EA-21102B
EA-21104A
EA-21104B
FA-21617
FA-21009A
FA-21009B
FCC-STR-013
EA-21207
EA-21408A
FA-21607
FA-21608
6
DT-21401
EA-21407
CL ACCESS ROAD (WIDTH 6M)
DF-21201
N.1410.000
DS-21201
SPE-21101
CL ACCESS ROAD (WIDTH 6M)
GB-21002
GB-21001
FIELD
EA-21214
DROP AREA
SHT3
GB-21401
EA-21209
FCC-STR-015
Y=1788250.000
X=2050800.000
EA-21211(LOWER)
N.1636.000
N.1687.000
N.1585.000
EA-21210(UPPER)
RUNDOWN TANK
SPE-21020
OFFICE
EC-21001
EC-21002
N.1771.000
N.1552.000
FCC-STR-002
LUBE OIL
N.1578.600
E.2040.000
SHT2
GA-21101A
GA-21101B
TOOL
SPE-21601
CL ACCESS ROAD (WIDTH 6M)
TOILET
MEROX MODULE
FCC-SHT-002
BATTERY LIMIT E.2030.000
BUS STATION
N.1797.500
N.1820.000
N.1780.000
N.1740.000
N.1700.000
N.1660.000
N.1620.000
N.1580.000
N.1540.000
N.1500.000
N.1460.000
N.1420.000
N.1380.000
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. ALL COORDINATES ARE IN METERS.
3. HPP EL. +0 = GL EL .+100200 = MSL EL. +4550
4. ABBREVIATION
- PR: STICK-BUILT PIPERACK
- PAR: MODULE RACK
- PAU: MODULE STRUCTURE
- STR: STICK-BUILT STRUCTURE
- SHT: SHELTER STRUCTURE
- DWG: DRAWING
SYMBOLOGY
- TYP: TYPICAL
- HPP: HIGH POINT PAVING REFERENCE POINT
- MSL: MEAN SEA LEVEL GROUND LEVEL CP DATE REVISIONS REFERENCE DRAWINGS REVIEWED BY
- FS: FIXED SIDE MCA DESCRIPTION DATE BY APR NUMBER TITLE
DRAWING HGA
DOS BOCAS REFINERY, PARAISO, TABASCO
- TOS: TOP OF STEEL GRATING 0 5 10 15 20 30 50 A2 ISSUE FOR DESIGN (FOR PLANNING) 15.MAY.2020 YJC KHL 2B-100-0-1-E-PL-0001 GENERAL LOCATION PLAN PROJECT YJC CATALYTIC CRACKING PLANT, FCC
PTI
- TOC: TOP OF CONCRETE SPECIALIST
CHECKERED PLATE B1 ISSUE FOR DESIGN (FOR PLANNING) 31.JUL.2020 YJC KHL R2B-P3-206-02-E-PL-00005 REACTOR REGENERATOR AND MAIN COL. SECTION 1/3
Infraestructura de SIMA
- GL: GROUND LEVEL GRAPHIC SCALE 1:500 METERS A3 ISSUE FOR DESIGN 12.MAR.2021 YJC KHL R2B-P3-206-02-E-PL-00006 REACTOR REGENERATOR AND MAIN COL. SECTION 2/3
Desarrollo, S.A. de C.V.
DBNR REVIEW BKC
U-21000
DROP AREA 0 ISSUE FOR CONSTRUCTION 02.JUL.2021 YJC KHL R2B-P3-206-02-E-PL-00007 REACTOR REGENERATOR AND MAIN COL. SECTION 3/3
- CL: CENTER LINE
R2B-P3-206-02-E-PL-00008 GAS CONCENTRATION SECTION COORDINATOR ASOCIADOS CONSTRUCTORES DBNR S.A. DE C.V.
APPROVAL KHL FCC OVERALL PLAN
- TL: TANGENT LINE BOUNDARY OF BATTERY LIMIT / DWG. LIMIT R2B-P3-206-02-E-PL-00009 LPG MEROX AND PROPYLENE RECOVERY SECTION REV
COORDINATION MHL PROJECT No. : SO6625
- EL: ELEVATION R2B-P3-206-02-E-PL-00004
CONTRACT NO. : PTI-ID-S-004/2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : 02.JUL.2021 SCALE : 1:500 DIMENSION: mm. PLACE : Dos Bocas, Paraiso, TAB. 0
PROJECT DIRECTOR