Soldier Pile Steel & Timber Lagging
Soldier Pile Steel & Timber Lagging
Soldier Pile Steel & Timber Lagging
1'-0"
CEMENT CONCRETE 2'-0" CHIP OUT SHAFT BACKFILL
GUTTER SEE BR. SHT. SP4 TO PLACE LAGGING.
3"
BACKFILL ALL VOIDS BEHIND
LAGGING WITH GRAVEL
BACKFILL FOR WALL.
(TYP.)
5'-0"
PREFABRICATED
DRAINAGE MAT
3'-0"
EXCAVATION PRIOR FRACTURED FIN FINISH
TO P.G.A. TENSIONING WITH PIGMENTED SEALER
LINE OF NO YP .)
N. (T
LOAD ZONE " MI VARIES
15'-0
¾"ø x 6" WELDED
HP
CONCRETE FASCIA REMAINING PORTION SHEAR STUDS
H
NGT OF SOLDIER PILE SHAFT AT 1'-0" (TYP.)
D LE . PANELS
BON
HP/3
1'-0"
3:1
SLO
*
PE 2" MIN. BEARING LENGTH
¢ PILE
SEE BR. SHT. SP2 FINAL GROUND LINE
TYPICAL SECTION
¢ PILE
* USE CONTROL DENSITY FILL WHEN PLACED
IN THE DRY. USE LEAN PUMPABLE CONCRETE
SHOWN FOR SOLDIER PILE WITH P.G.A. WHEN PLACED IN THE WET.
SIMILAR FOR SOLDIER PILE WITHOUT P.G.A.
P.G.A.= PERMANENT GROUND ANCHOR REMAINING PORTION
OF SOLDIER PILE SHAFT
LAGGING SYSTEM SHALL BE DESIGNED BY THE
CONTRACTOR AND SUBMITTED TO THE ENGINEER
FOR APPROVAL. THE SOIL TYPE FOR TIMBER
LAGGING IS .
LAGGING IN SERVICE
8.1-A3-2A
1112
LESS THAN 36 MONTHS