ALL ASIA AVIATION ACADEMY CESSNA 152 NORMAL OPERATIONS CHECKLIST CESSNA 152 TAXI CRUISE PREFLIGHT INSPECTION Taxi Clearance CLEARED Pitch SET COCKPIT Pitot Tube UNOBSTRUCTED Chocks OUT Throttle AS REQUIRED Cabin SANITIZED Stall Warning UNOBSTRUCTED Brakes TEST Elevator Trim SET Aircraft Docs. (MARROWS) CHECK Fuel Tank Vent UNOBSTRUCTED Mixture ADJUST ENGINE RUNUP Control Wheel Lock REMOVE Wing Tie-down DISCONNECTED (RUNUP AREA) Ignition OFF Aileron FREE & SECURE APPROACH Propeller Area CLEAR Flaps SECURE Parking Brakes SET Master Switch ON Brakes NOT LEAKING Throttle 1700 RPM Flight Instruments CHECK Fuel Quantity CHECK Magnetos CHECK RPM DROP Radios SET Flaps DOWN Carburetor Heat CHECK RPM DROP ATIS CHECK Master Switch OFF BEFORE STARTING ENGINE Suction Gage ON GREEN Carburetor Heat AS REQUIRED Fuel Shutoff Valve ON Engine Instruments ON GREEN Mixture RICH FUSELAGE & EMPENNAGE Preflight Inspection COMPLETE Ammeter CHARGING Seatbelts FASTENED Dents, Rivets, Screws CHECK Chocks IN Throttle Rudder Gust Lock REMOVE Seats, Seatbelts, ADJUST & Static CHECK (UPON WARMUP) LANDING Tail Tie-down DISCONNECT Shoulder Harness LOCK Idle CHECK Rudder & Elevator FREE & SECURE Fuel Shutoff Valve ON Flaps AS REQUIRED Friction Lock ADJUST RIGHT WING Radios, Electricals OFF Engine Instruments ON GREEN 1000 RPM Aileron FREE & SECURE Circuit Breakers ALL IN Landing Light ON Beacon/Nav/Strobe Lights ON Flaps SECURE Brakes TEST & SET Carburetor Heat COLD Wing Tie-down DISCONNECT STARTING ENGINE BEFORE TAKEOFF Brakes TEST Main Wheel Tire INFLATED (FINAL CHECK) Final Approach STABLE Brakes NOT LEAKING Take Off Briefing COMPLETE Fire Guard/Marshall READY Fuel Tank Sump DRAIN Cabin Doors CLOSED Primer IN AND LOCKED SHORT FIELD TAKE-OFF Fuel Quantity VISUAL CHECK Master Switch ON Mixture RICH Fuel Filler Cap SECURE Ignition Switch ON Take-off Checklist COMPLETE Carburetor Heat COLD NOSE Avionics SET Taxi MAX. RNWY Primer AS RQUIRED;LOCK Engine Oil Level CHECK Mixture RICH Brakes SET & HOLD Throttle OPEN 1/2 INCH Fuel Strainer DRAIN Circuit Breakers ALL IN Flaps 10˚ Propeller Area CLEAR Propeller & Spinner CHECK Elevator Trim TAKEOFF SETTING Throttle FULL Master Switch ON Alternator belt CHECK Fuel Shutoff Valve ON Brakes RELEASE Beacon ON Air Intake CHECK Flaps 0˚- 10˚ Climb 55 KIAS Ignition START Carburetor Air Filter CHECK Landing Light ON Flaps RETRACT WHEN CLEAR Throttle 1000 RPM Landing Lights CHECK Oil Pressure CHECK NORMAL Nose Wheel Strut & Tire INFLATED TAKEOFF SHORT FIELD LANDING Avionics ON Nose Tie-down DISCONNECT Intercom CHECK Static Source UNOBSTRUCTED Carburetor Heat COLD Pre-landing Check COMPLETE Transponder STANDBY LEFT WING Throttle FULL OPEN Airspeed 55 KIAS Flaps UP Main Wheel Tire INFLATED Engine Instruments ON GREEN Throttle TO MAINTAIN GLIDE Flight Control FREE & CORRECT Fuel Tank Sump DRAIN Airspeed ALIVE Touchdown POWER OFF Flight Instruments CHECK & SET Fuel Quantity VISUAL CHECK Elevator ROTATE @ 60 KTS Flaps UP Nav/Strobe Lights AS REQUIRED Fuel Filler Cap SECURE Climb 70-80 KTS Elevator FULL UP Briefing COMPLETE Radio CHECK (WHEN APPLICABLE) Elevator Trim SET FOR CLIMB Braking HEAVY/AS REQUIRED