065 DWG MRT IV 2024 - Modif Pipa Cooling Tower Stasiun Istora - MRT Jakarta-2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KEY PLAN

NOTES

Pipa dari dan ke


Cooling Tower Existing

Pipa Existing yang


akan di Modif

Pipa dari Softener ke


FWT PUMP Intermediate Tank

Pipa dari Product Tank


INTERMEDIATE BLOWDOWN PUMP ke Fresh Water Tank
FEED WATER TANK
TANK
Pipa Backwash

RO SYSTEM

PRODUCT PUMP

FILTER 1
SAND
CARBON SAND = REVISION MARK = REVISION MARK
FILTER 2 FILTER 2
SOFTENER PRODUCT TANK

FILTER 1
CARBON
NO. DESCRIPTION BY CHKD APVD DATE

OWNER

EXISTING PIPING APPROVED

KONTRAKTOR MEP
CHECKED

CHECKED DRAWN

HVAC - DETAIL DESIGN

TITTLE :

PROJECT: DRAWING NO :

PIPING EXISTING WTP STASIUN ISTORA DATE :


NTS
SCALE : FORMAT SIZE : A3

PT RENTASH MANDIRI SEJAHTERA ( MESCO-ECME )


KEY PLAN

NOTES

Pipa dari dan ke


Cooling Tower Existing

Pipa Existing yang


akan di Modif

Pipa dari Softener ke


UNION BALL
FWT PUMP Intermediate Tank
VALVE 3
Pipa dari Product Tank
BLOWDOWN PUMP ke Fresh Water Tank
PRODUCT PUMP FEED WATER TANK
INTERMEDIATE TANK
Pipa Backwash

RO SYSTEM

FILTER 1
SAND
CARBON SAND = REVISION MARK = REVISION MARK
UNION BALL FILTER 2 FILTER 2
SOFTENER PRODUCT TANK
VALVE 1

FILTER 1
CARBON
UNION BALL
VALVE 2

NO. DESCRIPTION BY CHKD APVD DATE

OWNER

PLANNING PIPING APPROVED

KONTRAKTOR MEP
CHECKED

CHECKED DRAWN

HVAC - DETAIL DESIGN

TITTLE :

PROJECT: DRAWING NO :

PIPING PLANNING WTP STASIUN ISTORA DATE :


NTS
SCALE : FORMAT SIZE : A3

PT RENTASH MANDIRI SEJAHTERA ( MESCO-ECME )

You might also like