PROJECT PROPOSAL

Date : December 20, 2023

Project Title : School Feeding Kitchen

Project Classification: Construction

Project Location : Tal-ut Elementary School, Tal-ut, Valecia, Carcar City Cebu

I. PURPOSE OF THE PROJECT

To create a safe and conducive building facility for parents and teachers in preparing foods for school
children. Provide access to quality foods, change dietary habits, and improve health and education
outcomes: To reduce rates of malnutrition, stunting, and wasting among participating children.

II. Scope of Works

The proposed project is to construct an isolated building structure intended for preparation and cooking
of foods for feeding of school children. The project also includes proper sanitations facilities and
programs such as installation of sanitary lines, grease traps, etc. as control to possible waste generated
during preparation of foods.

III. Expected Benefits

Upon the completion of the project, the parents assigned to prepare foods will be confident to
undertake their tasks safely while protecting the environment.

IV. Design and Structures

The design and structures of the facility shall consist of concrete floorings, half concrete walls, concrete
column foundation and footings for column post, food waste septic vault, standards sanitary lines and
fittings, good lumber for columns, roof trusses, etc.. (Please see attached drawings on separate sheets)

PERSPECTIVE

1
PROJECT PROPOSAL

Location Site:

THIS SITE

THIS SITE

V. Budgetary Cost Estimates

Materials Cost Estimates


Scope of Works Description of materials Qty Unit Unit Cost Total Cost Remarks
10mm x 6m DRB 20 Pcs. 175.85 3,517.00
12mm x 6m DRB 18 Pcs. 240.64 4,331.52 -
I-Concrete Works and Masonry Portland Cement (40 kg) 69 Bags 270.00 18,630.00 -
Fine sand 15 Cu.m. - - Available @ plant
A. Foundation and Flooring 6” thick CHB 800 Pcs. 18.50 14,800.00 -
aggregates 8 Cu.m. - - Available @ plant
600mmx600mm ceramic tile 100 Pcs. 35.00 3,500.00
1/2" x 6m tile PVC edging/Tile trim 6 pcs 35.00 210.00
Tile grout 3 Kgs. 65.00 180.00
Sub-total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 45,168.52
1/8” x 2” x 4” x 6m C-purlins 5 Pcs. 720.00 3,600.00 -
1/4” x 1 ½” x 1 ½” x 6m angle bar 5 Pcs. 685.00 3,425.00 -
1/4” x 2” x 2” x 6m angle bar 6 Pcs. 1,060.00 6,360.00 -
II-Steel Works and Roofing 8 ft. Gauge 26 corrugated 16 Shts. 330.00 5,280.00 -
Galvalum roofing sheet
2
PROJECT PROPOSAL

Vulca seal 1 Gal. 2,110.75 2,110.75 -


2 ½” x 25mm metal tex screw 600 pcs. 1.50 900.00 -
Welding rod #13 1 box 1,150.00 1,150.00 -
Sub-total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 22,825.00
Red leed 1 Gal. 625.00 625.00 -
Metal primer grey 1 Gal. 920.00 920.00 -
Paint thinner 1 Gals. 480.00 480.00 -
III-Painting works Baguio green roof guard paint 6 Gals. 705.25 4,231.50 -
#3 paint brush 4 Pcs. 30.00 120.00 -
#4 paint brush 4 Pcs. 42.00 168.00 -
Sub-total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 6,544.50
2”x3”x8’ Coco Lumber 100 Pcs. - - Available @ plant
IV-Forms and Scaffoldings 1/2" X 4’ X 8’ marine plywood 5 Shts. 895.00 4,475.00
Common nails #4 5 Kgs. 70.00 350.00
Common nails #1 1/2" 2 Kgs. 80.00 160.00
Sub-total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 4,985.00
2ӯ G.I. ball valve 1 set 2,080.00 2,080.00
2ӯ G.I. tee-joint 1 pc 280.25 280.25
2ӯ G.I. nipple 3 Pcs 18.50 55.50
2ӯ x 1ӯ G.I. coupling reducer 2 Pcs 185.00 170.00
1ӯ G. I. nipple 2 Pcs 50.00 100.00
1ӯ G.I. ball valve 2 sets 550.00 1,100.00
1ӯ G.I. elbow 14 Pcs 75.00 1,050.00
1ӯ G.I. tee-joint 1 Pc 95.50 95.00
1ӯ G.I. pipe S-40 5 Pcs 720.75 3,603.75
1ӯ x 1/2ӯ G.I. coupling reducer S-40 4 Pcs 85.00 340.00
1ӯ x 1/2ӯ G.I. tee-reducer S-40 9 Pcs 98.50 886.50
Sanitary Works/Fittings
1/2ӯ G.I. elbow 28 Pcs 40.25 1,127.00
1/2ӯ G.I. nipple 28 Pcs 20.50 574.00
1/2ӯ G.I. pipe S-40 3 Pcs 340.75 1,022.25
1/2ӯ G.I. faucet valve 16 sets 123.50 1,971.20
1ӯ G.I. pipe Clamp 30 Pcs 25.00 750.00
1ӯ G.I. pipe Clamp nails 80 Pcs 112.50 112.50
1/2ӯ G.I. pipe Clamp 80 Pcs 23.50 1,840.00
1ӯ G.I. pipe Clamp nails 170 Pcs 115.50 115.50
Teflon tape 12 rolls 5.00 60.00
Hack saw blade 3 pcs 40.00 120.00
Red leed/oxide paint 1 gal 625.00 625.00
Paint thinner 1 gal 480.00 480.00
Aluminum metal paint 1 gal 665.00 665.00
#1 paint brush 4 Pcs. 5.00 20.00
#2 paint brush 4 Pcs. 12.75 51.00

Sub-total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 19294.45

4ӯ PVC pipe 20 PCS 890.00 17,800.00


4ӯ PVC elbow 90 degrees 40 PCS 120.75 4,830.00
4ӯ PVC elbow 45 degrees 1 PCS 95.00 95.00
4ӯ PVC tee-joint 4 PCS 210.25 841.00
4ӯ PVC tee-joint w/ end cap 11 PCS 210.25 2,312.75
4ӯ PVC wye w/ end cap/clean out 7 PCS 185.75 1,300.25
4ӯ PVC clean out 5 PCS 92.75 463.75
4ӯ PVC pipe end cap 2 PCS 95.00 190.00
4ӯx2ӯ PVC tee-reducer 5 PCS 165.00 825.00
2ӯ PVC elbow 8 PCS 40.00 320.00
2ӯ PVC P- trap w/ end cap 6 PCS 125.25 751.50
2ӯ PVC pipe 3 PCS 330.00 990.00
Plumbing works/fittings
Porcelain white Toilet bowl 4 sets - - On-going canvassing
Wall mounted bucket type ordinary 5 sets - - On-going canvassing
urinal bowl porcelain white
Wall mounted ordinary lavatory 1 set - - On-going canvassing
porcelain white
4ӯ aluminum/stainless floor drain 11 pcs 100.00 1,100.00
cover
Solvent pipe 250cc 5 cans 115.00 575.00

3
PROJECT PROPOSAL

Teflon tape 6 rolls 5.00 30.00


4ӯ PVC pipe Clamp 12 pcs 35.00 420.00
4ӯ PVC pipe Clamp nails 30 pcs 120.00 120.00
Aluminum Fine screen/wire mesh 1 mtr 110.00 110.00
Sub-total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 33,073.75 Initial
Total Cost >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 164,964.97 Initial Cost
Labor Cost 57,737.74 @35% of Total Cost
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Grand Total >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 222,702.71 initial

Note: rough materials. Costing will be finalized once canvassing of materials is done.

Prepared by: Reviewed by: Noted by:

Ricky E. Dandolit Alma G. Bol-anon Rommel D. Reyes


Safety Officer HRA Officer In-charge Operations Head

Recommending Approval: Approved by:

Mr. Frank Chang Mr. Ku Chien Chang


General Manager Exec. Vice President