NAME OF WORK : CONSTRUCTION OF 2-STORIED OFFICE, TRAINING CENTER CUM OFFICER'S QUARTERS (2-UNIT) WITH 4-STORIED FOUNDATION) DUCK

HATCHERY FARM AT KISHOREGONJ, Package: 03, Lot No: 05

Legend =
1 Gap = 6 days

Period (Months)
Sl.
Description of Item Remarks
No.
1 2 3 4 5 6 7

01 Preparation of site including layout

02 Earth work in excavation


03 Sand filling
04 Brick flat soling
05 Mass concrete in all respect
06 Brick work in all respect
07 R.C.C. wall in respect
08 MS Rod
09 Plaster work in all respect
10 MS Door frame and door shutter
11 Aluminium Slaiding Door & Window
12 Flooring work including tiles
13 Water proofing work/lime terracing work
14 Drain & apron
15 Sanitary and plumbing work in all respect
16 Electrical work in all respect
17 Painting work in all respect
18 Site cleaning
19 Hand over and taken over
NAME OF WORK : CONSTRUCTION OF 4-STORIED DORMITORY BUILDING (8-UNIT) WITH 4-STORIED FOUNDATION) DUCK HATCHERY FARM AT KISHOREGONJ,
Package: 03, Lot No: 04

Legend =
1 Gap = 6 days

Period (Months)
Sl.
Description of Item Remarks
No.
1 2 3 4 5 6 7

01 Preparation of site including layout

02 Earth work in excavation


03 Sand filling
04 Brick flat soling
05 Mass concrete in all respect
06 Brick work in all respect
07 R.C.C. wall in respect
08 MS Rod
09 Plaster work in all respect
10 MS Door frame and door shutter
11 Aluminium Slaiding Door & Window
12 Flooring work including tiles
13 Water proofing work/lime terracing work
14 Drain & apron
15 Sanitary and plumbing work in all respect
16 Electrical work in all respect
17 Painting work in all respect
18 Site cleaning
19 Hand over and taken over