NGPD Safety Management System

Form NGPD 004/13


Element 6 Process Name-Job Safety Analysis (JSA)
Safe Operation JSA Form

JSA No.:

Testing of Cable Mandatory PPE: Hard Hat, Safety Shoes, Safety Glasses ,FRC , Proper
Job Description Gloves , Hearing Protection, Full Body Harness, Clear Safety Glasses (If
required)
Date 03.04.2019 Additional PPE: T-40
Division SAOPD Equipment Used:- Megger , Testing Kit, Multimeter , Hand Tools
Facility Aindar GOSP -04

Cold Permit Hot Permit Confide Space Permit Equipment


Revised New
Type of work Opening/Line JSA Revision
Break Permit

No. Job Steps Hazard Required Controls Action by


1. Conduct Joint Site Inspection to  Unsafe Working Area
Evaluate Hazards & Risks Identify the exact work location where the
 Hidden Hazards
job to be executed. Issuer &
 Miss Communication Discuss the related hazards and its Receiver
precautions.
 Violation Of Work Permit Certified Issuer & Receiver
2. Obtain Work Permit As Per The Procedure Select the right work permit as per the
Nature of Job nature of job.
Issuer &
 Lack of Awareness About The crew members shall be briefed about Receiver
Emergency Response Plan the Emergency Alarm and response
during the emergency assembly point.
3. Assign A Fire Watch  Not Trained For Fire Fighting Make sure that the Fire Watch is trained
Issuer ,
by a third party how to operate Fire
Receiver &
Fighting Equipment.
Supervisor
4. Inspection Prior To Start Work  Live Electrical Apparatus Make sure that the equipment being tested
is fully de energized and isolated prior to
start testing.

Isolate all the equipment to be tested from


supply prior to attaching, adjusting or
renovating any test connection.

5. Testing Activity  Damaged Hand Tools / Power Make sure the hand tools / power tools
Tools (Testing Kit) being used are in good condition.

All the connections in the current circuit Issuer ,


 Electrocution should be of low resistance, tight and Receiver &
secured. So as not be inadvertently Supervisor
opened.

Inspect test leads prior to use to make that


they are in good condition.

The testing engineer must be familiar with


the testing requirements.

Don’t use fragile test leads that could


break and short circuit.

All the hand tools / power tools being


used shall be inspected and color coded.

The electrical outlet of 220 volts shall be


fitted with RCD of 10 mA.
5. Testing Activity  Electrocution The generator being used for power
supply shall be properly grounded.

The working area shall be properly


barricaded with proper signage.
 Unauthorized Personnel Only authorized personnel shall stay in
the barricaded area.

Proper and regular housekeeping shall be


 Improper Housekeeping maintained during the job execution.

All the active work permits shall be closed Issuer ,


after finishing the job. Receiver &
Supervisor

 Heat Stress The workers working under open sky shall


be provided frequent breaks as per Heat
Stress Management Program to minimize
the chances of heat stress.

Make sure that the Hygrometer is


available for temperature monitoring

Temperature monitoring shall be done


properly and should be recorded in
Temperature monitoring sheet.

Pure and cold water shall be readily


available for the workers during the job
execution
Issuer ,
Receiver &
Supervisor