8'-2" 6'-2"

PLINTH SLAB DETAIL


S1 100 MM THICK
LVL 2'6" 8mm # @ 200 C/C STRAIGHT BOTHWAYS
100THK

PLINTH LVL.
11'-6"
11'-6"

brick
S1 S1 work
LVL 3'
LVL 3' FILLING
gr. lvl.
14'-4" 150

GROUND BEAM

PLACEMENT OF GROUND / PLINTH BEAMS


12'-10"
12'-10"

S1
LVL 3'

14'-4" SCHEDULE OF PLINTH SLAB:-


SLAB THICKNESS MAIN BAR SECONDARY TYPE REMARK
14'-4"
S1 4" 8 T@ 8"C/C 8 T@ 8"C/C PLINTH SLAB M20 MIX

STAIRCASE DOWELS 12# @ 6" C/C

S1
14'-8"

14'-8"

LVL 3' NOTE:Yellow colur slab shown is sunk slab


S1
LVL 1'6"

14'-4"

FLOOR SLAB PLAN