I. Quality Policy Statement
Ensiab Engineering Consulting (E2C) policy is to provide technical design and engineering services which
meet the customer’s specified project requirements and comply with all statutory and regulatory
requirements. We are totally committed to setting and achieving quality, and in all respects, the specified
requirements and reasonable expectations of our customers.
Ensiab Engineering Consulting (E2C) shall develop and maintain a Quality Management System and
maintain a consistently high quality in all work we undertake. Our Quality Management System shall
ensure that proper communication, work control and accountable records are generated for all work
undertaken.
Ensiab Engineering Consulting (E2C) staff are charged with promoting these aims and are required to
familiarize themselves with the contents of this quality manual which defines the Quality Management
System that has been established and adopted as the means for achieving these declared objectives.
Everyone connected with Ensiab Engineering Consulting (E2C) shall be supported according to their
individual needs for personal development, training and facilities.
Total Quality Management shall be applied to every aspect of our activity and quality shall be the
responsibility of everyone, in every activity, throughout Ensiab Engineering Consulting (E2C). E2C
accomplishes this by adhering to quality management and operational system that recognize customer
satisfaction as a primary goal.
II. Introduction
1. Background
Ensiab Engineering Consulting (E2C) was established in 2015, an engineering design and consulting firm
with the following specialist services and expertise:
• Front End Engineering Design
• Equipment Design
• Piping Engineering
• Electrical Engineering
• Detailed Engineering Design
• Machinery Engineering
• Civil/Structural Engineering
• Instrumentation Engineering
• Building Design
E2C is customer focused to provide quality engineering design at the right price and time schedule.
Ensiab Engineering Consulting (E2C) aim is to provide value for money engineering consultancy in support
of our customer’s design and services. We take pride in being reliable and friendly in day-to-day dealings
with our customers, good communication equates to the delivery of improved design quality.
E2C-QMP-001 Page 3 of 22
2. Purpose
The purpose of this quality manual is to establish and state the general policies and objectives
governing Ensiab Engineering Consulting (E2C) Quality Management System. These policies and
objectives define management’s intended arrangements for managing operations and activities in
accordance with E2C plans or protocol for achieving quality assurance and client satisfaction.
All changes to policies and objectives are reviewed to ensure that there no conflicts with the policies
stated in this Quality Manual (QM).
3. Scope
This Quality Manual defines:
• The overall quality policy and objectives adopted by E2C.
• The management effort that has been developed to implement this quality policy.
• Identifies the activities, processes and procedures used to manage the project’s quality
management.
• The continuous improvement of activities and processes utilized by Ensiab Engineering
Consulting (E2C).
E2C-QMP-001 Page 4 of 22
1. Managing Director
Managing Director is responsible for the overall management of E2C. He is responsible for the overall
and final success of all contracts undertaken, for providing guidance on all major issues and for
ensuring that all E2C design and consulting services are produced and delivered to the highest possible
level.
Managing Director is responsible for:
• Supervising the day to day running of E2C.
• The overall progress of the work with which he has been entrusted and the budget placed at
his disposal.
• Controlling budget, time schedules, Quality plans, resources and quality within the company
• Approving changes to agreed time schedules, resources and budgets.
• Ensuring that management will meet the customer business requirements and objectives as
well as keeping to the agreed time schedule.
• Maintaining overall responsibility for all projects.
2. Engineering Manager
Engineering Manager is responsible for the overall engineering activities of E2C. He is responsible for
the overall project management process and delivery timelines to keep projects on schedule and on
budget. Confronts and solves performance/operational issues to improve development efficiency.
Leads and develops the engineering team.
Engineering Manager report directly to Managing Director and his tasks are included:
• Identify the resource requirements
• Establish the team for work execution
• Set tasks and targets to the teams
• Provide technical support
• Monitor progress to ensure timely and cost-effective execution
• Ensure implementation of the QMS
• Identify areas for improvement
• Train the staff to maintain technical competently
3. Project Engineer
Project Engineer is appointed by Managing Director, and are responsible for the delivery of a project,
for organizing the project work, and distributing this work between the project staff according to the
directives, procedures and instructions making up the E2C QMS whilst duly observing the
requirements of E2C.
Project Engineer report directly to Managing Director and his tasks are included:
• Responsibility for the general progress of the work of the project
• Controlling the time schedules, work packages, resources and quality of the tasks allocated to
the project
• Ensuring that the project will meet the objective of the customer and the business needs of
E2C.
• Directing the studies of the project with the constant aim of achieving an accelerated and
sustained tempo of the project within the scope of their own particular quality plan and
individual work packages.
E2C-QMP-001 Page 5 of 22
4. Safety
To manage & identify hazards/aspects and risk associated to employee, client and the impact
on the environment. Prevents incidents and injuries with a focus on the integrity of
operations.
Safety report directly to Managing Director and his tasks are included:
• Participates in the necessary measurement and evaluation of the effectiveness of any
assigned safety management programs or procedures developed or modifications necessary
to achieve optimum results.
• Reviews technological developments and equipment to keep up to date on the devices and
techniques designed to eliminate or minimize hazards and determines whether these
developments and techniques have application in E2C.
5. Quality Administrator
To provide high standard of administrative support to enable the Quality team to work within a
framework of continual Quality Improvement. To coordinate the quality system continual
development and improvement, manage lessons learned and customer feedback as well yearly
internal audits.
Quality Administrator report directly to Managing Director and his tasks are included:
• To lead E2C team Quality systems to ensure that the team are equipped to drive forward the
Quality Improvement Strategy. Lead E2C efforts for ISO certification.
• To investigate, resolve and report on all complaints and compliments at E2C with regards to
customers and stakeholders.
E2C-QMP-001 Page 6 of 22
• Coordinate softcopy uploading/publishing of project records and completed client site project
with Electronic Document Management System (EDMS) specialist.
E2C-QMP-001 Page 7 of 22
E2C Quality Loop:
Project Performance
Review & Analysis
Engineering / QA-QC
Within E2C an effective QMS ensures that all activities are fully understood, controlled and
documented and that everyone knows exactly what and how to execute a task following one of the
E2C Work Procedures, processes or Instructions.
2. Organizational goals
The primary goal of E2C is the quality of the final design and services (at all times). To succeed, E2C
must be able to offer design and services that:
• Satisfy the customer’s requirements, standards and expectations.
• Comply with applicable local and Royal Commission standards and specifications.
In order to meet these goals, E2C is organized in such a way that technical, administrative and human
factors affecting the quality of E2C design and services are always under control.
3. Documentation requirements
3.1 General
E2C QMS documentation includes:
• Statements regarding quality policy and quality objectives.
• Documented procedures, which clearly describe the sequence of processes necessary to
ensure conformance with ISO 9001:2008.
• Documented instructions to ensure the effective operation and control of processes and
quality records.
E2C-QMP-001 Page 8 of 22
3.2 Quality Manual
This Quality Manual includes the scope of Ensiab Engineering Consulting (E2C) quality system.
Each section of this manual references the appropriate QM procedures. Interactions between
procedures are defined in this Quality Manual or in the Quality Procedures.
a. Policy and Objectives
E2C established and maintains a Quality Manual (QM) which includes:
• Details of any ISO 9001:2008 exclusions.
• Details of associated documented procedures.
• Their sequence and interaction.
b. Responsibility
Project Engineer is responsible for operating the QMS, ensuring that the Quality Manual (QM)
is fully and effectively implemented and for coordinating the writing availability of the
necessary processes, procedures and instructions.
b. Responsibility
Project Engineer is responsible for the overall planning of document control procedures
throughout E2C.
E2C-QMP-001 Page 9 of 22
E2C established and maintains a QA/QC system as a means of ensuring that the services we provide our
customers conform to specified requirements. This QA/QC system are included:
• Documented quality system procedures and instructions to ensure that all activities are
performed in accordance with established requirements.
• Effective management support to ensure compliance and the use of the QA/QC procedures and
instructions.
All E2C employees are strived to improve the quality of design and services to our customers. The QA/QC
program is a process of continuous improvement which requires input from everyone in the organization.
Everyone in the organization shall comply and endeavor to improve the process where possible. An
effective QA/QC program consist of the following key components:
• Established QA/QC procedures and instructions that comply with generally accepted industry
standards, Royal Commission, Saudi Government and local regulating authorities, and the project
specifications and standards establish by the customer;
• The identification and timely issuance to the project team any required controls, processes,
inspection equipment, fixtures, tools, materials and labor skills needed to properly execute the
project.
• Updating, as necessary, of quality control, inspection and testing techniques, including the
development of new methods and procedures.
• Identification of any commitments made which exceeds available resources in sufficient time to
properly acquire the required resources.
• Clarification of the standards of acceptability as required to support the overall QA/QC program
and our customer’s objectives.
• Review of the project process, technical design and service, inspection and test procedures to
ensure that applicable documentation reflects how activities are performed.
• Effective maintenance of quality records to document and track performance and improvement.
E2C-QMP-001 Page 10 of 22
d. Emphasis is placed on problem prevention rather than dependence on detection after occurrence.
2. Customer focus
a. Policy and Objectives
With the overall aim of achieving customer satisfaction, E2C will ensure that:
• Customer needs and expectations are determined and converted into requirements
• Customer requirements are fully understood and met
• Customer satisfaction is enhanced
b. Responsibility
E2C management has overall responsibility for establishing, implementing and maintaining this
activity.
3. Quality policy
a. Policy and Objectives
E2C-QMP-001 Page 11 of 22
E2C established its quality policy and ensure that it:
• Is appropriate for the needs of E2C and its customers
• Includes a commitment to meeting requirements and continual improvement
• Provides a framework for establishing and reviewing quality objectives
• Is communicated, understood and implemented throughout E2C
• Is regularly reviewed for continuing suitability
b. Responsibility
E2C management has overall responsibility for establishing, implementing and maintaining this
activity.
4. Planning
4.1 Quality objectives
a. Policy and Objectives
E2C established quality objectives at each relevant function and level. These quality objectives
will be consistent with the quality policy and the commitment to continual improvement. Quality
objectives are included those needed to meet design and service requirements.
b. Responsibility
E2C management has overall responsibility for establishing, implementing and maintaining this
activity.
b. Responsibility
Managing Director has overall responsibility for establishing, implementing and maintaining this
activity.
6. Management review
6.1 General
a. Policy and Objectives
E2C established a process for the periodic review of the QMS. It shall be reviewed to ensure its
continuing suitability, adequacy and effectiveness. The review evaluated the need for changes to
E2C QMS, including policy and objectives and continues to provide customer satisfaction.
b. Responsibility
Project Engineer is responsible for ensuring that quality records are maintained in a systematic
and presentable form.
All staff are responsible for ensuring that they provide the necessary records as required from
their involvement in implementing the quality systems.
b. Responsibility
Project Engineer is responsible for ensuring that quality records are maintained in a systematic
and presentable form.
All staff are responsible for ensuring that they provide the necessary records as required from
their involvement in implementing the quality system.
2. Human resources
2.1 General
a. Policy and Objectives
E2C assigned personnel who are competent (e.g. education, training, skills and experience, etc.).
b. Responsibility
Project Engineer has overall responsibility for establishing, implementing and maintaining this
activity.
E2C-QMP-001 Page 14 of 22
a. Policy and Objectives
E2C established and maintains system level procedure to:
• Determine competency and training needs.
• Provide training to address identified needs.
• Evaluate the effectiveness of training at defined intervals.
• Maintain appropriate records of education, training, skills, and experience.
• Ensure that the necessary expertise and levels of skills, etc. are available to handle the
expected workload and range of activities.
E2C established and maintains procedures to make its employees at each relevant function and
level aware of:
• The importance of conformance with the quality policy, and with the requirements of the
Quality Management System
• The significant impact of their work activities on quality, actual or potential.
• The benefits of improved personal performance.
• Their roles and responsibilities in achieving conformance with the quality policy and
procedures and with the requirements of the Quality Management System.
• The potential consequences of departure from specified procedures.
b. Responsibility
Project Engineers are responsible for ensuring that appropriate training is carried out and that all
staff involved in their projects are aware of the requirements, rules and procedures to which they
are to conform and against which they will be audited.
3. Infrastructure
a. Policy and Objectives
E2C developed and maintained the infrastructure to achieve design requirements regarding (but
not limited to) the following:
• Workspace and associated facilities.
• Hardware and Software.
• Tools and Equipment.
• Communication Facilities.
• Supporting Services.
b. Responsibility
Project Engineer has overall responsibility for establishing, implementing and maintaining this
activity.
4. Work environment
a. Policy and Objectives
E2C defined and managed those human and physical factors of the work environment needed to
achieve conformity of design.
This are included:
• Health and Safety conditions.
• Work methods.
• Work ethics.
• Ambient working conditions.
E2C-QMP-001 Page 15 of 22
b. Responsibility
Project Engineer has overall responsibility for establishing, implementing and maintaining this
activity.
b. Responsibility
E2C management has overall responsibility for establishing, implementing and maintaining this
activity.
2. Customer-related processes
2.1 Determination of requirements related to the design
a. Policy and Objectives
E2C established a process for identifying customer requirements that determine the:
• Completeness of the customer’s design and/or service requirements.
• Requirements not specified by the customer but necessary for fitness for purpose.
• Statutory, regulatory and legal requirements.
• Customer requirements for availability, delivery and support of product and/or service.
b. Responsibility
Managing Director, assisted by Project Engineers, has overall responsibility for establishing,
implementing and maintaining this activity.
E2C-QMP-001 Page 16 of 22
The customer requirements, including any requested changes, will be reviewed before a
commitment to supply a design is provided to the customer (e.g. submission of a tender,
acceptance of a contract or order).
This Contract Review will ensure that:
• Customer requirements are clearly defined for design and/or service
• Where the customer provides no written statement of requirement, the customer
requirements are confirmed before acceptance through email.
• Contract or order requirements differing from those previously expressed, (e.g. in a
tender or quotation), are resolved.
• E2C can meet the customer requirements for the design and/or service.
The results of the review and subsequent follow-up actions are recorded, and the information
disseminated to all the relevant personnel.
b. Responsibility
Project Engineer has overall responsibility for establishing, implementing and maintaining this
activity.
b. Responsibility
Managing Director has overall responsibility for establishing, implementing and maintaining this
activity.
b. Responsibility
Project Engineers have overall responsibility for establishing, implementing and maintaining this
activity
4. Purchasing
4.1 Purchasing Process
a. Policy and Objectives
E2C evaluated and selects suppliers based on their ability to supply in accordance with E2C
requirements. Evaluation, re-evaluation and selection criteria for suppliers will be established. The
results of evaluations and subsequent follow-up actions are recorded.
E2C system for control of all purchased or subcontracted services are ensured those services
purchased and received conform to specified requirements and include provision for the assessment
of suppliers and subcontractors. It also established rules for the specification of requirements for
purchased documents and the verification of services received.
b. Responsibility
Managing Director has overall responsibility for establishing, implementing and maintaining this
activity.
4. Analysis of data
a. Policy and Objectives
E2C analyzed all applicable data to determine the suitability, adequacy and effectiveness of the
QMS and use this to provide information relating to:
• Customer satisfaction and/or dissatisfaction
• Conformance to design requirements
• Characteristics of trends and opportunities for preventive action
• Suppliers
b. Responsibility
E2C management, assisted by Project Engineer has overall responsibility for establishing,
implementing and maintaining this activity.
E2C-QMP-001 Page 21 of 22
5. Improvement
1.1 Continual Improvement
a. Policy and Objectives
E2C planned and managed the processes necessary for the continual improvement of the QMS
through used of a system level procedure that describes the use of quality policy, objectives,
internal audits results, analysis of data, corrective and preventive action and management review
to facilitate continual improvement.
b. Responsibility
E2C management has overall responsibility for establishing, implementing and maintaining this
activity.
b. Responsibility
E2C management, assisted by the Project Engineers, has overall responsibility for establishing,
implementing and maintaining this activity.