QUIZ NO.

1
NBC PD 1096 RULE 2 TO 3
Total questions: 10
Time: 15mins
Instructor name: Eloisa F. Aquino

Name:
Block:
Date:

1. No person, firm or corporation, including any agency or instrumentality of the government shall construct, alter,
repair, convert, use, occupy, move, demolish and add any building/structure or any portion thereof or cause the same
to be done, without first obtaining a ______ ________ therefor from the Building Official assigned in the place
where the subject building/structure is located or to be done.

a) building permit b) work permit

c) construction permit d) building notice

2. Permits supplementary to a Building Permit shall be applied for and issued by the Building Official. These
include _______ and the _______ Permits.

a) Ancillary and the Accessory b) Mechanical and Electrical

c) Work and None-work d) Civil and Structural

3. WHICH IS not an Ancillary Permit?

a) Architectural Permit b) Sanitary Permit

c) Civil/Structural Permit d) Soil Test Permit

e) Mechanical Permit

4. __________ Permits. These may include, among others: bank and records vaults; swimming pools; firewalls
separate from the building/structure; towers; silos; smokestacks; chimneys; commercial/industrial fixed ovens;
industrial kilns/furnaces; water/waste treatment tanks, septic vaults; concrete and steel tanks; booths, kiosks and
stages; and tombs, mausoleums and niches.

a) TEMPORARY b) WORK

c) ANCILLARY d) ACCESSORY

5. Exemption From Building Permits:


A building permit shall not be required for the following, provided these shall not violate any provision of the Code
and this IRR. GIVE TWO (2)

a) MAINTENANCE WORKS b) MINOR CONSTRUCTIONS

c) UNDERGROUND CONSTRUCTION d) REPAIR WORKS


6. Together with the accomplished prescribed application form/s, the following shall be submitted to the OBO:
In case the applicant is the registered owner of the lot: EXCEPT ONE

a) Certified true copy of OCT/TCT, on file with the Registry of Deeds,

b) Barangay Clearance

c) Current Real Property Tax Receipt.

d) Tax Declaration

7. ________ sets of survey plans, design plans, specifications and other documents prepared, signed and sealed over
the printed names of the duly licensed and registered professionals.

a) 7 b) 6

c) 5 d) 4

8. That the supervising Architect/Civil Engineer shall keep at the jobsite at all times a _________ of daily
construction activities wherein the actual daily progress of construction including tests conducted, weather condition
and other pertinent data are to be recorded, same shall be made available for scrutiny and comments by the OBO
representative during the conduct of inspection his/her inspection pursuant to Section 207 of the Code.

a) penalty b) logbook

c) pointers d) pattern

9. That upon completion of the construction, the Owner shall submit the logbook duly signed and sealed to the
______ _______ including as-built plans and other documents and shall also prepare and submit a Certificate of
Completion of the project stating that the construction of the building/structure conform to the provision of the
Code, its IRR as well as the plans and specifications.

a) Mayor b) Secretary

c) Building Official d) Architect

10. That no building/structure shall be used until the Building Official has issued a ____________ therefor as
provided in the Code

a) Final Payment b) Building Permit

c) Specification d) Certificate of Occupancy