Professional Documents
Culture Documents
OPL0002.00 Ossining Public Library HVAC Upgrades EDIT Reduced
OPL0002.00 Ossining Public Library HVAC Upgrades EDIT Reduced
50 Broadway, Hawthorne,
New York 10532
914.747.2800
CLIENT
53 CROTON AVE
OSSINING, NY 10562
OSSINING, NY 10562
BOILER PLANT AND HVAC UPGRADES
INDEX OF DRAWINGS:
T0.1 COVER SHEET il KEY PLAN
MECHANICAUPLUMBING NORTH
M7.1 MECHANICAL DETAILS No use, reproduction or dissemination may be made of this drawing
ond the concepts set forth without the prior written consent of
M7.2 MECHANICAL DETAILS OLA Consultina Enaineers, PC. Coo11"iaht ©
T0.1
CHECKED BY
JK
DATE
10/17/17
“ ”
“ ”
“ ”
“ ”
OLA Consulting Engineers
50 Broadway, Hawthorne,
New York 10532
914.747.2800
CLIENT
EX. AC-1
EX. WWS/R
TO/FROM EACH
EX. 2" WWS
TO AC-3
i1
NORTH
KEY PLAN
WELL I 11
�- 1· \/. ·1
DEM. PORTION OF 3" 1 EX. 6" WWS
WWR FOR CONTROL I '
\ '
VALVE INSTALLATION
(TYP. 5)
EX. 4" WWS
EX. 8" WWR TO OTHER AC
ERV-3 UNITS
HEADER
==========1==========Hf��
PROJECT TITLE
AIR
SEPARATOR
I I OSSINING PUBLIC LIBRARY
l HVAC UPGRADES
I l--l J--;-rt-----
F -1
----------------1------ ___ T _________________
1
I
I
EX. 6"
WWS DN.
53 CROTON AVE
OSSINING, NY 10562
DRAWING TITLE
iiNORTH
MECHANICAL LOWER LEVEL M.E.R. PARTIAL PIPING DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
DEMOLITION PLAN
M1.1
CHECKED BY
JK
DATE
10/17/17
·
·
·
·
·
·
OLA Consulting Engineers
50 Broadway, Hawthorne,
New York 10532
914.747.2800
CLIENT
..
\
I
EX. AC-1
NEW 1" CW TO
8" WWR HEADER
EX. AC-3
� -
AREA OF
NEW 3" INLINE FLOW WORK
INDICATORS FOR
i1
EACH WELL (TYP. 5)
REFER TO DWG. M5.1 KEY PLAN
EX. WWS/R EX. 2" WWS
TO/FROM EACH TO AC-3 NORTH
WELL I\I I (:
EX. 6" WWS
NEW MOTORIZED
BALL VALVE FOR
EACH WELL (TYP. 5).
REFER TO DWG M5.1
EX. 4" WWS
EX. 8" WWR TO OTHER AC
RV-3 UNITS
HEADER I
EX. BASKET
I
BOILER ROOM I
3 ISSUED FOR BID 2/16/18
EI\ .. \ -
NEW
l
i " RPZ
-) WITH 3" DRAIN I
2 ISSUED FOR BID 12/20/17
_ �/�---,;+
- LINE TO FD
I
____,:=-
� HVAC UPGRADES
I
M4.1
CHECKED BY
JK
DATE
10/17/17
SCOPE OF WORK NOTES OLA Consulting Engineers
i--------� · __....., .
•,.
j
2. ERVF-1'S VFD IS CURRENTLY IN ALARM. PROVIDE SERVICE AND REPAIR AS 12 East 49th Street, 11th Fir.
New York, NY 10017
NECESSARY.
646.849.4110
3. ENABLE ERVF-1 TO MODULATE ITS SPEED AND EXHAUST DAMPER WHENEVER CONSULTING
ENGINEERS
AC-1'S SUPPLY FAN IS OPERATING IN THE OCCUPIED MODE. COORDINATE olace.com
WITH THE BALANCER TO OFFSET THE EXHAUST CFM 10% LESS FROM THE
SUPPLY CFM.
EX. AC-2 CLIENT
4. PROVIDE SERVICE FOR VFD'S TO RELEASE THE SUPPLY FAN VFD TO ALLOW
THE FAN TO RAMP TO 60 HZ. CURRENTLY LIMITED TO 51 HZ.
AC-2
A. MECHANICAL:
=·· ...... .. ......,._ ... �--- · ·
1. REMOVE THE REDUNDANT OUTSIDE AIR INTAKE DAMPER LOCATED IN THE
ELECTRICAL SWITCHGEAR ROOM.
B. BMS:
1. VERIFY PROGRAMMED OCCUPANCY SCHEDULING AND MODIFY AS NECESSARY.
MECHANICAL LOWER LEVEL MER NEW WORK PLAN 2. COORDINATE WITH THE BALANCER TO ESTABLISH TO CORRECT ERVF-2 SPEED
SCALE: 1/4" = 1'-0" NECESSARY TO KEEP THE BUILDING SLIGHTLY POSITIVE WITH RELATIONSHIP TO
THE OUTSIDE.
NORTH
AREA OF
AC-3 WORK
A. BMS:
EX. AC-1 1. VERIFY PROGRAMMED OCCUPANCY SCHEDULING AND MODIFY AS NECESSARY. KEY PLAN
2. WORK WITH THE BALANCER TO ESTABLISH TO CORRECT ERVF-3 SPEED
NECESSARY TO KEEP THE BUILDING SLIGHTLY POSITIVE WITH RELATIONSHIP TO
THE OUTSIDE. NORTH
B. BALANCING:
1. REPLACE THE BELTS AND SHEAVES' AND ADJUST TO DELIVER DESIGN CFM
WITHOUT EXCEEDING THE MOTOR RLA.
2. PERFORM AIR AND WATER BALANCE ON AC-3/ERVF-3
3. CALIBRATE THE OUTSIDE AIR DAMPER TO MAINTAIN THE VENTILATION MINIMUM
OUTSIDE AIR QUANTITY PER THE ORIGINAL DESIGN DOCUMENTS.
DRAWING TITLE
” ” ”
,-----
OLA Consulting Engineers
--�__J________l
EX. 3" CW MAIN
r
I
RUN IN EXISTING 1 f NEW CW FILL TO 12 East 49th Street, 11th Fir.
CONDUIT. WIRING BY BOILER SYSTEM New York, NY 10017
3" ~30' ELECTRICAL (REFER 646.849.4110
wws TO ELEC. DWGS). CONSULTING
ENGINEERS
olace.com
I
NEW 1'' CW I
H SENSOR (TYP.) (PRESSURE TRANSDUCER) AT EMERGENCY FILL
1 O' ABOVE PUMP INLET DEPTH (GLOBAL
WATER WL-400) (SEE NOTE 6). REFER ALSO EX. BACK PRESSURE I EX. TEMP SENSOR
TO SITE DWG E3.1 FOR WELL LOCATIONS. VALVE (NOTE 5)
�
8" RETURN LINE MANIFOLD OSSINING PUBLIC LIBRARY
I
NEW COMPOUND I
i1
I
EXISTING KEY PLAN
I
NEW 6" BYPASS
NORTH
I
8" SUPPLY MANIFOLD
NEW FLOW SWITCHES
I
2 EXISTING WELL DETAIL (TYP.)
SCALE: NONE I
I
I
M.E.R. FLOOR I
L _______ I
t=--=--=--=-
5 ISSUED FOR BID 2/11/19
(TYP.) 1
,----- - - - - - - - D v D 'v D v:u'vs 2 ISSUED FOR BID 12/20/17
� 2
�I
1 ; 1
EX. BMS CONTROL
I rREu sE Ex. 1 ];J : SIGNAL FOR BLEED
vAL vEs
1 ISSUED FOR REVIEW 11/2V17
rIr _ _
'----,c-----' '----,c-----'
CONDUIT FOR
I
No. ISSUE OR REVISION DATE
- I
I wiRING To LEVEL
SENSORS _.,;r - - - _J _j
vFD sPEED AND
START/STOP I No use, reproduction or disseminotion may be made of this drawing
I I -=--=--=--=- - -
SIGNALS (TYP.) ____,,,/
_J
I and the concepts set forth without the prior written consent of
OLA Consultina Enaineers, PC. Coovriaht ©
=t
------- -------- --------- _____ _J
PROJECT TITLE
I
I SIGNAL FROM
W-2,3,4,5
--�----- NEW BMS
_____________ _J LEVEL SENSORS - - - - - -
CONlROLLER
�AO'S TO CONTROL VALVES OSSINING PUBLIC LIBRARY
(4-20 mA) _______......,�����,......... V-1R V-2R V-3R HVAC UPGRADES
3" (TYP.)
� V-4R V-5R 53 CROTON AVE
M5.1
INSTALLATION TO BE PROVIDED BY CHECKED BY
MECHANICAL CONTRACTOR. SENSOR
1 PARTIAL FLOW SCHEMATIC TUBING TO BE VENTED PRIOR TO
JK
SCALE: NONE ENTERING THE WEATHER-PROOF DATE
JUNCTION BOX. 10/17/17
OLA Consulting Engineers
50 Broadway, Hawthorne,
New York 10532
914.747.2800
12 East 49th Street, 11th Fir.
New York, NY 10017
646.849.4110
CONSULTING
ENGINEERS
olace.com
CLIENT
PRESSURE BACKFLOW
�
_CITY WATER OSSINING PUBLIC LIBRARY
REDUCING-� �- PREVENTER FILL
VALVE 53 CROTON AVE
OSSINING, NY 10562
,--------F---.-----'--------...1...f(
I
I
® EB (50 GPM MAX)
�
--r-8 1 8 O"F
,-- 1 --1 1" SYSTEM
I I BYPASS VALVE
I I (OPENS WHEN
I I
EB
PUMP AT MIN.
SPEED)
EB
I I
I � I
I I KEY PLAN
: (720 MBH): (720 MBH)
I I
L __I__ J
NORTH
CHEMICAL SHOT FEEDER
I
I
I 1·
3"_/� 3•
I 3" HWR 3" HWR 5 ISSUEO FOR BIO 2/11/19
I 3" HWR BMS TEMP SENSOR (TYP.)
4 SEO AOOENOUM #1 8/21/18
�
3 ISSUEO FOR BIO 2/16/18
L-------+-o-..L..----------�------4------------------------------..L..----------------------�
2 ISSUED FOR BID 12/20/17
1 HOT WATER SYSTEM PARTIAL FLOW SCHEMATIC No. ISSUE OR REVISION DATE
SCALE: NONE
No use, reproduction or dissemination moy be made of this drawing
and the concepts set forth without the prior written consent of
OLA Consultina Enaineers, PC. Coo,riqht ©
PROJECT TITLE
DRAWING TITLE
MECHANICAL
SCHEMATICS
M5.2
CHECKED BY
JK
DATE
10/17/17
OLA Consulting Engineers
HOT WATER CONDENSING BOILER HOT WATER COIL SCHEDULE 50 Broadway, Hawthorne,
SCHEDULE DESIGNATION HWC-1 HWC-2 HWC-3 HWC-4 HWC-5 HWC-6 HWC-7 HWC-8
New York 10532
914.747.2800
DESIGNATION B-1 DEPT. PROGRAM CHILDREN'S CHILDREN'S ADULT CONFERENCE ADULT ADULT
LOCATION 12 East 49th Street, 11th Fir.
HEAD 121 ROOM 117 LIBRARY LIBRARY LIBRARY SUPERVISOR LIBRARY LIBRARY
LOCATION BOILER ROOM New York, NY 10017
HOT HOT HOT HOT HOT 646.849.4110
QTY 1 SYSTEM SERVED HOT WATER HOT WATER HOT WATER
WATER WATER WATER WATER WATER CONSULTING
ENGINEERS
olace.com
MODEL BMK-750 MODEL SDV5 SDV5 SDV5 SDV5 SDV5 SDV5 SDV5 SDV5
COIL:
INPUT (MBH) 750 CLIENT
FACE AREA (SQ. FT.) 0.67 1.22 1.22 .67 1.67 .67 3.0 2.43
GROSS OUTPUT (MBH) 720
No. OF ROWS/F.P.I. 1 1 1 1 1 1 2 1
MIN. GAS PRESSURE (W.C.) 4"
TUBE MATERIAL Cu Cu Cu Cu Cu Cu Cu Cu
MAX. GAS PRESSURE (W.C.) 14"
FIN MATERIAL Al Al Al Al Al Al Al Al
MAX. ALLOWED WORKING PRESSURE (PSIG) 160
FINNED HxL (IN) 8x12 12.5x14 12.5x14 8x12 15x16 8x12 18x24 17.5x20
MIN. FLOW RATE (GPM) 12
FLUID WATER WATER WATER WATER WATER WATER WATER WATER
MAX. FLOW RATE (GPM) 175 AIRFLOW (CFM) 300 500 800 400 1,000 300 2,000 540
OSSINING PUBLIC LIBRARY
WATER CONNECTIONS 3" E.A.T. ('F) DB/WB 55· 55· 55· 55' 55· 55· 55' 55' 53 CROTON AVE
EWT/LWT ("F) 140"/180" L.A.T. ("F) DB/WB 85" 85" 85" 85" 85" 85" 95" 95" OSSINING, NY 10562
AIR P.D. (IN H,O) .09 .07 .19 .18 .16 .09 .36 .05
DIMENSIONS (L x W x H) 25 X 28 X 78
E.W.T./L.W.T. ("F) 180"/167" 180"/162" 180"/164" 180"/168" 180"/157" 180"/167" 180"/132" 180·;1oo·
GAS BURNER:
GPM (SEE NOTE 2) 1.6 1.9 3.5 2.2 3.0 1.6 3.9 .61
PUMP SCHEDULE GAS INPUT (MBH) 750
W.P .D. (FT H,O) .96 .57 5.7 1.63 5.7 .96 2.3 .10
THERMAL EFFICIENCY (%) 95.5%
DESIGNATION P-1 TOTAL CAPACITY
ELECTRICAL DATA: 10.1 16.7 26.8 13.4 33.5 10.1 90.0 24.0
LOCATION BOILER ROOM (MBH)
BURNER BLOWER HP
NOTES:
SYSTEM SERVED HOT WATER VOLTS/¢/Hz 120/1/60 1. COILS BASED ON PRICE.
2. COILS SHALL HAVE A MINIMUM PRESSURE RATING OF 150 PSI.
E-1535 FLA 13.0
MODEL
1AAC NOTES:
BASE 1. BOILERS BASED ON AERCO.
TYPE
MOUNTED 2. PROVIDE ASME CSD-1 COMPLIANT CONTROLS.
GPM 50.0 3. PROVIDE BOILERS WITH 50 PSI ASME RELIEF VALVES, 3-1/4"
FLUID PRESSURE AND TEMPERATURE GAUGES, MANUAL RESET HIGH
WATER
LIMIT AQUASTAT, LOW WATER CUT OFF.
FLUID TEMP. ("F) 180" 4. PROVIDE MANUFACTURER' CONDENSATE NEUTRALZING KIT AIR SEPARATOR SCHEDULE EXPANSION TANK
TOTAL DYNAMIC HEAD
(FT H 2 0) 60 DESIGNATION AS-1 SCHEDULE
3,600 SERVICE HW DESIGNATION ET-1
RPM
- MODEL RL-3F SERVICE HW
NPSH (FT. H,O)
MOTOR: EXISTING VAV BOX SCHEDULE FLANGED TANGENTIAL
OPENING (IN)
3
MODEL D-80V
OPERATING WEIGHT (LBS) 271
BHP/HP 1.18/2.0 OPERATING WEIGHT 182
EXISTING / COOLING MAX HEATING DIAMETER/HEIGHT (IN) 16"/56"
TAG MIN CFM
VOLTAGE/¢/Hz 208/3/60 NEW CFM MAX CFM DIAMETER/HEIGHT (IN) 22.75/27.0
TANK AND ACCEPTANCE
STARTER: VAV-4-1 EXISTING 1,800 180 540 CAPACITY (GPM) 190 44.4/22.6
VOLUME (GAL)
TYPE VFD
i1
MAX. TEMP. ("F) 350
KEY PLAN
VAV-4-3 EXISTING 820 100 300
MIN. TEMP. ("F) 60"
LOCATION BOILER ROOM VAV-4-9 EXISTING 1,5D0 150 500 MAX. PRESS. (PSI) 125
NOTES:
MAX. TEMP. ("F) 200·
NOTES: VAV-4-11 EXISTING 720 100 300 1. AIR SEPARATORS SHALL BE BASED ON BELL
1. PUMPS BASED ON BELL AND MIN. PRESSURE (PSI) 28 NORTH
AND GOSSETT.
GOSSETT. NOTES: 2. SHALL HAVE FLANGED TANGENTIAL MAX. PRESSURE (PSI) 125
2. ALL MOTORS SHALL BE PREMIUM 1. REBALANCE EXISTING VAV BOXES AS SHOWN. OPENINGS.
EFFICIENCY. NOTES:
3. THE AIR SEPARATOR SHALL BE DESIGNED, 1. TANKS BASED ON BELL AND
CONSTRUCTED AND STAMPED FOR 125 PSIG AT GOSSETT AND SHALL BE ASME
350'F IN ACCORDANCE WITH THE ASME BOILER RATED AND STAMPED FOR 125
RADIANT HEATING PANEL SCHEDULE AND PRESSURE VESSEL CODE. PSIG.
WATER GPM 0.5 2.5 1.2 2.0 1.8 0.5 0.5 0.9 RANGE: 15-150 GPM; 2 ISSUED FOR BID 12/20/17
WP.D. (FT H,O) 1.5 12.1 2.9 10.6 4.2 0.3 0.3 2.3 Fl-1 WATER WELL WATER ERDCO 322_-12_5 3 3 75 NONE CONTRACTOR TO COORDINATE
DIRECTION AND END CONNECTIONS 1 ISSUED FOR REVIEW 11/2V17
CONSTRUCTION DATA:
TUBE MATERIAL COPPER COPPER COPPER COPPER COPPER COPPER COPPER COPPER ANALOG (4-20 No. ISSUE OR REVISION DATE
FM-2 WATER WELL WATER ONICON F-3100 6 4 450 NOTE 3
TUBE DIAM (IN.) �"OD too too roo tOD roo too too
mA)
No use, reproduction or disseminotion may be made of this drawing
NOTES: and the concepts set forth without the prior written consent of
PANEL MATERIAL ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM ALUMINUM
OLA Consultina Enaineers, PC. Coovriaht ©
PANEL WIDTH (IN.) 36" 30" 30" 36" 36" 18" 18" 36" 1. CONTRACTOR TO VERIFY ALL PIPE SIZES IN FIELD PRIOR TO ORDERING.
2. CONTRACTOR TO VERIFY ALL METER SIZES ARE SUITABLE FOR THE EXPECTED LOADS. PROJECT TITLE
NUMBER OF TUBES 6 5 5 6 6 3 3 6 3. FLOW METER REQUIRES EXTERNAL POWER. CONTRACTOR TO PROVIDE AND COORDINATE POWER SOURCE.
No. OF CIRCUITS 1 2 2 2 2 1 1 1 OSSINING PUBLIC LIBRARY
FLUSH FLUSH FLUSH FLUSH FLUSH FLUSH FLUSH FLUSH HVAC UPGRADES
PANEL MOUNT TYPE
MOUNT MOUNT MOUNT MOUNT MOUNT MOUNT MOUNT MOUNT VALVE SCHEDULE 53 CROTON AVE
NOTES: OSSINING, NY 10562
1. RADIANT CEILING PANEL BASED ON STERLING. DESIGN
VALVE LINE CONTROL BODY FAIL ACTUATOR
2. FURNISH ALL REQUIRED PANEL JOINT CLIPS, SUSPENSION CLIPS, SUPPORT CHANNELS. TAG FLUID AREA SERVED LOCATION VALVE TYPE GPM PD (PSI)
SIZE (IN.) SIZE (IN.) TYPE STYLE POSITION VOLTAGE
3. FINISH SHALL BE APPROVED BY ARCHITECT. M(MAX.)
DRAWING TITLE
4. COORDINATE ALL MOUNTING HEIGHTS WITH FIELD CONDITIONS.
5. CONTRACTOR TO PROVIDE 1" FOIL BACKED BATT INSULATION OVER RADIANT PANEL. V-1R WATER WELL WATER LOWER LEVEL M.E.R. 2-WAY/GLOBE 70 3 3 3 MODULATING FLGD N.C. 24V
6. LOCATION AND LAYOUT AS SHOWN ON PIPING DRAWINGS.
V-2R WATER WELL WATER LOWER LEVEL M.E.R. 2-WAY/GLOBE 37.5 3 3 3 MODULATING FLGD N.C. 24V MECHANICAL
SCHEDULES
V-3R WATER WELL WATER LOWER LEVEL M.E.R. 2-WAY/GLOBE 61 3 3 3 MODULATING FLGD N.C. 24V
V-4R WATER WELL WATER LOWER LEVEL M.E.R. 2-WAY/GLOBE 80 3 3 3 MODULATING FLGD N.C. 24V
V-5R WATER WELL WATER LOWER LEVEL M.E.R. 2-WAY/GLOBE 80 3 3 3 MODULATING FLGD N.C. 24V
- SEAL SCALE PROJECT NO.
V-3 WATER WELL WATER LOWER LEVEL M.E.R. 2-WAY/GLOBE 3 3 3 FLGD N.C. 24V
NJNIJIB)
NOTES: DRAWN BY DRAWING NO.
AC
M6.1
CHECKED BY
JK
DATE
10/17/17
³
�------ -
- PRESSURE REDUCING VALVE CONCRETE ANCHOR HILTI-K�CK BOLT, OLA Consulting Engineers
(SET TO PROVIDE 4 PSIG AT
SERIES HDI, OR APPROVED EQUAL.
PRESSURE GAUGE W/ NEEDLE VALVE
INSTALLATION SHALL BE IN
HIGH POINT IN THE SYSTEM) ACCORD ANCE �TH THE �-SUCTION PIPE (SEE 50 Broadway, Hawthorne,
HIGH CAPACITY STEEL AIR VENT- - - - - - -
--._ MANUFACTURERS RECOMMEND ATION.
PLANS FOR SIZES) New York 10532
914.747.2800
CENTRIFUGAL AIR SEPARATOR (PROVIDE LINE SIZE)
BEAM CLAMP AS
M ANUFACTURED B Y UNISTRUT.f
r -- - - -
m,L---C,,(1-="'�---------- GLOBE VALVE r- 1 2 East 49th Street, 11th Fir.
+
STEEL RESTR AINING STRAP.
UNION - - - - - - - - -
----- DISCHARGE PIPE (SEE
New York, NY 10017
PLANS FOR SIZES)
I INCREASER
THREADED HANGER ROD. REFER
GATE VALVES TO SCHEDULE BELOW FOR SIZE.
(IF REQUIRED) 646.849.4110
CLEVIS HANGER TYPICAL CONSULTING
COMBINATION BALANCE, ola ce.com
ENGINEERS
\ ------ -FILL
- LINE FROM EX. COLD WATER CARRIER PIPE BUTTERFLY VALVE
REDUCER ISOLATION AND CHECK
(WHERE REQ'D )�
INSULATION SHALL RUN VALVE. SEE PUMP
FLEXIBLE
'
SCHEDULE FOR SIZE.
CONTINUOUSLY BETWEEN PIPE
f
CONNECTION (TYP.)
AND SHIELD. CLIENT
INTERNAL STRAINER
PIPE INSULATION.-- -----lt
PRESSURE GAUGE
WELDED PIPE -------.._ COUPLER GUARD
INSTALL UNIT LEAVING ADEQUATE DISTANCE TO LOW CAPACITY STEEL AIR VENT INSULATION SHIELD. "TRUMPET" VALVE
REMOVE STRAINER ON UNITS WITH A STRAINER � - -
-INSERT THIS TEE WHEN
BASE MOUNTED END REDUCER
A
PARALLEL TANKS ARE
TO BE USED
PIPE HANGER SCHEDULE
PIPE DIA. 3 4"-2" 2 1 2" -3" 4 "-5" 6" s"-12" SUCTION PUMP ��=�-�
$==$-.J
��
+i=;::
(IF REQUIRED)
BLOWDOWN AND DRAIN VALVE WITH HOSE HANGER DIA. 3 8" 1 2" 5 8" 3 4" 7 8" .,..........--SUCTION DIFFUSER
CONNECTION (ON UNITS WITH STRAINER) ---� r ----+'+------, � PRESSURE GAUGE G (REDUCING TYPE) OSSINING PUBLIC LIBRARY
i��STRAINER REMOVAL SPACE
NOTES:
SYSTEM CONNECTION (CONNECT TO SIDE OF MAIN W/ NEEDLE VALVE ,-.,.____,.�---,, 53 CROTON AVE
1. CLEVIS HANGERS �TH WELDED INSULATION SHIELDS
BALL VALVE WITH
HEADER, TOP OR BOTTOM CONNECTION NOT PERMITTED)-�
SIMILAR TO R AUCH FIG. 1OOSH ON ALL PIPES LARGER
------- --AIR CHARGING VALVE HOSE END CAP OSSINING, NY 10562
::------.._ADJUSTABLE SUPPORT FOOT
THAN 1".
UNDERSLUNG CONNECTION CREATES THERMAL TRAP (12" MIN. DROP) (PRESSURIZE DRY 2. FOR PIPES 1" OR SM ALLER, A B AND HANGER WITH FLOOR ...,-,...0,;.,,,,;,- ,,;,,,;-, ,,·ce ·,- . ,-;.,•�, ·•N.. ,:.•.....:-,-,.:,•«· ,,.,
TANK EQUAL TO FILL
INSULATION SHIELD M AY BE USED SIMILAR TO R AUCH
DRAIN VALVE W/HOSE CONNECTION---------� \ FIG. NO. 1 ASH.
' VALVE PRESSURE) 3. FOR NONINSULATED PIPE, INSULATION SHIELDS MAY GROUT PUMP TO
BE OMITTED.
HOUSEKEEPING PAD) HOUSEKEEPING PAD
� EXPANSION TANK 4. ALL PIPE HANGERS SHALL BE G ALV ANIZED STEEL OR
F ACTORY P AINTED B LACK �TH ENAMEL.
(FlXED OR 5. FOR NON FERROUS PIPING �THOUT INSULATION,
REPLACABLE BLADDER ALL HANGERS SHALL BE COPPER PLATED OR FURNISHED NOTE:
TYPE)
�TH A DI-ELECTRIC BETWEEN PIPE AND HANGERS. SUPPORT SUCTION AND DISCHARGE PIPES SO
THAT NO LOAD IS IMPOSED ON PUMP CASING.
PIPE HANGER DETAIL END SUCTION PUMP PIPING DETAIL SOLID BASE
AIR SEPARATOR AND EXPANSION TANK DETAIL SCALE NONE
3 SCALE: NONE
TYP.---,-
///
f- -
AIR FLOW-
///
COIL
///
///
STRAINER
PROVIDE
-
///
'
///
AIR VENT, TYP. 5/8" Cu
KEY PLAN
///
i1
f-
RETURN
'
///
LOOPS
RADIANT HEATING
PANEL, TYP. -�
NORTH
DUCT TRANSFORMATION
0>-'!/� � �� E H� ��� OE � T� �WA
� _TE� R
= � C�O�IL � IN� D�U�CT� RADIANT HEATING PANEL PIPING DETAIL 2 CIRCUIT HOT WATER COIL PIPING SCHEMATIC
c N o 5 SCALE: NONE 2 SCALE: NONE
5 ISSUED FOR BID 2/11/19
BASED ON NEPTUNE
MODEL VTF 5HP
PRESSURE RATED POT 3/4" DRAIN WITH BALL BOILER
RADIANT HEATING
FEEDER. MIN, CAPACITY
1 /1000 SYSTEM VOLUME. VALVE AND HOSE CAP DRAWING TITLE
PANEL, TYP. .,----+-- INSTALL CONDENSATE
SEE DETAIL 13/M7 1
DRAIN KIT PER MFTR.
UNION
TO BOILER RETURN
HEADER INSTRUCTIONS MECHANICAL
[ HOUSEKEEPING PAD DETAILS
PROVIDE 5/8" HW JUMPERS
3/4" HOSE COCK -
BETWEEN CONTINUOUS
-...___________
CHEMICAL SHOT FEEDER PIPING SCHEMATIC RADIANT HEATING PANEL PIPING DETAIL 1 CIRCUIT HOT WATER BOILER PIPING DETAIL
SEAL SCALE PROJECT NO.
NJNIJIB)
7 SCALE NONE 4 SCALE: NONE 1 SCALE: NTS DRAWN BY DRAWING NO.
AC
M7.1
CHECKED BY
JK
DATE
10/17/17
®
®
® ®
®
®
HARDWARE SET
SET # ITEM & QUANTITY DESCRIPTION FINISH MFR NOTES
® ® ® ®
1
“ ”
“ ”
“ ”
“ ”
OLA Consulting Engineers
50 Broadway, Hawthorne,
New York 10532
914.747,2800
CLIENT
v�I-I·s
RF',TRC::-.VI
_ C: \//:::: F.''
HEIi''.:. f Vf
1-: _(_-; l-1C)CJl·/I _CL:LJV
----PULL BOX
.J\IOC::I1IE:;
��; I C)l?,\:_:L
BP-LL-4
' i1
NORTH
KEY PLAN
,,ov
PUMP STARTER/VFD-._____ IS) �--PANEL BP-LL
(FOR HWP-1) P-LL-o�--.
r------SEE NOTE 4. TYP.
@ BP-LL-11.13 � -SUMP PUMP CONTROL
PANEL
� -
SURFACE MOUNTED
BP-LL-9 LIGHTING FIXTURE.
SEE NOTE 1.
'.)
-����-THREE-WAY LIGHTING 5 ISSUED FOR BID 2/11/19
i
SWITCH. (TYP.)
\;-LL-4 8 4 SEO ADDENDUM ft 8/2V18
7
3 ISSUED FOR BID 2/16/18
NOTES:
DRAWING TITLE
WIRING/CONDUIT
' LEGEND: 1. PROVIDE (2) NEW LIGHTING FIXTURES TYPE ECLIPSE LIGHTING
574-0PL-LED/80W-3K-EBU-BK OR APPROVED EQUAL.
CD 4-#2/o & 1-#6 GND IN 2"c_ ELECTRICAL
2. REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION LOWER LEVEL PARTIAL
(1) 3-#8 & 1-#10 GND IN 3/4"C.
3. EQUIPMENT DENOTED WITH "EX." ARE EXISTING TO REMAIN. NEW WORK PLAN
4. CARBON MONOXIDE SHALL BE 120V HARDWIRED. CARBON MONOXIDE
ALARM SHALL BE SUPERVISED BY THE FACP VIA MONITOR MODULE.
PROVIDE ALL PROGRAMMING AS REQUIRED. COORDINATE FINAL SEAL SCALE PROJECT NO.
LOCATIONS IN FIELD.
AS NOTED
5. REFER TO DWG E5.1 FOR CIRCUIT OF NEW LIGHTING FIXTURES IN DRAWN BY DRAWING NO.
BOILER ROOM. AC
E3.2
CHECKED BY
6. COORDINATE EQUIPMENT INSTALLATION WITH THE FIELD CONDITIONS. JK
DATE
10/17/17
CONNECT TO EXISTING INITIATING CIRCUIT
r BP-LL PA NEL SCHEDULE
OLA Consulting Engineers
-#16 STATION.
/;:
�--BOILER BREAKGLASS
MAIN RATING: 225A MAIN C.B.: 150A KAIC 10KAIC FIRE ALARM SYSTEM RELAY.
50 Broadway, Hawthorne,
I I
' - MM ���
II.I
12 East 49th Street, 11th Fir.
BOILER
8 POLE ELECTRICALLY
� I
�
ENGINEERS
POLES BP-LL-2 olace.com
20 BOILER B-1
EXITING
HELD CONTACTOR
. /~� HWP-1 60 20 RECEPTACLE WITH NO CONTACTS.
2 ,
(1P-20A CB)
BP-LL©
'
�11111111 SQUARE- □ LG SERIES
20 CO ALARM
3 3 4 CLIENT
YTTTTTTTT
SPARE 20 20 CONTACTOR
_-N------+-��r�r�r�r OR APPROVED EQUAL.
5 6
2-#14J
ROOM LIGHTING 20 20 SPARE 10
7 8
Nt� 15
2
20 SPARE
SPARE 20 20 SPARE 18
16
OSSINING PUBLIC LIBRARY
RISER NOTES: 19 SPARE 20 20 SPARE 20
17
ST - SHUNT TRIP C.B. 3.) FIRE ALARM PANEL SHALL BE PROGRAMMED SO THAT
TABS GF - GFI TYPE TYPE
7
-:- 'IT E'
::;·\ [,1 'I·.__,11 .__J_I ·1 1= ,-, -) ,-. c: · L-�) 'F'
---------T;��r�r7- slc -ur\
·1
BE 2-#12 UON. COORDINATE WITH MECHANICAL CONTRACTOR.
_, \''/ _JI ) '�} L'-�''·-· �· )
i
I
i
I
17 il'KEY PLAN
, 1 1
i
)100A
11 100A '.:1soA )15DA C175A !,125A ;225A
\
225A I 4DOA
1
:225A \,5oA l,75A \,1sA T '.-1soA
'.
I;100A ;100AI I
II 7 1:1 NORTH
1
�
· 1
I I
i
I I I I
11600A I
�
I I
I I _J
1 II I I I
L__ _
'"
FIRE ALARM SEQUENCE OF OPERATIONS MATRIX:
"
""
J s< rr
SYSTEM OUTPUTS J
"�
-< -< �o w 0
r O"
v,O 0 O'
",_
z
""'
z w zZ wZ z O'w w
"
INDICATING/ CONTROLLED 0 J o'2 J" OJ
5J w -< JZ 0 O'
V>O
ZJ J
��> s<D
DEVICES rn O'
"�
� u5 "-< ow o
I
ZF
"J
"-< -J
0 -,c 0 ,_ "z - rr rn 0 ie �G:
�w rn
ELE/ I _c liZ _p ·AL 2 Lf-__-1 _p __ : E_c : pc liE::f- L" _ I LF JL _c SE � '5°" >w
"'
rZz
vi t;:;
"'"O'
Oz
u" z
-<"'
O rr � rr O0
um o:: G: <( ZOw WI z Sf z
-<0 z" ct" (/) u cir
�8@5
ie" ie" ie � ieJ ��8 -'e:. Oc,
WO cc J 0
5 ISSUED FOR BID 2/11/19
"'"' "'"'
-<" -<" -< rr-< s< rr -< rn -<
:; t3 � <\r-< ....J�O::
,.
� rr �O' �WU �w ��u Zr -< >o r> r
INITIATING DEVICES rs< r -< r�- r� ro - F5D Q_ (/] � "z u O'O � er
0 owz
Si�@
G
WWJ
SYSTEM INPUTS
OJ OJ
"'"' z
0�
-<o-<
£:2LLO
000 I" tJ O' '"�
IW I
4 SEO ADDENDUM ft 8/2V18
A B C D E F H I J K L
2
® ® ® 3 ISSUED FOR BID 2/16/18
1 MANUAL FIRE ALARM BOXES ® ®
SMOKE DETECTORS ® ® ® ® ® ®
3 ® ® ® ® ® 2 ISSUED FOR BID 12/20/17
DUCT SMOKE DETECTORS ®
5
4 WATERFLOW ® ® ® ® ® ® ®
1 ISSUED FOR REVIEW 11/2V17
TAMPER SWITCH ® ® ® ® ® ® ®
7
6 OPEN CIRCUIT ® ® No. ISSUE OR REVISION DATE
GROUND FAULT ® ®
8 NOTIFICATION APPLIANCE CIRCUIT SHORT ® ®
9 No use, reproduction or disseminotion may be made of this drawing
CARBON MONOXIDE ® ® ® and the concepts set forth without the prior written consent of
PANEL OLA Consultina Enaineers, PC. Coovriaht ©
BP-LL PROJECT TITLE
M ATRIX NOTES:
OSSINING PUBLIC LIBRARY
EXISTING FIRE ALARM SYSTEM SEQUENCE OF OPERATIONS SHALL
NOT BE ALTERED WITH EXCEPTION OF ADDITIONAL SEQUENCE FOR
HVAC UPGRADES
( 1 , ELECT RICA L ONE-LINE DIA GRAM
1.
WIRING/CONDUIT
' LEGEND: DRAWING TITLE
E5.1
CHECKED BY
JK
DATE
10/17/17