Doc: TSI-OPS-F-010 Rev. 00 Effective Date: 4 Jan 2021
Client BP Berau Ltd Start Date 30 Aug 2023 Project No.
Projec Leak Test Service Regular Location Tangguh LNG t Date Time Log 30 Aug 2023 05:30 Drop crew to New MCB for Meeting with client 06:00 Tarjo & Wartono preparation equipment, hose & instrument for offshore Leak Test Function Test Gas Booster (ELNUSA) result FAIL 07:00 TAR Crew removing all TAR Equipment’s PSV need to calibrate 07:15 Bob meet Zamzam discuss CCU used for mobilize equipment, hose & instrument 09:30 Pick up New Gas Booster from New ORF, sent to Shore Base 11:00 Load Gas Booster (TITIAN) to CCU 11:30 Lunch break 13:30 Back to Admin Office 14:00 Tarjo & Wartono pick up air hose at LNG Loading Point 15:00 Went to Instrument Workshop setting PSV for Train #3 Leak Test 16:30 Pick up PSV from Instrument Workshop 17:00 Hand over PSV to Night Shift Crew 17:30 Paper work 18:00 End of shift
OPTIONS ON Customer Acceptance TSI Supervisor/Engineer
SIGNATURES
A FULL signature is required Name: Company: Name:
only on the last page. Gunawan Wibisono The remaining pages MUST be initialed by the client & TSI Signature: Signature: