Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Catalogue
Catalogue.................................................................................................................................................................................I
1. Preface................................................................................................................................................................................... 1
2. Safety Precautions..................................................................................................................................................................1
3. Working Process.....................................................................................................................................................................3
4. Start-up...................................................................................................................................................................................4
4.1 Check before Start-up...................................................................................................................................................4
4.2 Switch on the Power.....................................................................................................................................................4
4.3 Rinse after Start-up.......................................................................................................................................................6
4.4Standby and Preheating.................................................................................................................................................6
5. A/D Calibration......................................................................................................................................................................7
6. Measure Parameters Setting of Item......................................................................................................................................9
6.1 Set the Measuring Parameters of Item..........................................................................................................................9
6.2 Explanation with the Setting of Item Parameters.........................................................................................................9
7. Add, Delete and Reset the Measurement Item.....................................................................................................................12
7.1 Add Measurement Item..............................................................................................................................................12
7.2 Delete Measurement Item..........................................................................................................................................12
7.3 Reset Measurement Item............................................................................................................................................12
8. Preparation before Measurement.........................................................................................................................................13
8.1 Preparation before Measurement................................................................................................................................13
8.2 Standard Operation of Collecting Serum before Measurement..................................................................................13
8.3 Standard Operation of Using Reagent........................................................................................................................13
8.4 Confecting the Mixed Solution of Reagent and Sample.............................................................................................14
9. Analytical Measurement...................................................................................................................................................... 15
9.1 Measurement Item......................................................................................................................................................15
9.2 Blank Measure............................................................................................................................................................15
9.3 Calibrate Measure...................................................................................................................................................... 15
9.4 QC Measure............................................................................................................................................................... 16
9.5 Sample Measure.........................................................................................................................................................16
10. Edit and Print Results.........................................................................................................................................................17
10.1 Query the Measurement Result................................................................................................................................17
10.2 Edit the Patient’s Information...................................................................................................................................18
10.3 Query the Laboratory Sheet......................................................................................................................................18
10.4 Modify the Results...................................................................................................................................................19
10.5 Print the Laboratory Sheet........................................................................................................................................19
10.6 Export and Import Data............................................................................................................................................19
11. QC Data..............................................................................................................................................................................21
12. Reagent, Sample and Waste...............................................................................................................................................23
12.1 Biochemical Reagent................................................................................................................................................23
I
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
12.2 Detergent..................................................................................................................................................................23
12.3 Precautions...............................................................................................................................................................23
13. Shutdown and Storage.......................................................................................................................................................24
13.1 The Process of Shutdown.........................................................................................................................................24
13.2 Storage......................................................................................................................................................................24
14. Instrument Maintenance.....................................................................................................................................................25
14.1 Preparation before Maintenance...............................................................................................................................25
14.2 Maintenance Record.................................................................................................................................................25
14.3 Daily Maintenance...................................................................................................................................................25
14.4 Weekly Maintenance................................................................................................................................................25
14.5 Monthly Maintenance...............................................................................................................................................26
14.6 Nonscheduled Maintenance......................................................................................................................................26
14.6.1 The Cleanness of Cuvette..............................................................................................................................26
14.6.2 Maintenance of Printer..................................................................................................................................28
14.6.3 Replace the Sample Tube..............................................................................................................................29
14.6.4 Replace the Tube of Peristaltic Pump............................................................................................................30
14.6.5 Replace the Fuse Protector............................................................................................................................31
Appendix 1: List of Main Replaceable Components........................................................................................................32
Appendix 2: The Factory Item Sequence and the Full Name of Test Code......................................................................33
Appendix 3: Table 1 of Maintenance Record...................................................................................................................34
Appendix 4: Table 2 of Maintenance Record...................................................................................................................36
II
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
1. Preface
This SOP file is mainly drawn up based on the Operating Manual of URIT-880 Semi-auto Chemistry Analyzer. Only
operating the analyzer and managing sample correctly and using reliable reagent can obtain correct and reliable results.
This file provides users with a standard operation process about how to operate URIT-880 Semi-auto Chemistry Analyzer
(hereinafter referred to as analyzer) correctly.
URIT reserves the right to renovate the relevant contents in this SOP file without separate notice.
2. Safety Precautions
1
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
DO NOT straight look at the light source when this analyzer is in motion (the status lamp is on).
3. Working Process
Start-up
Start-up
A/D calibration
A/D calibration
2
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Instrument maintenance
Instrument maintenance
Shutdown
Shutdown
4. Start-up
3
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
(2) Login software: Selecting the User Name, entering the Password, and then clicking the Login button, then users can
enter the interface of Main Menu.
4
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
6
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
5. A/D Calibration
(1) Rinse this analyzer with deionized water for 5 times to insure the cuvette is full with water.
(2) Click the Settings button in the interface of Main Menu to enter the interface of setting.
(3) Click the Water blank A/D button to enter the interface of Water blank A/D. Click Edit button, and then users can
correct the A/D value.
NOTE
1) The A/D value of wavelength which is between 300nm and 800nm is 3200 to 3900.
2) To guarantee the stability of calibration data, users should exclude bubbles in the cuvette and the situation
that the external power supply is instable.
(6) Click the Back button to return to the interface of Main Menu.
8
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Basic 2
(1) Unit: The unit of measure result. Users can select it according to the reagent instruction.
9
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
(2) Sampling Volume: The volume need to add into the reaction solution in measure. Its unit is μL. It can’t be too small, or
the measure result will be incorrect.
(3) Delay Time: The time from finishing imbibition to start the measure. (Set it as the reagent instruction.)
(4) Measure Time: The time of reading the absorbance which involves in calculating result. Set it as the reagent
instruction.
(5) Print or not: When selecting print, it will print the current measure result. Otherwise, it will not print.
(6) Decimal: The decimal digits of measure result can be 0 to 4. Please set as the reagent instruction.
Basic 3
(1) Usual value: The maximum value is the highest concentration of normal sample. The minimum value is the lowest
concentration of normal sample. If the measure result exceeds the reference range, the patient may be in bad health
condition. When the practical measure result is out of the reference range, the value exceeds the maximum value will be
marked by ↑, and the value exceeds the minimum value will be marked by↓.
①Reference:The minimum reference value and maximum reference value.
②Linear Range:Linear range of reagent.
(2) Substrate Exhaust: In the measurement of Kinetic method, the concentration of part of samples is quite high, and then
the substrate exhaust will arise.
Substrate Exhaust: It only applies to items measured by Kinetic method.
□ Enable: The function of selecting whether to use or not. (Not use-□, Use-■.)
Reaction Direction: Positive reaction or negative reaction.
Threshold: The minimum reference value and maximum reference value.
Calibrate 1
(1)Calibration Method: The calibration method(One point linear, Two point linear, Multi-point linear, Polygon method,
Logistic-Log 4P, Logistic-Log 5P, Spline)
(2)Regulatory A/Regulatory B:After the test, the system automatically uses the Regulatory factor to correct the test
result according to the following formula: Y=AX+B.
Among them, X is the result before correction, Y is the result after correction, A is the correction slope, and B is the
correction intercept.
Calibrate 2
(1) Concentration: The concentration of standard solution which is used to measure the K value.
(2) Abs: Absorbance of the measurement result.
(3) Factor: It is the standard factor (K value). The calibration factor can be set only when the calibration method is one
point linear.
The relationship between the concentration of standard solution and the calibrate coefficient is as following:
10
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
11
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
12
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
9. Analytical Measurement
(2) Click the Measure button in the Main Menu, to enter the interface of General Measure.
(3) Select the item that you want to measure, to enter the interface of General Measure of this item.
(4) According to the time of use, confect sufficient mixed solution of reagent and sample in advance in proportion. (Refer
to the Chapter 8.4 for the detailed procedures.)
(5) Click the Run button in the interface of General Measure of sample to start the measurement.
NOTE
For some items, users should incubate the mixed solution in the incubator or water bath case as the reagent
instruction before measure it in this analyzer.
9.4 QC Measure
(1) Click the QC button, system will prompt to pump in QC material in the Phase column. Users need to put the
measuring QC material under the sample tube and press the Start key, and then analyzer will start to pump in QC
material.
(2) After completing the QC measurement, system will prompt to select the lot of this QC material. Users can select the
existing QC lots in the drop-down box and input new QC lots by click the Add button. System will save this QC result
to the database of QC results which are used for QC analysis.
14
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
15
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
16
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
17
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Select the
storage path
18
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
11. QC Data
In the QC data interface, users can review the QC results and QC charts to judge if the item is out of control. Analyzer will
do mathematical statistics and calibration to the QC samples. Each item can save the QC data of at most 3 lots. And each lot
can at most save the QC data of the latest 3 months.
Click the QC in the Main Menu, to enter the interface to select QC item. Touching the item to measure, screen will show
the interface to select QC lot of this item. And in this interface, users can add and delete the QC lot, modify the name of QC
lot and review the QC data.
Function keys in the interface of QC Batches:
Empty: empty all QC lots of the current item.
Delete: delete the current QC lot.
Rename: rename the current QC lot.
Date: review the QC data of current QC lot. It indicates that there is no QC data when this button is gray.
Back: back to the previous menu.
Users can review QC lot by selecting items in its drop-down box. And then click Go to review the QC data. See as the
Figure 12. If the target value and SD value have been input, the QC curve will be calculated based on the input data.
Otherwise, system will draw the QC curve based on the mean value and SD value automatically calculated by this analyzer.
Figure 13 QC Curve
Parameter introduction:
Mean: the arithmetic mean value or the input target value of the current QC data. If the target value has been input, system
will preferentially display the target value.
SD: the standard deviation or the input SD value of the current QC data. If the SD value has been input, system will
preferentially display the SD value.
CV: the coefficient of variation of the current QC data.
20
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
12.2 Detergent
Detergent is optional.
12.3 Precautions
(1) When carrying out test and daily maintenance, be sure to obey the operation regulations of lab or clinical examination,
and wear protective gloves, clothes and goggles to avoid contacting the sample.
(2) All clinic samples should be handled according to the established operation regulations of lab or clinical examination,
as they may carry potential infectious disease. Wear protective clothes, gloves and goggles. No smoking and eating in
working area. Do not blow or suck the tubes.
(3) Carefully dispose of the wastes as they may carry potential contaminations and cause biologic and chemical hazard.
Obey the local medical regulations to handle and dispose the waste solution.
(4) Store reagents according to the instructions offered by reagent supplier. User should establish keeping-and-using
system for reagents, to avoid using expired reagents, misuse and mistaking as food. Storage should keep away from
excessive hot or cold environment.
21
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
13.2 Storage
(1) The packaged instrument should be stored in a breezy room with the temperature of 0 to 40 degrees centigrade,
atmospheric pressure of 63.2kPa to 106kPa, and relative humidity≤85%. Storage mixed with poison, injurant and
corrosive is forbidden.
(2) The cuvette and tubing should be filled with deionized water when it is not in use to prevent dirt from getting into and
influencing the precision of analyzer.
(3) Using the analyzer which is stored for over a year may fall short of precision. In this case, it is recommended to
recheck the analyzer before using it again.
NOTE
The recheck of analyzer must be performed by personnel authorized by URIT. If recheck is necessary, please
contact URIT.
22
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Tools Detergent
Sample tube Alkaline detergent
Peristalsis pipeline Anhydrous alcohol
Pincet Deionized water
Clean gauze
Clean cotton swab
Soft brush (for removing dust)
A set of hexagonal socket
23
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Cuvette
24
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Inlet Outlet
Install the print paper of internal thermal printer complying with the following precautions:
(1) Insure the power supply of the analyzer is cut off before installing the print paper.
(2) Close the cover of printer after installing the print paper.
The installing procedures of print paper:
(1) Open the cover of printer.
(2) Shear the print paper to the following type.
(3) Put the print paper to the paper inlet and remain appropriate length of paper out of the cover. And then press down the
cover of printer.
25
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
During the using process, if the sample tube is clogged and can’t be unclogged, users can replace it with the one provided by
the analyzer. The sample tube is transparent materials, with external diameter of 1.5mm and length of 200mm. One end of
the sample tube is connected by a silicone tube with external diameter of 4mm and length of 30mm.
The method to replace the sample tube is as following:
(1) Empty the liquid path.
(2) Turn off the analyzer and disconnect the power line.
(3) Open the cover of optical window on the left side and pull up the tube on the metal inlet tube of cuvette.
(4) Draw out the old sample tube from the sample guide steel tube. Insert the end connected by a silicone tube of a new
sample tube into the sample guide steel tube of cuvette. And then make the sample tube traversed the sample guide
steel tube.
Sample Tube
26
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
If the aspirating volume decreases obviously or the analyzer doesn’t aspirate at all during the working process, observe if the
peristaltic pump at the back of analyzer is leaking. If yes, the tube of peristaltic pump may be broken because of abrasion,
and users should confirm and replace it. Analyzer has equipped with a pump line (beige), with external diameter of 3.2mm,
and length of about 115mm to 125mm.
The method to replace it is as following:
(1) Empty the liquid path.
(2) Turn off the analyzer and disconnect the power line.
(3) Open the toggle arm of the peristaltic pump at the back of the analyzer.
(4) Take out the tube of peristaltic pump and right-angle connector from the neck of peristaltic pump.
(5) Take down the tube of peristaltic pump from the right-angle connector.
(6) Insert one end of the new tube of peristaltic pump upon a right-angle connector, the other end traverses into the tube
installation mouth of the peristaltic pump and gets out from the other end of installation mouth after rolling the head of
peristaltic pump for a circle. And then connect it to the other right-angle connector.
(7) After connecting the right-angle connector, lightly pull the pump tube to make it fully fits the peristaltic pump. It
should not get the flaw of distortion, wrinkle, etc. and keep the length of the two ends of pump tube is basically equal.
Lightly pull the two ends of pump tube if necessary to make it smooth.
(8) Put the toggle arm of peristaltic pump back.
27
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Right-angle connector
Tube of peristaltic
Tube of peristaltic pump
pump
Toggle arm
When the fuse protector is burnout, take out the case of fuse protector and replace it with delay fuse protector (T3.15AL
250V).
Note:
(1) Users must turn off the power and disconnect the power line before operating.
(2) DO NOT break the power interface or lid of fuse case when replacing the fuse protector.
28
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
29
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
SN Name Remark
1 Fuse protector T3.15AL 250V
2 Switching power supply
3 Boat-shaped switch
4 Power supply filter
5 Step motor(peristaltic pump) With plug
6 Power cord
7 Main board
8 Tube of peristaltic pump
9 Peristaltic pump
10 Cuvette
11 Ventilating Fan
12 Halogen lamp 6V 10W
13 Temperature sensor With plug
14 Light filter 340nm to 800nm
15 Signal board
16 Print interface board
17 Display interface board
18 Display screen
WARNING
1) The tube of peristaltic pump and fuse protector can be replaced by user and user must strictly follow the
replacement procedures specified in this file. If analyzer is damaged by false operation, URIT will
assume no liability to its safety, reliability and operation conditions.
2) The replaceable components should be provided by URIT. If you need to replace component, please
contact URIT for technical assistance.
30
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Appendix 2: The Factory Item Sequence and the Full Name of Test
Code
2 r-GT(r-glutamyltransferase) 20 Cl(Chlorine)
4 CHE(Cholinesterase) 22 Fe (Ferrum)
31
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
33
Hospital Version: V2.07
Department URIT-880 Standard Operation Process Exec Date: Jan. 30th, 2015
Room
Check/Maintain Item January February March April May June July August September October November December
Rinse/replace the
waste solution tube
Check/replace
cuvette
34
Hospital Version: V2.07
Check/replace URIT-880 Standard Operation Process
Department Exec Date: Jan. 30th, 2015
peristaltic pump
Room
Check/replace light
source lamp
Check/replace liquid
path
Operator
Note: Special maintenance includes rinsing/replacing the waste solution tube, checking/replacing cuvette, checking/replacing peristaltic pump,
checking/replacing light source lamp, etc.