IADC/SPE 59260

Downloaded from http://onepetro.org/SPEDC/proceedings-pdf/00DC/All-00DC/SPE-59260-MS/2966421/spe-59260-ms.pdf/1 by Kazakh-British Technical University user on 04 April 2024


Underbalanced Drilling in High-Loss Formation Achieved Great Success – A Field
Case Study
Shiying Luo, Southwest Petroleum Institute, Ruyu Hong, Yuzhou University, Yingfeng Meng, Liehui Zhang, Yun Li
Southwest Petroleum Institute, Changqing Qin, Liaohe Oilfield, China.

Copyright 2000, IADC/SPE Drilling Conference.


practice of UBD was conducted in well Xian-2 in Oct., 1997.
This paper was prepared for presentation at the 2000 IADC/SPE Drilling Conference held in Before drilling, an UBD technical team was formed and the
New Orleans, Louisiana, 23-25 February 2000.
team performed underbalanced drilling design carefully and
This paper was selected for presentation by an IADC/SPE Program Committee following discussed operation seriously. As a result, this UBD practice
review of information contained in an abstract submitted by the author(s). Contents of the
paper have not been reviewed by the International Association of Drilling Contractors or the was very successful. No loss circulation happened and that the
Society of Petroleum Engineers and are subject to correction by the author(s). The material, as
presented, does not necessarily reflect any position of the IADC or SPE, its officers, or initial oil production was 13.4 m3/d showed formation damage
members. Papers presented at IADC/SPE meetings are subject to publication review by had been reduced. After this, more wells were scheduled to be
Editorial Committees of the IADC and SPE. Electronic reproduction, distribution, or storage of
any part of this paper for commercial purposes without the written consent of the Society of drilled with UBD technique, even if the drilling cost in Well
Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract
of not more than 300 words; illustrations may not be copied. The abstract must contain
Xian – 2 was 1.2 times of a well drilled conventionally in the
conspicuous acknowledgment of where and by whom the paper was presented. Write same area. The following mainly introduces the technical
Librarian, SPE, P.O. Box 833836, Richardson, TX 75083-3836, U.S.A., fax 01-972-952-9435.
considerations in Well Xian-2.
Abstract Technical Considerations for UBD
This paper describes the execution of Well Xian-2 using Determination of magnitude of underbalance. During a
underbalanced drilling technique. At first, new equipment was UBD’s operation, a large pressure difference will lead to not
specially designed for the well, including a liquid/gas only possible well instability but also high producing velocity
separator and a new manifold. Then, the design of wellhead, in the formation, which would cause particles movement in
drillstring, casing, gas injection program, bit selection, well either velocity sensitive formation, sand production in
completion and base drilling fluid used in the well are unconsolidated formation, or permanent damage in stress
discussed. Besides, operation of UBD in the well is sensitive formation. On the other side, a small pressure
summarized in the paper. Finally, it is concluded that: UBD difference would be subjected to pressure fluctuation at the
technique can minimize loss of drilling fluid into formation bottom of a UBD’s well and positive pressure difference
and increase productivity. As a whole it makes money, though would appear and drive drilling fluids into the formation. So,
the drilling cost is increased compared with conventional UBD’s pressure difference determination should be based on
drilling. Simulation for underbalanced drilling plays an combined consideration of wellbore stability analysis,
important role in optimization of the drilling parameters, potential formation damage data, pressure fluctuation at the
which is dictated by actual reservoir inflow performance and bottom, formation properties and the capabilities of the
well conditions. equipment in use. According to this principle, simulation and
experiment were conducted for proper negative pressure
Introduction difference in Well Xian-2. The result was that it should be
Xianduhe oilfield is located in Quxian County, Sichuan 0.5Mpa to 1Mpa.
Province, China. The depth of the carbonate oil formation with How to select optimal underbalanced drilling parameters.
rich fractures is from 2780m to 2904m. In June, 1997, well UBD is an irreversible process affected by many factors, such
Xian-1 was drilled with 1.02 g/cm3 clay base mud in the oil as base mud density and pumping rate, gas injection rate, back
formation and 123 m3 mud lost into the oil formation due to pressure, etc. Determination of these parameters by simple
the low formation pressure of 22.2Mpa. Although loss of mud empirical formula is not enough to ensure successful
stopped after plugging materials were added into the mud, the underbalanced drilling. Thus, selection proper multi-phase
cost of the well construction increased and the formation was model for simulating underbalanced drilling to optimize some
damaged because the initial oil production rate was 3.5 m3/d, operation paramters is necessary. So, a software especially for
much lower than 14 m3/d anticipated. After this, UBD simulation was developed in VB5.0 by us. Its model,
Underbalanced Drilling (UBD) of gasified liquid was related to oil and gas properties’ change with the temperature,
recommended in the drilling of the oil formation and the first pressure and phase distribution in a borehole , was
2 Shiying Luo, Ruyu Hong, Yingfeng Meng, Liehui Zhang, etc. IADC/SPE 59260

developeded using multi-phase drift flux theory, in which working. Then, we can adjust the pumping rate slightly to
totally 6 phases are considered - injected gas, injected liquid, satisfy the requirement by changing the rotary speed of the
produced gas, oil, water and cuttings. This software is a diesel.
powerful tool for UBD’s optimal parameter selection. Gas injection rate adjust. The gas volume injected into the
Base mud for UBD. Like a conventional well, the circulating well can be adjusted by diverting part of gas into air when two
drilling fluid for an underbalanced operation can be very air compressors are working at the same time.
important. For an under-balanced well, the major functions of Stability of the well bore. During underbalanced drilling

Downloaded from http://onepetro.org/SPEDC/proceedings-pdf/00DC/All-00DC/SPE-59260-MS/2966421/spe-59260-ms.pdf/1 by Kazakh-British Technical University user on 04 April 2024


a drilling mud are: process, well stability is a major concern because of the
l Transporting drill cuttings in an effective and dispersed decrease of mud density. One primary aspect is the instability
fashion to the surface. of shale layer. So, KCl or KOH was added into the mud to
l Lubricating the bit or powering a downhole motor improve concentration of K+ in the drilling fluid.
assembly Formation damage control. Experience has indicated it is
l Effectively transporting produced formation fluids back difficult to maintain a condition of continuous under-balance
to surface in a safe fashion. pressure throughout the complete drilling operation, resulting
Several factors are significantly different when considering in fluid losses to the formation due to no mudcake on the
base mud designs for UBD operations in comparison to borehole wall and leading to possible significant damage. So,
conventional over-balanced applications. Most of these are a new elastic fiber-shaped additive, calcium carbonate
associated with the fact that there is a non-condensible gas particles, a kind of polymer were added into the base mud.
and produced formation fluids in continuous contact with the The size of the fibers and particles are determined by the
circulating drilling fluid. One of these considerations includes distribution of the pore diameters and/or fracture widths of the
compatibility with formation fluids. A second factor in target formation. This drilling fluid has the ability of
considering base mud design for UBD operations is dilution instantaneous plugging on the wall and reducing largely
by produced formation fluids. A third factor to consider is drilling fluid invasion into formation when instantaneous
corrosion. The last factor is viscosity. In Well Xian –2, the positive pressure difference is formed during underbalanced
base mud used for underbalanced drilling was from mud used drilling. When the underbalanced situation is resumed, fibers
for the upper formation after it had been treated according to and particles can be pushed back into well from the pores or
the above special considerations. fractures by the underbalance pressure.
Cutting tranport. Properties of the base fluid considered for Well configuration. In order to minimize cost of
cutting moving include that its density is below 1.05 and the underbalanced drilling, conventional drilling was used before
base fluid has enough viscosity to carry cuttings and formation entering the reservoir and 177.8mm casing was put to the
produced fluids to the surface. position 10m just above the target formation. The oil
Before underbalanced drilling, the base mud was treated formation was drilled to 2908m with 152.4mm bit where a
by all possible equipments, such as vibrating screen, desander 127mm liner was set. The specific well configuration of Well
and desilter, etc. Be sure to remove weight additives and Xian-2 is shown in Fig. 1.
useless solid from the mud. Drilling string and bit
Consistency index n and coefficient k of the base mud was Drilling string. Drilling string design for underbalance drilling
adjusted to 0.6~0.8 and 0.9 Pa.sn respectively. The funnel has no essential difference from the conventional drilling.
viscosity is 40to 50s and gel strengthô0 were 8 to 12 However, because underbalanced drilling can avoid some
Pa(10seconds) and 20 to 30 Pa(10min). The ability to make problems of overbalance drilling, consequently, bumper jar
mud by the formation is not strong, so it is not considered for and centralizer can not be used. For avoiding the bottom fluid
the mud design. flowing back into drilling string and pipe connection’s safety,
In additon, flow regime in annulus must be bubble or slug back pressure valve and cock on the drilling string is
phase to ensure the ability of multiphase to carry cuttings. necessary. The way of installing back pressure valve and cock
Here again, operation parameters optimization is important. is as follows ( Fig. 2 ):
Gas injection program. Adjustable parameters, such as gas (1) Both of them must be installed corollarily;
injection rate, mud pumping rate and density, back pressure, (2) One back pressure valve must be connected just next to
have different influence on flow parameters in annulus and bit.
bottom pressure. UBD’s simulation can optimize these factors (3) Near the wellhead, the back pressure valve and cock are
for assuring safe, smooth UBD’s practice and. One result from fixed every two strings.
UBD simulation for Well Xian - 2 is 6~10m3/min gas injection The drilling string for Well Xian-2 is: 6in bit+ back
rate and 8~14 1/s mud pumping rate. pressure valve(one) + 4 3/4in drilling collar +3 1/2 in drilling
Mud pumping rate adjust. During underbalanced drilling pipe +cock+back pressure valve+3 1/2 in drilling pipe.
process, a stepless pumping speed pump is a better choice, or Bit selection. Select the most proper drilling bit according to
if the condition is not available, we can turn on only one mud rock mechanical properties. Try to penetrate the target
pump and choose a small cylinder liner for the pump, remove formation using only one bit. So, we must perform
one output valve of the pump and let one cylinder stop underbalanced drilling operation carefully.
IADC/SPE 59260 Underbalanced Drilling in High-Loss Formation Achieved Great Success – A Field Case Study 3

Safety consideration increased by about 52% compared with conventional drilling


Explosion-proof. We carried out the experimental research on in the same formation.
limits and regularities of explosion when injected air mixes 3. Post job analysis showed that underbalanced drilling
with formation produced fluids under wellbore conditions technique is successful in Well Xian –2, and more wells have
during underbalanced drilling. Our study was used in the been scheduled to be drilled underbalanced.
design for underbalanced drilling in Well Xian - 2. 4. UBD’s simulation plays an important role in optimization
Meanwhile, we adopted explosion-proof membrane which of the drilling parameters, which is dictated by actual reservoir
was equipped at the boosting pipe. Under normal inflow performance and well conditions. In next UBD design,

Downloaded from http://onepetro.org/SPEDC/proceedings-pdf/00DC/All-00DC/SPE-59260-MS/2966421/spe-59260-ms.pdf/1 by Kazakh-British Technical University user on 04 April 2024


underbalance drilling operation, the membrane can work well more attention should be given to it.
under 2Mpa pressure. If sudden explosion happens near the 5. Completion method and well stimulation after well drilled
wellhead or in the surface pipe, instantaneous pressure surge underbalanced need further study.
may firstly destroy the explosion-proof membrane and release
the pressure in the wellbore or pipeline, so the important Acknowledgments
equipment, such as surface separator, can escape from the The authors wish to thank W. Zhang, Hong Liang for their
explosion. cooperation in the project.
Besides this, management is also an important factor for
safe underbalanced drilling. References
Special Equipment. Special equipment is a key factor for 1. J.C. Cunha & Fabio S. N. Rosa, Petrobras S. A.,” Underbalance
underbalanced drilling. Drilling Technique Improves Drilling Performance – A Field
Rotating head. An important part of the light weight drilling Case History”, Paper IADC/SPE 47802 presented at the 1998
system is the well rotating head. This equipment allows the IADC/SPE Asia Pacific Drilling Conference held in Jakarta,
Indonesia, 7-9 September 1998.
well to be drilled with the annular closed and eventually with 2. J. Surewaard, K. De Koning, M. Kool, SPE, D. Woodland, H.
some pessure in the well head. In our project, a new rotating Roed, SPE, and P. Hopmans, Petroleum Development Oman,”
head was developed by us. This equipment has dual seal(an Approach to Underbalanced Well Operations in Petroleum
elastic layer and and a rubber layer) and can be operated up to Development Oman”, Paper IADC/SPE 35069 presented at the
120 RPM and 10 MPa. On static conditions a pressure of up 1996 IADC/SPE Drilling Conference held in New Orlean,
to 14 Mpa is admissible. In order to minimize leaking Louisiana, 12-15 March 1996.
problems during the operation the rotating head must be 3. T. W. Hogg and J. E. Boyle, BP Exploration,” Colomian
aligned with the center of the rotary table to avoid premature Underbalanced Drilling Operations – Start Up Experience”,
wear of the rubbers. The return line from the well ( flow line) Paper IADC/SPE 37677 presented at the 1997 IADC/SPE
Drilling Conference held in Amsterdam, The Netherland, 4-6
is connected to the lateral of the rotating head and goes to the March 1997.
top of the separator. 4. F.J. YURKIW, P.L.CHURCHER, etal., PanCanadian Petroleum
Separating System. For the drilling of well Xian-2, a new gas- Limited, “Optimization of Underbalanced Drilling Operation to
liquid separator was designed by us. This equipment is a Improve Well Productivity”; The Journal of Canadian Petroleum
cylinder (diameter 1m, height 2.1m) that internally has 2 Technology, p. 28, September 1997.
concentric pipes. The fluid enters the cylinder tangentially in 5. D. Brant Bennion, F. Brent Thomas etal., Hycal Energy Research
the upper part of the two internal pipes in a helical trajectory Laboratory Ltd, “Underbalanced Drilling, Praises and Perils”;
where the separation between liquid and gas occurs. The gas Paper SPE 35242 presented at the SPE Permian Basin Oil & Gas
goes to the line of the burner and the liquid and cuttings are Recovery Conference, Midland,Texas, March 27-29, 1996.
6. J. Saponja, P. Eng., UBD Engineering Inc.,” Challenge with
then deviated to the shakers. A liquid seal is always present Jointed Pipe Underbalanced Operations”; Paper SPE 37066
internally in the separator to avoid the gas to travel to the presented at the 1996 SPE International Conference on
shakers. There is an automatic control with sensors for the Horizontal Well Technology held in Calgary, Canada, 18-20
liquid level that activate the pumps in order to keep the level November.
of the liquid seal within certain limits.
Manifold. In the flow line, between the rotating head and the
separator, there is a manifold that will restrict the flow to
control sudden increases in pressure due to slugs that normally
occur in this kind of operation. It is shown clearly in Fig. 3.

Conclusions and Remarks


After use of UBD technique in Well Xian-2, the main
conclusions are:
1. UBD technique used in such naturally fractured can prevent
loss circulation. In Well Xian–2, loss circulation did not
happen. At the same time, formation damage was reduced and
well productivity was improved.
2. Penetrating rate was improved. The average drilling speed
Downloaded from http://onepetro.org/SPEDC/proceedings-pdf/00DC/All-00DC/SPE-59260-MS/2966421/spe-59260-ms.pdf/1 by Kazakh-British Technical University user on 04 April 2024
IADC/SPE 59260
Shiying Luo, Ruyu Hong, Yingfeng Meng, Liehui Zhang, etc.

Fig.2 Schematic of drilling string


Fig.1 Well configuration
4
IADC/SPE 59260 Underbalanced Drilling in High-Loss Formation Achieved Great Success – A Field Case Study 5

Air compressor

Downloaded from http://onepetro.org/SPEDC/proceedings-pdf/00DC/All-00DC/SPE-59260-MS/2966421/spe-59260-ms.pdf/1 by Kazakh-British Technical University user on 04 April 2024


Gas flux meter

Valve
To stand pipe

Gas/liquid mixer
Rotating head

Sample analysis Fire

Depressurizing
Fire float

Flow-line Separator

Anti-explosion
membrane

Pump
Cutting Pump

Cleaning system
oil

Fig. 3 Schematic of surface flow chart

You might also like