Project: ladies saloon Bill of quantities
[ost ao a
[SUPPLY & APPLY PAINTS ON CEILING 4437
2 || SUPPLY & APPLY PAINTS ON EXISTING WALL 95 sqm
3 | SUPPLY & INSTALLATION OF GYPSUM PARTION WALL 30 sqm
sqm)
4 _ || SUPPLY & APPLY PAINTS ON GYPSUM PARTITION WALL 30
5 ‘Supply & installation of signage ( as per client ) 1 Qty
6 _ || SUPPLY & INSTLLATION OF SALOON MIRRORS 3 ty
7 _ || SUPPLY & INSTALLATION OF OPEN SHELVES BESIDE MIRRORS || 3 ty
8 _ || suPPLY & INSTALLATION OF PEDICURE BASINS 1 ty
9 || SUPPLY & INSTALLATION OF BASIN FOR WASHING. 2 ty
10 _|| SUPPLY & INSTALLATION OF NECESSARY PLUMBING WORKS. 10 Lm
11 |[SupPLy & INSTALLATION OF AC DUCTING WORKS 20 LM
12 _ |] SUPPLY & INSTALLATION OF AC DUFFUSER WORKS (4 SUPPLY] at
ks 4 RETURN ) Y
13_ || SUPPLY & INSTALLATION OF DOOR WITH NECESSARY 1 Q
supports ty
14 _ [SUPPLY & INSTALLATION OF ADJUSTABLE BEAUTY BED 1 ty
[SUPPLY & INSTALLATION OF RECEPTION COUNTER ( REQUIRED
5 1 aty
ISIZE )
16 _ [supply & installation of a sofa in waiting area 1 aty
17__ || supply & installation of reception chair 1 aty
18 || supply & installation of chairs in shampooing area 2 aty
19 _||supply & installation of basins for shampooing 2 ty
29 _ || Supply & installation of cabinets n storage area as per 2 aty
he area
‘Supply & installation of saloon chairs including manicure
2 . 5 ty
fand pedicure area
22 _ | Supply & installation of necessary lightings as per client nt aty
requirements
a prety & installation of maindoor & necessary mechanical], aty