Bersama ini kami kirimkan penawaran pembangunan Counter Makanan Dapur Abah di Bintaro Exchange
REVISI VOLUME RINCIAN PENAWARAN ANGGARAN BIAYA
No Uraian Pekerjaan Qty Stn Harga Stn Jumlah Spesifikasi
A. PEKERJAAN PERSIAPAN
1 Mob demob Tukang 1.00 set 1,500,000 1,500,000
2 Kebersihan area kerja dan koordinasi 1.00 ls 1,500,000 1,500,000
B. PEKERJAAN STAN MAKANAN AREA KASIR
1 Screed + keramik 30 x 30 10.00 m2 279,000.00 2,790,000 Roman 30 x 30
2 Dinding Rangka Holo 0.4mm 13.50 m2 850,000.00 11,475,000 Multiplek + hpl
3 Dinding Rangka Holo 0.4mm 10.00 m2 265,000.00 2,650,000 Gypsum + finish cat
4 Stop Kontak Dinding 3.00 bh 120,000.00 360,000 Philips
5 Lampu 6" 14 watt 4000k panel led 2.00 bh 225,000.00 450,000
6 Lampu 24 jam / night lamp 1.00 bh 455,000.00 455,000 6" 14 watt 4000k panel led

C PEKERJAAN STAN MAKANAN AREA DAPUR

1 Screed 2 layer 21.00 m2 165,000.00 3,465,000


2 Membran bakar 38.00 m2 285,000.00 10,830,000 2 layer
3 Keramik Lantai Roman 21.00 m2 225,000.00 4,725,000 Roman 30 x 30
m2 Finish Grc + Keramik
4 Dinding Rangka Holo 0.4mm 17.00 395,000.00 6,715,000
Dinding 30 x 30 roman
m2 Finish Gypsum + cat
5 Dinding Rangka Holo 0.4mm 32.00 225,000.00 7,200,000
mowlex
m2 Uclam braket gypsum 10
6 Plafond Rangka Holo 0.6 mm rod 6mm 21.00 295,400.00 6,203,400
mm + cat mowilex
Kusen Almunium + Pintu
7 Kusen dan Pintu dapur 1.00 set 2,850,000.00 2,850,000
Hpl + Assesoris
8 Box Mcb Inbow 12 Group 1.00 1 465,000.00 465,000
9 MCB 3 Phase 20 A 1.00 bh 615000 615,000
10 MCB 3 Phase 16 A 2.00 bh 487500 975,000
11 MCB 3 Phase 10 A 1.00 bh 427500 427,500
12 MCB 3 Phase 6 A 1.00 bh 372000 372,000
13 Stop Kontak 6.00 bh 120,000.00 720,000
14 Lampu 6" 14 watt 4000k panel led 5.00 bh 225,000.00 1,125,000

15 Lampu 24 jam / night lamp 1.00 bh 455,000.00 455,000 6" 14 watt 4000k panel led

16 Lampu Emergency 1.00 bh 850,000.00 850,000


17 Saklar Ganda 1.00 bh 120,000.00 120,000
18 Saklar Singel 1.00 bh 110,000.00 110,000
19 Kabel 3 x 2,5 mm 100.00 mtr 62,000.00 6,200,000 Suprime
20 Pipa Conduit 100.00 mtr 22,000.00 2,200,000

pipa ppr
21 Instalasi air bersih 1.00 lot 2,000,000.00 2,000,000
elbow,sock,flexible,valve
Pipa pvc aw 3",2" elbow
22 Instalasi air kotor 1.00 lot 2,500,000.00 2,500,000
dan sock
23 Grease Trap 1.00 set 650,000.00 650,000
24 Bak kontrol 1.00 lot 850,000.00 850,000 keramik 40 x 40 + tutup bak
kontrol
25 Exhouse Fan 1.00 bh 2,250,000.00 2,250,000 Panasonic 350 CFM
26 Penyesuaian Sprinkle 2.00 ttk 1,500,000.00 3,000,000
27 Smoke Detektor 1.00 bh 385,000.00 385,000
28 Pemasangan Kichen Hood zink dan penambahan 1.00 lot 2,000,000.00 2,000,000
ducting
Total 91,065,900.00

Sistem Pembayaran :
Dp 65% setelah harga disetujui
Sisa nya setelah selesai