TAJ CITY

TAJ CITY - HEAD QUARTER

BILL OF QUANTITIES

Construction Document

BASE ITEMS

ITEM NO.

DESCRIPTION

TOTAL L.E

Str.B.O.Q

113,169,128.14

Arch B.O.Q

87,997,235.38

Infra-Structure Works

2,798,263.29

Irrigation BOQ

1,030,374.54

Mechanical BOQ

67,925,066.25

Electrical BOQ

71,007,534.42

7
Landscape B.O.Q

15,313,826.30

GRAND SUMMARY

359,241,428.32

‫ مدينة مصر‬Madinet Masr

109 ‫تأسست‬

CITY

TAJ CITY - HEAD QUARTER

DATE: March 2023

REV. 01

Notes to be followed:

1-

The contractor to apply sample of the finishes materials to be approved by the


client/consultant prior to the supply.

2-

3-

Specifications to all items refer to Egyptian codes. In case of discrepancy between the
Egyptian codes and international codes, the Egyptian codes is to be followed.

Quantities of Earth work, Plain concrete, Reinforced concrete and Insulation for foundations
are indicative. Compensation shall be based on actual quantities measured from the
completed work.

ITEM NO.

DESCRIPTION

SYMPOL

SYMBOLS, ABBREVIATIONS AND DEFINITIONS

The following symbols and abbreviations are used in this bill of quantities:

Linear meter

L.M

square meter

Cubic meter

Centimeter

cm

Millimeter

mm

Number

NO.

Tonne

Ton

Percentage

Quantity

Qty

Mega pascal

MPA

Lump sump

L.S

Kilogram

kg

Architectural

Arch.

Thickness

thk. Thick

Meter/ Second

m/sec.
Meter/ Minute

m/min.

Minute

Min.

with

w/

Stainless steel

5.5

Galvanized Steel

G.S

Reinforced Concrete

R.C

Horizontal

HL.

Vertical

‫ ركة مدينة‬Refers to an ivet non class Surpreet to replacing a base ‫مصر لالن‬

item on the BO

VL.

Alternative Item (...)*

ITEM NO

DIVISION 03

CONCRETE

Section03 15.00

Concrete Accessories

Waterstops

BASE ITEMS

DATE: March 2023


Rev. 01

DESCRIPTION

UNIT

QTY

RATE

TOTAL

L.E

‫مائتان واثنان جنبها مصريا واثنان وثالثون قرشًا ال غير‬

supply and install water-stop for tank

Section 033000

Miscellaneous Cast-in-Place Concrete

Plain concrete (PC); including items mentioned in "Method of Measurements".

Characteristic Cube compressive Strength after 28 days 20Mpa

95.00

202.32

‫الفان وواحد وتسعون جنيها مصريا وواحد وسبعون قرشًا ال غير‬

Plain Concrete with 250 mm and 400 mm thickness under RC footings and tank.

m3

1,058.54

Reinforced concrete (RC); including items mentioned in Method of Measurements.

Characteristic Cube compressive Strength after 28 days 40 Mpa.

2,091.71

‫ستة آالف وسبعمائة وخمسة وستون جنيها مصريا واثني عشر قرشًا ال غير‬

6,765.12

768.00
‫‪m3‬‬

‫ثالثة عشر ألف ومائة وأربعة وعشرون جنيها مصريا وأربعة عشر قرشا ال غير‬

‫‪13,124.14‬‬

‫‪272.00‬‬

‫‪m3‬‬

‫‪3‬‬

‫‪Reinforced Concrete for Isolated footings.‬‬

‫‪4‬‬

‫‪Reinforced Concrete for combined footings.‬‬

‫‪5‬‬

‫‪Reinforced Concrete for tie beams & ground beams.‬‬

‫تسعة عشر ألف وتسعمائة وخمسة عشر جنيهًا مصريًا واثنان وثالثون قرشا ال غير‬

‫‪19,915.32‬‬

‫‪320.00‬‬

‫‪m3‬‬

‫عشرة آالف وسبعة وثالثون جنيها مصريا وأربعة وعشرون قرشا ال غير‬

‫‪10,037.24‬‬

‫‪272.00‬‬

‫‪m3‬‬

‫‪Reinforced Concrete for strip footings under the retaining walls‬‬

‫تسعة االف ومائة وأربعة وسبعون جنيها مصريا وثمانية وأربعون قرشًا ال غير ‪595.00‬‬

‫‪9,174.48‬‬

‫ثالثة عشر ألف وستمائة وخمسة عشر جنيهًا مصريًا وأربعة وأربعون قرشًا ال غير‬

‫‪13,615.44‬‬

‫‪450.00‬‬

‫‪m3‬‬

‫سبعة آالف وثمانمائة وستة وسبعون جنيها مصريا وواحد وأربعون قرشًا ال غير‬

‫‪7,876.41‬‬
138.00

m3

7 Reinforced Concrete for retaining walls.

8 Reinforced Concrete for shear walls & cores.

9 Reinforced Concrete for tank's foundation.

10

Reinforced Concrete for tank's retaining walls.

‫إثني عشر‬

‫ألف ومائة وخمسة وتسعون جنيها مصريا وسبعة وأربعون قرشا ال غير‬

12,195.47

142.00

m3

‫عشرة آالف وخمسمائة وثمانية وعشرون جنيها مصريا وأربعة وخمسون قرشًا ال غير‬

19,220.40

2,214,164.98

5,195,612.16

3,569,766.08

6,372,902.40

2,730,129.28

5,458,815.60

6,126,948.00

1,086,944.58

1,731,756.74

m3

11

Reinforced Concrete for tank's slab.

72.00
fair face Reinforced concrete (RC); including items mentioned in Method of Measurements.

Characteristic Cube compressive Strength after 28 days 40 Mpa.

12

Reinforced Concrete for Columns.

10,528.54

758,054.88

‫ثالثة عشر ألف ومائتان وثالثة وعشرون جنيهًا مصريًا وثالثة عشر قرشًا ال غير‬

13.223.13

900.00

m3

‫ستة عشر ألف وأربعة وثمانون جنيها مصريا وثمانية وتسعون قرشًا ال غير‬

16,084.98

321.00

m3

‫ثالثة عشر ألف وأربعمائة وواحد وتسعون جنيها مصريا وثمانية وتسعون قرشًا ال غير‬

13

Reinforced Concrete for Bearns

m3

3,495.00

14

Reinforced Concrete for Slabs & Stairs.

Reinforced concrete (RC); including items mentioned in Method of Measurements.

Characteristic Cube compressive Strength after 28 days 25 Mpa.

13.491.98

‫تسعمائة وثمانية جنيهًا مصريًا وتسعة وعشرون قرشًا ال غير‬

m2

272.00

908.29
‫خمسة عشر ألف وتسعمائة وثالثة وثالثون جنيهًا مصريًا وثمانية وعشرون قرشًا ال غير‬

15

Slab on grade 150 mm thick according to DWG (G-003)

Retiforced concrete for other non-structure element

16

Masonry Lintas Stiffeners, Posts, landscape,..etc.)

CARMELLTO SECTION SUMMARY

m3

50.00

15:99388

11,900,817.00

5.163.278.58

47.154.470.10

247,054.88

796,664.00

LEK

100,526,599.66

TAJ CITY - HEAD QUARTER

BASE ITEMS

DATE: March 2023 Rev. 01

ITEM NO

DIVISION 04:

MASONARY

Section 042200

DESCRIPTION

CONCRETE UNIT MASONARY


UNIT

QTY

RATE

TOTAL L.E

Supply and install concrete masonary block walls; including items mentioned in:Methode of
measurement".

‫ثالثمائة وثمانية عشر جنيها مصريا وثالثة وسبعون قرشًا ال غير‬

Concrete solid block, 120 mm thick for protecting insulation works for Retaining Walls and
Tank Walls

m2

286.44

318.73

91,297.02

CARRIED TO SECTION SUMMARY

L.E

91,297.02

‫ مدينة مصر تأسست‬Res Madinet Masr

TAJ CITY - HEAD QUARTER

BASE ITEMS

DESCRIPTION

ITEM NO

DIVISION 05:

METALS

Section 051223

Structural Metal Framing

2
CITY

DATE: March 2023.

UNIT

QTY

RATE

Rev. 01

TOTAL L.E

‫مائة وثالثة وعشرون جنيها مصريا وأربعة وأربعون قرشا ال غير‬

Supply and Install RHS Steel Sections with dimension according to the relevant drawings (RF-
901 & RF-902 & RF- (903) and specifications including connections, water proofing and all
work required to properly finish the work according to specifications.

kg

62,497.28

123.44

7,714,664.25.

‫مائة وثالثة وعشرون جنيها مصريا وأربعة وأربعون قرشًا ال غير‬

Supply and Install Steel stairs with dimension according to the relevant drawings (RF-905 &
RF-906) and specifications including connections, water proofing and all work required to
properly finish the work according to specifications.

kg

2,935.00

123.44

362,296.40

CARRIED TO SECTION SUMMARY

L.E

8,076,960.65

DIVISION 31:

EARTHWORK

Section 312000
Earth Moving

Excavation and off-site disposal including items mentioned in "Method of Measurements"

m3

‫مائة وواحد وثالثون جنيهًا مصريًا وأربعة عشر قرشًا ال غير‬

30.00

131.14

‫مائة وواحد وثالثون جنيها مصريا وأربعة عشر قرشا ال غير‬

Excavation in all soil types except rock soil and transporting to the public dumping areas

3,934.20

Excavation in rock and transporting to the public dumping areas

m3

100.00

131.14

backfilling under structure elements including items mentioned in "Method of


Measurements"

‫مانتان واثنان وأربعون جنيهًا مصريًا وثمانية وتسعون قرشًا ال غير‬

backfilling around structual elements with clean sand as per soil report recommendation.

m3

7,017.90

242.98

‫مائتان واثنان وأربعون جنيها مصريا وثمانية وتسعون قرشا ال غير‬

backfilling around structural elements with excavated soil that is acceptable as backfilling
material according to consultant engineer.

m3
Replacement soil under foundations as per soil report recommendation..

100.00

242.98

‫خمسمائة وتسعون جنيهًا مصريًا واثني عشر قرشًا ال غير‬

Replacement soil under foundations consists of sand and gravel with percentage 1:2 as per
confirmatory soil report recommendations.

Replacement soil under foundations consists of clean sand as per confirmatory soil report
recommendations.

13,114.00

1,705,209.34

24,298.00

m3

150.00

590.12

88,518.00

m3

100.00

‫مائة وستة وتسعون جنيها مصريا وواحد وسبعون قرشا ال غير‬

196.71

‫ستة عشر جنيها مصريا وثمانية وثمانون قرشًا ال غير‬

Surveying, adjust excavation to required level and trim

excavation edges. The price shall include compaction, all

necessary tests, bore holes... etc.

(This Item is applicable only if excavation was done by

another contractor otherwise these works are included in the


excavation item)

19.671.00

m2

7,023.00

16.88

118,548.24

m2

7,023.00

16.88

118,548.24

(This Item is applicable only if excavation was done by another contractor otherwise these
works are included in the excavation item)

CARRIED TO SECTION SUMMARY

1,973,292.78

‫ مدينة مصر‬Madinet Masr

TAJ CITY - HEAD QUARTER

ITEM NO.

BASE ITEMS

DESCRIPTION

CITY

DATE: March Rev. 01

TOTAL L.E

Div. 03

Div. 04

Div. 05

Div. 07

100,526,599.66
91,297.02

8,076,960.65

2,500,978.03

Div. 31

1,973,292.78

TAJ CITY

HEAD QUARTER

DATE: OCTOBER 2023

Notes to be followed:

1-

The contractor to apply sample of the finishes materials to be approved by the client/
consultant prior to the supply.

Specifications to all items refer to Egyptian codes. In case of discrepancy between the
Egyptian codes and international codes, the Egyptian codes is to be followed.

3-

Quantities of Earth work, Plain concrete, Reinforced concrete and Insulation for foundations
are indicative. Compensation shall be based on actual quantities measured from the
completed work.

2-

DIVISION: 03

CONCRETE

SECTION: 035440

CEMENT-BASED SCREED

Supply and install cement based screed below internal and external finishes including clean
sand layer if needed and all required to complete and finish the work as per drawings,
specifications and the instructions of the supervision engineer.

Alter.

(Section 093000)

‫مائتان وثالثة‬

‫عشر جنيهًا‬
‫مصريًا‬

‫واثنان وستون قرشًا ال غير‬

6* Sloped Floors, 100mm thickness, (for external corridors and MEP space at roof)

Alter.

2,441

213.62

Rate Only

7* Alter.

Floors, 100mm thickness.

‫مائتان وثالثة عشر جنيهًا‬

‫مصريًا‬

‫واثنان وستون قرشًا ال غير‬

3,860

213.62

Rate Only

SECTION: 042000 UNIT MASONRY

Notes:

DIVISION: 04

MASONRY

*The contractor shall submit the brick samples for approval before supplying.

Supply and build masonry bricks/blocks bedded and jointed in cement sand mortar,
including only reinforcing stirrups fixed to the concrete column for accessories and all.
necessary works according to drawings, M.O.M. specification and the instructions of the
supervision engineer.

Concrete solid brick, 120 mm thick.

‫ثالثمائة وثمانية عشر جنيها مصريا وثالثة وسبعون قرشا ال غير‬


‫‪1,625‬‬

‫‪318.73‬‬

‫‪517,936.25‬‬

‫‪2,532,320.08‬‬

‫‪869.811.35‬‬

‫الفان ومائتان وأربعة وخمسون جنيها مصريا وستة وتسعون قرشًا ال غير‬

‫‪M³‬‬

‫‪1,123‬‬

‫‪2,254.96‬‬

‫‪Concrete solid brick 250 mm thick.‬‬

‫القان وسبعمائة وثمانية وسبعون جنيهًا مصريًا وخمسة وتسعون قرشًا ال غير‬

‫‪M 313‬‬

‫‪2,778.95‬‬

‫‪Concrete solid brick, 250 mm thick, I hour fire rated.‬‬

‫‪Concrete solid brick, 120 mm thick, 1 hour fire rated.‬‬

‫أربعمائة وأربعة عشر جنيها مصريا وسنة وستون قرشًا ال غير‬

‫‪414.66‬‬

‫‪225,989.70‬‬

‫‪1,281,095.95‬‬

‫‪545‬‬

‫‪M²‬‬

‫الفان وسبعمائة وثمانية وسبعون جنيهًا مصريًا وخمسة وتسعون قرشًا ال غير‬

‫‪M‬‬

‫‪461‬‬

‫‪2,778.95‬‬

‫‪1‬‬

‫‪2‬‬

‫‪3‬‬
4

Concrete solid brick, 250 mm thick, 2 hours fire rated.

Concrete solid brick, 120 mm thick, 2 hours fire rated.

‫أربعمائة وأربعة عشر جنيها مصريا وستة وستون قرشًا ال غير‬

414.66

265,382.40

640

‫الفان ومائتان وأربعة وخمسون جنيها مصريا وستة وتسعون قرشا ال غير‬

Concrete solid brick, 250 mm under slab on grade.

42

2,254.96

94,708.32

DIVISION: 04

MASONRY

SECTION: 044216

STEEL-STUD-SUPPORTED STONE CLADDING

Cladding; mechanically fixed; including substructure: backing; all accessories and fittings;
fixing and any material or activity required to finish; provided samples for approval, as
specified and as elevation drawings, M.O.M, specification and the instructions of the
supervision engineer; to

‫احدى عشر ألف وخمسمائة وأربعة جنيها مصريا وسنة وعشرون قرشًا ال غير‬

Supply and install engineered stone cladding, white color, zero joint and plain texture, 30
mm thickness, on facades. Semi mechnical fixation, Rate includes any material or activity
required to finish the work as per drawings. Detail 01 DWG AR-E-202, Detail 05 DWG AR-E-
505

98

11,504.26

1,127,417.48

‫الفان ومائتان وواحد وثمانون جنيها مصريا وواحد وثالثون قرشا ال غير‬

Supply and install Cement Board Cladding including fiber, on facades and soffits. Rate
includes reveals determined in drawings; Rock wool insulation; and any material or activity
required to finish the work as per drawings. DWG AR-E- 201,202,203 & 204.

3,365

2.281.31

7,676,608.15

‫خمسة آالف وثالثمائة وخمسة وستون جنيها مصريا وثمانون قرشًا ال غير‬

Alter.

(Alternative) Supply and install Glassfibre Reinforced Concrete (GFRC) Cladding on facades
and soffits. Rate includes reveals determined in drawings; Rock wool insulation; and any
material or activity required to finish the work as per drawings, DWG AR-E-201,202,203 &
204.

3,365

5,365.80

Rate Only

‫ألف وتسعمائة وخمسة وعشرون جنيها مصريا وخمسة وثالثون قرشًا ال غير‬

Supply and install Triesta cladding, Gray color, 20 mm


thickness, plain texture, 600 x 300 mm, on facades. Wet fixation, Rate includes any material
or activity required to finish the work as per perspective in drawings DWG AR-E-

230

1,925.35

442,830.50

901.

DIVISION: 05 METALS

SECTION: 055000

METAL FABRICATIONS

Notes:

*The contractor is obliged to the dimensions and shapes of the steel sectors shown in the
drawings and submitting the shop drawings for approval prior to supply.

Metal fabrications; including brackets; all accessories and fittings; paint and fixing and items
mentioned in drawings M.O.M, specifications and the instructions of the supervision
engineer.

‫عشرة آالف وخمسمائة وسبعة وثمانون جنيها مصريا واثنان وأربعون قرشا ال غير‬

Steel Ladder, with Polyurethane Based Coating applied on epoxy primer paint, height 1500
mm.

NO.

5.00

10,587.42

‫اثنان وعشرون ألف وخمسمائة واثنان وعشرون جنيها مصريا وتسعة وثمانون قرشًا ال غير‬

Steel Ladder, with Polyurethane Based Coating applied on epoxy primer paint, height 5500
mm.

NO.

2.00

22,522.89
‫عشرون ألف وثمانمائة وثالثون جنيها مصريا وثالثة عشر قرشًا ال غير‬

Steel Ladder, with epoxy paint Coating applied on epoxy primer paint, height 5000 mm.

NO.

2.00

20,830.13

‫أربعة وعشرون ألف وتسعمائة وإحدى عشر جنيها مصريا وواحد وعشرون قرشًا ال غير‬

Steel Ladder, with epoxy paint Coating applied on epoxy primer paint, height 6000 mm.

NO.

1.00

24,911.21

‫ثمانية وعشرون ألف وثالثون جنيهًا مصريًا وخمسون قرشا ال غير‬

Steel Ladder, with epoxy paint Coating applied on epoxy primer paint, height 7000 mm.

NO.

1.00

28,030.50

‫ثمانية عشر ألف وثالثمائة وسبعة وخمسون جنيها مصريا وسبعة عشر قرشا ال غير‬

52,937.10

45,045.78

41,660.26

24,911.21

28,030.50

Galvanized Steel Ladder, with, height 4000 mm.(for Pump room)

NO.

1.00

18,357.17
18.357.17

‫خمسة عشر ألف ومائتان وثالثة عشر جنيهًا مصريًا وستة وعشرون قرشًا ال غير‬

Galvanized Steel Ladder, with, height 3000 mm. (for Pump room)

NO.

1.00

15.213.26

15,213.26

Stainless Steel Ladder, height 3000 mm. (for Water Tank)

‫ثالثة وخمسون ألف وثالثمائة وسبعة وثمانون جنيها مصريا وخمسة وتسعون قرشًا ال غير‬

‫ستة آالف واربعمائة وسبعون جنيها مصريا وخمسة وتسعون قرشًا ال غير‬

NO.

1.00

53,387.95

53,387.95

‫ بية مصر‬Escape Stair Interuption Metal Gate, with epoxy paint coatum applied on epoxy
primer paint, Refer to Detail 02

‫لالسكا‬

NO

2.00

6,470.95

12,941.90

ARRIED TO SECTION SUMMARY

292,485.13

SECTION: 055000

METAL FABRICATIONS
‫تسعة عشر ألف ومائة وستة وعشرون جنيها مصريا وستون قرشا ال غير‬

10

Trench Cover, chequered plate; including frames, neoprene strip: handles; all accessories
and fittings; fixing and finish: and all necessary works according to width as per DWG. AR- E-
111 & Detail 07 DWG. AR-E-505, M.O.M and specification. For RMU, transformer, switch
gear and generator

30.00

19,126,60

573.798.00

‫عشرون ألف ومائتان وثمانية وأربعون جنيها مصريا وثمانية وعشرون قرشًا ال غير‬

11

Chequered plate (Platform); including frames; neoprene strip; handles; all accessories and
fittings; fixing and finish; and all necessary works according to width as per Detail 09 DWG.
AR-E-505, M.O.M and specification. for MEP shafts

17.00

20,248.28

344,220.76

‫سبعة آالف وخمسمائة وتسعة وخمسون جنيها مصريا وستة وثالثون قرشا ال غير‬

12

Access Panels (400*400 mm), as Detail 10 DWG. AR-E-505

NO. 8.00

13

14

7,559.36

‫واحد وتسعون ألف ومائة وسبعة عشر جنيهًا مصريًا وثالثة وعشرون قرشًا ال غير‬

Door Hatch for Water Tank (2500*1500 mm), with Polyurethane Based Coating applied on
epoxy primer paint

NO.
1.00

91.117.23

‫أربعة وعشرون ألف ومائتان وسبعة وتسعون جنيها مصريا وثالثة وتسعون قرشا ال غير‬

Door Hatch for Water Tank (1000*1000 mm), with Polyurethane Based Coating applied on
epoxy primer paint

NO.

CARRIED TO SECTION SUMMARY

60,474.88

91,117.23

1.00

24,297.93

24,297.93

L.E

1,093,908.80

SECTION: 055213

PIPE AND TUBE RAILING

Supply and install Metal Handrails, epoxy paint, including all necessary fixing, fitting and
finish, complete as mentioned in drawings, M.O.M, specifications and the instructions of the
supervision engineer.

‫ثالثة آالف وستمائة وسبعة وأربعون جنيها مصريا واثني عشر قرشا ال غير‬

Floor mounted, 1000 mm high (900 mm from finish level), epoxy paint, for the Staircases, as
Detail 16 DWG AR-E- 503.

L.M

85.00

3,647.12

310.005.20
‫ألف وتسعمائة وثالثة وعشرون جنيهًا مصريًا وتسعة وخمسون قرشًا ال غير‬

Wall mounted, epoxy paint, for the Staircases, as Detail 15 DWG AR-E-503.

Laminated double glazed (6mm outer securite clear glass, 1.52mm PVB and 6mm inner
securite clear glass) railings, including items mentioned in drawings, M.O.M. specifications
and the instructions of the supervision

L.M 85.00

1,923.59

‫ثمانية آالف وأربعمائة وثالثة وستون جنيها مصريا وثمانية وسبعون قرشا ال غير‬

Internal Corridors and auditorium. Height 800 mm, as Detail 17 DWG AR-E-503.

163,505.15

L.M

562.35

8,463.78

4,759,606.68

‫إحدى عشر ألف وثالثمائة وعشرة جنيها مصريا وتسعة وستون قرشا ال غير‬

Internal Steel Stairs, Height 800 mm.

L.M

60.00

11,310.69

678,641.40

ITEM NO

DESCRIPTION

DIVISION: 07

THERMAL AND MOISTURE PROTECTION

SECTION: 071614

POLYMER MODIFIED CEMENT WATERPROOFING


Polymer modified cement waterproofing, including items mentioned in drawings, M.O.M.
specifications and the instructions of the supervision engineer, to

Wet areas floors, inner shafts

bathrooms

Coated foamed Roofing

UNIT

QTY

RATE

TOTAL L.E

‫ثالثمائة وسبعة وثالثون جنيها مصريا وثمانية وأربعون قرشًا ال غير‬

337.48

11,474.32

34

‫ثالثمائة وسبعة وثالثون جنيهًا مصريًا وثمانية وأربعون قرشًا ال غير‬

Waterproofing membrane, Polyurethane Foam with acrylic topcoat; including items


mentioned in drawings, M.O.M, specifications and the instructions of the supervision
engineer; to

325

337.48

‫ألف ومائتان وأربعة جنيها مصريا وثمانية وسبعون قرشًا ال غير‬

For Roof and external-corridors; 30 mm thickness

Supply and install water-proofing torchable bituminous membrane 4mm thick., including
skirting of same material and one coat of solvent based bituminous primer & cement screed
2cm thick. for protection. (composed water proofing with polyester reinforcement and fiber
glass). Rate includes all necessary works and testing according to drawings, M.O.M,
specifications and the instructions of the supervision engineer, to

4,220

1.204.78

109,681.00

5,084,171.60

External Corridors

1 Alter.

Wet areas floors, inner shafts

2* Alter.

bathrooms

‫ثالثمائة وخمسون جنيها مصريا وثمانية وتسعون قرشا ال غير‬

1,900

350.98

‫ثالثمائة وخمسون جنيهًا مصريًا وثمانية وتسعون قرشًا ال غير‬

34

350.98

‫ثالثمائة وخمسون جنيهًا مصريًا وثمانية وتسعون قرشًا ال غير‬

CARRIED TO SECTION SUMMARY

666,862.00

Rate Only

325

350.98
Rate Only

L.E

5,872,188.92

ITEM NO

BASE ITEMS

DESCRIPTION

DIVISION: 07

THERMAL AND MOISTURE PROTECTION

SECTION: 079500

EXPANSION CONTROL

Expansion joints; including fire barrier, aluminium cover

plate, all accessories and fittings; fixing and finishing:

complete; as specified in Detail 4 DWG. AR-E-504, Μ.Ο.Μ.

specifications and the instructions of the supervision

engineer, to

Internal expansion joints

DATE: OCTOBER 2023

Rev. 00

UNIT

QTY

RATE

TOTAL

L.E

Floor to floor,

Floor to floor, ground level;


‫‪3‬‬

‫‪Ceiling to ceiling‬‬

‫‪4‬‬

‫‪Floor to wall‬‬

‫‪5‬‬

‫‪Ceiling to wall‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيهًا مصريًا وستون قرشًا ال غير‬

‫‪L.M‬‬

‫‪85‬‬

‫‪4,724.60‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيها مصريا وستون قرشا ال غير‬

‫‪4,724.60‬‬

‫‪46‬‬

‫‪L.M‬‬

‫اربعة االف وسبعمائة وأربعة وعشرون جنيها مصريا وستون قرشًا ال غير‬

‫‪4,724,60‬‬

‫‪46‬‬

‫‪L.M‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيهًا مصريًا وستون قرشًا ال غير‬

‫‪L.M‬‬

‫‪31‬‬

‫‪4,724.60‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيها مصريا وستون قرشًا ال غير‬

‫‪31‬‬

‫‪4,724.60‬‬

‫‪L.M‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيها مصريا وستون قرشًا ال غير‬

‫‪401,591.00‬‬
‫‪217,331.60‬‬

‫‪217,331.60‬‬

‫‪146.462.60‬‬

‫‪146,462.60‬‬

‫‪6‬‬

‫‪Wall to Wall‬‬

‫‪External expansion joints‬‬

‫‪7‬‬

‫‪Floor to wall; ground level‬‬

‫‪8‬‬

‫‪Wall to wall‬‬

‫‪9‬‬

‫‪Floor to floor, roof level‬‬

‫که مدينة مصران‬

‫‪L.M‬‬

‫‪100‬‬

‫‪4,724.60‬‬

‫‪472,460.00‬‬

‫أربعة االف وسبعمائة وأربعة وعشرون جنيها مصريا وستون قرشًا ال غير‬

‫‪L.M‬‬

‫‪20‬‬

‫‪4,724.60‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيهًا مصريًا وستون قرشًا ال غير‬

‫‪L.M‬‬

‫‪70‬‬

‫‪4.724.60‬‬

‫أربعة آالف وسبعمائة وأربعة وعشرون جنيها مصريا وستون قرشًا ال غير‬

‫‪CARRIED TO SECTION SUMMARY‬‬


L.M

82

4,724,60

94,492.00

330.722.00

387,417.20

L.E

2,4141270.60ITEM NO

BASE ITEMS

DESCRIPTION

DATE: OCTOBER 2023

Rev. 00

UNIT

QTY

RATE

TOTAL L.E

DIVISION: 08 OPENINGS

SECTION: 081113 HOLLOW METAL DOORS AND FRAMES

Notes:

*The contractor shall submit the shop drawings and provide samples with all necessary
ironmengeries to be approved by the consultant before supply.

The contractor shall verify the sizes of the openings and the number on site before
installation.
*The Rate includes all the necessary experiments and tests required for metal works
according to the approved drawings and sample, M.O.M, specifications and the instructions
of the supervision engineer.

Doors; flush galvanized steel; hollow core; including; frames; ironmongery; fixing and paint;
to

Type 01, 600*2050mm, Access Door

Type 01, 600*2050mm, 45mins fire rated,, Access Door

Type 01, 600*2050mm, 90mins fire rated,, Access Door

‫تسعة عشر ألف وخمسمائة وتسعة وسبعون جنيها مصريًا وستون قرشًا ال غير‬

19.579.60

NO.

‫تسعة عشر ألف وثمانمائة جنيها مصريا‬

‫وتسعة وخمسون قرشًا ال غير‬

19,800.59

NO.

‫تسعة عشر ألف وثمانمائة جنيها مصريا وتسعة وخمسون قرشًا ال غير‬

19,800.59

NO.

‫ثالثة وعشرون ألف ومائتان وتسعة عشر جنيها مصريا وواحد وخمسون قرشًا ال غير‬

23,219.51

NO.

‫ثالثة وعشرون ألف ومائة وثالثة وتسعون جنيها مصريا وواحد وخمسون قرشًا ال غير‬

NO. 9

23.193.51

‫ثالثة وعشرون ألف وثمانمائة وستة وخمسون جنيهًا مصريًا وخمسون قرشًا ال غير‬
‫‪Type 01, 900-2250mm, 45mins fire rated‬‬

‫‪5‬‬

‫‪Type 01, 1000*2250mm‬‬

‫‪137,057.20‬‬

‫‪99,002.95‬‬

‫‪118,803.54‬‬

‫‪162,536.57‬‬

‫‪208,741.59‬‬

‫‪357,847,50‬‬

‫‪95,426.00‬‬

‫‪23,986.49‬‬

‫‪NO.‬‬

‫‪15‬‬

‫‪23,856.50‬‬

‫‪6‬‬

‫‪Type 01, 1000*2250mm, 45mins fire rated‬‬

‫‪7‬‬

‫‪Type 01, 1000*2250mm, 90mins fire rated‬‬

‫ثالثة وعشرون ألف وثمانمائة وستة وخمسون جنيها مصريا وخمسون قرشا ال غير‬

‫‪23,856.50‬‬

‫‪4‬‬

‫‪NO.‬‬

‫ثالثة وعشرون ألف وتسعمائة وستة وثمانون جنيها مصريًا وتسعة وأربعون قرشًا ال غير‬

‫‪23,986.49‬‬

‫‪1‬‬

‫‪NO.‬‬

‫‪Type 01, 1100*2050mm, 45mins fire rated‬‬


Type 01. 1100*2050mm, 90mins fire rated

‫ثالثة وعشرون ألف وتسعمائة وستة وثمانون جنيها مصريا وتسعة وأربعون قرشًا ال غير‬

23,986.49

NO.

‫أربعة وعشرون ألف وستمائة واثنان وستون جنيها مصريا وثمانية وأربعون قرشًا ال غير‬

24,662.48

143,918.94

197,299,84

25,325.46

01.301.84

L.E

1,645.922.46

NO.

10

Type 01, 1100*2250mm

‫خمسة وعشرون ألف وثالثمائة وخمسة وعشرون جنيهًا مصريًا وستة وأربعون قرشًا ال غير‬

NO.

Type 01, 1100*2250mm, 45mins fire rated

CARRIED TO SECTION SUMMARY

OPENINGS

SECTION: 081113 (Cont,) HOLLOW METAL DOORS AND FRAMES

Doors; flush galvanized steel; hollow core; including; frames; ironmongery, fixing and paint;
to
‫‪Type 01, 1100 2250mm, 90mins fire rated‬‬

‫خمسة وعشرون ألف وثالثمائة وخمسة وعشرون جنيهًا مصريًا وستة وأربعون قرشًا ال غير‬

‫‪NO.‬‬

‫‪15‬‬

‫‪25,325.46‬‬

‫الثمانية وثالثون ألف ومائتان وثمانية جنيها مصريا وستة عشر قرشًا ال غير‬

‫‪38,208.16‬‬

‫‪4‬‬

‫‪NO.‬‬

‫تسعة وثالثون الف وأربعمائة وواحد وسبعون جنيهًا مصريًا وثمانية عشر قرشًا ال غير‬

‫‪39,471.18‬‬

‫‪NO.‬‬

‫‪2‬‬

‫ثالثون ألف وخمسة وثمانون جنيها مصريا وأربعون قرشا ال غير‬

‫‪1 30,085.40‬‬

‫‪NO.‬‬

‫‪12‬‬

‫‪13‬‬

‫‪Type 01, 1900*2250mm‬‬

‫‪Type 01, 1900-2250mm, 45mins fire rated‬‬

‫خمسة وأربعون ألف ومائتان وتسعة وستون جنيهًا مصريًا وأربعة قرشا ال غير‬

‫‪45,269.04‬‬

‫‪4‬‬

‫‪NO.‬‬

‫خمسة وأربعون ألف ومائتان وتسعة وستون جنيهًا مصريًا وأربعة قرشًا ال غير‬

‫‪45.269.04‬‬

‫‪NO.‬‬

‫أربعة وأربعون ألف ومائة وسبعة وسبعون جنيها مصريا وسبعة قرشًا ال غير‬
‫‪44,177.07‬‬

‫‪2‬‬

‫‪NO.‬‬

‫‪14‬‬

‫‪15‬‬

‫‪Type 01, 2100 2250mm‬‬

‫‪16‬‬

‫‪17‬‬

‫‪18‬‬

‫‪Type 01, 2100 2550mm, 45mins fire rated‬‬

‫‪Type 01, 2100 2550mm, 90mins fire rated‬‬

‫‪Type 02, 2100 2550mm, with louvers‬‬

‫‪19 Type 03, 2100 2550mm, with louvers‬‬

‫‪20 Type 04, 1900*2250mm, double egress‬‬

‫تسعة وخمسون ألف وخمسمائة وواحد وثمانون جنيهًا مصريًا وواحد وسبعون قرشًا ال غير‬

‫‪1 59,581.71‬‬

‫‪NO.‬‬

‫الثمانية وثالثون ألف وتسعمائة واثنى عشر جنيها مصريا وتسعة عشر قرشا ال غير‬

‫‪NO. 1‬‬

‫‪38,912.19‬‬

‫تسعة وثالثون ألف وأربعمائة وواحد وسبعون جنيها مصريا وثمانية عشر قرشًا ال غير‬

‫‪21‬‬

‫‪Type 04, 1900-2250mm, double egress, 45mins fire rated‬‬

‫‪NO.‬‬

‫‪2‬‬

‫‪39,471.18‬‬

‫‪379,881.90‬‬

‫‪152,832.64‬‬
78,942.36

30,085.40

181,076.16

45,269.04

88,354.14

59,581.71

38,912.19

78,942.36

ITEM NO

BASE ITEMS

DESCRIPTION

DATE: OCTOBER 2023

Rev. 00

UNIT

QTY

RATE

TOTAL

L.E

DIVISION: 08

OPENINGS

SECTION: 082110

WOOD DOORS

Supply & install-one hinged-leaf wooden door, Door Frame: Musky Wood (Pine wood)
Covered with HPL + MDF with PVC lipping. Door leaf: Inner frame Musky wood, Stiles, Rails,
Honeycombed panel, Door covered with MDF with 2 sides and HPL with 2 sides, PVC
covered all around the door leaf, including fixing, painting, frames and hardware set &
accessories and any material or activity required to finish the work as mentioned in
drawings, specifications and the instructions of the supervision engineer

One hinged leaf wood door


2

‫اثني عشر ألف وستة وستون جنيهًا مصريًا وواحد وسبعون قرشًا ال غير‬

13

12,066.71

‫ثالثة وعشرون ألف ومائة واثنان وستون جنيهًا مصريًا وأربعون قرشًا ال غير‬

23,162.40

‫عشرة االف وثمانمائة واثنان وخمسون جنيهًا مصريًا وتسعة قرشًا ال غير‬

One hinged leaf wood door (fire rated not less than 45 min)

Double hinged leaf wood door

SECTION: 083616

SINGLE-PANEL DOORS

13

10,852.09

‫إحدى عشر ألف ومائة وأربعون جنيها مصريا وسبعة وتسعون قرشًا ال غير‬

Supply and install One hinged leaf HPL Panel for toilet doors the price inclued all the
accessories & all necessary works to finish the work as per drawings, M.O.M, specifications
and the instructions of the supervision engineer.

SECTION: 084415

GLAZED ALUMINUM CURTAIN WALLS AND

WINDOW WALLS

156,867.23

115,812.00
141,077.17

M 88

11,140.97

980,405.36

Aluminum glazed window walls: RAL#9006 electrostatic painting, including insulated units;
frames and sub-frames; Aluminum thickness not less than 2mm; fire sealant; sills; full
tempered double glazed (6mm outer clear glass, 16 mm Air space and 6mm inner clear
glass); glazing beads and gaskets; ironmongery; all accessories, fixtures and fittings; fixing
and installation; as specified and as shown on elevations drawings, M.O.M, specifications
and the instructions of the supervision engineer, to

Curtain Walls

‫ستة آالف ومائتان وأربعة عشر جنيهًا مصريًا وسبعة وسبعون قرشًا ال غير‬

820

6.244.77

5.096,111.40

‫ألف وستمائة وخمسة على جنيها مصريا واثنان وثمانون قرشًا ال غير‬

Aluminum Strip between Cement board and Curtain wall (Depth 27 mm and Width 20 mm),
Color Code RAL# 9003

CARRIED TO SECTION SUMMARY

L.M

40

1,615.82

64,632.80

L.

6.554,905.96

BASE ITEMS

ITEM NO
DESCRIPTION

DIVISION: 08 OPENINGS

UNIT

QTY

DATE: OCTOBER 2023

Rev. 00

RATE

TOTAL L.E

SECTION: 086323

RIDGE METAL-FRAMED SKYLIGHTS

Supply and Install skylights, including main system Metal- frames; secondary system
Aluminum sub-frames: RAL#9006 electrostatic painting, ironmongery; Laminated double
glazed -Triplex glass (6mm outer securite clear glass, 1.52mm PVB and 6mm inner securite
clear glass), sealants and glazing gaskets; all accessories, fixtures and fittings; fixing and
installation; as specified and as shown on elevations drawings, M.O.M, specifications and the
instructions of the supervision engineer; to

For Roof

Supply and Install skylights, including main system Metal- frames; secondary system
Aluminum sub-frames; RAL#9006 electrostatic painting, ironmongery, Composite
(polystrene boards between double Aluminum Panels), sealants and glazing gaskets; all
accessories, fixtures and fittings; fixing and installation; as specified and as shown on
elevations drawings, M.O.M, specifications and the instructions of the supervision engineer,
to

For Roof

‫المانية آالف وتسعمائة وواحد وخمسون جنيها مصريا وخمسة وخمسون قرشًا ال غير‬

260

8,951.55

2,327,403.00

2
‫ثمانية االف وتسعمائة وواحد وخمسون جنيهًا مصريًا وخمسة وخمسون قرشًا ال‬.

200

8.951.55

1,790,310.00

ITEM NO

Alter.

DESCRIPTION

DIVISION: 08 OPENINGS

SECTION: 086323 (Cont,) RIDGE METAL-FRAMED SKYLIGHTS

Alternative Supply and Install Metal-framed skylights, including frames; sub-frames;


RAL#7012, with Polyurethane Based Coating applied on epoxy primer paint, ironmongery;
sealants and glazing gaskets; all accessories, Laminated double glazed - Triplex glass (6mm
outer securite clear glass, 1.52mm PVB and 6mm inner securite clear glass), fixtures and
fittings; fixing and installation; as specified and as shown on elevations drawings, M.O.M,
specifications and the instructions of the supervision engineer, to

For Roof

UNIT

QTY

RATE

TOTAL L.E

‫مائة وثمانية وستون ألف وسبعمائة وخمسة وثالثون جنيها مصريا وواحد وستون قرشا ال غير‬

Alternative Supply and Install Metal sheets (surrounding item above) skylights, including
frames; sub-frames; RAL#7012, with Polyurethane Based Coating applied on epoxy primer
paint, ironmongery; sealants and glazing gaskets; all accessories, Composite (polystrene
boards between double 4.0mm Metal sheets), fixtures and fittings; fixing and installation; as
specified and as shown on elevations drawings, M.O.M, specifications and the instructions of
the supervision engineer, to

2 Alter.

For Roof

M
260

168,735.61

‫مائة وثمانية وستون ألف وسبعمائة وخمسة وثالثون جنيهًا مصريًا وواحد وستون قرشا ال غير‬

200

168,735.61

Rate Only

Rate Only

Madinet Masr

HEAD QUARTER

BASE ITEMS

DATE: OCTOBER 2023

ITEM NO

DESCRIPTION

UNIT

QTY

RATE

SECTION: 089119

FIXED LOUVERS

DIVISION: 08 OPENINGS

Architectural aluminum louvers; RAL#9003 electrostatic painting, including blades; frames


and sub-frames; Aluminum thickness not less than 1.0mm; ironmongery; all accessories and
fittings; fixing; as specified and as shown on elevation drawings, M.O.M, specifications and
the instructions of the supervision engineer, to

Louvers

SECTION: 088313

MIRRORS

‫ثالثة آالف وثمانمائة وعشرون جنيها مصريا وتسعة قرشا ال غير‬


Mirrors, including backing; indirect light; fixing; all accessories and fittings: complete as
mentioned per drawings. M.O.M, specifications and the instructions of the supervision
engineer.

57

3,820.09

‫الفان وأربعمائة وسبعون جنيهًا مصريًا وثالثة وثمانون قرشًا ال غير‬

2.470.83

145

‫ألفان وأربعمائة وسبعون جنيها مصريا وثالثة وثمانون قرشًا ال غير‬

Height-1025mm,-Toilet Mirrors

Height 1025mm, handicapped toilet Mirror

2,470.83

CITY

Rev. 00

TOTAL L.E

217,745.13

358.270.35

2,470.83

Madinet Masr

HEAD QUARTER

BASE ITEMS

DATE: OCTOBER 2023

ITEM NO
DESCRIPTION

UNIT

QTY

RATE

SECTION: 089119

FIXED LOUVERS

DIVISION: 08 OPENINGS

Architectural aluminum louvers; RAL#9003 electrostatic painting, including blades; frames


and sub-frames; Aluminum thickness not less than 1.0mm; ironmongery; all accessories and
fittings; fixing; as specified and as shown on elevation drawings, M.O.M, specifications and
the instructions of the supervision engineer, to

Louvers

SECTION: 088313

MIRRORS

‫ثالثة آالف وثمانمائة وعشرون جنيها مصريا وتسعة قرشا ال غير‬

Mirrors, including backing; indirect light; fixing; all accessories and fittings: complete as
mentioned per drawings. M.O.M, specifications and the instructions of the supervision
engineer.

57

3,820.09

‫الفان وأربعمائة وسبعون جنيهًا مصريًا وثالثة وثمانون قرشًا ال غير‬

2.470.83

145

‫ألفان وأربعمائة وسبعون جنيها مصريا وثالثة وثمانون قرشًا ال غير‬

Height-1025mm,-Toilet Mirrors

Height 1025mm, handicapped toilet Mirror


M

2,470.83

CITY

Rev. 00

TOTAL L.E

217,745.13

358.270.35

2,470.83

Page 01

1,645,922.46.

Page 02

1,133,877.90

Page 03

6,554,905.96

Page 04

4,117,713.00

Page 05

Page 06

578,486.31

Page 01

1,645,922.46.

Page 02

1,133,877.90

Page 03

6,554,905.96

Page 04
4,117,713.00

Page 05

Page 06

578,486.31

DIVISION: 09 FINISHES

SECTION: 092400

PORTLAND CEMENT PLASTERING

Notes:

*The Plaster (internal and external) works are measured geometrically only, with the
deduction of the surfaces that have not been plaster applied.

Supply and apply cement plaster for surfaces, including grooves where required, metal lath
and all necessary work. Rate includes any material, all accessories, smooth finish or any
activity required to finish the work as per drawings, M.O.M, specifications and the
instructions of the supervision engineer.; to

Walls; 20 thick: internal

Walls: 20 thick; external

‫مائة وستة وأربعون جنيها مصريًا وأربعة وسبعون قرشًا ال غير‬

15,400.00

146.74

‫مانتان وثمانية وأربعون جنيها مصريا وأربعة عشر قرشا ال غير‬

1,060.00

248.14

2,259,796.00

263,028.40

DIVISION: 09 FINISHES
SECTION: 092900 GYPSUM BOARD

Notes:

The contractor shall provide samples of the types of boards, catalogs, the required sizes and
shop drawings for approval before supply.

All types of gypsum ceilings produced by a company approved before supply.

For gypsum boards, the Stil Prim suspension system is used from approved company with
hot dip galvanized sheet sections.

Quantities will be measured geometrically, Horizontal without any allowances for different
levels in the ceiling. Follow the instructions of the manufacruturer vendors and coordinate
with the sub-contractors for MEP works to review the locations of the required outlets and
consider all required openings.

*Rate includes supply and implementation of shadow gap accessories by walls and the
ceilings with an approved sample

Gypsum board Wall Partition; including gypsum layer 15 mm to both sides; furring, acoustic
insulation; all accessories, fittings and fixing; as specified as per drawings, M.O.M.
specifications and the instructions of the supervision engineer.

Walls, thickness 100mm

Supply and install gypsum board/tiles for suspended ceiling as per drawings: rate includes
suspension system, finish and all material or activity required to finish the work as per
drawings, M.O.M, specifications and the instructions of the supervision engineer.

‫الف ومائة وثالثة وثالثون جنيهًا مصريًا وواحد وتسعون قرشًا ال غير‬

1,091.00

1,133.91

1,237,095.81

‫سبعمائة وستة وستون جنيها مصريا وأربعة وسبعون قرشا ال‬

Walls, thickness 100mm

1,091.00
1,133.91

1,237,095.81

Supply and install gypsum board/tiles for suspended ceiling as per drawings; rate includes
suspension system, finish and all material or activity required to finish the work as per
drawings, M.O.M, specifications and the instructions of the supervision engineer.

‫سبعمائة وستة وستون جنيها مصريا وأربعة وسبعون قرشا ال غير‬

12.5mm thickness moisture resistant gypsum board/ tiles (600x600)mm. for (Toilets).

Supply and install gypsum board Cladding FOR ALL EXTERNAL WALLS THAT EXCEED 4,00 M
SHALL BE SOLID BLOCK WITH HEIGHT 2.5M AND THE REST OF THE WALL WILL BE DRY WALL.
as per drawings; rate includes suspension system, finish and all material or activity required
to finish the work as per drawings, M.O.M. gpesifications and the instructions of the
supervision

‫محبر‬

12.5mukness white gypsum Board

DOMOS CARRIED TO SECTION SUMMARY

324.00

‫ألف وسبعة وواحد وثمانون جنيها مصريا وخمسة وثمانون فرشًا ال غير‬

m2

1.00

1,781.85

LE

248,423.76

766.74

1,78185

1.487,401.42

DIVISION: 09 FINISHES

SECTION: 093000

1
TILING

Supply and install (non slip) ceramic tiles for floors, including, sand, mortar bed or adhesive
on screed. Rate includes any material or activities required to finish the work as per
drawings, M.O.M, specifications and the instructions of the supervision engineer.

‫بعمائة وسبعة وثالثون جنيها مصريا وسبعة وخمسون قرشا ال غير‬

Floors for toilets, non slippery ceramic tiles size 450 x 450 mm

Full bodied ceramic tiles and fittings; including backing: fixing mortars or adhesive and
plaster; as per drawings, specifications and the instructions of the supervision. engineer.

120.00

437.57

52,508.40

‫أربعمائة واثنان وأربعون جنيها مصريا وسبعة وأربعون قرشا ال غير‬

442.47

26.00

‫ستمائة وثالثون جنيها مصريا وثمانية وتسعون قرشًا ال غير‬

Wall for executive toilets 1200mm Height

Wall base for toilets (except executive), 100mm high

HDF (High Density fiber) Engineered wood flooring, 8.0mm thick: Class 32; including Ferrazze
Cement tiles for under layers; fixings and finish; as per drawings, specifications and the
instructions of the supervision engineer.

L.M

60.00

630.98

‫ألف ومائة وواحد وثمانون جنيها مصريا واثنان وخمسون قرشا ال غير‬
Floors; HDF, 8.0mm thick; minimum Class 32 Engineered wood flooring/HDF: 12.00 mm
thick; including Terrazzo Cement tiles for under layers; fixings and finish; as per drawings,
specifications and the instructions of the supervision engineer.

535,00

1,181.52

‫خمسة آالف وتسعمائة وثالثة وعشرون جنيها مصريًا واثنان وتسعون قرشًا ال غير‬

11.504.22

37,858.80

632,113.20

‫خمسة آالف وتسعمائة وثالثة وعشرون جنيها مصريا واثنان وتسعون قرشا ال‬

4 ALT

Engineered wood flooring/HDF: 12.00 mm thick

Floors, 600*600mm, for workspaces

Wall Base 100mm Height

MF

1.00

5,923.92

‫أربعمائة وأربعة وعشرون جنيها مصريا وواحد وثمانون قرشًا ال غير‬

4,957.00

424.81

‫مائة وواحد وثالثون جنيهًا مصريًا وثالثة وتسعون قرشا ال غير‬

CARRIED TO SECTION SUMMARY

L.M

2,979.00

131.93
LE

5,923.92

2,105,783.17

393,019.47

3.238.711.18

7 ALT

FINISHES

Supply and install terrazzo tiles, rate includes clean sand, bedding cement mortar, grouting
and any material or activity required to finish the work as per drawings, specifications and
the instructions of the supervision engineer.

‫ثالثمائة وستة وستون جنيها مصريا وأربعة وأربعون قرشا ال غير‬

Size (300x300) mm Terrazzo tiles includes skirting, for external corridors and MEP space at
(roof and rooms)

2,441.00

366.44

‫تسعمائة وخمسة وستون جنيها مصريا وإحدى عشر قرشا ال غير‬

Heavy Duty Terrazzo tiles, for external corridors and MEP

space at (roof and rooms)

SECTION: 096340

STONE FLOORING

1.00

894,480.04

965.11

965.11
Stone flooring set with mortar, including items mentioned as per drawings, specifications
and the instructions of the supervision engineer.

‫ثالثة آالف وثالثمائة واثنان وأربعون جنيها مصريا واثنان وسبعون قرشًا ال غير‬

20mm thick heavy duty PIETRA GREY (Turkish) marble for entrance/ lounge.

2,250.00

3,342.72

‫سبعمائة وثمانية وعشرون جنيهًا مصريًا وأربعة وتسعون قرشًا ال غير‬

20mm thick heavy duty PIETRA GREY (Turkish) marble threshold.

L.M

7,521,120.00

120.00

728.94

87,472.80

‫ألفان وستمائة وسبعة وستون جنيهًا مصريًا وثمانية وسبعون قرشًا ال غير‬

1 Alter.

20mm thick heavy duty CARARA WHITE marble for entrance/lounge.

2 Alter.

2,250.00

2,667.78

‫ستمائة وواحد وستون جنيها مصريا وخمسة وأربعون قرشًا ال غير‬

Rate Only

20mm thick heavy duty CARARA WHITE marble threshold. L.M 120.00 661.45

Rate Only

5
6

SECTION: 096340 (Cont,) STONE FLOORING

Stone flooring tiles set with mortar and clean sand; including items mentioned in, M.O.M.
specifications and the instructions of the supervision engineer.

‫ألف وستمائة وخمسة وخمسون جنيها مصريا وسبعة وثالثون قرشا ال غير‬

Exterior Entrance floor (Rough Textured Triesta Marble Gray color), 20mm thick, fixing on
concrete stairs using mortar

15.00

1,655.37

24,830.55

‫ألف واثنان وخمسون جنيهًا مصريًا واثنان وتسعون قرشا ال غير‬

Internal stairs steps, (Rough Textured Triesta Marble Gray color), 40mm thick treads, 20mm
thick risers, 20mm. skirting fixing on concrete stairs using mortar

L.M

250.00

1,052.92

263,230.00

‫ألف وستمائة وخمسة وخمسون جنيها مصريا وسبعة وثالثون قرشا ال غير‬

Internal stairs landings, (Rough Textured Triesta Marble Gray color), 20mm thick. including
100mm skirting fixing on concrete landings using mortar

120.00

1.655.37

198,644.40

‫ألف وستمائة وخمسة وخمسون جنيها مصريا وسبعة وثالثون قرشًا ال غير‬

Floors, (Rough Textured Triesta Marble Gray color), 20mm thick, including 100mm skirting
fixing, using mortar
M

180.00

1,655.37

‫ألف واثنان وخمسون جنيها مصريا واثنان وتسعون قرشًا ال غير‬

Auditorium stairs steps 200mm height, (CARARA WHITE Marble), 40mm thick treads. 20mm
thick risers

L.M

30.00

1,052.92

‫ثالثة آالف وثالثمائة واثنان وأربعون جنيهًا مصريًا واثنان وسبعون قرشًا ال غير‬

Auditorium floors (PIETRA GREY (Turkish) Marble).

20mm thick, fixing, using mortar

99.00

3.342.72

297,966.60

31,587.60

330,929.28

‫الفان وثمانمائة وإحدى عشر جنيها مصريا وأربعة عشر قرشا ال غير‬

7 Alter.

Auditorium stairs steps 200mm height (PIETRA GREY (Turkish) Marble), 40mm thick treads,
20mm thick risers

8 Alter.

IM

30.00

2.811.14

Rate Only

‫الفان وستمائة وسبعة وستون جنيها مصريا وثمانية وسبعون قرشا ال غير‬
Auditorium floors, (CARARA WHITE Marble), 20mm thick, fixing, using mortar

MP

99.00

2,667.78

Rate Only

‫الف واثنان وخمسون جنيها مصريا واثنان وتسعون قرشًا ال غير‬

External stairs steps (Rough Textured Triesta Marble Gray color), 40mm thick treads, 20mm
thick risers, 20mm skirting fixing on concrete stairs using mortar

L.M

98.00

1,052.92

103,186.16

‫الف وستمائة وخمسة وخمسون جنيها مصريًا وسبعة وثالثون قرشًا ال غير‬

‫دينة‬nternal stairs landings (Rough Textured Triesta Marble Smy color), 20mm thick, including
100mm skirting fixing ocondrete landings using mortar

• ‫القط‬

Mast

CARRIED TO SECTION SUMMARY

12.00

1,655,37

19,864.44

ZEK

LE

1.270.289.03

SECTION: 096513
RESILIENT WALL BASE AND ACCESSORIES

P.V.C base 100mm high including backing, fixing and finish; as specified in drawings,
specifications and the instructions of the supervision engineer; to

‫ثالثمائة وثالثة وعشرون جنيها مصريا وسبعة عشر قرشًا ال غير‬

For workspaces-F.O.H offices/meeting/prayer rooms, executive office

SHEET CARPETING

Wall-to-wall-carpet tiles, 12mm thickness, including bedding: underlay Ferrazze Cement Tiles
and fixing; as specified in drawings, specifications and the instructions of the supervision
engineer, to

L.M.

531.00

323.17

171,603.27

Floors, for prayer rooms

SECTION: 097500

STONE FACING

‫الفان ومائة وسبعة وستون جنيها مصريا وستة وستون قرشا ال غير‬

99.00

2,167,66

214.598.34

Stone facing, set with mortar and wire tie, including items mentioned in drawings, M.O.M.
specifications and the instructions of the supervision engineer, to

CARARA WHITE Marble, 20mm thick, for Entrance/ Lounge

‫ثالثة آالف وأربعمائة وسبعة وسبعون جنيها مصريا وواحد وسبعون قرشًا ال غير‬
420.00

3,477.71

‫الثالثمائة وسبعة وسبعون جنيها مصريا وسبعة وتسعون قرشًا ال غير‬

CARARA WHITE Marble base, 100mm high, 20mm thick, for workspaces/ Cafeteria

LM

134.00

1,460,638.20

377.97

50,647.98

‫ الفان وستمائة وسبعة وستون جنيها مصريا وثمانية وسبعون قرشًا ال‬.

SECTION: 096513

RESILIENT WALL BASE AND ACCESSORIES

P.V.C base 100mm high including backing, fixing and finish; as specified in drawings,
specifications and the instructions of the supervision engineer; to

‫ثالثمائة وثالثة وعشرون جنيها مصريا وسبعة عشر قرشًا ال غير‬

For workspaces-F.O.H offices/meeting/prayer rooms, executive office

SHEET CARPETING

Wall-to-wall-carpet tiles, 12mm thickness, including bedding: underlay Ferrazze Cement Tiles
and fixing; as specified in drawings, specifications and the instructions of the supervision
engineer, to

L.M.

531.00

323.17

171,603.27

Floors, for prayer rooms

SECTION: 097500

STONE FACING
1

‫الفان ومائة وسبعة وستون جنيها مصريا وستة وستون قرشا ال غير‬

99.00

2,167,66

214.598.34

Stone facing, set with mortar and wire tie, including items mentioned in drawings, M.O.M.
specifications and the instructions of the supervision engineer, to

CARARA WHITE Marble, 20mm thick, for Entrance/ Lounge

‫ثالثة آالف وأربعمائة وسبعة وسبعون جنيها مصريا وواحد وسبعون قرشًا ال غير‬

420.00

3,477.71

‫الثالثمائة وسبعة وسبعون جنيها مصريا وسبعة وتسعون قرشًا ال غير‬

CARARA WHITE Marble base, 100mm high, 20mm thick, for workspaces/ Cafeteria

LM

134.00

1,460,638.20

377.97

50,647.98

‫ الفان وستمائة وسبعة وستون جنيها مصريا وثمانية وسبعون قرشًا ال‬.

CARARA WHITE Marble base, 100mm high, 20mm thick, for workspaces Cafeteria

CARARA WHITE Marble for the sides of the elevators 20mm thick,

LM

134.00
‫‪377.97‬‬

‫‪50,647.98‬‬

‫‪M‬‬

‫‪40,00‬‬

‫‪2,667.78‬‬

‫الفان وستمائة وسبعة وستون جنيها مصريا وثمانية وسبعون قرشا ال غير‬

‫ربعة آالف ومائة واثنان وخمسون جنيها مصريا وستة وستون قرشا ال غير‬

‫*‪1‬‬

‫‪PIETRA GREY (Turkish) Marble, 20mm thick, for Entrance/Lounge‬‬

‫‪Alter.‬‬

‫*‪2‬‬

‫‪M‬‬

‫‪420.00‬‬

‫‪106,711.20‬‬

‫‪4,152.66‬‬

‫‪Rate Only‬‬

‫ربعمائة وثالثة وستون جنيها مصريا وثالثة وعشرون قرشًا ال غير‬

‫‪PIETRA GREY (Turkish) Marble base, 100mm high, 20mm thick, for workspaces/ Cafeteria‬‬

‫‪L.M‬‬

‫‪1,025.00‬‬

‫‪463.23‬‬

‫‪Alter.‬‬

‫ألفان وستمائة وسبعة وستون جنيها مصريا وثمانية وسبعون قرشا ال غير‬

‫مدينة‬

‫‪CARARA WHITE Marble for the sides of the elevators 50mm thick,‬‬

‫‪CARRIED TO SECTION SUMMARY‬‬

‫‪M‬‬

‫‪40.00‬‬
2,66778

LE

Rate Only

Rate Only

2,004,198.99

SECTION: 096900

ACCESS FLOORING

Raised Floor, 600*600mm, 300mm high, with white hpl finish, including two steps with riser
150mm high, apalyin ante Manic epoxy below the mised foor, with same material and items
mentioned in drawings, M.O.M, specifications and the instructions of the supervision
engineer; to

‫سبعة عشر ألف وخمسمائة وخمسة وثمانون جنيها مصريا وتسعة وعشرون قرشا ال غير‬

120.00

17,585.29

Calcuim Sulphate Raised Floor, as per drawings

‫واحد وعشرون ألف ومائة وثمانية وعشرون جنيها مصريا وأربعة وسبعون قرشًا ال غير‬

1 Alter.

Wood core Raised Floor

SECTION: 099113

EXTERIOR PAINTING

External Acrylic washable emulsion paint; to concrete, masonry and plaster, color code RGB
240, 240, 240, as specified in drawings, M.O.M, specifications and the instructions of the
supervision engineer; to

On fairface concrete Walls

On fairface concrete Soffits


MP

120.00

21.128.74

‫مائة وتسعة وثمانون جنيهًا مصريًا وثالثون قرشًا ال غير‬

60.00

189.30

‫مائة وتسعة وثمانون جنيها مصريا وثالثون قرشا ال غير‬

2,247.00

189.30

‫مائة وتسعة وثمانون جنيهًا مصريًا وثالثون قرشًا ال غير‬

On Plaster Walls

External Acrylic washable emulsion paint; color code RGB 100, 100, 100, to Cement board;
as specified in drawings, M.O.M, specifications and the instructions of the supervision
engineer; to

Walls

1,060.00

189.30

‫مائة وتسعة وثمانون جنيها مصريا وثالثون قرشًا ال‬

3,365.00 189.30

2.110,234.80

Rate Only

11,358.00

425.357.10
200,658.00

636,994.50

SECTION: 099123

INTERIOR PAINTING

Supply and apply internal painting. Two (2) coats cold applied with Bituminous base, on
concrete soffits, including but not limited to materials, all works required to meet drawings,
M.O.M, specifications and the instructions of the supervision engineer; to

On fairface concrete Soffits

Internal Acrylic washable emulsion paint; color code RGB 240, 240, 240, to concrete and
plaster; as specified in drawings, M.O.M, specifications and the instructions of the
supervision engineer, to

On fairface concrete walls

On plaster Walls

1 Alter.

On fairface concrete Soffits

‫تسعة وأربعون جنيهًا مصريًا وستة قرشًا ال غير‬

MP

11,840.00

49,06

‫مائة وخمسة وعشرون جنيها مصريا وثمانية وثالثون قرشا ال غير‬

4,400.00

125.38

‫مائة وخمسة وعشرون جنيها مصريا وثمانية وثالثون قرشًا ال غير‬

125.38

15,400.00

‫مائة وخمسة وعشرون جنيها مصريا وثمانية وثالثون قرشا ال غير‬

Internal Acrylic washable emulsion paint; color code RGB 240, 240, 240, to gypsum board; as
specified in drawings, M.O.M, specifications and the instructions of the supervision
engineer, to

Walls and Ceilings

Anti bacterial Paints

11,840.00

125.38

‫مائة وخمسة وعشرون جنيها مصريا وثمانية وثالثون قرشا ال غير‬

125.38

2,182.00

‫مائة وخمسة وتسعون جنيهًا مصريًا وثمانية وحسون قرشًا ال غير‬

M2

1.00

195.58

580,872.29

551,672.00

1,930,852.00

Rate Only

273,579.16

195.58

SECTION: 099600

HIGH-PERFORMANCE COATINGS
Heavy duty epoxy coating: Rate includes any material or activity required to finish the work
as per as specified in drawings. M.O.M. specifications and the instructions of the supervision
engineer; to

1" Alter.

Floors, (on cement screed)

2 Alter.

Wall Base 100mm. (on plaster)

‫ألف ومائة وسبعة وأربعون جنيها مصريا وواحد وأربعون قرشا ال‬

2.420.00

1,147.41

‫مائة وأربعة وثالثون جنيها مصريا وتسعة وتسعون قرشا ال غير‬

Heavy duty epoxy coating with waterproofing; Rate includes any material or activity required
to finish the work as specified in drawings, M.O.M, specifications and the instructions of the
supervision engineer; to

1 Alter.

Floors, (on cement screed)

L.M

1.320.00

Rate Only

134.99

Rate Only

‫ألف وثالثمائة وتسعة وأربعون جنيها مصريا وتسعة وثمانون قرشًا ال غير‬

Heavy duty colored epoxy coating: Rate includes any material or activity required to finish
the work as specified in drawings, M.O.M, specifications and the instructions of the
supervision engineer, to

Floors, (on cement screed)

Alter.

1,030.00
1,349.89

Rate Only

‫ألف وخمسمائة واثنان وخمسون جنيها مصريا وسبعة وثالثون قرشا ال غير‬

Heavy duty anti slip epoxy coating: Rate includes any material or activity required to finish
the work as specified in drawings, M.O.M, specifications and the instructions of the
supervision engineer, to

2,671.00

1,552.37

‫ألف وثالثمائة وتسعة وأربعون جنيها مصريا وتسعة وثمانون قرشًا ال غير‬

4* & 5*

& 6* Floors, (on leveled fair-faced concrete), at stairs/ ramps

Alter.

CURRIED TO SECTION FIAT

Rate Only

210.00 1,349.89

Rate Only

FINISHES

SECTION: 099600 (Cont,)

HIGH-PERFORMANCE COATINGS

Heavy duty anti-static epoxy coating; as specified in drawings, M.O.M, specifications and the
instructions of the supervision engineer; to

‫ستة االف وسبعمائة وتسعة وأربعون جنيها مصريا وثالثة واربعون قرشا ال غير‬

Alter.

Floors, (on cement screed), at M.E.P spaces

180,00

6.749.43
Rate Only

Page 01

2,522,824,40

Page 02

1,487,301.42

Page 03

3,238,711.18

Page 04

8,504,037.95

Page 05

1,270,239.03

Page 06

2,004.198.99

Page 07

3,384,602.40

Page 08

3,337.171.03

Page 09

Page 10

SECTION: 101400

SPECIALTIES

SIGNAGE

Supply and install external building signs; logos; suspension system; lighting, lettering; all
accessories; fixtures and fittings; fixing and finishing; as specified in drawings, engineer; to
M.O.M, specifications and the instructions of the supervision

Logo sign

‫مائة وخمسة وستون ألف وأربعمائة وثمانية وعشرون جنيهًا مصريًا وأربعون قرشًا ال غير‬

Supply and install fabricated metal sign 01, colors Letters font and text size as per approved
sample, as per Detail 02 in DWG AR-E-506.
1

NO.

165.428.40

165,428.40

SECTION: 102113.16

Altern PLASTIC-LAMINATE-CLAD TOILET ative COMPARTMENTS

Cubicle partitions; high pressure laminate; HPL; dividing panels and doors; including
ironmongery and fixings; as per drawings, M.O.M, specifications and the instructions of the
supervision engineer, to

Type 01: 2000 high

SECTION: 102215

GLASS PARTITIONS

‫خمسة عشر ألف وستمائة وستة وتسعون جنيها مصريا وسبعة وأربعون قرشا ال غير‬

All glass Partitions, 2600mm height from Finish Floor, including doors, swing, manual, made
of securite glass, thickness 10 mm; ironmongery; all accessories, fixtures and fittings; fixing
and installation; as specified and as shown on elevations drawings, M.O.M, specifications
and the instructions of the supervision engineer; to

L.M

169

15.696.47

Glass Partitions

‫كة مدينة‬

‫ثالثة االف وستمائة وخمسة وتسعون جنيهًا مصريًا وواحد وثالثون قرشًا ال‬

Rate Only

1,080
3,695.31

3,990,934.80

SECTION: 102600

WALL AND DOOR PROTECTION

Supply and install Wall Protection, including all accessories, fitting and fixing, as per
drawings, M.O.M, specifications and the instructions of the supervision engineer;

P.V.C

1*

Rubber

‫ الفان ومائة وواحد وثمانون جنيها مصريا وخمسة وثالثون قرشا ال‬.

L.M

285

2,181.35

‫ألف وستمائة وسبعة جنيهًا مصريًا وأربعة وسبعون قرشًا ال غير‬

L.M

285

1,607.74

621,684.75

Rate Only

HEAD QUARTER

BASE ITEMS

DATE: OCTOBER 2023 Rev. 00

ITEM NO

DESCRIPTION

UNIT

QTY

RATE
TOTAL L.E

DIVISION SUMMARY

Page 01

165,428.40

Page 02

3,990,934.80

Page 03

621,684.75

ITEM NO

BASE ITEMS

DESCRIPTION

SECTION: 110101

DIVISION: 11

EQUIPMENT

FAÇADE ACCESS EQUIPMENT

Maintenance system for window and curtain wall cleaning: to fit purpose; including all
components, accessories and fittings; complete; as specified and as shown on wall sections
and details; to

DATE: OCTOBER 2023

Rev. 00

UNIT

QTY

RATE

TOTAL L.E

‫ثمانية ماليين وخمسمائة وواحد وتسعون ألف وسبعمائة وواحد وسبعون جنيها مصريا وخمسة وأربعون قرشًا ال غير‬

Complete BMU cleaning system with galvanized steel track; 142 m; at upper roof

Item
1

Complete monorail cleaning system with soffit track mounted; 31 m

Item

included

Complete rope access anchors (D-Plates) and rail system 99 m long for each side

Item

included

Complete fall arrest safety line system at Roof

Item

included.

8,591,771.45

8,591,771.45

1*

Alter.

DIVISION: 12 FURNISHINGS

SECTION: 123661 SIMULATED STONE COUNTERTOPS

Simulated stone counter top; 20mm thickness; comprising splash back & fascia; including
supports and clips; anchors and brackets; all accessories, fittings and fixings; complete; as
specified in drawings, M.O.M, specifications and the instructions of the supervision
engineer; to

Granite, With Width 600mm ‫حاليب‬

‫الفان وخمسمائة وأربعة وستون جنيها مصريا وتسعة وسبعون قرشا ال غير‬

2,564.79

141

L...M
‫الفان وثمانمائة وأربعة وثالثون جنيها مصريا وستة وسبعون قرشًا ال غير‬

Verdi Granite, With Width 600mm

361,635.39

L.M

141

2,834.76

Rate Only

‫ألفان وخمسمائة وأربعة وستون جنيها مصريا وتسعة وسبعون قرشا ال‬

1**

GANDOLA Granite. With Width 600mm

Alter.

SECTION: 124813 ENTRANCE FLOOR MATS AND FRAMES

L.M

141

2,564.79

Rate Only

‫ثمانية عشر ألف ومائة وسبعة وعشرون جنيها مصريا وثمانية وثمانون قرشا ال غير‬

Entrance floor matt; extruded aluminium rail with vinyl cushion; including frame; screed; and
fixing; as per drawings, M.O.M, specifications and the instructions of the supervision
engineer; to

75

18,127.88

1,359,591.00

‫شركة مدينة مصر لالسكا‬

ITEM NO

BASE ITEMS
DATE: OCTOBER 2023

Rev. 00

DESCRIPTION

UNIT

QTY

RATE

TOTAL LE

DIVISION: 22 PLUMBING

SECTION: 224200

COMMERCIAL PLUMBING FIXTURES

Including supply mixers and waste fittings, according to drawings, M.O.M, specifications and
the instructions of the supervision engineer, to

844,656.39

422,794.20

558,780.20

‫أربعة عشر ألف وثالثمائة وستة عشر جنيها مصريا وواحد وعشرون قرشا ال غير‬

NO.

59

14,316.21

‫الثمانية وعشرون ألف ومائة وستة وثمانون جنيها مصريا وثمانية وعشرون قرشًا ال غير‬

28,186.28

NO.

15

‫عشرة آالف ومائة وتسعة وخمسون جنيها مصريًا وأربعة وستون قرشًا ال غير‬

10,159.64

55

NO.

1
‫‪Lavatory‬‬

‫‪2‬‬

‫‪Kitchen Sink‬‬

‫‪European Water Closet, including Flush Tank‬‬

‫تسعمائة وخمسة وستون جنيها مصريا وسبعة عشر قرشا ال غير‬

‫‪965.17‬‬

‫‪53,084.35‬‬

‫‪56,552.36‬‬

‫‪335,388.08‬‬

‫‪55‬‬

‫‪NO.‬‬

‫ثمانية وعشرون ألف ومائتان وستة وسبعون جنيها مصريا وثمانية عشر قرشًا ال غير‬

‫‪28,276.18‬‬

‫‪2‬‬

‫‪NO.‬‬

‫‪3‬‬

‫‪4‬‬

‫‪Perineal hose bib‬‬

‫‪5‬‬

‫‪Shower Cabinet, 1500*800mm‬‬

‫واحد وأربعون ألف وتسعمائة وثالثة وعشرون جنيها مصريا وواحد وخمسون قرشا ال غير‬

‫‪41,923.51‬‬

‫‪8‬‬

‫‪NO.‬‬

‫ثالثة وثالثون ألف وسبعمائة وسبعة وأربعون جنيها مصريا وثالثة عشر قرشًا ال غير‬

‫‪6‬‬

‫‪Shower Tray, 900*900mm‬‬

‫‪7‬‬
Janitor Sink

NO.

33,747.13

236,229.91

BASE ITEMS

ITEM NO

DESCRIPTION

UNIT

QTY

RATE

TOTAL L.E

BUILDING SUMMARY

DATE: OCTOBER 2023 Rev. 00

DIVISION 03-CONCRETE

DIVISION 04-MASONRY

DIVISION 05-METALS

15,034,100.18

7,298,152.36

DIVISION 07-THERMAL AND MOISTURE PROTECTION

8,286,459.52

DIVISION 08-OPENINGS

14,030,905.63

DIVISION 09-FINISHES

DIVISION 10-SPECIALTIES

DIVISION 11-EQUIPMENT

DIVISION 12-FURNISHINGS
DIVISION 22-PLUMBING (SANITARY FIXTURES)

25,749,086.40

4,778,047.95

8,591,771.45

1,721,226.39

2,507,485.49