HIRA For HVAC (Chiller Related Equipment) Maintenace Work
HIRA For HVAC (Chiller Related Equipment) Maintenace Work
SIEMENS
Division: - SRE BU / BS: - SRE/AM Project /Factory Name: - R&D Building Doc No: SRE/R&D/EIPL/HIRA/01
Almost certain
circumstances.
Could happen,
R = SxL
Could occur at
% possibility)
occur at most
occur in most
Will probably
but probably
Expected to
possibility)
some time
Unlikely
(> 90%
Elimination 1
Likely
times
Rare
Severity (S) Substitution /Reduction at source 2
OHSAS 18001 : Occu. Health & Safety ISO 14001: Environmental Impact (Scale, Severity & Duration of Impact) 1 2 3 4 Engineering Controls/ Conservation/Reuse/Recycle/Treatment 3
Minor environmental incident (leakage, spillage, waste of resource etc.) within the workplace & not lasting Low Low Low Medium
First Aid Case/temp Illness/Near Miss Incident of less severe in nature for more than 1 shift. Or, conservation of natural resources (water/fuel/electricity etc.) or, business 1 (Acceptable & Non- (Acceptable & Non- (Acceptable & Non- (Acceptable & Admin Controls (Training/Supervision/Guidelines/procedures/PTW/signages/posters/ etc.) 4
opportunity through waste/scrap/conservation. significant) significant) significant) Significant)
Moderate environmental incident within the workplace/department & not lasting for more than 1 day and /or
waste of natural resources as follows (by judgement): 1) Water: 1 % of average monthly consumption 2)
Reportable / Loss Time Injury/major fire with injury/Near Miss incident of high Low Medium High
Diesel/fuel: 0.25 % of avg monthly consumption 3) Electricity: 1 % of monthly energy consumption 4) 1 % Medium (Acceptable
severity/legal approvals about to expire in 2 weeks & no action taken / the 2 (Acceptable & Non- (Acceptable & (Not acceptable Personal Protective Equipment's / Proper segregation/ Secondary containment 5
excess of monthly raw material 5) HW waste or air /water emission or noise very close to permissible Significant)
& Significant)
& Significant)
measured parameters(or its exposure) are 10 % within the permissible limits. significant)
limits, or, legal approvals about to expire in 2 weeks & no action taken in this regard. Interested parties
communication without involvement of legal authorities.
Reportable environmental incident (fire/major leakage/spillage) within the factory/site. and /or waste of
natural resources as follows (by judgement) :
Major / Serious Injuries/Occupational Diseases /legal approvals expired / the Low Medium High High
1) Water: 5 % of average monthly consumption 2) Diesel/fuel: 1 % of avg monthly consumption 3)
measured parameters (or its exposure) are not complying with the permissible 3 (Acceptable & Non- (Acceptable & (Not acceptable & (Not acceptable
Electricity: 5 % of monthly energy consumption 4) 5 % excess of monthly raw material 5) HW waste or air Significant) & Significant)
limits. significant) Significant)
/water emission or noise exceeding than the permissible limits, or, legal approvals expired & no action
evident. Interested parties communication with involvement of legal authorities.
Reportable environmental incident (fire/major leakage/spillage) affecting nearby external areas & HW
Fatality / Permanent Disability/ Legal approvals not obtained or measured Medium High High High
waste/ or air or water emission or noise exceeding than the permissible limits for continuously for 3
parameters not meeting the legal requirements for more than 3 months & 4 (Acceptable & (Not acceptable & (Not acceptable & (Not acceptable
months/cycles or received communication from legal authority on legal non-compliance & actions taken in Significant) & Significant)
actions taken in this regard not evident. Significant) Significant)
this regard are not evident.
Likelihood
Likelihood
Emergency activities] 18001 (OH&S) (Y/N); Provide brief if 'Y' Acceptable & Significant; Significant & Not-acceptable
applicable)) Type Risk/
Severity
Severity
relevance Anapest / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Impact
1. Safety induction is required for all new joiners by the EHS officer / electrical area In charge of
SRE/ Location specific Induction to be provided
Mobilization and deployment of manpower
2. Explain hazard identification and control measures to workers through daily tool box talk each day
Lack of site knowledge
1 Injured by himself or themselves before starting work
Y(Local Admin/Siemens Internal
OH&S 3 2 6 4 3 1 3 Acceptable & Non-Significant
Training and Documentation Resulting to personal injury & property Requirement) 3. Explain each employee what to do and what not to do
Lack of training
damage
Improper documentation
4. Job Specific training / TBT to be provided for the activity by referring HIRA/ SWMS.
5. Job specific PTW importance to be discussed & make sure the copy is available with site team
related to the activity.
Standing on door step while travelling Fall injury or fatality / Hit by vehicles causing Y(Local Admin/Siemens Internal
OH&S 4 3 12 Instructions and road safety rules to be followed. 4 4 1 4 Acceptable & Significant
via transport/ crossing of roads loss of body parts or fatality Requirement)
2 Travel to site personnel
Air pollution, Resource depletion, noise Y(Local Admin/Siemens Internal
EMS Commutation using personal vehicle 3 3 9 Use company hired or pool cars over personal or local taxi transport. 4 3 1 3 Acceptable & Non-Significant
pollution Requirement)
1. Before unloading ensure that all cylinders have valve guards in place.
2. Ensure that cylinders are gently lowered from the truck.
3. Use of safety shoes, safety helmets.
4. While unloading ensure that there are no obvious leakages in the cylinder.
1. Injury cause due to breakage of cylinder
5. Store upright and use in well ventilated, secure areas away from pedestrian or vehicle
valve resulting in cylinder acting as a
thoroughfare.
1. Leakage from the cylinder projectile Y(Local Admin/Siemens Internal
OH&S 4 3 12 6. Guard cylinders against being knocked violently or allowed to fall. 4 4 1 4 Acceptable & Significant
2. Suddenly fall of cylinder 2. Foot injury while unloading cylinders from Requirement)
7. Always move cylinders securely with an appropriate trolley.
Unloading, shifting& storage of compressed truck
3 8. Keep in a cool, well ventilated area, away from heat sources, sources of ignition and combustible
gas cylinder 3. Gas leakage from cylinder.
materials, especially flammable gases.
9. Keep full and empty cylinders separate.
10. Keep oil and grease away from cylinders and valves.
11. Never use force when opening or closing valves.
Improper floor condition in loading/ Toppling of materials resulting into major Y(Local Admin/Siemens Internal 1. Material handling by vehicle is allowed on firm ground only.
OH&S 4 3 12 4 4 1 4 Acceptable & Significant
unloading area injury or even fatality Requirement) 2. Work permit system to be followed.
Unrestricted Page 1 of 4
Hazard Identification and Risk Assessment
SIEMENS
Likelihood
Likelihood
Emergency activities] 18001 (OH&S) (Y/N); Provide brief if 'Y' Acceptable & Significant; Significant & Not-acceptable
applicable)) Type Risk/
Severity
Severity
relevance Anapest / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Impact
OH&S Sitting on chair for the long hours Ergonomically Problems 2 3 6 NA Tacking breaks while long hours sitting on chairs at suitable intervals 1 2 1 2 Acceptable & Non-Significant
OH&S Sitting on computer/ laptop for long time Irritation to eye/Ergonomically hazards 2 3 6 NA Tacking breaks while long hours sitting on chairs at suitable intervals 1 2 1 2 Acceptable & Non-Significant
5 Working in the site office
1. Cleaning on Floor.
OH&S Wet floor in the office Slip or trip 2 3 6 NA 1 2 1 2 Acceptable & Non-Significant
2. Training requirement of Housekeeping.
1. Scaffold training should be given to all workers. , A type cage ladder should be used.
2. Only competent manpower should be engaged for erection and dismantling of scaffold.
3. Full body safety harness must be worn and anchored during erection.
4. Scaffold material should not kept in access/Pathway.
5. Tested tools and tackles should be use. Area to be barricaded & unauthorized entry should be
restricted and Cautionary signage to be displayed.
6. All necessary PPEs(Helmet, gloves/ safety shoes, FBH etc.) must be use while carrying out the
Physical injury, property damage
Fall of material /fall of workmen, collaps job.
Person Injury
of scaffold ,incompetent manpower, 7. Proper stocking of material at work area.
lack of awareness/knowledge of scaffolding
Scaffolding material is not in good 8. Scaffold wheel should be locked and green tag must be sticked during the work.
work can lead to incident,
condition like- damaged rusted 9. Ensure that scaffold should not touch to live electrical cable.
Work at height /Use of mobile scaffold & slip & fall due to improper access. Y(Local Admin/Siemens Internal
6 OH&S scaffolding components, scaffold 3 3 9 10. Material should not throw from height to ground floor. 4 3 2 6 Acceptable & Significant
cage ladder ( Up to 3m height) Failure of scaffold while load is higher Requirement)
erection was performed on unstable 11. After 2meter height use scaffold outrigger.
resulting into fall of person and material
surface, 12. Mobile Scaffold placed near doorways, walkways, passageways or driveways shall be secured
causing major injury
Lack of knowledge about scaffolding from accidental displacement and suitable barricade shall be provided around it.
Toppling of scaffold and fall of person and
work 13. Maintain 3-point contact, while climbing up and down.
material causing major injury
14. Scaffold shall not be moved, shifted when occupied .
15. Scaffold should be inspected by client safety personnel before start of use.
16.Handrails and toe guards shall be provided at the staging before staring any work. No work shall
be allowed without guardrails and toe guards. While erecting guards rails all the workmen shall use
full body harness and shall anchor the hook in the structural steel
17. Scaffolding installation is allowed only after safety inspection.
18. Adequate supervision and follow-up work permit system.
Metallic fumes, Disposal of Grinding Y(Local Admin/Siemens Internal 1. Grinding activity should be done well ventilated area. 2. Ensure optimum
EMS Waste generation, Resource Depletion 3 3 9 5 3 2 6 Acceptable & Non-Significant
wheel, Electricity usage Requirement) and efficient use of grinding machine.
Y(Local Admin/Siemens Internal 1. Use of spark arrestor on the grinding machine. 2. Use of appropriate
OH&S Sparks during grinding operation Burning to user or other working area 3 3 9 3 3 2 6 Acceptable & Non-Significant
Requirement) PPE's. 3. Follow up of work permit system.
Y(Local Admin/Siemens Internal 1. Use of good quality grinding wheel recommended by manufacturer.
OH&S Use of bad Quality Grinding wheel Body injury to operator or other working 3 3 9 3 3 2 6 Acceptable & Non-Significant
Requirement) 2. Safety Essentials no.09 to be followed.
1. Permit to work system must be followed, SOPs for change over system must be followed
2. Emergency preparedness document should be in place
3. Complete Isolation of all incoming, outgoing, For inside equipment's maintenance works,
1. Cut Injury upstream and downstream isolation must be implemented,
Electrical Isolation of VAV,Fire damper,Fresh 1. Electric Energy
2. Damage to electrical equipment's in plant Y(Local Admin/Siemens Internal 4. Follow 6 golden rules of electricity for each isolation, Before touching the surfaces.
8 air unit,AC timer,CRC,AHU,Cassette OH&S 2. Dust Exposure 4 2 8 3 4 1 4 Acceptable & Significant
room Requirement) 5. All electrical testing tools must be connected through 30mA RCCB (Based on instrument manual)
AC/VRV/AC. 3. Sharp Edge 3. Electric shock with double insulated cables.
6. Ensure all rotating parts are protected with guards
7. Usage of calibrated device (< 1 year) for testing works.
8. Use NCVD with Electrical gloves to check voltages across line.
Unrestricted Page 2 of 4
Hazard Identification and Risk Assessment
SIEMENS
Likelihood
Likelihood
Emergency activities] 18001 (OH&S) (Y/N); Provide brief if 'Y' Acceptable & Significant; Significant & Not-acceptable
applicable)) Type Risk/
Severity
Severity
relevance Anapest / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Impact
1. Ensure all machine and tools must be checked and tagged fit for use as per manufacturer's
checklist
2. Inspect the machine before usage
3. Tag the machine if it passes the technical requirements
4. Relevant checklists to be maintained at locations for the machines.
5. Safe operating procedures to be followed by referring the OEM user manuals
6. Competent trained personnel to operate machine
7. Periodical inspection and maintenance conducted
8. Electric Connections should be take from RCCB powered DB's
1.Entrap of person / body part in 9. The Live Trailing cables should be minimized and warning signages needs to be placed
running Blower Engagement injury
Machine & Tools Inspection & Testing Electrical shock, physical injury , equipment 10. All the rotating parts of the machine needs to be guarded
2. Blower in to motion due to back
(compressor and Condenser fan damage - resulting to personal injury & Y(Local Admin/Siemens Internal Ensure the relevant PPE's are worn
9 OH&S pressure 4 2 8 3 4 1 4 Acceptable & Significant
motor,VAV,Fire damper,Fresh air unit,AC property damage Requirement) 11. Use of plastic body/double insulated power tools
3. Improper grounding, improper Electrocution
timer,CRC,Cassette,VRV,AHU AC). 12. Area in the vicinity should be kept clear of combustible material.
operation and maintenance Injury due to rotating fan blade/belt drive 13. Physical Isolation of Electrical Power Source (Lock Out/Tag Out) to be ensured while
4. Rotating fan blade/belt drive.
performing any activity on the rotating/moving parts.
14. Do proper inspection of tools tackles used for cleaning.
15. Re-assess risk at the time of work and if changes are seen on the incorporate points in HIRA
documents.
16. Follow work permit system and Follow OEM SOP during work.
17. Workmen's training, ensure that they know how to do work or not, and keep effective
supervision during work.
18. Provide appropriate PPE at work and ensure it is used (Follow RFQ)
19. Before working in the area, do safety walk, make observation and follow the principles of ZHC.
Unrestricted Page 3 of 4
Hazard Identification and Risk Assessment
SIEMENS
Likelihood
Likelihood
Emergency activities] 18001 (OH&S) (Y/N); Provide brief if 'Y' Acceptable & Significant; Significant & Not-acceptable
applicable)) Type Risk/
Severity
Severity
relevance Anapest / OH&S Hazard Env. Impact / OH&S Risk Risk/Impact
Impact
1. Physical injury
2. Cold Burn 1.Ensure requirements of refrigerant charging are as per the specifications given by designer.
Refrigerant Charging Y(Local Admin/Siemens Internal
18 OH&S Failure of flanges/ Pipe/ Cylinders 3. Environment degradation 4 2 8 2. Ensure All Flange bolts are tightened to the required torque. 3 4 1 4 Acceptable & Significant
Using Manifold gauge) Requirement)
4. Burn injury 3. It must be done in parts in order to have better visibility for area under refrigerant charging.
5. dizziness if Inhaled