DAIILY REPORT

ERECTION OLEO CHEMICAL


SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 2 Hiab 5T 1 Unit
2 Construction Manager
3 Project Control/Document Control/Cost Control
4 Engineering / Surveyor
4 HRD/Humas/GA
5 Finance/Accounting
6 Procurement/Warehouse/Logistic
7 QA/QC
8 Safety, Health, Environment (SHE)
9 Facility

DIRECT MANPOWER
10 Supervisor 2
11 Mandor 1
12 Fitter 3
13 Semi Fitter 4
14 Helper 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 12

1 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 9
Erection Kolom C25, C25, C25, C20, C20, C20,
2 C23 Oleo 7 1

3 Erection Beam B238, B204 Oleo 2

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam oleo 1292948.12 1 - 20439 20439 1.58%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

2 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

3 OF 102
4 OF 102
5 OF 102
6 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 27-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 2 Trado 1 Unit
2 Construction Manager 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control
4 Engineering / Surveyor
4 HRD/Humas/GA
5 Finance/Accounting
6 Procurement/Warehouse/Logistic
7 QA/QC
8 Safety, Health, Environment (SHE)
9 Facility

DIRECT MANPOWER
10 Supervisor 2
11 Mandor 1
12 Fitter 3
13 Semi Fitter 2
14 Helper 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 10

7 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 27-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
Activity Location Qty Unit Remarks
1 Melangsir material kolom Oleo 7
Erection Kolom C20, C31, C24, C18, C15, C14, 1
2 C19 Oleo 7

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom oleo 1292948.12 1 20439 25673 46112 3.57%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

8 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 27-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

9 OF 102
10 OF 102
11 OF 102
12 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 28-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 3 3
13 Semi Fitter - 4 4
14 Helper - 2 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 21

13 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 28-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 8
2 Erection Kolom C20, C20, C20 Oleo 3 1
3 Erection Beam B189, B177, B204, B324, B318 Oleo 5

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam oleo 1292948.12 1 46111.833 12239.8333 58351.7 4.51%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

14 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 28-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

15 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 29-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 3 3
14 Helper - 1 1
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 18

16 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 29-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 5
2 Erection Kolom C20, C20, C35, C9 Oleo 4 1
3 Erection Beam B204 Oleo 1

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam 1292948.12 1 58351.667 13263.83 71615.5 5.54%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

17 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 29-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

18 OF 102
19 OF 102
20 OF 102
21 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 30-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 1 1
13 Semi Fitter - 4 4
14 Helper - 2 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 19

22 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 30-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 2
1
2 Erection Kolom C3, C8 Oleo 2

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom 1292948.12 1 71615.5 6994.00 78609.50 6.08%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

23 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 30-Sep-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

24 OF 102
25 OF 102
26 OF 102
27 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 2-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 2 2
14 Helper - 2 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 18

28 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 2-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 7
2 Erection Kolom C4, C13, C10, C36 Oleo 4 1
3 Erection Beam B139, B64, B197 Oleo 3

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam 1292948.12 1 78609.5 13861.00 92470.50 7.15%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

29 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 2-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

30 OF 102
31 OF 102
32 OF 102
33 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 3-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 3 3
14 Helper - 2 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 19

34 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 3-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 6
2 Erection Kolom C32, C37, C5, C11, C12 Oleo 5 1
3 Erection Beam B102 Oleo 1

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam 1292948.12 1 92470.5 13571.00 106041.50 8.20%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

35 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 3-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

36 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 5-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 15.13
Cloudy
Light Rain 15.13 - 17.00
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 6 6
14 Helper - 2 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 22

37 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 5-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 15.13
Cloudy
Light Rain 15.13 - 17.00
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 6
2 Erection Kolom C32, C37, C5, C11, C12 Oleo 5 1
3 Erection Beam B102 Oleo 1

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam Oleo 1292948.12 1 106041.5 15396.64 121438.14 9.39%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

38 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 5-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 15.13
Cloudy
Light Rain 15.13 - 17.00
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

39 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 6-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 6 6
14 Helper - 2 2
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 22

40 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 6-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 10
2 Erection Kolom C17, C29, C30, C27, C28, C26 Oleo 6 1
3 Erection Beam B141, B65, B65, B163 Oleo 4

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam Oleo 1292948.12 1 121438.14 16807.79 138245.93 10.69%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

41 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 6-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

42 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 8-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 0 0
13 Semi Fitter - 3 3
14 Helper - 0 0
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 15

43 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 8-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 6
Erection Beam B101, B140, B101, B114, B178, 1
2 B114 Oleo 6

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection kolom dan beam Oleo 1292948.12 1 138245.93 5115.00 143360.93 11.09%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

44 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 8-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

45 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 9-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 5 5
14 Helper - 0 0
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 19

46 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 9-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 9
Erection Beam B18, B77, B65, B114, B189, 1
2 B161, B100, B186, B170 Oleo 9

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 143360.93 6121.14 149482.07 11.56%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

47 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 9-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

48 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 10-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 5 5
14 Helper - 1 1
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 20

49 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 10-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 8
Erection Beam B102, B205, B102, B189, B204, 1
2 B266, B274, B273 Oleo 8

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 149482.07 5008.83333 154490.90 11.95%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

50 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 10-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

51 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 11-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22
23
24
25
GRAND TOTAL : 24

52 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 11-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 4
Erection Beam B102, B205, B102, B189, B204, 1
2 B266, B274, B273 Oleo 4

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 154490.9 2360.33333 156851.24 12.13%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

53 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 11-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

54 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 12-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Trado 1 Unit
2 Construction Manager - - 3 Excavator 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

55 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 12-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 11
Erection Beam B197, B160, B197, B118, B76, 1
2 B136, B138, B300, B251, B197, B64 Oleo 11

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 156851.24 4047.08 160898.32 12.44%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

56 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 12-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

57 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 13-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

58 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 13-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 13
Erection Beam B196, B305, B306, B64, B64,
1
2 B251, B187, B304, B300, B251, B118, B241, Oleo 13
B183

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 160898.3214 4352.36 165250.68 12.78%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

59 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 13-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

60 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 14-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 6 6
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 23

61 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 14-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 18
Erection Beam B217, B312, B188, B306,
1
2 B307, B188, B306, B307, B239, B237, B215, Oleo 18
B312, B313, B306, B282

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 165250.6786 5395.43 170646.11 13.20%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

62 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 14-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

63 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 15-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 6 6
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 23

64 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 15-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 17
Erection Beam B316, B306, B154, B316,
B237, B114, B306, B316, B50, B265, B283, 1
2 B236, B314, B237, B263, B160, B185 Oleo 17

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 170646.11 5957.81 176603.92 13.66%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

65 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 15-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

66 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 16-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

67 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 16-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 12
Erection Beam B192, B65, B250, B124, B65,
B270, B271, B124, B270, B280, B172, B195 1
2 Oleo 12

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 176603.92 5121.29 181725.20 14.06%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

68 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 16-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

69 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 17-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

70 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 17-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 3
Erection Beam B270, B185, B185
1
2 Oleo 3

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 181725.20 1066.69 182791.90 14.14%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

71 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 17-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

72 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 18-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

73 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 18-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 9

Erection Beam B189, B232, B213, B232, 1


2 Oleo 9
B245, B102, B205, B227, B162

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 182791.90 4622.83 187414.73 14.50%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

74 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 18-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

75 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 20-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

76 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 20-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 3

1
2 Erection Beam B160, B160, B144 Oleo 3

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 187414.73 1138.50 188553.23 14.58%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

77 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 20-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

78 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 21-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

79 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 21-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 4

1
2 Erection Beam B103, B206, B233, B193 Oleo 4

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 188553.23 1755.18 190308.41 14.72%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

80 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 21-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

81 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 22-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 1 1
13 Semi Fitter - 5 5
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 21

82 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 22-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 5

1
2 Erection Beam B122, B155, B279, B60, B60 Oleo 5

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 190308.41 2987.73 193296.14 14.95%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

83 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 22-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

84 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 23-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

85 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 23-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 26
Erection Beam B60, 1PR-B304, 1PR-B5,1PR-
B303, 1PR-B304, 1PR-B5, 1PR-B303, 1PR- 1
2 B302, B175, B174, 1PR-B300, 1PR-B300, Oleo 26
B115, DLL

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 193296.14 7981.53 201277.68 15.57%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

86 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 23-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

87 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 24-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - - 3 CRANE 250T 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 9 9
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 26

88 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 24-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material beam Oleo 32
Erection Beam 1PR-B300, 1PR-B300, 1PR-
B300, 1PR-B3, B184, B289, B60, 1PR-B5, B60, 1
2 1PR-B303, 1PR-B3, B63, 1PR-B3, 1PR-B3, Oleo 32
B300, DLL

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 201277.68 10376.95 211654.63 16.37%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

89 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 24-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

90 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 25-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Crane 50T 1 Unit
1 Project Manager 1 - 1 2 Hiab Crane 12T 1 Unit
2 Construction Manager - - 3 CRANE 250T 1 Unit
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 7 7
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 24

91 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 25-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 28
2 Erection kolom: C33, C34, C38, C39 Oleo 4
3 Erection beam : B60, B60, B63, B292, B102, 1
B232, 1PR-B300, 1PR-B300, 1PR-B300, B258, Oleo 24
B276, B266, DLL

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 211654.63 18658.49 230313.12 17.81%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

92 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 25-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

93 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Hiab Crane 12T 1 Unit
1 Project Manager 1 - 1 2 CRANE 250T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 10 10
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 27

94 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 13
Erection beam : B270, B276, B224, B224,
B60, B190, B191, B240, B185, B258, B245, 1
2 B270, DLL Oleo 13

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 230313.12 5082.55 235395.66 18.21%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

95 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

96 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Hiab Crane 12T 1 Unit
1 Project Manager 1 - 1 2 CRANE 250T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 9 9
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 26

97 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 9
Erection beam : B220, B275, B245, B156,
B157, B246, B249, B241, B222 1
2 Oleo 9

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 235395.66 4103.33 239499.00 18.52%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

98 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

99 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

A. SAFETY ISSUE

No Statistic Previous Today Cumulative Man Hours Previous Today Cumm


1 Fatality - - - Total Man-hours Last 24 Hours
2 LTI - - - Number of Accident Last 24 Hours
3 RWDC - - - Near miss
4 MTC - - -
5 First Aid Case - - -
6 Near Miss Incident - - -
7 Environment Damage - - -

B. MANPOWER & EQUIPMENT STATUS


B.1 Manpower Status C.2 Equipment Status
INDIRECT MANPOWER No. Equipment Status Qty Unit
No. Description HO Site Total 1 Hiab Crane 12T 1 Unit
1 Project Manager 1 - 1 2 CRANE 250T 1 Unit
2 Construction Manager - -
3 Project Control/Document Control/Cost Control 1 - 1
4 Engineering / Surveyor 1 - 1
4 HRD/Humas/GA - 1 1
5 Finance/Accounting - - -
6 Procurement/Warehouse/Logistic - 2 2
7 QA/QC - 1 1
8 Safety, Health, Environment (SHE) - 2 2
9 Facility - - -

DIRECT MANPOWER
10 Supervisor - 2 2
11 Mandor - 1 1
12 Fitter - 2 2
13 Semi Fitter - 10 10
14 Helper - 3 3
15
16
17
18
19
20
21
22 h
23
24
25
GRAND TOTAL : 27

100 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

C. CONSTRUCTION ACTIVITY
A. Activity Location Qty Unit Remarks
1 Melangsir material kolom dan beam Oleo 11
Erection beam : B119, B142, B121, B66,
B125, B126, B127, B287, B128, B126 1
2 Oleo 11

D. SUMMARY PROGRESS CONSTRUCTION ACTIVITY


No Activity Vol (kg) Unit Previous Today Cumm % Complete Remarks
1 Erection beam Oleo 1292948.12 1 239499.00 5388.20 244887.19 18.94%
2
3
4
5
6
7

E. OTHERS ACTIVITY
1
2
3
4

F. TOMORROW ACTIVITY
1
2
3
4
5

G. AREA OF CONCERN
1

101 OF 102
DAIILY REPORT
ERECTION OLEO CHEMICAL
SEI MANGKE, SIMALUNGUN, SUMATERA UTARA
INDONESIA

Date : 26-Oct-23

DR/CSK/SOI/MS/05/2023/001
Weather Condition :
Type of Weather Time
Clear 08.00 - 17.00
Cloudy
Light Rain
Clear

H. PHOTO ACTIVITY

Prepared By, Verified by, Aprroved By,

Supervisor
Cemerlang Samudera Kontrindo Lian Juan Engineering Sheel Oil Indonesia

102 OF 102