Day 8 & 9 of 45 Pea 2023 24
Day 8 & 9 of 45 Pea 2023 24
DAY
8
Understanding the Rig Components
Rotary System
45 Days Long Circulation
Virtual
System
Internship on
Oil & Gas
Industrial Well Control
Tubular Handling System
Practices
System,
2
Petroleum Engineers Association©
Derrick or Mast and Substructure
◊ DERRICK is a large load bearing structure, usually of bolted construction. The standard derrick has
four legs standing at the corners of the substructure.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
3
Petroleum Engineers Association©
Derrick or Mast and Substructure
◊ MAST is a portable derrick that can be raised as unit. For transporting by land, the mast can be
divided into two or more section.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
4
Petroleum Engineers Association©
Derrick or Mast and Substructure
◊ SUBSTRUCTURE is the foundation in which the derrick or mast and usually the Drawworks sit. It
contains space for storage and well control equipment.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
5
Petroleum Engineers Association©
Prime Movers are a Source of Power
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
6
Petroleum Engineers Association©
Power System – Prime Movers
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
7
Petroleum Engineers Association©
Hoisting System
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
8
Petroleum Engineers Association©
Rotating System - Swivel
◊ The rotary tool that is hung from the hook of the traveling block to suspend the drillstring and permit
it to rotate freely.
◊ It also provides connection for the rotary hose and provide passageway for the flow of drilling fluid into
the drillstem.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
9
Petroleum Engineers Association©
Rotating System - Kelly Spinner
◊ A pneumatically controlled device mounted below the Swivel that when actuated causes the Kelly to
spin.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
10
Petroleum Engineers Association©
Rotating System - Kelly
◊ The heavy steel member, usually four or six-sided that is suspended from the Swivel through the Rotary
Table and connected to the topmost joint of drillpipe to turn the drill stem as the rotary table turns.
◊ It has a bored passageway that permits fluid to be circulated into the drill stem and up the annulus or
vise versa.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
11
Petroleum Engineers Association©
Rotating System – Rotary Table
◊ Equipment used to turn the drill stem and support the drilling assembly.
◊ It has a beveled gear arrangement to create the rotational motion and opening into which bushings are
fitted to drive and support the drilling assembly.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
12
Petroleum Engineers Association©
Circulating System
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
13
Petroleum Engineers Association©
Circulating System
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
14
Petroleum Engineers Association©
Circulating System – Solids Control System
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
15
Petroleum Engineers Association©
Tubular and Tubular Handling Equipment
1. Drill Pipe
2. Drill Collar
16
Petroleum Engineers Association©
Tubular and Tubular Handling Equipment
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
17
Petroleum Engineers Association©
Tubulus handling at the Rig Floor
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
18
Petroleum Engineers Association©
Drill Bit
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
19
Petroleum Engineers Association©
Drilling Progress Chart
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
20
Petroleum Engineers Association©
45 Days Long Virtual Internship on Oil & Gas Industrial Practices
Agenda: Drilling Fluids
DAY
9
Functions of Drilling Fluid
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
22
Petroleum Engineers Association©
While Drilling Through the Formations
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
23
Petroleum Engineers Association©
Prevent Formation Fluids Flowing into the Wellbore
45 Days Long
formation to fracture and this will result in the loss of
Virtual expensive mud into the formation.
Internship on
Oil & Gas The flow of mud into the formation whilst drilling is
Industrial
Practices
known as lost circulation. This is because a certain
proportion of the mud is not returning to surface but
flowing into the formation.
24
Petroleum Engineers Association©
Prevent Formation Fluids Flowing into the Wellbore
P = ρ x g x h = 0.052 x MW x TVD
Where,
25
Petroleum Engineers Association©
Cool and Lubricate the Bit
The rock cutting process will, in particular with PDC bits, generate
a great deal of heat at the bit. Unless the bit is cooled, it will
overheat and quickly wear out.
The circulation of the drilling fluid will cool the bit down and help
45 Days Long lubricate the cutting process.
Virtual
Internship on
Oil & Gas
Industrial
Practices
26
Petroleum Engineers Association©
Maintain Wellbore Stability
Maintaining a stable wellbore is of primary
importance during drilling and production of oil and
gas wells.
27
Petroleum Engineers Association©
Maintain Wellbore Stability
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
28
Petroleum Engineers Association©
Field Tests – Mud Density/Mud Weight
The density of the drilling mud can be determined with the help of a mud balance, where the cup of the balance
is completely filled with a sample of the mud and the lid placed firmly on top (some mud should escape through
the hole in the lid).
The balance arm is placed on the base and the rider adjusted until the arm is level. The density can be read
directly off the graduated scale at the left-hand side of the rider.
45 Days Long
Virtual Mud densities are usually reported to the nearest 0.1 ppg (lbs per gallon). Other units in common use are lbs/ft3,
Internship on psi/ft, psi/1000ft, kg/l and specific gravity (S.G.).
Oil & Gas
Industrial
Practices
29
Petroleum Engineers Association©
Field Tests – Mud Density/Mud Weight
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
https://www.youtube.com/watch?v=8wNEN6SOa7M
30
Petroleum Engineers Association©
Field Tests – Viscosity (Marsh Funnel Viscometer)
The essential elements of the device are a plumb bob attached to a torsion spring and deflection gauge and a
cylinder which can be rotated at a range of rotary speeds.
45 Days Long
The plumb bob is suspended inside the
Virtual
Internship on cylinder and the whole is immersed in a sample
Oil & Gas of the drilling mud. When the outer cylinder is
Industrial
Practices rotated the mud between the cylinder and
plumb bob is sheared.
32
Petroleum Engineers Association©
API Filter Press
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
33
Petroleum Engineers Association©
API Filter Press
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
34
Petroleum Engineers Association©
HP API Filter Press
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
35
Petroleum Engineers Association©
Common Additives used in WBM and OBM
1. Weighting Materials
2. Viscosifiers
7. Lubricating Materials
36
Petroleum Engineers Association©
Mud Tank
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
37
Petroleum Engineers Association©
Mud Pumps
Positive displacement type pumps are used (reciprocating pistons) to deliver the high volumes and high
pressures required to circulate mud through the drillstring and up the annulus.
The discharge line from the mud pumps is connected to the standpipe – a steel pipe mounted vertically
on one leg of the derrick. A flexible rubber hose (kelly hose) connects the top of the standpipe to the
swivel via the gooseneck.
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
38
Petroleum Engineers Association©
Mud Circulation
https://www.youtube.com/watch?v=KovWXkppGOQ
https://www.youtube.com/watch?v=4qqVLHOot2A
https://www.youtube.com/watch?v=QRSIDDTSTR4
45 Days Long
Virtual
Internship on
Oil & Gas
Industrial
Practices
39
Petroleum Engineers Association©