NOTES

1) ALL DIMENSIONS ARE MILLIMETERS, ELEVATIONS & CO-ORDINATES ARE IN METERS.


A 2) MAIN PLANT DATUM ELEVATION IS THE HIGH POINT OF PAVING (H.P.P.) WHICH EQUALS TO 100.000 METERS. A
AND IT CORRESPONDS TO 7.55m BASED ON ROYAL COMMISSION DATUM THAT IS EQUAL TO MEAN SEA LEVEL.
3) ANY DISCREPANCY ON THIS DRAWING TO BE REPORTED TO ENGINEERING IMMEDIATELY FOR CLARIFICATION.
4) FOR CLOSELY SPACED FOUNDATIONS, DEEPER FOUNDATIONS SHALL BE CAST BEFORE SHALLOW DEPTH
FOUNDATIONS.
5) MATERIALS :
STEEL REINFORCEMENT : ASTM A615/A615M, GRADE60 (fy = 415MPa) SHALL BE AS PER AES-C-0004
REINFORCEMENT WITH FUSION BONDED EPOXY COATED REBARS.
CONCRETE : MIN. COMPRESSIVE STRENGTH AT 28 DAYS f 'c = 30 MPa SHALL BE AS PER AES-C-0004
ANCHOR BOLT : GRADE OF STEEL FOR ANCHOR BOLT SHALL BE ASTM A36/A36M OR F1554 GRADE 36.
THREADS TO BE UNC CLASS 2A TYPE. ANCHOR BOLT SHALL BE HOT-DIP GALVANIZED
AFTER FABRICATION.
B 6) SPECIAL COATING FOR BELOW GROUND CONCRETE STRUCTURES IN PLANTS : B
1st COAT: SEALER COAT +
2800 2nd COAT: TWO PACK SOLVENT FREE POLYURETHANE COATING
1000 3rd COAT: TWO PACK SOLVENT FREE POLYURETHANE COATING
2500 == == (SEE AES-S-007 CYCLE AES-PCS-117).
== 2200

OF FDN. & COL.


==

OF FDN. & COL.


OF FDN. & COL.

OF FDN. & COL.


4 4

1000

300
==

==
3 3
- -
1 1 2 2

2200
C C

500
==

==
2500

2800
500

600
==

==

==

==
- - - - - - 300
==
500
500
600 ==
==
== OF FDN. & COL.
HOLDS
OF FDN. & COL.
OF FDN. & COL. HOLD-1 FOUNDATION UNDER HOLD
OF FDN. & COL.

D D
F/W DETAIL OF FNJ001 F/W DETAIL OF FNJ002 F/W DETAIL OF FNJ003 F/W DETAIL OF FNJ004
(SCALE: 1 : 50) (SCALE: 1 : 50)
(SCALE: 1 : 50) (SCALE: 1 : 25)

E E

100.000 HPP

F 100.000 HPP 100.000 HPP 100.000 HPP F

CONSTRUCTION JOINT
(TYP)
600

600
600

98.050 BOF

400
98.050 BOF 98.050 BOF
98.000 PTS 98.000 PTS 98.000 PTS 98.050 BOF
G 50 THK. LEAN CONCRETE (TYP.) G
98.000 PTS

SECTION 1 SECTION 2 SECTION 3 SECTION 4


(SCALE: 1 : 50) - (SCALE: 1 : 50) - (SCALE: 1 : 50) - (SCALE: 1 : 25) -

H H

I I

REFERENCE DOCUMENTS
800
== DRAWING NO DESCRIPTION
PROJECT SPECIFICATION FOR DESIGN CRITERIA OF STEEL
4245-AX-SG-1350000001 (CV-135-0051-SPC)
300 STRUCTURES AND CONCRETE WORKS
OF COLUMN

HOLD-1
== 4245-AA-SG-1350000001 (CV-135-0001-SPC) PROJECT SPECIFICATION FOR CONCRETE WORKS

4245-AA-DX-1350000001 (CV-135-0001-DST) REINFORCED CONCRETE - GENERAL NOTES


250

5 5 4245-AA-DX-1350000002 (CV-135-0002-DST) REINFORCED CONCRETE - SYMBOLS AND ABBREVIATIONS


300
==

J
- - 2500
2500
4245-AA-DX-1350000003 (CV-135-0003-DST) REINFORCED CONCRETE - STANDARD DETAILS
J
== 2500
4245-AX-DX-1350000005 (CV-135-0005-DST) REINFORCED CONCRETE - ANCHOR BOLTS STANDARD DETAILS
2500 ==
500 600 650 1250
== 600 650 1250 4245-XX-DE-1360000001 (PI-136-0001-DLA) EQUIPMENT LAYOUT PROCESS INTERFACE BUILDING PLAN FROM EL 100.000 AND ABOVE
== CONCRETE FOUNDATION DRAWING FOR PIB BUILDING 1362-BL001A -
600 650 1250 4245-AA-DC-1362502001 (CV-136-0599-DLA)
FOUNDATION LAYOUT
300
OF FDN. & COL.

OF FDN. & COL.


CONCRETE FOUNDATION DRAWING FOR PIB BUILDING 1362-BL001A -
4245-AA-DC-1362502003 (CV-136-0601-DLA)
FOUNDATION PLINTHS - REINFORCEMENT
== CONCRETE FOUNDATION DRAWING FOR PIB BUILDING 1362-BL001A -

OF FDN. & COL.


4245-AA-DC-1362502004 (CV-136-0602-DLA)
FOUNDATION PLINTHS - BBS

OF FDN. & COL.


580
MAIN STRUCTURES & EQUIPMENT FOUNDATION KEY-PLAN FOR BLENDING,
4245-AA-DA-1350000203 (CV-135-0203-DLA)
2600

2100

EXTRUSION, SUB-STATION / PIB & CHEMICAL STORAGE AREA 118, 119, 133, 136
6 6 7 7
2500

2500

1 370 300
500

500
==

==

==

- - - == -
300 370

8 8

2500

600
9 9

==

==

2500
K - - K

500
==

==
500 500 - -
OF COLUMN

== ==
580

600 600
== == 500 500

5 5 400 300 550


OF FDN. & COL.
300
==

- -
250

OF FDN. & COL. OF FDN. & COL.


OF FDN. & COL.
300
==
L OF FDN. & COL. F/W DETAIL OF FNJ006 F/W DETAIL OF FNJ007 F/W DETAIL OF FNJ008 F/W DETAIL OF FNJ009 L
(SCALE: 1 : 50) (SCALE: 1 : 50) (SCALE: 1 : 50) (SCALE: 1 : 50)

F/W DETAIL OF FNJ005


(SCALE: 1 : 25)
APPROVED FOR CONSTRUCTION
Date Initials Signature
31-Mar-2022 S. Villari
M M

100.000 HPP
00 31-Mar-2022 Issued For Construction M.Carbone M.Piatti A.Zoppellaro

B 24-Mar-2022 Issued For Design M.Carbone M.Piatti A.Zoppellaro

N A 02-Feb-2022 Issued For Preliminary M.Carbone M.Piatti A.Zoppellaro N


Rev Date Reason For Issue Prepared by Checked by Approved by
100.000 HPP 100.000 HPP 100.000 HPP 100.000 HPP
CONFIDENTIALITY - This document and the information herein contained are the confidential proprietary information of APOC project. Any disclosure to third
parties, use, or reproduction without proper authorization is strictly prohibited.

Advanced Polyolefins
600

600

600
600

98.050 BOF 98.050 BOF 98.050 BOF


O 98.050 BOF T O
400

98.000 PTS 98.000 PTS 98.000 PTS 98.000 PTS


98.050 BOF APOC PP PLANT
JUBAIL INDUSTRIAL CITY, KINGDOM OF SAUDI ARABIA
98.000 PTS

MODEL NAME: 4245-AA3D-1362-BL001A


CONCRETE FOUNDATION
SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION 9 DRAWING FOR PIB BUILDING 1362-BL001A
(SCALE: 1 : 25) - (SCALE: 1 : 50) - (SCALE: 1 : 50) - (SCALE: 1 : 50) - (SCALE: 1 : 50) - FOUNDATION PLINTHS - FORMWORK
SCALE: 1:100 SHEET 1 OF 1
P P
CONTRACTOR REVISION FORMAT
Doc. Ref.
4245-AA-DC-1362502002

OWNER
CV-136-0600-DLA
00 A0